Homebuilding & Renovating

How to… build to oversite

After the foundations comes the oversite — the concrete slab that constitutes your ground floor. Reaching this point comprises all the work between pouring the foundations up to building the walls.

The process is broadly similar whether you’re constructing a garage, extension or a new dwelling, although insulation and cavity wall (in the case of masonry builds) requirements will vary, so your Building Regs’ drawings will be your starting point. Whether you intend to have a hand in the work, oversee proceedings as the project manager on your own build, or simply would like to understand how it’s typically done, here I’ll provide an overview.

The first job is to establish the highest point of the footings. In

You’re reading a preview, subscribe to read more.

More from Homebuilding & Renovating

Homebuilding & Renovating3 min read
Q Is Using Solar Panels And Heat Pumps Together A Good Idea?
Given the rapidly rising cost of energy it goes without saying that we all would realistically like an energy-efficient home, and if there was a chance to get some energy for free then that seems to be a complete no-brainer. So is this a pipe dream o
Homebuilding & Renovating1 min read
Homebuilding & Renovating
EDITORIALEditor in Chief Claire LloydEditor Beth MurtonDeputy Editor Teresa ConwayAssociate Editor Natasha BrinsmeadAssistant Editor Jo MessengerDeputy Editor (website) Amy WillisNews Editor Joseph MullaneContributions by Seán O’Connell & Alex Burrow
Homebuilding & Renovating5 min readArchitecture
Taking Control
HOMEOWNERS Mike and Jane Cuva HOUSE TYPE Detached two-storey five-bedroom house HOUSE SIZE 375m ² LOCATION Woking, Surrey PROJECT Extensive remodel and extension BUILD ROUTE Self-managed subcontractors and DIY BUILD TIME Four years PLOT/HOUSE COST £9

Related