BILAL AHMAD BHAT AT NATIPORA Sr# Particulars Unit Qty Rate (Rs) Amount (Rs) 1 HOT WATER GENERATOR Supply,installation testing and commissioning of hot water generator, along with ,accessories,,civil foundation, chimney, and minor civil works capacity: 30,000 kcal/hr capacity Fuel:Diesel Fired no 1 125000 125000 2 PUMPING CIRCUIT: Supply,installation,testing and commissioning of hot water circulation pump alongwith base frame,control valves and accessories etc. Pump Capacity Motor Capacity: 1 hp no 1 9500 9500 3 DAY OIL SERVICE TANK: Supply,installation,testing and commissioning of oil service tank alongwith trestle ,level guage,inlet outlet connections,etc. Capacity: 100lts Type: mild steel. 4 EXPANSION TANK; Supply,installation,testing and commissioning of Expansion tank alongwith insulation fittings & base frame etc. Capacity: 100lts Type: Mild steel 5 RADIATORS: Supply,installation,testing and commissioning of Hot water Radiators of following capacity with isolation valves a) 500Kcal/hr (T1) (Towel Rack) a)1000Kcal/hr (R1) c) 2000Kcal/hr (R2) d) 2500Kcal/hr (R3) d) 3500Kcal/hr (R4) d) 4000Kcal/hr (R5) h) 4500Kcal/hr (R6) Fan Coil Unit Supply,installation,testing and commissioning of Wall mounted Fan Coil Unit of following capacity with isolation valves a) 3000Kcal/hr (F1) HOT WATER PIPING Supply,installation,testing and commissioning of MS 'C' class Hot water piping of following dias. a) 40mm b) 32mm c) 25mm d) 20mm INSULATION Supply,installation,testing and commissioning of Glass wool insulation with chicken mesh and HDPE wrap
no
5000
5000
no
8000
8000
no no no no no no no
1 1 1 3 1 1 2
no
19000
19000
10 25 50 85
a) 40mm b) 32mm c) 25mm d) 20mm 9 CONTROL VALVES Supply,installation,testing and commissioning of control valves of following sizes alongwith nipples and flanges a) 40mm b) 32mm c) 20mm 10 AIR RELEASE VALVES Supply,installation,testing and commissioning of air release valves 20mm
10 25 50 85
no no no no
2 4 6