These are major earthworks operations. Cut refers to the removal of excess material to Clearing and Grubbing reach formation level. : Removal and excavation operation of natural material trees, roots etc. for Excavation : disposal from that area. Concreting Formwork Lean concrete : Weepholes : 75mm PVC Pipes use to drain. : : Excavation of soils The use of designed concrete grade. Mould being use to form proper shape Grade 15 concrete

METHOD STATEMENT FOR RETAINING WALL

ACTIVITY Stage 1 1.1 : Survey Works

Carry out survey earthworks to identify proper position/level of R.C wall. : Excavation

Stage 2 2.1 2.2

Excavation to the level required. Protect slope from falling. : Lean Concrete

Stage 3 3.1

Lay 50mm thick lean concrete. : Placement of formwork

Stage 4 4.1

Placement of formwork for footing. : Placement of reinforcement

Stage 5 4.2 4.3

Placement of reinforcement in the formwork and tied up properly. Install weepholes at specified locations : Concreting works

Stage 6 4.4 4.5

Pour concrete to footing. Vibrating concrete in footing : Backfilling and compact earth

Stage 7 4.6 4.7

Backfill and spread the soil using selected backfill Compact the soil in layers of 0.3m thick : Placement of formwork for wall

Stage 8 4.8

Placement of formwork for the wall.

-2-

METHOD STATEMENT FOR RETAINING WALL

Stage 9 4.9

Placement of reinforcement

Placement of reinforcement in the formwork and tied up properly. 4.10 Install weepholes at specified locations Stage 10 : Concreting works

4.11 Pour concrete to wall. 4.12 Vibrating concrete in wall Stage 11 : Strike the formworks 4.13 Strike the formwork. Stage 12 : Backfiling and compact earth

4.14 Backfill and spread the soil using selected backfill 4.15 Compact the soil in layers of 0.3m thick Stage 13 : Site clearance

4.16 Clear the site from all construction debris