1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. 2. FOR GENERAL NOTES & LEGENDS REFER DRAWING EA-681100. 3. THE MAXIMUM OPERATIONAL HEIGHT OF ELECTRICAL EQUIPMENT SHALL NOT BE MORE THAN 1.8 METRES. TOP ELEVATION OF ALL WALL MOUNTED PANELS SHALL BE AT SAME LEVEL. THE HORIZONATAL SPACING BETWEEN ADJUCENT PANELS SHALL NOT BE LESS THAN 200MM.
01(28204)
3
36700
12000
14300
10400
C00-EMH-193
C00BJR06 RECEPTACLE FOR TRANSFORMER OIL FILTERATION (200A) DEMIN BLDG THIS SHT. LV A TERMINAL BOX C00-C-1259 19 20 CONTROL BOX C00-C-0115 C00-D433-02 STUB-UP HV TERMINAL BOX N:1619.921 E:2476.741 C00-C-2102 C00-D456-01 STUB-UP 16B
C00-D433-01 STUB-UP C00-C-0114 A HV TERMINAL BOX CONTROL BOX N:1625.821 E:2476.741 LV TERMINAL BOX C00-C-1052 C00-C-1053 C00-C-1054 C00-C-1055 C00-C-1056 C00-C-1057 C00-D456-01 STUB-UP
A C00-C-1258
3300
22 C00-C-1262
LIGHTING MAST
LEGEND
21A
4500
01(28202)
A
C00-C-2101 3 4 11 23A 23B 24 C00BJS17 WELDING RECEPTACLE FOR DEMIN ELECTRICAL BLDG (63A) 8
13B
15B
15A
15C
31 28
C00-EMH-191
I/C
B/C
I/C
ELECTRICAL ROOM
1900 1850
6000
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
4600
2100
3200
900
4000
2000
2400
900 800
4400
30
GA DEMIN & REMIN WATER PLANTS DUCT BANK LAYOUT DEMIN & REMIN WATER PLANTS CABLE TRAY LAYOUT DEMIN & REMIN WATER PLANTS
2
4600 2100 3200 7700
5D
5C
4800
5B
5A
2900
C00-D435-01 STUB-UP C00-C-1252 MATCH LINE AT E:2460.794 SEE SHEET 02 OF THIS DRAWING FOR CONTINUATION 6 27 32 C00-C-1227 12 9
D
C00-SAU-61-AN-061 ELECT/CNTRL HVAC C00-SAU-61-AN-060 ELECT/CNTRL HVAC
PLAN VIEW
LEGEND TAG NUMBER DESCRIPTION LEGEND TAG NUMBER DESCRIPTION EL. 4.15M 1 COOBJY REMIN MCC-A 15C C00BUD 125V DC DEMIN DCDB
COOBJZ
REMIN MCC-B
16A
C00BFG
COOBL57
LDB OUTDOOR
16B
C00BFH
C00BL58
LDB INDOOR
17
C00BJW
DEMIN BUILDING SERVICES MCC-A C00-C-1058 C00-C-1059 C00-C-1060 C00-C-1061 C00-C-1062 C00-C-1063 C00-C-2102 HV TERMINAL BOX LV TERMINAL BOX C00-C-0115 C00-C-1052 C00-C-1053 C00-C-1054 C00-C-1055 C00-C-1056 C00-C-1057 C00-C-2101 LV TERMINAL BOX HV TERMINAL BOX
5A
C00CPB74GH001
18
C00BJX
C
5B C00CPB74GH003 DMIN I/O CABINET-1 19 C00BFT07 13.8/0.48 KV DEMIN XFMR-1
C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR
5C
C00CPB74GH004
20
C00BFT08
00
04/08/2011
NP/MP
VT/BR
----
BR
5D
C00CPB74GH002
21A
C00BTU09
REV. NO.
DATE
BY
DESCRIPTION
CHKD.
CERT.
APPD.
Project Title
CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C
C00BLQ26
21B
C00BTU10
C00BLT37
22
C00BTA04
CONTROL BOX
CONTROL BOX
Client
C00BLT38
23A
C00BTZ09 C00BTZ10
C00-C-0114
C00-CPB-74-GN-001
NETWORK CABINET
23B
Consultant
SECTION A-A
10 C00-GCP-34-GH-016 REMIN CNTRL PNL 24 C00BVY04 BATTERY MNTRG PNL (DEMIN DCDB)
B
11 C00BVD23 125V DC LIGHTING PANEL 25 C00-GCF-34-GH-001/002/003 DM SYSTEM PLC CABINET
Contractor
ARABIAN BEMCO
12
BMS PANEL
26A
DELETED
13A
C00BJE
26B
DELETED
Drawing Title
13B
C00BJF
27
C00BLQ27
LLC
ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT
14A
C00BRU09
28
C00SGA41GH004
FACP
01
14B
C00BRU10
29
C00SGA41GH104A
I/O CABINET-1
14C
C00BRV09
30
C00SGA41GH104B
I/O CABINET-2
NP/MP
CHECKED BY:
VT/BR
DATE COMPLETED:
SCALE:
1:50
14D
C00BRI
01A
31 C00-CYE-63-GH-209 BPS 32 C00BUD23 125V DC LIGHTING PANEL
OPRG. DEPT.:
ELECTRICAL
ENG. DEPT.:
ELECTRICAL
CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.
APPROVAL/CERTIFICATION INFORMATION
15A
C00BTL07
01(28205)
REV. NO.
15B
QURAYYAH
JOB ORDER NO.
INDEX PLANT NO. DRAWING NUMBER
SAUDI ARABIA
SHEET NO. REV. NO.
C00BTL08
1-0923053.01
8 7 6 5 4 3 2
GQP17
EA-681137
1
01 OF 04
01
SECA00
SEC-A (2004/10)
DMS VECTOR
NOTES
1. FOR ALL NOTES, LEGENDS AND REFERENCE DRAWINGS REFER SHT. 01 OF THIS DRAWING.
3 36700
12000
12000
12700
F
MATCH LINE AT E:2460.794 SEE SHEET 01 OF THIS DRAWING FOR CONTINUATION C00-SA-61-AN-063 DEMIN HVAC
C00-D421-01 STUB-UP
C00-D423-01 STUB-UP
BPS
MFAP TO SHT.04
LEGEND
C00-C-1256 C00-C-1253 C00-GCF-34-AH-001 HWT IMMERSION TANK HEATER-1 C00-GCF-34-AH-002 HWT IMMERSION TANK HEATER-2 C00-D426-01 STUB-UP D CONTROL ROOM CLOCK BLOCK PUBLIC ADDRESS
C00-C-1260 TO SHT.04 C00-GCF-34-AA-010 C00 DEMIN WATER MOV C00-D424-01 STUB-UP C00-D424-02 STUB-UP C00-D424-03 STUB-UP
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
COO-GCP-34-AP-003 SODIUM BI-CARBONATE DOSING PUMP COO-GCP-34-AP-002 CALCIUM HYPOCHLORITE (BLEACH)PUMP COO-GCP-34-AP-001 CALCIUM HYPOCHLORITE (BLEACH)PUMP
C00-C-1261
D
COO-GCP-34-AP-006 CALCIUM CHLORIDE DOSING PUMP
D
TO SHT.04
C00-D449-01 STUB-UP C00-GCK-34-AP-001 DEMINERALIZED WATER TRANSFER PUMP C00-D448-01 STUB-UP C00-D448-02 STUB-UP C00-D447-01 STUB-UP
F C00BJS19 WELDING RECEPTACLE FOR DEMIN PLANT (63A) C00-SMG-34-BZ-003 HOIST ISOLATOR BOX G C00-GCN-34-AH-003 CBST HEATER-C C00-GCC-34-AN-001 MIXED BED BLOWER SKID C00-D450-01 STUB-UP C00-D451-01 STUB-UP
C00-D452-01 STUB-UP
C
C00-GCN-34-AH-001 CBST HEATER-A
C00-D449-02 STUB-UP
C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR
C00-D427-01 STUB-UP
C00-GCK-34-AP-003 DEMINERALIZED WATER TRANSFER PUMP C00-D447-02 STUB-UP C00-C-1089 C00-C-2012 C00-C-1077 C00-C-2003 C00-C-1076 C00-C-2002 C00-GCK-34-AA-004 C00 DEMIN H20 TRNF PMP-C SUC MOV
00
04/08/2011
NP/MP
VT/BR
----
BR
C00-GCN-34-AP-006 CAUSTIC TRUCK UNLOADING TRNSFER PUMP C00-C-1311 C00-GCN-34-AP-002 ACID DOSING PUMP H C00-C-1314 C00-C-1315
C00-GCF-34-AP-010 REGENERATION WATER PUMP C00-GCF-34-AP-011 REGENERATION WATER PUMP C00-D450-02 STUB-UP C00-GCF-34-AP-012 REGENERATION WATER PUMP C00-GCK-34-AA-005 C00 DEMIN H20 TRNF PMP-A DIS MOV
REV. NO.
DATE
BY
DESCRIPTION
CHKD.
CERT.
APPD.
Project Title
CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C
Client
Consultant
C00-C-1313
C00-C-1312
C00-C-1316 C00-C-1317 C00-C-1318 C00-C-1319 C00-C-1320 C00-GCN-34-AP-008 CAUSTIC DOSING PUMPS C00-GCN-34-AP-007 CAUSTIC DOSING PUMP C00-GCN-34-AP-010 CAUSTIC DOSING PUMP C00-GCN-34-AP-009 CAUSTIC DOSING PUMP C00-D427-03 STUB-UP C00-GQB-54-GH-002 DMIN SNT LIFT STN PNL
C00-GCK-34-AA-007 C00 DEMIN H20 TRNF PMP-C DIS MOV C00-GCK-34-AA-003 C00 DEMIN H20 TRNF PMP-B SUC MOV C00-GCK-34-AA-006 C00 DEMIN H20 TRNF PMP-B DIS MOV
Contractor
C00-GCN-34-AP-005 ACID DOSING PUMP C00-GCN-34-AP-004 ACID DOSING PUMP C00-GCN-34-AP-001 ACID TRUCK UNLOADING TRANSFER PUMP
Drawing Title
LLC
ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT
01
NP/MP
CHECKED BY:
VT/BR
DATE COMPLETED:
SCALE:
1:50
PLAN VIEW
EL. 4.15M
01A
OPRG. DEPT.:
ELECTRICAL
ENG. DEPT.:
ELECTRICAL
CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING CONTRACTORS/INSTALLERS PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
JOB ORDER NO.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.
APPROVAL/CERTIFICATION INFORMATION
REV. NO.
QURAYYAH
INDEX PLANT NO. DRAWING NUMBER
SAUDI ARABIA
SHEET NO. REV. NO.
1-0923053.01
8 7 6 5 4 3 2
GQP17
EA-681137
1
02 OF 04
01
SECA00
SEC-A (2004/10)
DMS VECTOR
NOTES
1. FOR ALL NOTES, LEGENDS AND REFERENCE DRAWINGS REFER SHT. 01 OF THIS DRAWING.
C00-D431-04 STUB-UP
C00-GCN-34-AP-011 NEUTRALIZED EFFLUENT TRANSFER PUMP C00-GCN-34-AP-012 NEUTRALIZED EFFLUENT TRANSFER PUMP
C00-D431-03 STUB-UP
C00-D431-02 STUB-UP C00-GCC-34-AN-003 NEUTRALIZED SUMP AIR BLOWER C00-GCF-34-AA-021 REGENERATION WASTE MOV C00-C-1310 C00-D431-01 STUB-UP
C00-EMH-192
LEGEND
C00-D430-01 STUB-UP
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
E:2450.000
C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR
00
04/08/2011
NP/MP
VT/BR
----
BR
REV. NO.
DATE
BY
DESCRIPTION
CHKD.
CERT.
APPD.
Project Title
CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C
Client
Consultant
B
C00-C-1121 C00-C-2232
Contractor
Drawing Title
ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT
NP/MP
CHECKED BY:
VT/BR
DATE COMPLETED:
SCALE:
1:50
01A
OPRG. DEPT.:
ELECTRICAL
ENG. DEPT.:
ELECTRICAL
CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING CONTRACTORS/INSTALLERS PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.
APPROVAL/CERTIFICATION INFORMATION
REV. NO.
QURAYYAH
JOB ORDER NO.
INDEX PLANT NO. DRAWING NUMBER
SAUDI ARABIA
SHEET NO. REV. NO.
PLAN VIEW
EL. 4.15M
1-0923053.01
4 3 2
GQP17
EA-681137
1
03 OF 04
01
SECA00
SEC-A (2004/10)
DMS VECTOR
NOTES
1. FOR ALL NOTES, LEGENDS AND REFERENCE DRAWINGS REFER SHT. 01 OF THIS DRAWING.
H
4 4 3 3 36700 7600 4400 4200 7800 2300 10400 2 1 1
F
B
LEGEND
C00-SAU-62-AN-065 TOILET/LOCKER EXHAUST FAN C00-SAU-62-AN-064 TOILET/LOCKER EXHAUST FAN C00-GKB-35-AH-060 TOIKLET/SHOWER-RT-EWH-DRP-001
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
01
D C00-SAU-62-AN-060 CHEMICAL STORAGE EXHAUST FANS
C00-C-1260
C00-C-1261
C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR
00
04/08/2011
NP/MP
VT/BR
----
BR
REV. NO.
DATE
BY
DESCRIPTION
CHKD.
CERT.
APPD.
Project Title
CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C
Client
Consultant
Contractor
Drawing Title
H
LLC
ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT
NP/MP
CHECKED BY:
VT/BR
DATE COMPLETED:
SCALE:
1:50
01A
ROOF PLAN
OPRG. DEPT.:
ELECTRICAL
ENG. DEPT.:
ELECTRICAL
CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING CONTRACTORS/INSTALLERS PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
JOB ORDER NO.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.
APPROVAL/CERTIFICATION INFORMATION
REV. NO.
QURAYYAH
INDEX PLANT NO. DRAWING NUMBER
SAUDI ARABIA
SHEET NO. REV. NO.
1-0923053.01
8 7 6 5 4 3 2
GQP17
EA-681137
1
04 OF 04
01
SECA00
SEC-A (2004/10)
DMS VECTOR