Sunteți pe pagina 1din 4

8

NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. 2. FOR GENERAL NOTES & LEGENDS REFER DRAWING EA-681100. 3. THE MAXIMUM OPERATIONAL HEIGHT OF ELECTRICAL EQUIPMENT SHALL NOT BE MORE THAN 1.8 METRES. TOP ELEVATION OF ALL WALL MOUNTED PANELS SHALL BE AT SAME LEVEL. THE HORIZONATAL SPACING BETWEEN ADJUCENT PANELS SHALL NOT BE LESS THAN 200MM.

01(28204)

3
36700

12000

14300

10400

C00-EMH-193

C00BJS18 WELDING RECEPTACLE FOR DEMIN XFMR (63A)

C00BJR06 RECEPTACLE FOR TRANSFORMER OIL FILTERATION (200A) DEMIN BLDG THIS SHT. LV A TERMINAL BOX C00-C-1259 19 20 CONTROL BOX C00-C-0115 C00-D433-02 STUB-UP HV TERMINAL BOX N:1619.921 E:2476.741 C00-C-2102 C00-D456-01 STUB-UP 16B

C00-SA-61-AN-067 NOVAC ROOM HVAC-2 C00-SA-61-AN-066 NOVAC ROOM HVAC-1

C00-D433-01 STUB-UP C00-C-0114 A HV TERMINAL BOX CONTROL BOX N:1625.821 E:2476.741 LV TERMINAL BOX C00-C-1052 C00-C-1053 C00-C-1054 C00-C-1055 C00-C-1056 C00-C-1057 C00-D456-01 STUB-UP

A C00-C-1258
3300

C00-D455-01 STUB-UP C00-D454-03 STUB-UP C00-D454-02 STUB-UP C00-D454-01 STUB-UP

22 C00-C-1262

C00-SAU-62-AN-062 BATTERY ROOM EXHAUST FAN

LIGHTING MAST

21B C00-C-1263 C00-SAU-62-AN-063 BATTERY ROOM EXHAUST FAN

LEGEND

C00-SGC-41-AA-043 DELUGE VALVE

C00-C-1058 C00-C-1059 C00-C-1060 C00-C-1061 C00-C-1062 C00-C-1063 16A

21A
4500

01(28202)
A

C00-C-2101 3 4 11 23A 23B 24 C00BJS17 WELDING RECEPTACLE FOR DEMIN ELECTRICAL BLDG (63A) 8

C00-SGC-41-AA-042 DELUGE VALVE

DELUGE VALVE STATION

I/C B/C I/C


9000 1400

13A C00-D432-01 STUB-UP

13B

15B

15A

15C

31 28

C00-EMH-191

I/C

B/C

I/C

ELECTRICAL ROOM
1900 1850

6000

29 C00-D428-01 STUB-UP C00-D428-02 STUB-UP B

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

4600

2100

3200

900

4000

2000

2400

900 800

4400

30

ELECTRICAL INSTALLATION KEY PLAN


1 C00-C-1257 17 C00-SAU-61-AN-062 DEMIN HVAC 14A 18 14B 14C 14D 25 10 C00-C-1254

EA-681100 EA-682907 EA-681337 EA-681237 EA-686703 EA-689193 EA-690426 EA-690420

GA DEMIN & REMIN WATER PLANTS DUCT BANK LAYOUT DEMIN & REMIN WATER PLANTS CABLE TRAY LAYOUT DEMIN & REMIN WATER PLANTS

2
4600 2100 3200 7700

5D

5C
4800

5B

5A
2900

DIMENSIONAL DRAWING DEMIN PLANT TRANSFORMER GA 480V DEMIN PLANT SWITCHBOARD


C

C00-D435-01 STUB-UP C00-C-1252 MATCH LINE AT E:2460.794 SEE SHEET 02 OF THIS DRAWING FOR CONTINUATION 6 27 32 C00-C-1227 12 9

GA 120V AC DEMIN UPSDB GA 125V DC DEMIN DCDB

D
C00-SAU-61-AN-061 ELECT/CNTRL HVAC C00-SAU-61-AN-060 ELECT/CNTRL HVAC

PLAN VIEW
LEGEND TAG NUMBER DESCRIPTION LEGEND TAG NUMBER DESCRIPTION EL. 4.15M 1 COOBJY REMIN MCC-A 15C C00BUD 125V DC DEMIN DCDB

COOBJZ

REMIN MCC-B

16A

C00BFG

DEMIN SWBD BUS-A

COOBL57

LDB OUTDOOR

16B

C00BFH

DEMIN SWBD BUS-B

C00BL58

LDB INDOOR

17

C00BJW

DEMIN BUILDING SERVICES MCC-A C00-C-1058 C00-C-1059 C00-C-1060 C00-C-1061 C00-C-1062 C00-C-1063 C00-C-2102 HV TERMINAL BOX LV TERMINAL BOX C00-C-0115 C00-C-1052 C00-C-1053 C00-C-1054 C00-C-1055 C00-C-1056 C00-C-1057 C00-C-2101 LV TERMINAL BOX HV TERMINAL BOX

5A

C00CPB74GH001

DMIN CONTROLLER CABINET

18

C00BJX

DEMIN BUILDING SERVICES MCC-B

C
5B C00CPB74GH003 DMIN I/O CABINET-1 19 C00BFT07 13.8/0.48 KV DEMIN XFMR-1

C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR

5C

C00CPB74GH004

DMIN I/O CABINET-2

20

C00BFT08

13.8/0.48 KV DEMIN XFMR-2

00

04/08/2011

NP/MP

FOR SEC APPROVAL

VT/BR

----

BR

5D

C00CPB74GH002

DMIN I/O CABINET-3

21A

C00BTU09

120V AC DEMIN UPS BATTERY-A

REV. NO.

DATE

BY

DESCRIPTION

CHKD.

CERT.

APPD.

Project Title

CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C

C00BLQ26

380/220V AC LIGHTING PANEL

21B

C00BTU10

120V AC DEMIN UPS BATTERY-B

C00BLT37

OUTDOOR LDB TRANSFORMER

22

C00BTA04

125V DC DCDB BATTERY FOR DEMIN

CONTROL BOX

CONTROL BOX

Client

C00BLT38

INDOOR LDB TRANSFORMER

23A

C00BTZ09 C00BTZ10

BATTERY MNTRG PNL (DEMIN UPS)

C00-C-0114

C00-CPB-74-GN-001

NETWORK CABINET

23B

BATTERY MNTRG PNL (DEMIN UPS)

Consultant

SECTION A-A
10 C00-GCP-34-GH-016 REMIN CNTRL PNL 24 C00BVY04 BATTERY MNTRG PNL (DEMIN DCDB)

L AHMEYE R I ERNA I NT T ONAL


B
in association with

B
11 C00BVD23 125V DC LIGHTING PANEL 25 C00-GCF-34-GH-001/002/003 DM SYSTEM PLC CABINET
Contractor

ARABIAN BEMCO

12

BMS PANEL

26A

DELETED

CONTRACTING CO. LTD


INDUSTRIAL and POWER PROJECTs DEVELOPERS & CONTRACTORS

13A

C00BJE

DEMIN WATER PLANT MCC-A

26B

DELETED
Drawing Title

13B

C00BJF

DEMIN WATER PLANT MCC-B

27

C00BLQ27

127 AC LIGHTING PANEL

LLC

ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT

14A

C00BRU09

120V AC DEMIN UPS-1

28

C00SGA41GH004

FACP

01

14B

C00BRU10

120V AC DEMIN UPS-2

29

C00SGA41GH104A

I/O CABINET-1

14C

C00BRV09

BYPASS XFMR FOR DEMIN UPS

30

C00SGA41GH104B

I/O CABINET-2

DRAWING ENTIRELY REVISED

DRAWN BY: DATE STARTED:

NP/MP

CHECKED BY:

VT/BR
DATE COMPLETED:

SCALE:

1:50

14D

C00BRI

120V AC DEMIN UPSDB

01A
31 C00-CYE-63-GH-209 BPS 32 C00BUD23 125V DC LIGHTING PANEL

CHICAGO, ILLINOIS 60603-5780

OPRG. DEPT.:

ELECTRICAL

ENG. DEPT.:

ELECTRICAL

CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.

APPROVAL/CERTIFICATION INFORMATION

15A

C00BTL07

125V BATTERY CHARGER-A FOR DEMIN

LOCATED ON THE WORK SITE, INCLUDING

01(28205)

CONTRACTORS/INSTALLERS PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.

REV. NO.

15B

QURAYYAH
JOB ORDER NO.
INDEX PLANT NO. DRAWING NUMBER

SAUDI ARABIA
SHEET NO. REV. NO.

C00BTL08

125V BATTERY CHARGER-B FOR DEMIN

1-0923053.01
8 7 6 5 4 3 2

GQP17

EA-681137
1

01 OF 04

01
SECA00

SEC-A (2004/10)

DMS VECTOR

NOTES
1. FOR ALL NOTES, LEGENDS AND REFERENCE DRAWINGS REFER SHT. 01 OF THIS DRAWING.

3 36700

12000

12000

12700

C00-SAU-61-AN-065 CONTROL ROOM HVAC-2

C00-SAU-61-AN-064 CONTROL ROOM HVAC-1

F
MATCH LINE AT E:2460.794 SEE SHEET 01 OF THIS DRAWING FOR CONTINUATION C00-SA-61-AN-063 DEMIN HVAC

C00-D421-01 STUB-UP

C00-D423-01 STUB-UP

C00-D453-01 STUB-UP C00-C-1321

C00-D425-01 STUB-UP C00-C-1322

BPS

MFAP TO SHT.04

LEGEND

C00-C-1256 C00-C-1253 C00-GCF-34-AH-001 HWT IMMERSION TANK HEATER-1 C00-GCF-34-AH-002 HWT IMMERSION TANK HEATER-2 C00-D426-01 STUB-UP D CONTROL ROOM CLOCK BLOCK PUBLIC ADDRESS

C00-C-1264 C00-C-1265 C00-C-1266

C00-C-1252 C00-D435-02 STUB-UP

C00-C-1260 TO SHT.04 C00-GCF-34-AA-010 C00 DEMIN WATER MOV C00-D424-01 STUB-UP C00-D424-02 STUB-UP C00-D424-03 STUB-UP

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

COO-GCP-34-AP-005 CALCIUM CHLORIDE DOSING PUMP

COO-GCP-34-AP-004 SODIUM BI-CARBONATE DOSING PUMP

COO-GCP-34-AP-003 SODIUM BI-CARBONATE DOSING PUMP COO-GCP-34-AP-002 CALCIUM HYPOCHLORITE (BLEACH)PUMP COO-GCP-34-AP-001 CALCIUM HYPOCHLORITE (BLEACH)PUMP

C00-C-1261

D
COO-GCP-34-AP-006 CALCIUM CHLORIDE DOSING PUMP

D
TO SHT.04

C00-D449-01 STUB-UP C00-GCK-34-AP-001 DEMINERALIZED WATER TRANSFER PUMP C00-D448-01 STUB-UP C00-D448-02 STUB-UP C00-D447-01 STUB-UP

F C00BJS19 WELDING RECEPTACLE FOR DEMIN PLANT (63A) C00-SMG-34-BZ-003 HOIST ISOLATOR BOX G C00-GCN-34-AH-003 CBST HEATER-C C00-GCC-34-AN-001 MIXED BED BLOWER SKID C00-D450-01 STUB-UP C00-D451-01 STUB-UP

C00-D452-01 STUB-UP

C
C00-GCN-34-AH-001 CBST HEATER-A

C00-GCN-34-AH-002 CBST HEATER-B

C00-GCK-34-AP-002 DEMINERALIZED WATER TRANSFER PUMP

C00-D449-02 STUB-UP

C00-D451-02 STUB-UP C00-D452-02 STUB-UP

C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR

C00-D427-01 STUB-UP

C00-GCK-34-AP-003 DEMINERALIZED WATER TRANSFER PUMP C00-D447-02 STUB-UP C00-C-1089 C00-C-2012 C00-C-1077 C00-C-2003 C00-C-1076 C00-C-2002 C00-GCK-34-AA-004 C00 DEMIN H20 TRNF PMP-C SUC MOV

00

04/08/2011

NP/MP

FOR SEC APPROVAL

VT/BR

----

BR

C00-GCN-34-AP-006 CAUSTIC TRUCK UNLOADING TRNSFER PUMP C00-C-1311 C00-GCN-34-AP-002 ACID DOSING PUMP H C00-C-1314 C00-C-1315

C00-C-1323 C00-C-1324 C00-C-1325

C00-GCC-34-AN-002 MIXED BED BLOWER SKID C00-D427-02 STUB-UP HEAT TRACING JB

C00-GCF-34-AP-010 REGENERATION WATER PUMP C00-GCF-34-AP-011 REGENERATION WATER PUMP C00-D450-02 STUB-UP C00-GCF-34-AP-012 REGENERATION WATER PUMP C00-GCK-34-AA-005 C00 DEMIN H20 TRNF PMP-A DIS MOV

REV. NO.

DATE

BY

DESCRIPTION

CHKD.

CERT.

APPD.

Project Title

CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C

Client

Consultant

C00-C-1313

C00-GCN-34-AP-003 ACID DOSING PUMP

C00-C-1312

C00-C-1316 C00-C-1317 C00-C-1318 C00-C-1319 C00-C-1320 C00-GCN-34-AP-008 CAUSTIC DOSING PUMPS C00-GCN-34-AP-007 CAUSTIC DOSING PUMP C00-GCN-34-AP-010 CAUSTIC DOSING PUMP C00-GCN-34-AP-009 CAUSTIC DOSING PUMP C00-D427-03 STUB-UP C00-GQB-54-GH-002 DMIN SNT LIFT STN PNL

C00-GCK-34-AA-007 C00 DEMIN H20 TRNF PMP-C DIS MOV C00-GCK-34-AA-003 C00 DEMIN H20 TRNF PMP-B SUC MOV C00-GCK-34-AA-006 C00 DEMIN H20 TRNF PMP-B DIS MOV

L AHMEYE R I ERNA I NT T ONAL


B
in association with

Contractor

C00-GCN-34-AP-005 ACID DOSING PUMP C00-GCN-34-AP-004 ACID DOSING PUMP C00-GCN-34-AP-001 ACID TRUCK UNLOADING TRANSFER PUMP

C00-GCK-34-AA-002 C00 DEMIN H20 TRNF PMP-A SUC MOV

ARABIAN BEMCO CONTRACTING CO. LTD


INDUSTRIAL and POWER PROJECTs DEVELOPERS & CONTRACTORS

Drawing Title

LLC

ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT

01

DRAWN BY: DATE STARTED:

NP/MP

CHECKED BY:

VT/BR
DATE COMPLETED:

SCALE:

1:50

PLAN VIEW
EL. 4.15M

01A

CHICAGO, ILLINOIS 60603-5780

OPRG. DEPT.:

ELECTRICAL

ENG. DEPT.:

ELECTRICAL

CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING CONTRACTORS/INSTALLERS PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
JOB ORDER NO.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.

APPROVAL/CERTIFICATION INFORMATION

REV. NO.

QURAYYAH
INDEX PLANT NO. DRAWING NUMBER

SAUDI ARABIA
SHEET NO. REV. NO.

1-0923053.01
8 7 6 5 4 3 2

GQP17

EA-681137
1

02 OF 04

01
SECA00

SEC-A (2004/10)

DMS VECTOR

NOTES
1. FOR ALL NOTES, LEGENDS AND REFERENCE DRAWINGS REFER SHT. 01 OF THIS DRAWING.

C00-D431-04 STUB-UP

C00-GCF-34-AA-020 REGENERATION WASTE MOV E:2480.000 C00-C-1309

C00-GCN-34-AP-011 NEUTRALIZED EFFLUENT TRANSFER PUMP C00-GCN-34-AP-012 NEUTRALIZED EFFLUENT TRANSFER PUMP

C00-D431-03 STUB-UP

C00-D431-02 STUB-UP C00-GCC-34-AN-003 NEUTRALIZED SUMP AIR BLOWER C00-GCF-34-AA-021 REGENERATION WASTE MOV C00-C-1310 C00-D431-01 STUB-UP

C00-GCC-34-AN-004 NEUTRALIZED SUMP AIR BLOWER

C00-EMH-192

LEGEND

C00-D430-01 STUB-UP

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NEW DEMIN WATER STORAGE TANK

E:2450.000

C00-GCK-34-AA-001 C00 DEMIN TNK IN MOV

C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR

00

04/08/2011

NP/MP

FOR SEC APPROVAL

VT/BR

----

BR

REV. NO.

DATE

BY

DESCRIPTION

CHKD.

CERT.

APPD.

Project Title

CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C

Client

Consultant

L AHMEYE R I ERNA I NT T ONAL


B
in association with

B
C00-C-1121 C00-C-2232

Contractor

ARABIAN BEMCO CONTRACTING CO. LTD


INDUSTRIAL and POWER PROJECTs DEVELOPERS & CONTRACTORS

C00-GCK-34-AA-012 C00 OC DEMIN TNK IN MOV


LLC

Drawing Title

ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT

EXISTING DEMIN WATER STORAGE TANK


DRAWN BY: DATE STARTED:

NP/MP

CHECKED BY:

VT/BR
DATE COMPLETED:

SCALE:

1:50

01A

CHICAGO, ILLINOIS 60603-5780

OPRG. DEPT.:

ELECTRICAL

ENG. DEPT.:

ELECTRICAL

CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING CONTRACTORS/INSTALLERS PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.

APPROVAL/CERTIFICATION INFORMATION

REV. NO.

QURAYYAH
JOB ORDER NO.
INDEX PLANT NO. DRAWING NUMBER

SAUDI ARABIA
SHEET NO. REV. NO.

PLAN VIEW
EL. 4.15M

1-0923053.01
4 3 2

GQP17

EA-681137
1

03 OF 04

01
SECA00

SEC-A (2004/10)

DMS VECTOR

NOTES
1. FOR ALL NOTES, LEGENDS AND REFERENCE DRAWINGS REFER SHT. 01 OF THIS DRAWING.

H
4 4 3 3 36700 7600 4400 4200 7800 2300 10400 2 1 1

F
B

LEGEND

C C00-C-1264 C00-C-1265 C00-C-1266

C00-SAU-62-AN-065 TOILET/LOCKER EXHAUST FAN C00-SAU-62-AN-064 TOILET/LOCKER EXHAUST FAN C00-GKB-35-AH-060 TOIKLET/SHOWER-RT-EWH-DRP-001

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

01
D C00-SAU-62-AN-060 CHEMICAL STORAGE EXHAUST FANS

C00-C-1260

C00-SAU-62-AN-061 CHEMICAL STORAGE EXHAUST FANS

C00-C-1261

C
01 01/20/2012 HB IFC AS PER 30621127-000-H11T-06204 VT/BR ---BR

00

04/08/2011

NP/MP

FOR SEC APPROVAL

VT/BR

----

BR

REV. NO.

DATE

BY

DESCRIPTION

CHKD.

CERT.

APPD.

Project Title

CONVERSION OF QURAYYAH OPEN CYCLE POWER PLANT TO COMBINED CYCLE POWER PLANT PROJECT C

Client

Consultant

L AHMEYE R I ERNA I NT T ONAL


B
in association with

Contractor

ARABIAN BEMCO CONTRACTING CO. LTD


INDUSTRIAL and POWER PROJECTs DEVELOPERS & CONTRACTORS

Drawing Title

H
LLC

ELECTRICAL INSTALLATION DEMIN & REMIN WATER PLANTS QURAYYAH COMBINED CYCLE POWER PLANT

DRAWN BY: DATE STARTED:

NP/MP

CHECKED BY:

VT/BR
DATE COMPLETED:

SCALE:

1:50

01A
ROOF PLAN

CHICAGO, ILLINOIS 60603-5780

OPRG. DEPT.:

ELECTRICAL

ENG. DEPT.:

ELECTRICAL

CONTRACTOR/INSTALLER SHALL TAKE ALL APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING CONTRACTORS/INSTALLERS PERSONNEL (OR THAT OF ITS SUBCONTRACTOR(S)) PERFORMING THE WORK.
JOB ORDER NO.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED
DOC. NO.

APPROVAL/CERTIFICATION INFORMATION

REV. NO.

QURAYYAH
INDEX PLANT NO. DRAWING NUMBER

SAUDI ARABIA
SHEET NO. REV. NO.

1-0923053.01
8 7 6 5 4 3 2

GQP17

EA-681137
1

04 OF 04

01
SECA00

SEC-A (2004/10)

DMS VECTOR

S-ar putea să vă placă și