Sunteți pe pagina 1din 15

AMUEL &

A STRONG TO CREATE WEALTH DESIRE

BY
KNOWLEDGE

KNOWLEDGE BASE ON MINERAL PROCESSING AND SYNTHETIC MINERAL PRODUCTION


EXTENSIVE STUDY FOR UTILIZATION OF MINERSLS, LOW GRADE ORE & OVERBURDEN
OUR STRATEGY OF CONSULTANCY 1. STUDY DEMAND 2. MARKET SURVEY OF THE ORE 3. ORE PROCESSING 4. CONSTITUTED TEAM OF EXPERTS 5. LABORATORY SCALE STUDY OF ORE 6. PILOT SCALE PRODUCTION 8. SELECTION OF SUITABLE TECHNOLOGY

AMUEL TEAM CONSIST 1. 2. 3. 4. 5. 6. ANIL PASSARY JHON APPLEBY BILLY MORIMOTTO S.C.MISHRA S.K.DAS ANUP AGARWAL

PROMET AUSTRAILIA TEAM 1. 2. 3. 4. 5. JIM CRIBBES BRIAN POVEY CHRISTOPHER WELSH Dr. RICHARD C PECK DEREK MACAULEY

NOW READY TO CATER TO THE REQUIREMENT OF

1. 2.

MINERAL PROCESS INDUSTRY MINING INDUSTRY

ANALYSE CUSTOMERS REQUIREMENT STUDY VARIOUS OPTIONS AVAILABLE

BASIC ENGINEERING & DETAILED ENGINEERING

PREPARATION OF THE BUSINESS MODEL

IMPLEMENTATION

ONE OF OUR INOVATION FOR SLIME MANAGEMENT GOLF COURSE OR FRUIT ORCHARD DEVELOPEMENT OVER EXHAUSTED SLIME POND

Total Project Capabilities


Operations Management & Training

AMUEL

Pre-feasibility & Feasibility Studies

Financing Assistance Services

AMUEL
Start-up Assistance &

Basic & Detailed Engineering

Audit Project Management Services Procurement/Inspection /Equipment Supply

PRESENTATION

ON
INSTALLATION OF A CHROME ORE BENEFICIATION PLANT

ENQUIRY INPUTS
PLANT CAPACITY 10,000 Mt CONCENTRATE PER MONTH
FEED QUALITY 17% Cr2O3

PRODUCT QUALITY 30% Cr2O3


NO INFORMATION HAS BEEN PROVIDED FOR FE/CR RATIO

PLANT CONSTRUCTION
IT IS EXPECTED THAT THE PLANT OF SUCH SCALE COULD BE COMPLETED WITHIN 18 MONTHS FROM GO-AHEAD. THE WORK INVOLVES FOLLOWING TENTATIVE VOLUME OF CONSTRUCTION:
CONCRETE STRUCTURAL STEEL WORK 3700 4000 CU M 525 700 TON

CONSTRUCTION POWER 200 TO 250 kVA AND WATER 150 CU M PER DAY AT PEAK CONSTRUCTION PERIOD ARE AVAILABLE AT SITE.

UTILITIES
WATER SYSTEM

RECIRCULATING WATER QTY. SPECIFIC WATER CONSUMTION

.. ..

300 - 400 CU M/HR 1.0 2.0 CU M/T

SPECIFIC WATER CONSUMTION CAN BE CONTROLLED BY DEPLOYING EFFECTIVE TAILINGS MANAGEMENT SYSTEM

POWER SYSTEM

ESTIMATED POWER REQUIREMENT

..

800 1000 kVA

POWER CONSUMPTION WILL BE MOSTLY DEPENDENT ON THE MATERIAL CHARACTERISTICS AND CANNONT BE ESTIMATED VERY ACCURATELY

10

BENEFICIATION PLANT
TYPICAL PROCESS FLOW SHEET THE PROCESS FLOW SHEET WILL BE COMPOSED OF FOLLWING UNIT PROCESSES: COMMINUITION SIZING GRAVITY CONCENTRATION DEWATERING

11

PROCESS CONCEPT

IN ORDER TO DEVELOP PROCESS FLOW SHEET A DETAILED TEST WORK TO BE CONDUCTED THE PROCESS FLOW SHEET WILL THEN BE CONFIRMED WITH THE PILOT PLANT STUDY. THE QUALITY OF SAMPLE REQUIRED WILL BE CONFIRMED LATER.

SOME OF THE TEST DATA:


TESTING AGENCY PRODUCT SOURCE OF SAMPLE FEED GR. PRODUCT Cr2O3 RECOVERY Cr2O3 GR. Cr2O3 YIELD % % % IN %

NML NML RRL RRL BARC

SOUTH KALIAPANI SUKRANGI SOUTH KALIAPANI SUKRANGI SOUTH KALIAPANI

20 23 24 26 33

42 50 50 50 52

50 53 62 68 84

23.8 24.4 29.8 35.3 53.3

12

PROCESS CONCEPT (CONTD)


RESULTS OF CONFIRMATORY TESTWORK:
COMPOSITE SKLP:SUKG 50 : 50 33.35 54.05 73.45 45.35 0.75 2.9:1

SKLP FEED GRADE, % Cr2O3 PRODUCT GRADE, % Cr2O3 RECOVERY IN CONCENTRATE, % Cr2O3 DISTR. YIELD WEIGHT, % SiO2 IN CONCENTRATE, % Cr:Fe RATIO IN CONCENTRATE 33.50 54.10 79.80 49.40 1.10 2.9:1

SUKG 33.20 54.00 67.10 41.30 0.40 2.9:1

TAILINGS GRADE, % Cr2O3

13.40

18.60

16
13

CONSIDERATION FOR SITE SELECTION


1. 2.

3. 4. 5. 6.
7. 8.

CONSUMPTION POINT LANDED COST OF ORE AT CONSUMPTION POINT LAND AVAILABILITY LOCATION OF MINES DISPOSAL OF WASTE INFRASTRUCTURE FACILITY LOGISTIC COST WATER

9.

10. 11. 12. 13. 14. 15. 16. 17. 18.

POWER HUMAN RESOURCES MARKET OF PRODUCTS AND BY-PRODUCTS OTHER INPUT COST FUTURE EXPANSION ADMINISTRATION FUEL COST PAY BACK PERIOD MAINTENENCE TIME FOR PROJECT EXECUTION

AMUEL

THANK YOU
AMUEL ENGINEERING PVT LTD