Cemfis India Pvt Ltd

CONCRETE POUR CARD


DATE ..
CARD NO ..
NAME OF CUSTOMER ............................
NAME OF WORK .....................................
WORKSITE :...............................................
GRADE OF CONCRETE ...........................
LOCATION OF CONCRETING ...........................
REFERENCE DRAWING
APPROVING AUTHORITY

ENGINEER
CONSULTANT
INSPECTION ITEMS PIOR TO CONCRETEING

CLINET

REINFORCEMENT
1) SPACING
2) BAR DIA
3) FREE FORM RUSTING
4) SATISFYING THE DRAWING
SHUTTERING
1) OILED AND READY TO USE
2) POSITIONING
3) MINIMUM COVER
MAINTAINED
4) LEVEL
INSPECTION ITEMS DURING CONCRETEING
TIME OF COMMENCE ______________________
`1) CONCRETE QUALITY
2) TEST CUBE MOULDS READY
3) VIBRATION PROPERLY DONE
4) LEVEL MAINTIAINED
5) CONRETE QUANTITY
TIME OF COMPLETION ______________________
POST CONCRETING INSPECTION
1) SURFACE
2) LEVEL
3) SHUTTERING CLEANING AND
READY FOR USE AGAIN

__________________
SITE ENGINEER

___________________
CONSULTANT

____________________
CLINET