. Her TPC is sea water is 31 t/cm. She is in a port in a summer zone, in water with a relative density of 1.010. In this condition, the waterline is 30mm below the bottom of the winter Loadline. How much additional cargo can be loaded?
43.6mm
Permitted Waterline
250mm
25mm 30mm
W
Starting Waterline
Question Two: A vessel has a summer displacement of 12000 tonnes, with a summer draught of 14 metres. Her TPC is sea water is 33 t/cm. She is in a port in a summer zone, in water with a relative density of 1.015. In this condition, the waterline is 50mm below the bottom of the winter Loadline. How much additional cargo can be loaded?
36.4mm
Permitted Waterline
292mm
25mm 50mm
W
Starting Waterline
Question Three: A vessel has a summer displacement of 10000 tonnes, with a summer draught of 10 metres. Her TPC is sea water is 28 t/cm. She is in a port in a summer zone, in water with a relative density of 1.005. In this condition, the waterline is 50mm above the top of the winter Loadline. How much additional cargo can be loaded?
71.4mm
Permitted Waterline
208mm
50mm
Starting Waterline
Question Four: A vessel has a summer displacement of 7000 tonnes. Her TPC is sea water is 25 t/cm. She is in a port in a summer zone, in water with a relative density of 1.003. In this condition, the waterline is 80mm above the top of the summer Loadline. How much cargo must be unloaded?
Starting Waterline
80mm 61.6mm
Permitted Waterline