Sunteți pe pagina 1din 2

Power Control Cable Philosophy ESSAR SALAYA

DF001

This drawing and design is the property of AREVA and must not be copied or lent without prior permission in writing

Name Date Name Date Name Date Name Date

Name Date Name Date Name Date Name Date SDA 25.02.09 Name Date SDA 25.02.09

Name Date Name Date Name Date Name Date Name Date NGS 25.02.09

0
REV.

FIRST ISSUE
DESCRIPTION

Name Date

SIGN.

SIGN.

DRAWN

CHECKED

APPROVED

CLIENT :

CONSULTANT :
PROJECT :

ESSAR POWER GUJRAT LTD. TCE CONSULTING ENGINEERS LTD


2 X 600 MW SALAYA THERMAL POWER PLANT, GUJRAT

LOA No.:

SA01/E01/610002655 Dtd.: 07 APRIL 2008


EBOP VENDOR TITLE :

Control Cable Philosophy


AREVA T&D SYSTEMS INDIA LTD.
A-7, SECTOR-65

NOIDA (INDIA) - 201301

DOCUMENT No.

TOTAL SH.

SH. No.

REV.

PEI-7602PN063-4-CON-024

001

PEI-7602PN063-4-CON-024

SIGN.

REV -00 PEI-7602PN063-4-CON-024 1 of 2

Power Control Cable Philosophy ESSAR SALAYA

LINE,TIE & GT BAY


4-1CTA LINE CT 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 LINE CTJB

AIR-CONDISIONED KIOSK-DIA-1

5CX2.5 5CX2.5

(FOR TARIFF METERING , MAIN) (FOR TARIFF METERING , CHECK)

TARIFF METER PANEL BAY MARSHALLING KIOSK

CONTROL, DI, DO, I/L R Ph CB 400KV 4-2 TIE CB LCC CONTROL, DI, DO, I/L Y Ph CB AUX. SUPPLY

5CX10

(FOR TARIFF METERING , MAIN) 5CX10 (FOR TARIFF METERING , CHECK)

4-1EMVT EMVT

2CX2.5 2CX2.5 2CX2.5 2CX2.5 2CX2.5 2CX2.5 4-3BMK CONTROL, DI, DO, I/L B Ph CB 400KV GT PANEL1 Relay & BCU CONTROL, DI, DO, I/L R Ph ISO CONTROL, DI, DO, I/L AUX. SUPPLY STUB PROTECTION RELAY 400KV ISO A MB CONTROL, DI, DO, I/L Y Ph ISO LINE EMVTJB

4-1CVT LINE CVT

2CX2.5 2CX2.5 2CX2.5 2CX2.5 2CX2.5 2CX2.5 2CX2.5 2CX2.5 2CX2.5

5CX10 LINE CVTJB 5CX2.5 5CX2.5 5CX2.5 5CX2.5

(FOR METERING IN BCU,SYNCH CHECK) (FOR DISTANCE MAIN 1 PROT.,59) (FOR BUSBAR MAIN1& 2 PROT.) (FOR DISTANCE MAIN 1 PROT.) (FOR DISTANCE MAIN 2 PROT.) 5CX2.5 (FOR STUB PROT.) 19CX2.5 (FOR TRIP COIL 1 , PROTECTION TRIP1, TC SUPERVISION, CONTROL) 19CX2.5 (FOR TRIP COIL 2 , PROTECTION TRIP2, TC SUPERVISION, CONTROL) DI, DO, CONTROL CIRCUIT., AUX. SUPPLY

LINE PANEL MAIN 1 RELAY AND BCU PANEL AND PERIPHERAL UNIT FOR BUSBAR PROTECTION

LINE PANEL MAIN 2 RELAY AND BCU PANEL

Overhead line & GT Differential Protection

CONTROL, DI, DO, I/L B Ph ISO

4-1CTB BAY BUS 1 CT

4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 4CX2.5 BAY BUS 1 CTJB PLCC PANEL

CONTROL, DI, DO, I/L R Ph ISO CONTROL, DI, DO, I/L AUX. SUPPLY AUX. SUPPLY CONTROL, DI, DO, I/L B Ph ISO 19CX2.5 (FOR TRIP COIL 1 , PROTECTION TRIP1, TC SUPERVISION, CONTROL) 19CX2.5 (FOR TRIP COIL 2 , PROTECTION TRIP2, TC SUPERVISION, CONTROL) 400KV ES. AE CONTROL, DI, DO, I/L MB 400KV ISO B MB CONTROL, DI, DO, I/L Y Ph ISO

5CX2.5 5CX2.5 5CX2.5

(FOR 21L1 FROM TIE CT MB) (FOR 21L2 FROM TIE CT MB) (FOR BCU METERING FROM TIE CT MB)

400KV GT PANEL 2

Relay & BCU

AUX. SUPPLY 400KV CONTROL, DI, DO, I/L ES BE MB

Overall Differential covering GT,UT & ST

CONTROL, DI, DO, I/L R Ph CB 400KV 4-1 CB LCC CONTROL, DI, DO, I/L Y Ph CB BAY MARSHALLING KIOSK CONTROL, DI, DO, I/L B Ph CB AUX. SUPPLY 4-1BMK

Trip, Allarm, Analod I/P, DI

5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 BAY BUS 1 CTJB 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5

R 4-3CT BAY BUS 2 CT Y TRANSFORMER MARSHALLING BOX OLTC

DC1(DCDB) R Ph ISO CONTROL, DI, DO, I/L 400KV ISO A MB CONTROL, DI, DO, I/L AUX. SUPPLY 3PH 415V AC SUPPLY FROM ACDB CONTROL, DI, DO, I/L B Ph ISO

DC2(DCDB)

DC1 to TIE CB PANEL

CONTROL, DI, DO, I/L Y Ph ISO

RTCC Panel

R Ph ISO CONTROL, DI, DO, I/L 400KV ISO. B MB CONTROL, DI, DO, I/L

FROM TIE CT MB FOR METERING (FOR OVERHEAD DIFF FROM TIE CT MB) (FOR OVERALL DIFF FROM TIE CT MB)

CONTROL, DI, DO, I/L Y Ph ISO

CONTROL, DI, DO, I/L B Ph ISO CONTROL, DI, DO, I/L 400KV ES. AE MB TIE BAY CR PANEL TIE CTJB-A TO BAY CT MB 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 5CX2.5 R 4-2CTA TIE CT

400KV ES BE MB

CONTROL, DI, DO, I/L DI, DO, I/L,AUX. SUPPLY

5CX2.5 Note: 1. CORE CROSS SECTION SIZES IN Sq. mm 2.Cable supply is not in AREVA's Scope
3. Cable supply and laying not in AREVA's SCOPE

LBB RELAY LBB RELAY TIE CTJB-B

10X5CX2.5 4X3CX2.5 10X5CX2.5 4X3CX2.5 10X5CX2.5 4X3CX2.5

4-2CTB TIE CT

5CX2.5

5CX2.5

TO BAY CTMB

4.All cable sizes taken optimally subject to approval by the client. 5.One BMK is considerd for each breaker section 6. The cable sizes will be finalised after approval of I/O List which will be submitted after receiving the inputs required for auxiliary signal list.

PEI-7602PN063-4-CON-024

Page 2 of 2

Rev-00

S-ar putea să vă placă și