Sunteți pe pagina 1din 4

A 1 2 3 4 5

Comparison between LEED India & GRIHA


S.No. 1 SUSTAINABLE SITES Construction Activity Pollution Prevention SITE SELECTION CRITERIA Criteria No. - Credit Pre Requisite 1 SS Credit 1-

LEED India
Description Criteria - Credit

GRIHA
Description

Contaminated Site Remediation. No Criterion for previously developed land.

Criterion 1-1 POINT

6 7

Site Selection including proximity to services and brownfield criterion. No Criterion for previously developed land.

No Criterion
Forbids development on farmland, wetlands and within 50 feet of a water body. Density Calculations define the Criterion 1- no point requirement of Public Amenities.

8 Development Density and Community Connectivity 9 10 11 ECOLOGICAL CONSERVATION 12 13 14 15 PARKING AND TRANSPORT 16 17 18 19 20 21 SS Credit 2

Included in the site selection criterion. Public services not dealt in detail. Housing not dealt in detail.

1 point to Public Services.


2 points to Housing (40%) within 2 kms. Brownfield Development.

Criterion 2 & 3

Preserve and protect landscape during construction (selectively applicable). Soil conservation (till postconstruction). .. .. Included in the site selection criterion.

Natural Topography and Landscape to be protected. Protected > 20% - 1 point. Protected >30% - 2 points. Transport Credits are easier to Criterion 1 achieve. eg. 3000 sq.mts. will require only 36 cycle parkings. Special parking for shared Vehicles.

No Criterion for shared parking.

Stormwater Design

HEAT ISLAND EFFECT 22 23 LIGHT POLLUTION 24 25 26 27 28 2 WATER EFFICIENCY WATER CONSUMPTION 29

Heat island effect reduction on roof (2 points). Heat Island effect reduction on parking (2 points). No description in outdoor lighting. No description on sensors. Night Pollution Reduction from exterior and facade.

Reduce hard paving on-site and provide shaded hard paved surfaces. Roof and parking not described specifically. Efficient outdoor lighting. No description on sensors. No comments on night pollution.

20% REDUCTION-1 CREDIT

30% REDUCTION-2CREDIT 30 31 Water Efficient Landscaping Not considered Use high efficiency irrigation technologies, OR, use captured rain or recycled site water, to reduce potable water consumption for irrigation by 50% over conventional means

32 Use only captured rain or recycled site water to eliminate all potable water use for site irrigation (except for initial watering to establish plants), OR do not install permanent landscape irrigation systems. 33

C Innovative Wastewater Treatment and Reuse

E Option 01 - Reduce the use of municipally provided potable water for building sewage conveyance by a minimum of 50%. Option 02 -Treat 100% of wastewater on-site to tertiary standards.

G Provide necessary treatment of waste water for achieving the desired concentrations for disposal/reuse.

34 Carry out water testing for various parameters prescribed in the Pollution Control Acts, Rules and notifications, CPCB, 1998, for disposal in surface water and on land or other reuse application

35 36 3

ENERGY AND ATMOSPHERE


Prerequisite 1 Fundamental Commissioning of Building Systems Intention is to verify and ensure that fundamental building elements and systems are designed, installed and calibrated to operate as intended Establish the minimum level of energy efficiency for the base bldg and systems. Intention is to reduce ozone depletion Not considered

37 Minimum Energy Performance 38

Not considered

CFC Reduction in HVAC&R Equipment 39 Optimize Energy Performance Intention is to achieve increasing levels of energy performance above the prerequisite standard to reduce environmental impacts .

Commitment Employ 100% zero ODP insulation; HCFC / and CFC free HVAC and refrigeration equipments and/ halon-free fire suppression and fire extinguishing systems. Climate respo-nsive design.

40 41

42 Renewable Energy (2.5%1p, 7.5%-2p,12.5%-3p) Encourage renewable technologies to reduce environmental impacts associated with fossil fuel energy use.

Avoid over designing of lighting & HVAC 10%-40% less energy consum-ption through simulation Renewable energy utilization

43 44 Verify and ensure that the entire building is designed, constructed and calibrated to operate as intended. 1% (mandatory) - 5% of lighting Where evidence can be provided showing a client commit-ment to a firm commissioning period prior to hand over to ensure efficient operation of all the services within the building. Commitment Employ 100% zero ODP insulation; HCFC/ and CFC free HVAC and refrigeration equipments and/ halon-free fire suppression and fire extinguishing systems. Energy audit report to be prepared by approved auditors of the Bureau of Energy Efficiency, Government of India.

Enhanced Commissioning

45 Reduce ozone depletion and support early compliance with the Montreal Protocol. Ozone Protection

46 Measurement and Verification Provide for the ongoing accountability and optimizan of bldg energy & water consumption performance over time

47

Green Power 48

E Encourage the development Criterion 18 and use of grid-source, renewable energy techno-logies on a net zero pollution basis

G 1% (mandatory) - 5% of lighting load.

Criterion 19

20% or more of annual energy requir-ed for heating water through renewab-le energy based water-heating system.

49 50 51 52 53 54 55 56 57 INDOOR ENVIRONMENTAL QUALITY 5 LEED recognizes that on an average people spend 90% of their time at home as a result of which IEQ becomes a very critical factor for maintaining occupants health. Minimun IAQ Performance Aims to establish minimum IAQ performance to prevent development of IAQ related problems.

GRIHA doesnt have a category dedicated to IEQ st but the 1 two categories have subheads- Health and Well Being.
Not considered

58

59 Environmental Tobacco Smoke (ETS) Control Aims to minimize exposure of occupants, indoor surfaces and air distribution systems to ETS. Achieved by prohibiting smoking in the building + distancing smoking areas from others. + separating ventilation systems of smoking rooms entirely. + sealing gaps in floors, walls, etc. + weatherstripping doors Aims to achieve zero exposure to tobacco smoke for nonsmokers and exclusive ventilation for smoking rooms

60 Outdoor air Delivery Monitoring Achieved by installing CO2 monitoring systems that generate alarm when conditions vary by 10% from set point. Monitoring devices to be located between a height 3 and 6 from the floor. CO2 and airflow measurement equipment may also be installed and connected to HVAC and BAS system for corrective action.

Not considered

61 Increased Ventilation Achieved by improving IAQ 30% above ASHRAE 62.12004 requirements for mechanically ventilated systems. Heat recovery may be adopted. Achieved in naturally ventilated buildings by conforming to the recommendations set forth in Carbon Trust Good Practice Guide. Not considered

62

C Construction IAQ Management Plan

E During Construction Achieved by meeting recommendations set in Design Approaches of the SMACNA IAQ Guidelines + protecting absorptive materials on site from moisture damage. Using filtration media with a MERV of 8 at each return grill in case air handlers are used. After Construction Using filtration media with a MERV of 8 flush out building post construction and replace with MERV 13 or better.

Aims to reduce air pollution due to onsite construction by ensuring proper screening, covering stockpiles, covering bricks and loads of dusty materials, wheel-washing facility, and water spraying to reduce respiratory problems.

63 Low Emitting Materials Adhesive and sealants Paints Carpet Composite wood and agrifiber products Healthy indoor environment maintained by use of low VOC materials. Achieved by employing permanent entryway systems in the direction of travel for at least6. Exhausting rooms with harmful gases present with negative pressure w.r.t adjacent rooms. Providing air filtration media of MERV 13 or better. Aims to select materials with low to zero quantities of such chemicals so as to minimize the source of emission. In selecting low VOC materials, a practical thumb rule is to choose water-based products with low odour. Halon-free fire suppression and fire extinguishing systems to eliminate or control the release of ozonedepleting substances into the atmosphere.

64 Indoor Chemical & Pollutant Source Control

65 Controllability of Systems Lighting 66 Thermal Comfort Achieved by providing individual comfort control for 50% of the building occupants. Achieved by providing a minimum Daylight Facto of 2% in 75% of all spaces. Views Achieved by providing direct line of sight to vision glazing for 90% of the occupants. 69 Not considered Achieved by providing individual control for 90% of the building occupants.

Not considered

67 Daylight 68

Not considered