Sunteți pe pagina 1din 106

(CIVIL BILLS AUDITING)

TG BUILDING UPTO 13TH R.A. BILL


ABSTRACT
CODE.
DESCRIPTION OF ITEM
NO.

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.00

17227.225

15526.930

1700.295

2273993.70

2049554.76

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.00

11964.836

10216.787

1748.049

1028975.90

878643.68

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.00

477.586

427.683

49.903

1146206.40

1026439.20

B-3
a)
b)
c)

RCC
For M20C grade concrete
For M25C grade concrete
For M30C grade concrete

CUM
CUM

2950.00
2950.00
3060.00

2167.590
552.781
698.552

2101.635
542.460
685.560

65.955
10.321
12.992

6394390.50
1630703.95
2137569.12

6199823.25
1600257.00
2097813.60

B-8
B-9

None Shrinkable GROUT


PVC Water Stoppers

CUM
MTR

36000.00
400.00

10.762
40.800

9.820
40.800

0.942
0.000

387432.00
16320.00

353520.00
16320.00

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.00

388.407

385.614

2.793

2524645.50

2506491.00

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.00

44.781

40.313

4.468

1074744.00

967512.00

E-1

FORM WORK (SHUTTERING)

1) at and all heights above plinth level


2) at all heights below plinth level
E-2 Pockets Shuttering

SQM
SQM
SQM

400.00
325.00
900.00

5843.386
3105.551
129.712

5870.743
3056.021
35.324

-27.357
49.530
94.388

2337354.40
1009304.08
116740.80

2348297.20
993206.83
31791.60

F MASSONRY
F-1 Brick Work (1:6)
F-2 Brick work (1:4)

CUM
SQM

3560.00
550.00

166.852
58.998

166.852
58.998

0.000
0.000

593993.12
32448.90

593993.12
32448.90

F-3 RR Masonry
a) With Cement mortar (1:6)

CUM

2500.00

8.191

8.191

0.000

20477.50

20477.50

G
G-2
a)
b)

SQM
SQM

160.00
180.00

6287.093
1999.500

6287.093
1999.500

0.000
0.000

1005934.88
359910.00

1005934.88
359910.00

CUM

1500.00

456.731

448.820

7.911

685096.50

673230.00

CUM

2410.00

15.342

15.342

0.000

36974.22

36974.22

SQM
SQM

600.00
600.00

60.343
1558.203

60.343
1558.203

0.000
0.000

36205.80
934921.80

36205.80
934921.80

K-2 Aluminiun Doors with shutters SWG 16


a) Single Leaf Doors
b) Double Leaf Doors

SQM
SQM

6000.00
6500.00

24.900
22.320

24.900
22.320

0.000
0.000

149400.00
145080.00

149400.00
145080.00

K-6 Aluminum Windows & Ventileters


b) Aluminum partition

SQM

5000.00

402.907

402.907

0.000

2014535.00

2014535.00

SQM

525.00

333.100

333.100

0.000

174877.50

174877.50

SQM

790.00

242.305

242.305

0.000

191420.95

191420.95

CUM

500.00

2.859

2.859

0.000

1429.50

1429.50

PLASTERING AND FINISHING ITEM


Plastering (1:4)
15 mm thick (in one operation)
20 mm thick (in one operation)

SOLING AND HARDCORE


Boulder soiling 150mm to 250mm
H-1 thickness
Boulder soiling 25 mm to 50mm
H-2 thickness
J FLOORING
J-5 Glazed white Tiles
J-11 Ironite Floor Finishing
K

DOORS AND WINDOWS

P MISCELLANEOUS
P-9 Pre-Cast RCC Slabs
12.5 mm Thick Texture Finshed False
P-11 Ceiling
P-17 Breaking concrete & Brick Walls
a) Brick Work
X

NONE TENDER ITEM

M30C grade concrete for ICE Cubes using

2
3
4
5
6
7
8

Apex paint using 32mm TG raft Columns


TG Deck slab centering
Sand filling
Solid block
Hollow block
Supplying and laying Kota stone
Supplying & Fixing Virtifyed Tiles
M-20 Concrete Supply to Spone ( As per
DGM Instruction)
Supplying and laying Brick COBA
(Weathering Course)

9
10

CUM

45.00

663.992

663.992

0.000

29879.64

29879.64

Rmt

12.00

2592.000

2592.000

0.000

31104.00

31104.00

SQM
SQM
CUM
CUM
SQM
SQM

1050.00
1410.00
4865.00
5175.00
1116.00
1188.00

580.605
931.549
30.945
713.746
1215.841
295.170

561.166
931.549
30.945
713.746
1215.841
295.170

19.439
0.000
0.000
0.000
0.000
0.000

609635.25
1313484.09
150547.43
3693635.55
1356878.56
350661.96

589224.30
1313484.09
150547.43
3693635.55
1356878.56
350661.96

CUM

2950.00

20.000

20.000

0.000

59000.00

59000.00

SQM

959.00

1457.600

1457.600

0.000

1397838.40

1397838.40

37453750.88

36412763.21

ABOVE SUM = Rs.

EXCESS
AMOUNT

224438.94

150332.21

119767.20

194567.25
30446.95
39755.52
33912.00
0.00

18154.50

107232.00

-10942.80
16097.25
84949.20

0.00
0.00

0.00

0.00
0.00

11866.50
0.00

0.00
0.00

0.00
0.00

0.00

0.00
0.00

0.00

0.00
0.00
20410.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1040987.67

(CIVIL BILLS AUDITING)


BOILER - 1 UPTO R/A. BILL -13

ABSTRACT
CODE.
NO.

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.00

3593.325

3469.980

123.345

474318.90

458037.36

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.00

2446.933

2446.933

0.000

210436.24

210436.24

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.00

93.664

88.880

4.784

224793.60

213312.00

B-3
a)

RCC
For M20C grade concrete

CUM

2950.00

525.900

482.092

43.808

1551405.00

1422171.40

B-8

None Shrinkable GROUT

CUM

36000.00

3.376

3.394

-0.018

121536.00

122184.00

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.00

21.862

21.862

0.000

142103.00

142103.00

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.00

3.293

3.250

0.043

79032.00

78000.00

E-1

FORM WORK (SHUTTERING)

1)

at and all heights above plinth level

SQM

400.00

82.275

76.790

5.485

32910.00

30716.00

2)

at all heights below plinth level

SQM

325.00

675.110

623.210

51.900

219410.75

202543.25

E-2

Pockets Shuttering

SQM

900.00

13.864

16.974

-3.110

12477.60

15276.60

CUM

3560.00

18.838

18.838

0.000

67063.28

67063.28

F
F-1

MASONARY
1:6 Brick Work

H
H-1

SOILING & HARD CORE


Stone Bolders & Soling 150 mm to 250
mm thk.

CUM

1500.00

257.635

254.995

2.640

386452.50

382492.50

NON TENDER ITEMS

Hollow Block

CUM

5175.00

2.400

2.400

0.000

12420.00

12420.00

Supplying & Laying Gravel Filling

SQM

750.00

118.100

74.800

43.300

88575.00

56100.00

3622933.87

3412855.63

ABOVE SUM = Rs.

EXCESS
AMOUNT
16281.54

0.00

11481.60

129233.60
-648.00

0.00

1032.00

2194.00
16867.50
-2799.00

0.00

3960.00

0.00
32475.00

210078.24

(CIVIL BILLS AUDITING)


BOILER - 2 UPTO R/A. BILL -13
ABSTRACT
CODE.
DESCRIPTION OF ITEM
NO.

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.00

3606.860

3212.919

393.941

476105.52

424105.31

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.00

2695.902

2512.000

183.902

231847.57

216032.00

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.00

106.659

104.113

2.546

255981.60

249871.20

B-3
a)

RCC
For M20C grade concrete

CUM

2950.00

464.294

456.897

7.397

1369667.30

1347846.15

B-8

None Shrinkable GROUT

CUM

36000.00

3.376

2.443

0.933

121536.00

87948.00

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.00

23.194

21.428

1.766

150761.00

139282.00

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.00

2.918

2.875

0.043

70032.00

69000.00

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.00
325.00
900.00

347.985
451.526
19.349

304.275
444.125
13.804

43.710
7.401
5.545

139194.00
146745.95
17414.10

121710.00
144340.63
12423.60

H
H-1
X

SOILING & HARD CORE


Bolder & Soling 150 mm o 250 mm thk
NON TENDER ITEMS

CUM

1500.00

116.835

116.835

0.000

175252.50

175252.50

1
2

Hollow Blocks
Supplying & Levelling Gravel Filling

CUM
CUM

5175.00
750.00

21.958
52.8

21.958
8.8

0.000
44.000

113632.65
39600.00

113632.65
6600.00

ABOVE SUM = Rs.

3307770.19

3108044.03

EXCESS
AMOUNT

52000.21
15815.57
6110.40
21821.15
33588.00
11479.00

1032.00

17484.00
2405.33
4990.50
0.00
0.00
33000.00

199726.16

(CIVIL BILLS AUDITING)


AIR COOLED STREEAM CONDTIONSER - 1 UPTO R/A. BILL -13
ABSTRACT
CODE. NO.

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.00

4189.687

2167.997

2021.690

553038.684

286175.604

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.00

3567.888

1559.730

2008.158

306838.368

134136.78

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.00

188.342

104.064

84.278

452020.8

249753.6

B-3
a)

RCC
For M20C grade concrete

CUM

2950.00

226.126

225.318

0.808

667071.7

664688.1

B-8

None Shrinkable GROUT

CUM

36000.00

0.395

0.171

0.224

14220

6156

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.00

17.493

17.255

0.238

113704.5

112157.5

D
D-1
E-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles
FORM WORK (SHUTTERING)

TON

24000.00

0.514

0.272

0.242

12336

6528

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.00
325.00

274.446
493.189

252.947
488.7

21.499
4.489

109778.4
160286.425

101178.8
158827.5

SOILING & HARD CORE


Stone Boulders Soling 150 to 250 mm thk

CUM

1500.00

215.129

215.129

0.000

322693.5

322693.5

CUM

5175.00

11.077

11.077

0.000

57323.475

57323.475

2769311.852

2099618.859

H
H-1
X

NON TENDER ITEM

1)

Hollow Block

ABOVE SUM = Rs.

EXCESS
AMOUNT

266863.08

172701.588

202267.2

2383.6
8064

1547

5808
8599.6
1458.925

0
669692.993

(CIVIL BILLS AUDITING)


WTP UPTO R/A. BILL -13
ABSTRACT
DESCRIPTION OF ITEM
CODE. NO.
A-1
EARTH WORK IN EXCAVATION
a)
Upto a depth of 6.00m

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

CUM

132.000

2112.034

1536.445

575.589

278788.49

202810.74

A-3

Backfilling 150 mm thk layer

CUM

86.000

6.900

6.900

0.000

593.40

593.40

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

173.994

156.321

17.673

417585.60

375170.40

B-3
a)
b)

RCC
For M20C grade concrete
For M25C grade concrete

CUM

2950.000
2950.000

318.817
37.247

289.014
32.984

29.803
4.263

940510.15
109878.65

852591.30
97302.80

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

26.980

26.963

0.017

175370.00

175259.50

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts,
Curb Angles

TON

24000.000

3.101

3.554

-0.453

74424.00

85296.00

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

1251.617
788.316
7.474

1230.078
788.316
7.474

21.539
0.000
0.000

500646.80
256202.70
6726.60

492031.20
256202.70
6726.60

F
F-1
F-2

MASSONRY
Brick Work (1:6)
Brick work (1:4)

CUM
SQM

3560.000
550.000

119.010
101.466

117.198
101.466

1.812
0.000

423675.60
55806.30

417224.88
55806.30

PLASTERING AND FINISHING ITEM

G-2
a)
G-3
H

Plastering (1:4)
15 mm thick (in one operation)
Ceiling plaster 10 mm thickness

SQM
SQM

160.000
190.000

1352.371
237.725

1352.371
237.725

0.000
0.000

216379.36
45167.75

216379.36
45167.75

CUM

1500.000

265.804

260.664

5.140

398706.00

390996.00

H-1

SOLING AND HARDCORE


Boulder soiling 150mm to 250mm
thickness

J
J-3
J-5
J-11

FLOORING
Ceramic Tiles
Glazed White Tiles
Ironite Floor Finishing 25 mm thk

SQM
SQM
SQM

1400.000
600.000
600.000

86.015
70.998
682.471

86.015
70.998
682.471

0.000
0.000
0.000

120421.00
42598.80
409482.60

120421.00
42598.80
409482.60

K
K-2
a)
b)

DOORS AND WINDOWS


Aluminium Doors 16 SWG
Single Leaf Doors
Double Leaf Doors

SQM
SQM

6000.000
6500.000

8.640
9.600

8.640
9.600

0.000
0.000

51840.00
62400.00

51840.00
62400.00

K-6
b)

Aluminium Windows & Ventileters


Aluminum partition

SQM

5000.000

54.615

54.615

0.000

273075.00

273075.00

P
P-9
P-11

SQM
SQM

525.000
790.000

69.880
10.710

69.880
10.710

0.000
0.000

36687.00
8460.90

36687.00
8460.90

a)
b)

MISCELLANEOUS
RCC Pre-cast slab
False Ceiling 12.5 mm thk
Breacking concrete floor, brick walls,
including by manual chipping and
cutting.
Brick work
Concrete work

CUM
CUM

500.000
3500.000

141.283
19.228

141.283
19.228

0.000
0.000

70641.50
67298.00

70641.50
67298.00

X
1
2
3

NONE TENDER ITEM


Sand filling
Solid block
Brick Coba weathering courses

CUM
CUM
SQM

1410.000
4865.000
959.000

383.195
11.296
242.060

340.752
11.296
242.060

42.443
0.000
0.000

540304.95
54955.04
232135.54

480460.32
54955.04
232135.54

P-17

ABOVE SUM = Rs.

5870761.73

5580014.63

EXCESS
AMOUNT

75977.75
0.00

42415.20
87918.85
12575.85
110.50

-10872.00

8615.60
0.00
0.00

6450.72
0.00

0.00
0.00

7710.00

0.00
0.00
0.00

0.00
0.00

0.00

0.00
0.00

0.00
0.00

59844.63
0.00
0.00

290747.10

(CIVIL BILLS AUDITING)


RAW WATER TANK UPTO R/A. BILL -13
ABSTRACT
CODE.
DESCRIPTION OF ITEM
NO.

UNIT

UNIT
RATE (Rs.)

BILLED
CHECKED AND
QTY AS PER
APPROVED
CONTRACTOR
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

2626.313

1706.905

919.408

346673.32

225311.46

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

74.151

74.151

0.000

177962.40

177962.40

B-3
b)
B-9

RCC
For M25C grade concrete
PVC Water Stoppers

CUM
MTR

2950.000
400.000

877.986
147.000

869.117
147.000

8.869
0.000

2590058.70
58800.00

2563895.15
58800.00

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

86.021

73.612

12.409

559136.50

478478.00

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.000
325.000

3244.070
102.490

3138.130
46.060

105.940
56.430

1297628.00
33309.25

1255252.00
14969.50

F
F-1
F-2

MASSONRY
Brick Work (1:6)
Brick work (1:4)

CUM
SQM

3560.000
550.000

1.737
131.520

1.737
131.520

0.000
0.000

6183.72
72336.00

6183.72
72336.00

SQM

460.000

999.435

999.435

0.000

459740.10

459740.10

Rmt

50.000

360.000

360.000
0.000
18000.00
ABOVE SUM = Rs. 5619827.99

M WATER PROOFING INSULATION


M-3 1:3 Cment Plaster in 2 layer water Proof
X
1

NONE TENDER ITEM


Fixing for GI water stoper

18000.00

5330928.33

EXCESS
AMOUNT
121361.86

0.00

26163.55
0.00

80658.50

42376.00
18339.75

0.00
0.00

0.00

0.00

288899.66

CODE. NO. DESCRIPTION OF ITEM

(CIVIL BILLS AUDITING)


AIR COOLED STREAM CONDTIONSER - 2 UPTO R/A. BILL -13
ABSTRACT
BILLED
CHECKED AND
UNIT
UNIT
QTY AS PER
APPROVED
RATE (Rs.)
CONTRACTOR
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

4136.428

2506.998

1629.430

546008.50

330923.74

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

3481.143

1432.144

2048.999

299378.30

123164.38

B
B-1
B-2

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456
PCC M-15

CUM
CUM

2400.000
2610.000

48.041
140.302

47.759
139.982

0.282
0.320

115298.40
366188.22

114621.60
365353.02

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

225.288

224.872

0.416

664599.60

663372.40

B-8

Grouting

CUM

36000.000

0.139

0.139

0.000

5004.00

5004.00

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

16.427

12.908

3.519

106775.50

83902.00

INSERT & JIGS

D-1

Foundation bolts, Anchors bolts, Nuts, Curb Angles

TON

24000.000

0.514

0.296

0.218

12336.00

7104.00

E-1
1)
2)

FORM WORK (SHUTTERING)


at and all heights above plinth level
at all heights below plinth level

SQM
SQM

400.000
325.000

274.446
489.382

241.689
435.02

32.757
54.362

109778.40
159049.15

96675.60
141381.50

H
H-1

SOLING & HARD CORE


Stone Boulers 150 to 250 mm thk

CUM

1500.000

215.129

215.129

0.000

322693.50

322693.50

NON TENDER ITEMS


Hollow Blocks

CUM

5175.000

11.077

11.077

0.000

57323.48

57323.48

2764433.04

2311519.22

X
1)

ABOVE SUM = Rs.

EXCESS
AMOUNT

215084.76

176213.91

676.80
835.20

1227.20
0.00

22873.50

5232.00

13102.80
17667.65

0.00

0.00
452913.82

(CIVIL BILLS AUDITING)


DOSSING AREA UPTO R/A. BILL -13
ABSTRACT
DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

766.507

572.832

193.675

101178.92

75613.82

25565.10

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

642.575

509.022

133.553

55261.45

43775.89

11485.56

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

29.436

29.436

0.000

70646.40

70646.40

0.00

B-3
a)
B-9

RCC
For M20C grade concrete
PVC WATER STOPPERS

CUM
MTR

2950.000
400.000

87.301
12.400

87.301
12.400

0.000
0.000

257537.95
4960.00

257537.95
4960.00

0.00
0.00

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

3.889

3.889

0.000

25278.50

25278.50

0.00

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

1.031

0.984

0.047

24744.00

23616.00

1128.00

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

268.023
183.149
7.710

268.023
183.149
7.710

0.000
0.000
0.000

107209.20
59523.43
6939.00

107209.20
59523.43
6939.00

0.00
0.00
0.00

F
F-1

MASSONRY
Brick Work (1:6)

CUM

3560.000

10.245

10.245

0.000

36472.20

36472.20

0.00

CODE.
NO.

F-2

Brick work (1:4)

SQM

550.000

34.820

34.820

0.000

19151.00

19151.00

0.00

G
G-2

PLASTERING & FINISHING ITEMS


1:4 Ceiling Plaster

SQM

160.000

111.868

111.868

0.000

17898.88

17898.88

0.00

J
J-11

FLOORING
Ironite Floor Finish 25 mm thk

SQM

600.000

149.281

149.281

0.000

89568.60

89568.60

0.00

CUM

1500.000

39.872

39.872

0.000

59808.00

59808.00

0.00

CUM
CUM

500.000
3500.000

28.205
7.728

28.205
7.728

0.000
0.000

14102.50
27048.00

14102.50
27048.00

0.00
0.00

SQM

1410.000

90.178

90.178
0.000
ABOVE SUM = Rs.

SOLING AND HARDCORE

H-1
P

Boulder soiling 150mm to 250mm thickness


MISCELLANEOUS

P-17
a)

Breacking Brick work &Rcc structure


Brick work
Concrete work
NONE TENDER ITEM
Sand filling

X
1

127150.98

127150.98

0.00

1104479.01

1066300.35

38178.66

(CIVIL BILLS AUDITING)


SECONDRY CRUSHER HOUSE UPTO R/A. BILL -13
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a)
Upto a depth of 6.00m

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

CUM

132.000

1495.420

1252.263

243.157

197395.44

165298.72

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

1395.163

1152.006

243.157

119984.02

99072.52

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

15.797

15.782

0.015

37912.80

37876.80

B-3
a)
b)

RCC
For M20C grade concrete
For M25C grade concrete

CUM
CUM

2950.000
2950.000

363.460
10.004

358.226
10.004

5.234
0.000

1072207.00
29511.80

1056766.70
29511.80

B-8

Grouting Work

CUM

36000.000

2.493

2.493

0.000

89748.00

89748.00

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

47.053

47.053

0.000

305844.50

305844.50

D
D-1

INSERTS & JIGS


MS Inserts & Fdns Bolts

TON

24000.000

2.844

2.492

0.352

68256.00

59808.00

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

1815.134
249.290
27.942

726053.60
1755.863
59.271
81019.25
237.040
12.250
25147.80
0.000
27.942
ABOVE SUM = Rs. 2753080.21

702345.20
77038.00
0.00

2623310.23

EXCESS
AMOUNT
32096.72

20911.50

36.00

15440.30
0.00
0.00

0.00

8448.00

23708.40
3981.25
25147.80

129769.98

(CIVIL BILLS AUDITING)


FLY ASH SILO & BED ASH SILO UPTO R/A. BILL -13
ABSTRACT
CODE.
DESCRIPTION OF ITEM
NO.

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTO

CHECKED
AND
APPROVED

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

2177.468

1158.069

1019.399

287425.78

152865.11

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

2015.714

996.315

1019.399

173351.40

85683.09

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

34.414

31.217

3.197

82593.60

74920.80

B-3
b)

RCC
For M25C grade concrete

CUM

2950.000

530.233

530.233

0.000

1564187.35

1564187.35

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

135.765

120.772

14.993

882472.50

785018.00

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

2.471

1.975

0.496

59304.00

47400.00

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.000
325.000

1606.607
164.460

642642.80
53449.50

642642.80
53449.50

3745426.93

3406166.65

1606.607
0.000
164.460
0.000
ABOVE SUM = Rs.

EXCESS
AMOUNT
134560.67

87668.31

7672.80

0.00

97454.50

11904.00

0.00
0.00

339260.28

(CIVIL BILLS AUDITING)


ACC & MCC UPTO R/A. BILL -13
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a) Upto a depth of 6.00m

UNIT

BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
RATE (Rs.) CONTRACTOR
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

CUM

132.000

793.439

487.830

305.609

Rs. 104,733.95

Rs. 64,393.56

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

520.578

449.160

71.418

Rs. 44,769.71

Rs. 38,627.76

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

28.184

28.184

0.000

Rs. 67,641.60

Rs. 67,641.60

B-3
a)
b)

RCC
For M20C grade concrete
For M25C grade concrete

CUM
CUM

2950.000
2950.000

55.344
66.374

55.344
66.374

0.000
0.000

Rs. 163,264.80
Rs. 195,803.30

Rs. 163,264.80
Rs. 195,803.30

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

11.878

11.878

0.000

Rs. 77,207.00

Rs. 77,207.00

D
D-1

INSERTS & JIGS


MS Inserts & fdns Bolts

TON

24000.000

1.467

1.467

0.000

Rs. 35,208.00

Rs. 35,208.00

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.000
325.000

689.806
163.680

689.806
163.680

0.000
0.000

Rs. 275,922.40
Rs. 53,196.00

Rs. 275,922.40
Rs. 53,196.00

F MASONARY
F-1 Brick Work 1:6
F-2 Brick Work 1:4

CUM
SQM

3560.000
550.000

63.469
31.200

63.469
31.200

0.000
0.000

Rs. 225,949.64
Rs. 17,160.00

Rs. 225,949.64
Rs. 17,160.00

G PLASTERING & FINISHING ITEMS


G-2 Plaster with 1:4
a) 15 mm thk in one operation

SQM

160.000

360.044

360.044

0.000

Rs. 57,607.04

Rs. 57,607.04

b) 20 mm thk in one operation


G-3 CEILING PLASTER 1:4

SQM
SQM

180.000
190.000

470.158
227.070

470.158
227.070

0.000
0.000

Rs. 84,628.44
Rs. 43,143.30

Rs. 84,628.44
Rs. 43,143.30

H SOLING & HARD CORE


H-1 Stone Boulders 150 to 250 mm thk

CUM

1500.000

18.209

18.209

0.000

Rs. 27,313.50

Rs. 27,313.50

K
K-2
a)
b)
K-6

SQM
SQM
SQM

6000.000
6500.000
5000.000

2.400
7.200
79.520

2.400
7.200
79.520

0.000
0.000
0.000

Rs. 14,400.00
Rs. 46,800.00
Rs. 397,600.00

Rs. 14,400.00
Rs. 46,800.00
Rs. 397,600.00

SQM

790.000

85.204

85.204

0.000

Rs. 67,311.16

Rs. 67,311.16

SQM
SQM
SQM
SQM

1116.000
1410.000
5175.000
959.000

60.270
8.640
4.200
177.757

60.270
0.000
Rs. 67,261.32
8.640
0.000
Rs. 12,182.40
4.200
0.000
Rs. 21,735.00
194.610
-16.853
Rs. 170,468.96
ABOVE SUM = Rs. Rs. 2,271,307.52

Doors & Windows


Aluminium Doors 16 Gauge
Single Leaf Doors
Double Leaf Doors
Aluminium Windows & Ventileter

P Miscellaneous
P-11 False Ceiling
X
1)
2)
3)
4)

Non Tender Items


Supplying & Laying Kota Stone
Sand Filling
Hollow Block
Brick Coba Weathering Course

Rs. 67,261.32
Rs. 12,182.40
Rs. 21,735.00
Rs. 186,630.99

Rs. 2,240,987.21

EXCESS
AMOUNT
Rs. 40,340.39

Rs. 6,141.95

Rs. 0.00

Rs. 0.00
Rs. 0.00

Rs. 0.00

Rs. 0.00

Rs. 0.00
Rs. 0.00

Rs. 0.00
Rs. 0.00

Rs. 0.00

Rs. 0.00
Rs. 0.00

Rs. 0.00

Rs. 0.00
Rs. 0.00
Rs. 0.00

Rs. 0.00

Rs. 0.00
Rs. 0.00
Rs. 0.00
-Rs. 16,162.03

Rs. 30,320.31

(CIVIL BILLS AUDITING)


HRSC TANK UPTO R/A. BILL -13
ABSTRACT
UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

267.098

178.305

88.793

35256.936

23536.260

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

230.904

159.508

71.396

19857.744

13717.688

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

7.757

7.757

0.000

18616.800

18616.800

B-3
b)

RCC
For M25C grade concrete

CUM

2950.000

63.949

61.096

2.853

188649.550

180233.200

B-9
a)

Stoppers dumbbell shaped


PVC Water stoppers

Rmt

400.000

91.225

91.225

0.000

36490.000

36490.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

6.231

6.231

0.000

40501.500

40501.500

D
D-1

Inserts & Jigs


MS Inserts & Fdns Bolts

TON

24000.000

0.084

0.084

0.000

2016.000

2016.000

E-1

FORM WORK (SHUTTERING)

1)
2)
F
F-2

at and all heights above plinth level


at all heights below plinth level
MASSONRY
Brick work (1:4)

SQM
SQM

400.000
325.000

296.714
112.256

296.714
110.294

0.000
1.962

118685.600
36483.200

118685.600
35845.550

SQM

550.000

5.035

5.035

0.000

2769.250

2769.250

G
G-2
a)

Finishing & Plastering Items


1:4 Cment Sand Morter
15 mm thk in one operation

SQM

160.000

118.730

118.730

0.000

18996.800

18996.800

CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

b)

20 mm thk in one opearion

SQM

180.000

149.040

149.040

0.000

26827.200

26827.200

ABOVE SUM = Rs. Rs. 545,150.580 Rs. 518,235.848

EXCESS
AMOUNT
11720.676

6140.056

0.000

8416.350

0.000

0.000

0.000

0.000
637.650
0.000

0.000

0.000

Rs. 26,914.732

(CIVIL BILLS AUDITING)


PA FAN 1&2 NEAR BOILER 2 UPTO R/A. BILL ABSTRACT
BILLD
QTY AS PER
CONTRACTOR

UNIT

UNIT
RATE (Rs.)

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

496.944

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

399.704

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

10.633

B-3
b)

RCC
For M25C grade concrete

CUM

2950.000

138.446

B-8

None Shrinkable GROUT

CUM

36000.000

4.834

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

5.231

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.004

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

149.693
44.573
45.446

DESCRIPTION OF ITEM
CODE. NO.

ABOVE S

CIVIL BILLS AUDITING)


NEAR BOILER 2 UPTO R/A. BILL -13
ABSTRACT
CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

172.740

324.204

65596.608

22801.680

42794.928

75.500

324.204

34374.544

6493.000

27881.544

6.376

4.257

25519.200

15302.400

10216.800

70.228

68.218

408415.700

207172.600

201243.100

4.834

0.000

174024.000

174024.000

0.000

5.231

0.000

34001.500

34001.500

0.000

0.004

0.000

96.000

96.000

0.000

76.456
38.980
38.980

73.237
5.593
6.466

59877.200
14486.225
40901.400

30582.400
12668.500
35082.000

29294.800
1817.725
5819.400

ABOVE SUM = Rs. Rs. 857,292.377 Rs. 538,224.080

Rs. 319,068.297

(CIVIL BILLS AUDITING)


PA FAN 1&2 NEAR BOILER 1 UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM
UNIT

BILLD
UNIT
QTY AS PER
RATE (Rs.) CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

496.944

172.740

324.204

65596.608

22801.680

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

399.704

75.500

324.204

34374.544

6493.000

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

10.633

6.376

4.257

25519.200

15302.400

B-3
b)

RCC
For M25C grade concrete

CUM

2950.000

138.446

70.228

68.218

408415.700

207172.600

B-8

None Shrinkable GROUT

CUM

36000.000

4.834

4.834

0.000

174024.000

174024.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

5.231

5.231

0.000

34001.500

34001.500

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.004

0.004

0.000

96.000

96.000

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

151.940
44.573
45.446

78.703
43.572
38.980

73.237
1.001
6.466

60776.000
14486.225
40901.400

31481.200
14160.900
35082.000

CUM

3500

0.967

0.967

0.000

3384.500

3384.500

P
P-17
b)

MISCELLANEOUS
Breacking Brick work & RCC structure
Concrete work

ABOVE SUM = Rs. Rs. 861,575.677

Rs. 543,999.780

EXCESS
AMOUNT
42794.928

27881.544

10216.800

201243.100
0.000

0.000

0.000

29294.800
325.325
5819.400

0.000

Rs. 317,575.897

(CIVIL BILLS AUDITING)


SA FAN 1 NEAR BOILER 1 UPTO R/A. BILL -13
ABSTRACT
UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

298.548

90.324

208.224

39408.336

11922.768

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

255.853

54.075

201.778

22003.358

4650.450

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

6.620

3.462

3.158

15888.000

8308.800

B-3
b)
B-8

RCC
For M25C grade concrete
Grouting Work

CUM
CUM

2950.000
36000.000

62.741
1.775

25.895
1.775

36.846
0.000

185085.950
63900.000

76390.250
63900.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

3.369

3.369

0.000

21898.500

21898.500

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.082

0.082

0.000

1968.000

1968.000

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

123.357
27.503
16.915

CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

56.934
66.423
49342.800
22773.600
11.121
16.382
8938.475
3614.325
16.915
0.000
15223.500
15223.500
ABOVE SUM = Rs. Rs. 423,656.919 Rs. 230,650.193

EXCESS
AMOUNT
27485.568

17352.908

7579.200

108695.700
0.000

0.000

0.000

26569.200
5324.150
0.000

Rs. 193,006.726

(CIVIL BILLS AUDITING)


SA FAN 1 NEAR BOILER 2 UPTO R/A. BILL -13
ABSTRACT
DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

178.695

83.901

94.794

23587.740

11074.932

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

139.928

47.612

92.316

12033.808

4094.632

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

5.980

3.462

2.518

14352.000

8308.800

B-3
b)
B-8

RCC
For M25C grade concrete
Grouting Work

CUM
CUM

2950.000
36000.000

57.803
1.947

25.895
1.947

31.908
0.000

170518.850
70092.000

76390.250
70092.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

3.369

3.369

0.000

21898.500

21898.500

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.036

0.036

0.000

864.000

864.000

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

100.677
21.023
12.845

56.934
11.121
12.845

43.743
9.902
0.000

40270.800
6832.475
11560.500

22773.600
3614.325
11560.500

CODE.
NO.

ABOVE SUM = Rs. Rs. 372,010.673 Rs. 230,671.539

EXCESS
AMOUNT
12512.808

7939.176

6043.200

94128.600
0.000

0.000

0.000

17497.200
3218.150
0.000

Rs. 141,339.134

(CIVIL BILLS AUDITING)


SA FAN 2 NEAR BOILER 2 UPTO R/A. BILL -13
ABSTRACT
DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

178.695

83.901

94.794

23587.740

11074.932

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

5.980

3.462

2.518

14352.000

8308.800

B-3
b)
B-8

RCC
For M25C grade concrete
Grouting Work

CUM
CUM

2950.000
36000.000

36.801
1.487

25.895
1.487

10.906
0.000

108562.950
53532.000

76390.250
53532.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

3.369

3.369

0.000

21898.500

21898.500

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.000
325.000

32.787
21.023

32.787
11.121

0.000
9.902

13114.800
6832.475

13114.800
3614.325

241880.465

187933.607

CODE.
NO.

ABOVE SUM = Rs.

EXCESS
AMOUNT
12512.808

6043.200

32172.700
0.000

0.000

0.000
3218.150

53946.858

(CIVIL BILLS AUDITING)


ESP& MCC UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM
UNIT

BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
RATE (Rs.) CONTRACTOR
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

566.080

451.680

114.400

74722.560

59621.760

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

478.189

363.807

114.382

41124.254

31287.402

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

16.654

16.654

0.000

39969.600

39969.600

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

82.169

82.169

0.000

242398.550

242398.550

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

6.834

6.834

0.000

44421.000

44421.000

D
D-1

Inserts & Jigs


MS inserts & Fdns Bolts

TON

24000.000

1.278

1.278

0.000

30672.000

30672.000

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pocket Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

470.533
82.888
0.000

470.533
82.888
0.000

0.000
0.000
0.000

188213.200
26938.600
0.000

188213.200
26938.600
0.000

F
F-1
F-2

Masonary
Brick Work 1:6
Brick Work 1:4

CUM
SQM

3560.000
550.000

61.259
26.676

61.259
26.676

0.000
0.000

218082.040
14671.800

218082.040
14671.800

G
G-2
a)

Plastering & Finishing Items


Plastering Work 1:4
15 mm thk in one operation

SQM

160.000

158.460

158.460

0.000

25353.600

25353.600

b)

20 mm thk in one operation

SQM

180.000

327.490

327.490

0.000

58948.200

58948.200

H
H-1

Soling & Hard Core


Stone Boulder 150 to 250 thk

CUM

1500.000

16.705

12.800

3.905

25057.500

19200.000

K
K-2
a)
K-6
b)
K-9
b)

Doors & Windows


Aluminium Doors 16 Gauge
Single Leaf Doors
Aluminium Windows & Ventileter
Aluminium Partion
MS Rolling Shutters 20 Gauge Hood
With Wicket Gate

SQM

6000.000

4.800

4.800

0.000

28800.000

28800.000

SQM

5000.000

47.857

47.857

0.000

239285.000

239285.000

SQM

4100.000

10.500

10.500

0.000

43050.000

43050.000

P
P-11

Miscellaneous
False Ceilling

SQM

790.000

49.218

49.218

0.000

38882.220

38882.220

Non Tender Items


Supplying & Laying Kotta Stone
Brick Coba weathering courses

SQM
SQM

1116.000
959.000

55.683
127.281

55.683
0.000
62142.228
127.281
0.000
122062.479
ABOVE SUM = Rs. 1564794.831

X
1)
2)

62142.228
122062.479

1533999.679

EXCESS
AMOUNT
15100.800

9836.852

0.000

0.000

0.000

0.000

0.000
0.000
0.000

0.000
0.000

0.000

0.000

5857.500

0.000
0.000
0.000

0.000

0.000
0.000

30795.152

(CIVIL BILLS AUDITING)


WTP BOILER PIPE RACK FOUNDATION UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM
UNIT

BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
EXCESS
RATE (Rs.) CONTRACTOR
QTY
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

526.738

379.079

147.659

69529.416

50038.428

19490.988

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

461.628

324.161

137.467

39700.008

27877.846

11822.162

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

11.633

11.038

0.595

27919.200

26491.200

1428.000

B-3
a)
C
a)

RCC
For M20C grade concrete
STEEL REINFORECEMENTS
With MS Round of all Diameters

CUM

2950.000

57.904

50.761

7.143

170816.800

149744.950

21071.850

TON

6500.000

4.023

3.485

0.538

26149.500

22652.500

3497.000

TON

24000.000

1.463

0.940

0.523

35112.000

22560.000

12552.000

SQM
SQM

400.000
325.000

89.125
39.080

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

86.245
2.880
35650.000
34498.000
19.460
19.620
12701.000
6324.500
ABOVE SUM = Rs. 417577.924 340187.424

1152.000
6376.500

77390.5

(CIVIL BILLS AUDITING)


CHS - MCC ROOM UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM
UNIT

BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED EXCESS
RATE (Rs.) CONTRACTOR
QTY
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

598.910

555.613

43.297

79056.120

73340.916

5715.204

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

510.007

466.710

43.297

43860.602

40137.060

3723.542

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

12.170

10.893

1.277

29208.000

26143.200

3064.800

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

49.745

49.745

0.000

146747.750

146747.750

0.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

1.925

1.925

0.000

12512.500

12512.500

0.000

D
D-1

Inserts & Jigs


MS Inserts & Fdns Bolts

TON

24000.000

0.422

0.422

0.000

10128.000

10128.000

0.000

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.000
325.000

206.120
92.558

205.160
92.558

0.960
0.000

82448.000
30081.350

82064.000
30081.350

384.000
0.000

F
F-1
F-2

Masonary
Brick Work 1:6
Brick Work 1:4

CUM
SQM

3560.000
550.000

37.205
18.423

37.205
18.423

0.000
0.000

132449.800
10132.650

132449.800
10132.650

0.000
0.000

G
G-2
a)

Plastering & Finshing Items


1:4 Cement Mortar Plaster
15 mm thk in one operation

SQM

160.000

195.948

186.480

9.468

31351.680

29836.800

1514.880

b)

20 mm thk in one operation

SQM

180.000

258.336

256.785

1.551

46500.480

46221.300

279.180

H
H-1

Soling & Hard Core


Stone Boulders 150 to 250 mm thk

CUM

1500.000

27.335

17.540

9.795

41002.500

26310.000

14692.500

K
K-2
a)
b)
K-6
b)

Doors & Windows


Aluminium Doors 16 Gauge
Single Leaf Doors
Double Leaf Doors
Aluminium Windows & Ventileters
Aluminium Partions

SQM
SQM

6000.000
6500.000

2.520
3.150

2.520
3.150

0.000
0.000

15120.000
20475.000

15120.000
20475.000

0.000
0.000

SQM

5000.000

30.587

30.587

0.000

152935.000

152935.000

0.000

P
P-11

Miscellaneous
False Ceiling

SQM

790.000

15.510

15.510

0.000

12252.900

12252.900

0.000

Non Tender Items


Supplying & Laying Cotta Stone
Brick Coba weathering Course

SQM
SQM

1116.000
959.000

51.050
91.450

51.050
91.450

0.000
0.000

56971.800
87700.550

56971.800
87700.550

0.000
0.000

X
1
2

ABOVE SUM = Rs. 1040934.682 1011560.576 29374.106

(CIVIL BILLS AUDITING)


NEUTRLIZATION PIT UP TO R/A. BILL -13
ABSTRACT
CODE.
NO.

BILLED
CHECKED AND
EXCESS
QTY AS PER
APPROVED
QTY
CONTRACTOR
QTY

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

721.358

647.286

74.072

95219.256

85441.752

9777.504

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

15.886

15.886

0.000

38126.400

38126.400

0.000

B-3
a)
C
a)

RCC
For M20C grade concrete
STEEL REINFORECEMENTS
With MS Round of all Diameters

CUM

2950.000

67.744

67.744

0.000

199844.800

199844.800

0.000

TON

6500.000

8.385

7.337

1.048

54502.500

47690.500

6812.000

B-9
a)

Water Stopper
PVC water stoppers

Rmtr

400.000

90.000

90.000

0.000

36000.000

36000.000

0.000

D
D-1

Inserts & Jigs


MS Inserts & Fdns Bolts

TON

24000.000

0.332

0.086

0.246

7968.000

2061.600

5906.400

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.000
325.000

157.500
94.310

157.500
94.310

0.000
0.000

63000.000
30650.750

63000.000
30650.750

0.000
0.000

F
F-1
F-2

MASSONRY
Brick work (1:6)
Brick work (1:4)

CUM
SQM

3560.000
550.000

7.406
34.575

7.406
34.575

0.000
0.000

26365.360
19016.250

26365.360
19016.250

0.000
0.000

G
G-2
a)

Plastering & Finishing Items


Plastering with 1:4 cement & Sand
15 mm thk in one operation

SQM

160.000

176.900

174.700

2.200

28304.000

27952.000

352.000

J-11

Abortion resistant 15mm thick ironist


topping and 25mm thick bottom

SQM

600.000

112.000

110.000
2.000
67200.000
66000.000
ABOVE SUM = Rs. 666197.316 642149.412

1200.000

24047.904

(CIVIL BILLS AUDITING)


COAL SHED UP TO 13TH R.A.BILL
ABSTRACT
CODE.
DESCRIPTION OF ITEM
NO.

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.00

26510.171

26510.171

0.000

3499342.57

3499342.57

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.00

6989.397

6989.397

0.000

601088.14

601088.14

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.00

806.989

796.479

10.510

1936773.60

1911549.60

B-3
a)

RCC
For M20C grade concrete

CUM

2950.00

2630.047

2466.834

163.213

7758638.65

7277160.30

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.00

298.282

287.988

10.294

1938833.00

1871922.00

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.00

1.646

1.646

0.000

39504.00

39504.00

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.00
325.00

2625.717
1145.802

2625.717
959.692

0.000
186.110

1050286.80
372385.65

1050286.80
311899.90

SOLING AND HARDCORE


Boulder soiling 150mm to 250mm
H-1 thickness

CUM

1500.00

3530.065

2323.068

1206.997

5295097.50

3484602.00

P MISCELLANEOUS
P-17 Breaking concrete & Brick Walls
B) Concrete Work

CUM

3500.00

2.233

2.233

0.000

7815.50

7815.50

NONE TENDER ITEM

Supplying and levelling Gravel Fillings

SQM

750.00

852.995

852.995

0.000

639746.25

639746.25

ABOVE SUM = Rs. 23139511.66 20694917.06

EXCESS
AMOUNT

0.00

0.00

25224.00

481478.35

66911.00

0.00

0.00
60485.75

1810495.50

0.00

0.00

2444594.60

(CIVIL BILLS AUDITING)


GANTRY SUPPORT FOUNDATION UP TO 13TH R.A. BILL
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a)
Upto a depth of 6.00m

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

CUM

132.000

248.400

248.400

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

209.215

210.512

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

5.192

3.894

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

33.994

33.994

D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.280

0.230

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400
325

27.2
75.48

27.2
73.42

ABOVE SUM = Rs.

13TH R.A. BILL


EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

0.000

32788.800

32788.800

0.000

-1.297

17992.490

18104.032

-111.542

1.298

12460.800

9345.600

3115.200

0.000

100282.300

100282.300

0.000

0.050

6720.000

5520.000

1200.000

0.000
2.060

10880.000
24531.000

10880.000
23861.500

0.000
669.500

ABOVE SUM = Rs. 205655.39 200782.232 4873.158

(CIVIL BILLS AUDITING)


AHS PIPE RACK FOUNDATIONS -1 UP TO 13th R.A. BILL
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a)
Upto a depth of 6.00m

UNIT
UNIT RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

CUM

132.000

231.037

231.037

0.000

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

199.169

199.169

0.000

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

5.114

5.114

0.000

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

26.754

26.754

0.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

3.008

2.707

0.301

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

1.063

1.063

0.000

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400
325

24.615
150.41

24.615
150.41

0.000
0.000

ABOVE SUM = Rs.

R.A. BILL
BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

30496.884

30496.884

0.000

17128.534

17128.534

0.000

12273.600

12273.600

0.000

78924.300

78924.300

0.000

19552.000

17595.500

1956.500

25512.000

25512.000

0.000

9846.000
48883.250

9846.000
48883.250

0.000
0.000

242616.568 240660.068

1956.5

(CIVIL BILLS AUDITING)


AHS PIPE RACK FOUNDATIONS -2 UP TO 13th R.A. BILL
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a) Upto a depth of 6.00m

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

CUM

132.000

121.148

121.148

0.000

15991.536

15991.536

0.000

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

105.262

105.262

0.000

9052.532

9052.532

0.000

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

2.681

2.681

0.000

6434.400

6434.400

0.000

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

15.226

15.226

0.000

44916.700

44916.700

0.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

1.705

1.705

0.000

11082.500

11082.500

0.000

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.894

0.894

0.000

21456.000

21456.000

0.000

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400
325

13.86
91.6

13.86
91.6

0.000
0.000

5544.000
29770.000

5544.000
29770.000

0.000
0.000

144247.668

144247.668

ABOVE SUM = Rs.

(CIVIL BILLS AUDITING)


FIRE FIGHTING PIPE SUPPORTS-1 & 2, 5 MTR LVL FLUSH TANK & DUMP TUBE UP TO 13 th
ABSTRACT
CODE.
DESCRIPTION OF ITEM
NO.

UNIT

UNIT
RATE (Rs.)

BILLED
CHECKED AND
QTY AS PER
APPROVED
CONTRACTOR
QTY

EXCESS
QTY

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

1065.510

991.800

73.710

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

742.667

668.958

73.709

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM 2400.000

13.048

13.048

0.000

B-3
a)
B-9

RCC
For M20C grade concrete
PVC Water Stopper

CUM 2950.000
MTR 400.000

147.957
173.556

119.230
173.556

28.727
0.000

E-1

FORM WORK (SHUTTERING)

2)

at all heights below plinth level

SQM

325

718.921

512.924

205.997

SQM

460

316.48

231.2

85.280

M Water Proofing by Hydro Indulation


M-3 Water Proofing Cement Plaster 1:3

ABOVE SUM = Rs.

DUMP TUBE UP TO 13 th R.A. BILL


BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

140647.320

130917.600

9729.720

63869.362

57530.388

6338.974

31315.200

31315.200

0.000

436473.150
69422.400

351728.500
69422.400

84744.650
0.000

233649.325

166700.300

66949.025

145580.800

106352.000

39228.800

1120957.557 913966.388 206991.169

(CIVIL BILLS AUDITING)


ROAD WORK UP TO 13TH R.A. BILL
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a)
Upto a depth of 6.00m

UNIT
UNIT RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

CUM

132

6728.198

4869.788

1858.41

888122.136

642812.016

Extra Over Item A-1 & A-2 above for every


additional lead of 500 mtr. Or part to there
beyound initial lead of 1000 mtr.

CUM

120

6728.198

4869.788

1858.41

807383.76

584374.56

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

534.125

406.32

127.805

1281900

975168

B-3
a)

RCC
For M20C grade concrete

CUM

2950

613.8

573.3

40.5

1810710

1691235

C
C-1

Steel & Reinforcement


MS Round Steel of all diameters

TON

6500

60.907

76.404

-15.497

395895.5

496626

E-1

FORM WORK (SHUTTERING)

2)

at above Plinth Beam Level

SQM

400

308.5

270.47

38.03

123400

108188

H
H-1

Soling & Hard Core


Stone Boulders 150 to 250 mm thk

CUM

1500

1799.76

1089.876

709.884

2699640

1634814

X
1

Non Tender Item


Supplying & Levelling Gravel Filling

SQM

750

534.125

442.551

91.574

400593.75

331913.25

A-4

ABOVE SUM = Rs. 8407645.146 6465130.826

EXCESS
AMOUNT
245310.12

223009.2

306732

119475

-100730.5

15212

1064826

68680.5

1942514.32

(CIVIL BILLS AUDITING)


AHS MCC ROOM UP TO 13TH RA BILL
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a)
Upto a depth of 6.00m

UNIT
UNIT RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

CUM

132

398.99

318.713

80.277

52666.68

42070.116

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

267.237

250

17.237

22982.382

21500

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

19.443

16.658

2.785

46663.2

39979.2

B-3
a)

RCC
For M20C grade concrete

CUM

2950

53.495

46.369

7.126

157810.25

136788.55

D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000

0.613

0.613

14712

14712

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400
325

139.74
223.244

116.791
199.723

22.949
23.521

55896
72554.3

46716.4
64909.975

F
F-1

MASSONRY
Brick Work (1:6)

CUM

3560

75.773

59.378

16.395

269751.88

211385.68

G
G-2
a)
b)

PLASTERING AND FINISHING ITEM


Plastering (1:4)
15 mm thick (in one operation)
20 mm thick (in one operation)

SQM
SQM

160
180

310.43
346.4

338.962
231.28

-28.532
115.12

49668.8
62352

54233.92
41630.4

SOLING AND HARDCORE

H-1
K

Boulder soiling 150mm to 250mm thickness CUM

1500

6.998

6.998

10497

10497

DOORS AND WINDOWS

K-2
a)
b)

Aluminiun Doors with shutters SWG 16


Single Leaf Doors
Double Leaf Doors

SQM
SQM

6000
6500

5.4
9.45

5.4
9.45

0
0

32400
61425

32400
61425

K-6
b)

Aluminum Windows & Ventileters


Aluminum partition

SQM

5000

30.16

31.96

-1.8

150800

159800

CUM

500

2.76

2.76

1380

1380

SQM
SQM

1410
1116

37.451
30.427

37.451
30.427

0
0

52805.91
33956.532

52805.91
33956.532

P MISCELLANEOUS
P-17 Breaking concrete & Brick Walls
a) Brick Work
X

NONE TENDER ITEM

1
2

Sand filling
Supplying and laying Kota stone

ABOVE SUM = Rs. 1148321.934 1026190.683

EXCESS
AMOUNT
10596.564

1482.382

6684

21021.7

9179.6
7644.325

58366.2

-4565.12
20721.6

0
0

-9000

0
0

122131.251

(CIVIL BILLS AUDITING)


CAMPUS WORK UP TO 13TH RA BILL
ABSTRACT
CODE. DESCRIPTION OF ITEM
NO.
A-1 EARTH WORK IN EXCAVATION
a)
Upto a depth of 6.00m

NONE TENDER ITEM

Volvo, Hitchi-120, JCB, Breaker for Coal


Loading, Back Filling, Road Levelling, PA
Fan Work, Gravel

UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

CUM

132.000

1433.600

1433.600

0.000

189235.20

189235.20

0.00

Rs.

1.00

312198.00

150838

161360.000

312198.00

150838.00

161360.00

ABOVE SUM = Rs. 501433.20 340073.20 161360.00

(CIVIL BILLS AUDITING)


ESP - 1 UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM
UNIT

BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
EXCESS
RATE (Rs.) CONTRACTOR
QTY
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

1475.223

1305.467

169.756

194729.436

172321.644

22407.792

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

1191.001

874.630

316.371

102426.086

75218.180

27207.906

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

38.819

33.483

5.336

93165.600

80359.200

12806.400

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

143.899

143.601

0.298

424502.050

423622.950

879.100

B-7

Gruthing with Concrete

CUM

6600.000

3.235

3.235

0.000

21351.000

21351.000

0.000

B-8

None Shrinkable GROUT

CUM

36000.000

1.654

0.677

0.977

59544.000

24372.000

35172.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

41.361

14.188

27.173

268846.500

92222.000

176624.500

D
D-1

INSERTS & JIGS


Fabricating & Erection Fdns. Bolts,inserts

TON

24000.000

0.101

0.101

0.000

2424.000

2424.000

0.000

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

75.810
301.337
28.903

75.100
301.337
28.903

0.710
0.000
0.000

30324.000
97934.525
26012.700

30040.000
97934.525
26012.700

284.000
0.000
0.000

CUM

1500.000

49.097

49.097

0.000

73645.500

73645.500

0.000

H-1

SOLING & HARD CORe

Stone Boulders 150 to 250 mm thk

X
1)

NON TENDER ITEM


Hollow Block

CUM

5175.000

15.828

15.828
0.000
81909.900
81909.900
0.000
ABOVE SUM = Rs. 1476815.297 1201433.599 275381.698

(CIVIL BILLS AUDITING)


ESP - 2 UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.

BILLED
CHECKED AND
QTY AS PER
APPROVED
CONTRACTOR
QTY

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

1466.744

1305.467

161.277

193610.208

172321.644

21288.564

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

1164.859

874.63

290.229

100177.874

75218.18

24959.694

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

38.819

33.483

5.336

93165.6

80359.2

12806.4

B-3
a)

RCC
For M20C grade concrete

CUM

2950

143.601

143.601

423622.95

423622.95

B-8

None Shrinkable GROUT

CUM

36000

1.083

1.083

38988

38988

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

15.494

11.953

3.541

100711

77694.5

23016.5

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000

2.853

2.664

0.189

68472

63936

4536

D-1
E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400
325
900

182.598
193.295
28.903

74.1
193.295
28.903

108.498
0
0

73039.2
62820.875
26012.7

29640
62820.875
26012.7

43399.2
0
0

H
H-1

SOLING & HARD CORE


Stone Boulders 150 to 250 mm thk

CUB

1500

49.097

49.097

73645.5

73645.5

NON TENDER ITEMS


Hollow Blocks

CUB

5175

15.828

15.828

81909.9

81909.9

X
1)

ABOVE SUM = Rs. 1336175.807 1206169.449 130006.358

(CIVIL BILLS AUDITING)


SA FAN 2 NEAR BOILER 1 UP TO R/A. BILL -13
ABSTRACT
DESCRIPTION OF ITEM
CODE. NO.

BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
QTY
UNIT RATE (Rs.) CONTRACTOR

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

198

90.324

107.676

26136

11922.768

14213.232

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

159.521

54.075

105.446

13718.806

4650.45

9068.356

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

5.692

3.462

2.23

13660.8

8308.8

5352

B-3
b)

RCC
For M25C grade concrete

CUM

2950

57.803

25.895

31.908

170518.85

76390.25

94128.6

B-8

Grouting Work

CUM

36000

1.443

1.443

51948

51948

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

3.369

3.369

21898.5

21898.5

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000

0.048

0.048

1152

1152

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400
325
900

100.677
20.063
12.845

56.934
43.743
40270.8
22773.6
17497.2
11.121
8.942
6520.475
3614.325
2906.15
12.845
0
11560.5
11560.5
0
ABOVE SUM = Rs. 357384.731 214219.193 143165.538

(CIVIL BILLS AUDITING)


TUNNEL UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.

BILLED
CHECKED AND
QTY AS PER
APPROVED
CONTRACTOR
QTY

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

317.091

317.091

41856.012

41856.012

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

5359.242

1841.842

3517.4

460894.812

158398.412

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

249.271

69.271

180

598250.4

166250.4

B-3
a)
b)

RCC
For M20C grade concrete
For M25C grade concrete

CUM
CUM

2950
2950

339.495
210.05

300.737
174.416

38.758
35.634

1001510.25
619647.5

887174.15
514527.2

B-8

Grouting Work

CUM

36000

0.48

0.48

17280

17280

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

27.7

27.7

180050

180050

INSERT & JIGS

D-1

Foundation bolts, Anchors bolts, Nuts, Curb Angles TON

24000

2.13

2.13

51120

51120

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pocket Shuttering

SQM
SQM
SQM

400
325
900

1977.366
76.818
12.444

1691.117
76.818
0

286.249
0
12.444

790946.4
24965.85
11199.6

676446.8
24965.85
0

CUM

1500

32.4

32.4

48600

48600

H
H-1

SOLING AND HARDCORE


Boulder soiling 150mm to 250mm thickness

M
M-1

WATER PROOFING / HYDRO INSULATION


Waterproofing of RCC Slab

NONE TENDER ITEM

1
a)
2
3)

Earth Work in Excavation


above 6.00m lvl
Sand filling
Brick Coba weathering course

SQM

460

959.459

597.372

CUM
CUM
SQM

312
1410
959

8956.16
55.994
61.64

5067.923
2794321.92
1213129.944
3888.237
27.997
78951.54
39475.77
27.997
33.643
59112.76
26849.123
27.997
ABOVE SUM = Rs. 7220058.184 4320914.781

362.087

441351.14

274791.12

EXCESS
AMOUNT
0

302496.4

432000

114336.1
105120.3
0

114499.6
0
11199.6

166560.02

1581191.976
39475.77
32263.637

2899143.403

(CIVIL BILLS AUDITING)


5TR2& 6TR1 UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

UNIT

UNIT
RATE (Rs.)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

414.4

362.6

51.8

54700.8

47863.2

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

394.16

342.37

51.79

33897.76

29443.82

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

3.536

3.536

8486.4

8486.4

B-3
a)

RCC
For M20C grade concrete

CUM

2950

18.732

18.732

55259.4

55259.4

B-8

None Shrinkable GROUT

CUM

36000

0.132

0.132

4752

4752

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

1.783

1.783

11589.5

11589.5

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400
325
900

22.88
64.36
5.44

22.88
64.36
5.44

0
0
0

9152
20917
4896

9152
20917
4896

ABOVE SUM = Rs. 203650.86 192359.32

EXCESS
AMOUNT
6837.6

4453.94

0
0

0
0
0

11291.54

(CIVIL BILLS AUDITING)


IBD, CBD TANK& HP DOSING TANK UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.

BILLED
CHECKED AND
EXCESS
QTY AS PER
APPROVED
QTY
CONTRACTOR
QTY

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

73.575

48.015

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

2.475

B-3
a)

RCC
For M20C grade concrete

CUM

2950

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

D-1
E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

25.56

9711.90

6337.98

3373.92

2.475

5940.00

5940.00

0.00

20.498

20.498

60469.10

60469.10

0.00

6500

0.644

0.644

4186.00

4186.00

0.00

TON

24000

0.114

0.114

2736.00

2736.00

0.00

SQM
SQM

400
325

28.36
2.36

0
11344.00
28.36
0
767.00
2.36
ABOVE SUM = Rs. 95154.00

11344.00
767.00

0.00
0.00

91780.08

3373.92

(CIVIL BILLS AUDITING)


COLLING TOWER UPTO R/A. BILL -13
ABSTRACT
BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
EXCESS
UNIT RATE (Rs.) CONTRACTOR
QTY
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

166.694

150.626

16.068

22003.608

19882.632

2120.976

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

17.675

15.615

2.06

42420

37476

4944

B-3
a)
b)

RCC
For M20C grade concrete
For M25C grade concrete

CUM

2950
2950

12.347
63.143

12.347
59.192

0
3.951

36423.65
186271.85

36423.65
174616.4

0
11655.45

B-9
a)

Stoppers dumbbell shaped


PVC Water stoppers

Rmt

400

130

130

52000

52000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

7.128

7.128

46332

46332

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000

0.425

0.425

10200

10200

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400
325

456.716
21.608

455.64
20.844

1.076
0.764

182686.4
7022.6

182256
6774.3

430.4
248.3

E-2

Pocket shuttering

SQM

900

4.195

4.195

3775.5

3775.5

CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

SOLING AND HARDCORE

H-1

Boulder soiling 150mm to 250mm thickness

CUM

1500

19.155

19.155

28732.5

28732.5

M
M-3

Water Proofing by Hydro Insulation


Cement Plaster 1:3 Water Proof

SQM

460

182.096

182.096

83764.16

83764.16

P
P-9

Miscellaneous
RCC Pre-cast Slab

SQM

525

75.4

75.4

39585

39585

X
5

NONE TENDER ITEM


Solid block

CUM

4865

43.795

43.795
0
213062.675
ABOVE SUM = Rs. 954279.94

213062.675

934880.82

19399.13

(CIVIL BILLS AUDITING)


DM TANK 123 UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.

BILLED
CHECKED AND
QTY AS PER
APPROVED
CONTRACTOR
QTY

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

374.221

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

B-3
a)

RCC
For M20C grade concrete

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

D-1

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

265.98

108.241

49397.172

35109.36

14287.812

313.46

205.189

108.271

26957.56

17646.254

9311.306

2400

17.748

17.748

42595.2

42595.2

CUM

2950

76.127

76.127

224574.65

224574.65

TON

6500

6.678

6.678

43407

43407

TON

24000

0.012

0.012

288

288

SQM
SQM

400
325

65.287
190.058

65.287
190.058

0
0

26114.8
61768.85

26114.8
61768.85

0
0

Boulder soiling 150mm to 250mm thickness

CUM

1500

18.302

18.302

27453

27453

NONE TENDER ITEM


Bitumen layer 50mm thick

SQF

280

1203.616

336961.8

50.68

815918.91

23649.80

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SOLING AND HARDCORE

H-1
X
1

0.181
337012.48
1203.435
ABOVE SUM = Rs. 839568.71

(CIVIL BILLS AUDITING)


LDO TANK UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.

BILLED
CHECKED AND
EXCESS
QTY AS PER
APPROVED
QTY
CONTRACTOR
QTY

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

472.132

472.132

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

452.547

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

B-3
b)

RCC
For M25C grade concrete

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

D-1

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

62321.424

62321.424

452.547

38919.042

38919.042

64.737

51.777

12.96

155368.8

124264.8

31104

2950

13.357

13.357

39403.15

39403.15

TON

6500

1.331

1.331

8651.5

8651.5

TON

24000

0.082

0.082

1968

1968

E-1

FORM WORK (SHUTTERING)

2)

at all heights below plinth level

SQM

325

85.26

85.26

27709.5

27709.5

F
F-1

MASSONRY
Brick Work (1:6)

CUM

3560

40.383

40.383

143763.48

143763.48

G
G-2

Plastering & Finishing Items


Plaster 1:4 Cement Mortar

SQM

180

314.838

314.838

56670.84

56670.84

CUM

1500

84.496

84.496

126744

126744

H
H-1

SOLING AND HARDCORE


Boulder soiling 150mm to 250mm thickness

ABOVE SUM = Rs.

661519.74

630415.74

31104.00

(CIVIL BILLS AUDITING)


BELT CONVEYOUR UPTO R/A. BILL -13
ABSTRACT
CODE.
NO.

BILLED
CHECKED AND
QTY AS PER
APPROVED
CONTRACTOR
QTY

DESCRIPTION OF ITEM

UNIT

UNIT
RATE (Rs.)

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

1782.882

1427.086

355.796

235340.424

188375.352

46965.072

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

1676.953

1321.065

355.888

144217.958

113611.59

30606.368

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

22.834

20.313

2.521

54801.6

48751.2

6050.4

B-3
a)

RCC
For M20C grade concrete

CUM

2950

87.265

65.035

22.23

257431.75

191853.25

65578.5

B-8

None Shrinkable GROUT

CUM

36000

0.044

0.044

1584

1584

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

14.077

10.219

3.858

91500.5

66423.5

25077

D
D-1

INSERTS & JIGS


MS Inserts & Fdns Bolts

TON

24000

0.418

0.418

10032

10032

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400
325
900

101.07
370.475
32.512

0.27
40428
40320
108
100.8
77.057
120404.375
95360.85
25043.525
293.418
1
29260.8
28360.8
900
31.512
ABOVE SUM = Rs. 985001.407 784672.542 200328.865

(CIVIL BILLS AUDITING)


ID FAN 1& 2 UPTO R/A. BILL -13
ABSTRACT
UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

1265.153

821.128

444.025

167000.196

108388.896

A-2

Back Filling

CUM

86.000

395.320

395.320

0.000

33997.520

33997.520

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

132.729

97.568

35.161

318549.600

234163.200

B-3
b)

RCC
For M25C grade concrete

CUM

2950.000

303.187

286.512

16.675

894401.650

845210.400

B-8

None Shrinkable GROUT

CUM

36000.000

3.164

2.348

0.816

113904.000

84528.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

22.525

14.584

7.941

146412.500

94796.000

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.297

0.297

0.000

7128.000

7128.000

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400.000
325.000
900.000

630.844
180.806
62.572

CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

549.920
80.924
252337.600
123.028
57.778
58761.950
62.572
0.000
56314.800
ABOVE SUM = Rs. Rs. 2,048,807.816

219968.000
39984.100
56314.800
Rs. 1,724,478.916

EXCESS
AMOUNT
58611.300
0.000

84386.400

49191.250
29376.000

51616.500

0.000

32369.600
18777.850
0.000
Rs. 324,328.900

(CIVIL BILLS AUDITING)


TRANSFER TOWER 1& 2 UPTO R/A. BILL -13
ABSTRACT
BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
EXCESS
UNIT RATE (Rs.) CONTRACTOR
QTY
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

862.86

401.6

461.26

113897.52

53011.2

60886.32

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

855.605

394.345

461.26

73582.03

33913.67

39668.36

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

5.836

5.052

0.784

14006.4

12124.8

1881.6

B-3
a)

RCC
For M20C grade concrete

CUM

2950

38.272

38.272

112902.4

112902.4

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

2.457

2.457

15970.5

15970.5

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400
325
900

38.34
74.99
14.88

38.34
74.99
4.08

0
0
10.8

15336
24371.75
13392

15336
24371.75
3672

0
0
9720

CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

ABOVE SUM = Rs. 383458.6

271302.32 112156.28

KAMACHI SPONGE AND POWER CORPORATION LIMITED


DATE:- 17/02/2012

SUBMISSION OF AUDIT STATEMENT


CONTRACTOR NAME

R.R.THULASI BUILDERS (I) Pvt. Ltd.,

ACTIVITY

CIVIL WORKS

AUDIT STATUS

UP TO 13TH R.A. BILL

SUBMISSION DATE

18/02/2012

With reference to above subject, we are hereby submitting the audit statement on account
of M/s. R.R. THULASI BUILDERS (I) PVT. LTD. against their civil activities for 2X 35 MW Capitive
Power Plant at M/s. KAMACHI SPONGE & POWER CORPORATION LIMITED.
SUMMARISED STATEMENT ARE AS-------SL. NO.

PARTICULARS

AMOUNT (Rs.)

TOTAL CLAIMED AMOUNT UP TO 13TH


R.A BILL

133008610.02

TOTAL CHECKED & PAYABLE AMOUNT


UP TO 13TH R.A BILL

118678761.70

NET DEDUCTION / EXCESS AMOUT UP


TO 13TH R.A. BILL

14329848.32

Total Payable Amount in Words ( up to 13th R.A. Bill ) -- Rs. Eleven Corer Eighty Six Lac Seventy Eight Thousand
Seven Hundred Sixty One and Seventy Paisa Only

Moreover, Due to Honey-Comb at several structures, Poor Finishing work at Flush Tank, T.G. Building
Top Floor, Primary and Secondary Crusher House, WTP Slab, Tunnel. The Hold Amount against above
is 1 % of the Total Payable Amount.
Amount Hold = Rs.
Net Payable Amount =

Rs.

1186787.62
117,491,974.08

i.e Net Payable Amount ----- Rs. Eleven Corers Seventy Four Lac Ninety One Thousand Nine Hundred
Seventy Four & Eight Paisa Only.
Note:

Please find the attached enclosers herewith this.

TRUST ENGINEERS

KAMACHI SPONGE AND POWER CORPORATION LIMITED


R.R.THULASI BUILDERS (I) Pvt. Ltd., (CIVIL BILLS AUDITING).

SUMMURY OF BILLS UP TO 13TH


MASTER SHEET
SI. No. DESCRIPTION

BILLED AMOUNT

CHECKED AMOUNT

Boiler 1

3622933.868

3412855.628

Boiler 2

3307770.192

3108044.033

TG Building

37453750.882

36412763.208

Air Cooled Stream Condenser Unit - 1

2769311.852

2099618.859

Air Cooled Stream Condenser Unit - 2

2764433.039

2311519.215

ESP - 1

1476815.297

1201433.599

ESP - 2

1336175.807

1206169.449

WTP

5870761.728

5580014.630

Raw Water Tank

5619827.986

5330928.330

10

Dosing Area

1104479.009

1066300.351

11

ID Fan 1&2

2048807.816

1724478.916

12

Transfer Tower 1&2

383458.600

271302.320

13

Secondry Crusher House

2753080.208

2623310.232

14

Primary Crusher House

2470645.933

2222675.979

15

Fly Ash Silo & Bed Ash Silo

3745426.930

3406166.648

16

Belt Conveyor

985001.407

784672.542

17

ACC & MCC

2271307.519

2240987.210

18

Colling Tower

954279.943

934880.817

19

HRSC Tank

545150.580

518235.848

20

DM Tank

839568.712

815918.914

21

Tunnel

7220058.184

4320914.781

22

PA Fan I & II (Near Boiler I)

861575.677

543999.780

23

PA Fan I & II (Near Boiler II)

857292.377

538224.080

24

SA Fan II (Near Boiler I)

357384.731

214219.193

25

SA Fan I (Near Boiler I)

423656.919

230650.193

26

SA Fan I (Near Boiler II)

372010.673

230671.539

27

SA Fan II (Near Boiler II)

241880.465

187933.607

28

LDO Tank

661519.736

630415.736

29

5TR2 & 6TR1

203650.860

192359.320

30

IBD, CBD Tank & HP Dosing Tank

95154.000

91780.080

31

ESP - MCC Room

1564794.831

1533999.679

32

WTP to Boiler Pipe Rack Foundation

417577.924

340187.424

33

Lime Crusher House& Lime Tunnel

791545.208

671451.438

34

CHS - MCC Room

1040934.682

1011560.576

35

Neutralization Pit

666197.316

642149.412

36

Gantry Support Foundations

205655.390

200782.232

37

Coal Shed

23139511.664

20694917.064

38

AHS Pipe Rack Foundation - 1

242616.568

240660.068

39

144247.668

144247.668

40

AHS Pipe Rack Foundation - 2


Fire Fighting Pipe Support, -5 mtr. Level Flush
Tank & Dump Tube

1120957.557

913966.388

41

Road Work

8407645.146

6465130.826

42

AHS MCC ROOM

1148321.934

1026190.683

43

Campus Work

501433.200

340073.200

133008610.018

118678761.695

GROSS SUM = Rs.


TOTAL CLAIMED AMOUNT = Rs.
TOTAL CHECKED AMOUNT = Rs.
TOTAL EXCESS AMOUNT = Rs.

133008610.02
118678761.70
14329848.32

Total Payable Amount in Words ( up to 13th R.A. Bill ) -- Rs. Eleven Corer Eighty Six Lac Seventy Eight Thousand
Seven Hundred Sixty One and Seventy Paisa Only

TED

EXCESS AMOUNT

210078.240
199726.159
1040987.674
669692.993
452913.824
275381.698
130006.358
290747.098
288899.656
38178.658
324328.900
112156.280
129769.976
247969.954
339260.282
200328.865
30320.309
19399.126
26914.732
23649.798
2899143.403
317575.897
319068.297
143165.538
193006.726
141339.134
53946.858
31104.000
11291.540

3373.920
30795.152
77390.500
120093.770
29374.106
24047.904
4873.158
2444594.600
1956.500
0.000
206991.169
1942514.320
122131.251
161360.000
14329848.323

Seventy Eight Thousand

(CIVIL BILLS AUDITING)


PRIMARY CRUSHER HOUSE UPTO R/A. BILL -13
ABSTRACT
BILLED
CHECKED AND
UNIT
QTY AS PER
APPROVED
UNIT RATE (Rs.) CONTRACTOR
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

1834.248

1229.37

604.878

242120.736

162276.84

79843.896

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86

1718.877

1114.049

604.828

147823.422

95808.214

52015.208

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

22.81

13.48

9.33

54744

32352

22392

B-3
a)
b)

RCC
For M20C grade concrete
For M25C grade concrete

CUM
CUM

2950
2950

241.263
21.889

227.873
21.889

13.39
0

711725.85
64572.55

672225.35
64572.55

39500.5
0

B-8

Grouting Work

CUM

36000

2.316

2.316

83376

83376

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

33.652

33.652

218738

218738

D
D-1

INSERTS & JIGS


MS Inserts & Fdns Bolts

TON

24000

2.697

2.433

0.264

64728

58392

6336

E-1

FORM WORK (SHUTTERING)

1)
2)
E-2

at and all heights above plinth level


at all heights below plinth level
Pockets Shuttering

SQM
SQM
SQM

400
325
900

1177.318
175.951
19.685

1105.656
164.041
2.633

71.662
11.91
17.052

470927.2
57184.075
17716.5

442262.4
53313.325
2369.7

28664.8
3870.75
15346.8

F
F-1

MASONARY
1:6 Brick Work

CUM

3560

94.66

CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

94.66
0
336989.6
336989.6
0
ABOVE SUM = Rs. 2470645.933 2222675.979 247969.954

(CIVIL BILLS AUDITING)


LIME CRUSHER HOUSE & LIME TUNNEL UP TO 13 TH R.A.BILL
ABSTRACT
CODE.
DESCRIPTION OF ITEM
NO.

UNIT

UNIT
RATE (Rs.)

BILLED
CHECKED AND
EXCESS
QTY AS PER
APPROVED
QTY
CONTRACTOR
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EXCESS
AMOUNT

A-1
a)

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132

1289.974

1044.144

245.83

170276.568

137827.008

32449.56

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400

14.061

14.061

33746.4

33746.4

B-3
b)

RCC
For M25C grade concrete

CUM

2950

82.695

80.488

2.207

243950.25

237439.6

6510.65

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500

8.668

1.218

7.45

56342

7917

48425

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400
325

497.424
26.88

462.821
26.88

34.603
0

198969.6
8736

185128.4
8736

13841.2
0

M Water Proofing by Hydro Insulation


M-1 Water Proofing

SQM

460

102.54

61.524

41.016

47168.4

28301.04

18867.36

CUM
SQM

1410
959

8.032
21.93

8.032
21.93

0
0

11325.12
21030.87

11325.12
21030.87

0
0

NONE TENDER ITEM

1
2

Sand filling
Brick Coba weathering courses

ABOVE SUM = Rs. 791545.208 671451.438 120093.77

S-ar putea să vă placă și