Sunteți pe pagina 1din 2

Annexure-1 (Company Technical Details)

Area of Working : Earthen Dams, Excavation, Embankment, Site levelling, Mass Concreting, Hydro Power Projects

NAME OF FIRM : CONTACT PERSON: DESIGNATION CONTACT NO. EMAIL ID ADDRESS : : :

DM CORPORATION PVT. LTD. VIJAY JOSHI DIRECTOR 9850067967 vijay.joshi@dminfra.com 240/B, MOHITE HOUSE, GEN. THORAT MARG, TARABAI PARK, KOLHAPUR - 416003 FY'10-11 84.45 Total Numbers 52 295 22 4 5 10 3 3 3 FY'11-12 79.39 Can be Deployed 25 125 12 4 4 10 3 2

Location of Working: MAHARASHTRA (E.g. Mention state or region) 1. Turnover Statistics Sl No Activity Description 1 Company Turnover Unit Cr.

FY'09-10 70.62 Capacity

2. List of Owned Equipments Sl No Equipment Description No. Model Year of Manufacture L&T 170CK, Komatsu PC 2001 Excavator TATA SK 1613/36,EICHER 2 Tipper 3 Dozer CATERPILLAR D8H 4 Motor Grader 5 Vibratory Roller L&T 1107/1104 6 WMM Plant 7 WMM Sensor Paver SAGA 210 AG / NAKODA 8 Rock Breaker 9 Water Tanker TATA 10 Wagon Drills 11 Trailers ASHOK LEYLAND 12 Tandem Roller SINGH 13 Pneumatic Tyre Roller 14 Hot Mix Plant Bitumen Sprayer 15 Sensor Paver 16 Concrete Batching Plant FIORI (ARA) AJAX 17 Transit Mixer ASHOK LEYLAND 18 Concrete Pump 19 Boom Placer 20 Shuttering Material (Sqm) 21 Kerb Laying M/c 22 Crane 23 Crusher Plant SINGH Excavator Fitted 24 PC-200 / SAGA 25 Wagon Drills (Crawler mounted) HINDUSTAN 2021 WITH 2 26 Loader 27 Compressor (mention type) 28 Drill Machine 29 Water Tanker/Sprinkler DIESEL PUMP, GENERATOR, 30 Any Other Equipments

7500L 30T 7.5T

6 Cum

2 4 6 1000

2 4 1000 3 3 3 3 4 4 10

200 TPH / 50 TPH

4 4 3 3 4 4 10

3. Staff

Technical 20 Minor Structure Major Structure

Admin 30 Yes/No Yes/No


Duration

Other 700 (If Yes, Mention the type of Structure) (If Yes, Mention the type of Structure)
Year of Completion

Total Nos 750

4. Can you perform Structural works also

5. Details of Completed and Ongoing Projects


Sl No Project Description Scope of Work Client Projects got Completed in last three years ( Regarding Mentioned Turn Over above for Roadworks) 1 DHOMBALKWADI EARTHEN DAM EARTHEN DAM 2 CHITRI EARTHEN DAM
GOVT. OF MAHARASHRTA WATER RESOURCES DEPT. GOVT. OF MAHARASHRTA WATER RESOURCES DEPT.

Value (in Lakhs)

6 YEARS 5 YEARS

2000 2000

17094 5055

3 4 5

DHOMBALKWADI ICPO PHATAKWADI HEP NIPRO LAND DEVELOPMENT

TUNNELING HEP (30 YEARS BOT) SITE DEVELOPMENT

GOVT. OF MAHARASHRTA WATER RESOURCES DEPT. DM CORPORATION PVT. LTD. (BOT BY GOMWRD)

2 YEARS 2 YEARS 6 MONTHS 1 YEAR

2000 2011 2011 2009

1250 4322 2700 2230

SHIMIZU CORPORATION, JAPAN

6 METRO HI-TECH Presently Ongoing Projects:

SITE DEVELOPMENT & BUILDING METRO HI-TECH CO-OP. TEXTILE PARK LTD. CONSTRUCTION

7 8 9 10 11 12

ARJUNA DAM ARJUNA ICPO ARJUNA CANAL ARJUNA MAIN CANAL TARALI HEP DIGRAJ HEP NIRA BHIMA RIVER LINKING TUNNEL(JV WITH SOMA)

EARTHEN DAM TUNNEL CANAL CANAL HEP HEP 9 KM OPEN EXCAVATION 15 KM TUNELLING

GOVT. OF MAHARASHRTA WATER RESOURCES DEPT. GOVT. OF MAHARASHRTA WATER RESOURCES DEPT. GOVT. OF MAHARASHRTA WATER RESOURCES DEPT. GOVT. OF MAHARASHRTA WATER RESOURCES DEPT. DM CORPORATION PVT. LTD. (BOT BY GOMWRD) DM CORPORATION PVT. LTD. (BOT BY GOMWRD)

8 YEARS 2 YEARS 2 YEARS 1 YEAR 1YEAR In process

In process In process In process In process In process In process

27825 1288 847 96 4830 1338

13

GOVT. OF MAHARASHTRA WATER RESOURCES DEPT.

In process

In process

53674

S-ar putea să vă placă și