Unidad: M3
ITEM: BASICO
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
AGUA
LTS
160
12.00
1,920.00
M3
0.52
23,000.00
11,960.00
M3
0.94
33,200.00
31,208.00
GLN
0.1
7,700.00
770.00
KLS
260
468.00
121,680.00
GLN
0.006
45,000.00
270.00
SUBTOTAL MATERIALES
167,808.00
11,253.00
SUBTOTAL MANO DE
OBRA
12,378.30
ARENA GRUESA
GRAVA TRITURADA DE 3/4
GASOLINA CORRIENTE
CEMENTO GRIS CONQUISTADOR
ACEITE MOTOR 4 TIEMPOS
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC
1.1
12,378.30
EQUIPO
MEZCLADORA DE 9 PIES CUBICOS
DIA
0.06
36,540.00
2,192.40
GLB
2.4
1,250.00
3,000.00
SUBTOTAL EQUIPO
5,192.40
185,378.70
185,379.00
HERRAMIENTA MENOR
COSTO
DIRECTO
MORTERO 1:2
Unidad: M3
ITEM: BASICO
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
AGUA
LTS
250
12.00
3,000.00
M3
0.97
23,000.00
22,310.00
KLS
510
468.00
238,680.00
SUBTOTAL MATERIALES
263,990.00
11,253.00
SUBTOTAL MANO DE
OBRA
16,879.50
1,250.00
1,250.00
SUBTOTAL EQUIPO
1,250.00
282,119.50
282,120.00
ARENA MEDIANA
CEMENTO GRIS CONQUISTADOR
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC
1.5
16,879.50
EQUIPO
HERRAMIENTA MENOR
GLB
COSTO
DIRECTO
MORTERO 1:4
Unidad: M3
ITEM: BASICO
DESCRIPCION
UND
MATERIALES
ARENA FINA
M3
CANT.
1.16
DESP.%
PRECIO UNIT
23,000.00
VALOR TOTAL
26,680.00
AGUA
LTS
185
12.00
2,220.00
KLS
364
468.00
170,352.00
SUBTOTAL MATERIALES
199,252.00
11,253.00
SUBTOTAL MANO DE
OBRA
16,879.50
1,250.00
1,250.00
SUBTOTAL EQUIPO
1,250.00
217,381.50
217,382.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC
1.5
16,879.50
EQUIPO
HERRAMIENTA MENOR
GLB
COSTO
DIRECTO
Unidad: M3
ITEM: BASICO
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
AGUA
LTS
190
12.00
2,280.00
M3
0.56
23,000.00
12,880.00
M3
0.84
33,200.00
27,888.00
GLN
0.1
7,700.00
770.00
KLS
350
468.00
163,800.00
ARENA GRUESA
GRAVA TRITURADA DE 3/4
GASOLINA CORRIENTE
CEMENTO GRIS CONQUISTADOR
0.006
45,000.00
270.00
SUBTOTAL MATERIALES
207,888.00
11,253.00
SUBTOTAL MANO DE
OBRA
12,378.30
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC
1.1
12,378.30
EQUIPO
MEZCLADORA DE 9 PIES CUBICOS
DIA
0.06
36,540.00
2,192.40
GLB
2.7
1,250.00
3,375.00
SUBTOTAL EQUIPO
5,567.40
225,833.70
225,834.00
HERRAMIENTA MENOR
COSTO
DIRECTO
CAMPAMENTO TABLA 18 M2
Unidad: UND
ITEM: 1.01
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
BALASTRO DE RIO CANTO RODADO-ARENA
M3
19,000.00
38,000.00
UND
2,000.00
12,000.00
UND
20,880.00
41,760.00
UND
14
353.00
4,942.00
UND
LBS
23
4
2,400.00
2,000.00
55,200.00
0.35
8,028.00
TABLA 1x10x3M OTOBO
UND
77
7,100.00
546,700.00
UND
14
22,667.00
317,338.00
UND
2,750.00
5,500.00
SUBTOTAL MATERIALES
1,029,468.00
20,616.00
SUBTOTAL MANO DE
OBRA
350,472.00
TEJA ONDULIT #6
PORTACANDADO
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
17
350,472.00
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
6,000.00
12,000.00
GLB
1,250.00
3,750.00
SUBTOTAL EQUIPO
15,750.00
1,395,690.00
1,395,690.00
HERRAMIENTA MENOR
COSTO
DIRECTO
LOCALIZACION-REPLANTEO CERRAMIENTO-VARIO
Unidad: ML
ITEM: 1.02
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
LISTON 2 x2x3M. OTOBO
UND
0.05
3,500.00
175.00
LBS
0.01
2,000.00
20.00
ROL
0.01
2,500.00
SUBTOTAL MATERIALES
25.00
PUNTILLA 2 CC
PIOLA GRUESA 50 METROS
220.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
0.015
20,616.00
309.24
HC
0.015
44,127.00
SUBTOTAL MANO DE
OBRA
661.90
1,250.00
125.00
SUBTOTAL EQUIPO
125.00
1,316.14
1,316.00
971.14
EQUIPO
HERRAMIENTA MENOR
GLB
0.1
COSTO
DIRECTO
Unidad: ML
ITEM: 1.03
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ALAMBRE GALVANIZADO # 18 U
KG
0.03
3,136.64
94.09
M2
3,150.00
3,150.00
SUBTOTAL MATERIALES
3,244.09
14,990.00
SUBTOTAL MANO DE
OBRA
1,499.00
1,250.00
SUBTOTAL EQUIPO
191.25
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.1
1,499.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.153
191.25
COSTO
DIRECTO
4,934.34
4,934.00
Unidad: M3
ITEM: 1.04
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
84,100.00
2,523.00
SUBTOTAL EQUIPO
2,523.00
2,523.00
2,523.00
EQUIPO
RETROEXCAVADORA JD-510
HRS
0.03
COSTO
DIRECTO
Unidad: M3
ITEM: 1.05
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
5,627.00
SUBTOTAL MANO DE
OBRA
8,440.50
1,250.00
212.50
SUBTOTAL EQUIPO
212.50
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
1.5
8,440.50
EQUIPO
HERRAMIENTA MENOR
GLB
0.17
COSTO
DIRECTO
8,653.00
8,653.00
Unidad: M3
ITEM: 1.06
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
EQUIPO
VOLQUETA 5 M3
VJE
0.26
40,600.00
10,556.00
HRS
0.05
82,000.00
4,100.00
SUBTOTAL EQUIPO
14,656.00
14,656.00
14,656.00
RETROEXCAVADORA CARGADORA
COSTO
DIRECTO
Unidad: M2
ITEM: 2.01
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
225,834.00
13,550.04
SUBTOTAL MATERIALES
13,550.04
14,990.00
SUBTOTAL MANO DE
OBRA
5,996.00
6,000.00
540.00
MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
M3
0.06
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.4
5,996.00
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
0.09
HERRAMIENTA MENOR
GLB
0.03
COSTO
DIRECTO
1,250.00
37.50
SUBTOTAL EQUIPO
577.50
20,123.54
20,124.00
Unidad: M3
ITEM: 2.02
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
CUARTON 2"x4"x3M OTOBO
UND
0.1
8,000.00
800.00
LBS
0.2
2,000.00
400.00
UND
0.115
7,100.00
816.50
M3
1.05
225,834.00
237,125.70
SUBTOTAL MATERIALES
239,142.20
14,990.00
SUBTOTAL MANO DE
OBRA
44,220.50
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
2.95
44,220.50
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
1.5
6,000.00
9,000.00
GLB
0.03
1,250.00
37.50
SUBTOTAL EQUIPO
9,037.50
292,400.20
292,400.00
HERRAMIENTA MENOR
COSTO
DIRECTO
UNIDAD: M3
ITEM: 2.03
DESCRIPCION
UND
CANT.
DESP.%
VALOR TOTAL
PRECIO UNIT
MATERIALES
CUARTON 2"x4"x3M OTOBO
UND
1.55
8,000.00
12,400.00
LBS
0.15
2,000.00
300.00
UND
3.1
7,100.00
22,010.00
M3
1.05
225,834.00
237,125.70
SUBTOTAL MATERIALES
271,835.70
26,243.00
SUBTOTAL- MANO DE
OBRA
157,458.00
PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC
157,458.00
EQUIPO
VIBRADOR ELECTRICO
DIA
0.04
32,712.00
1,308.48
M3
1.5
6,000.00
9,000.00
GLB
0.831
1,250.00
1,038.75
DIA
170.00
850.00
DIA
128.00
640.00
DIA
0.88
75,000.00
66,000.00
U/D
714.00
1,428.00
SUBTOTAL- EQUIPO
80,265.23
COSTO
DIRECTO
509,558.93
509,559.00
Unidad: KLS
ITEM: 2.04
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ALAMBRE NEGRO # 18
KLS
0.03
0.03
3,100.00
93.02
UND
0.03
0.03
2,552.00
76.58
KLS
1.03
2,650.00
2,729.50
SUBTOTAL MATERIALES
2,899.10
5,627.00
SUBTOTAL MANO DE
OBRA
225.08
3,124.18
3,124.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.04
COSTO
DIRECTO
225.08
Unidad: M2
ITEM: 2.05
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
600.00
201.00
MATERIALES
TAPON GALV .1/2 AGUA-GAS
UND
0.335
PUNTILLA 2 CC
LBS
0.2
2,000.00
400.00
UND
4,106.00
12,318.00
1.3
2,240.00
2,912.00
SUBTOTAL MATERIALES
15,831.00
20,616.00
SUBTOTAL MANO DE
OBRA
4,123.20
1,250.00
192.50
SUBTOTAL EQUIPO
192.50
20,146.70
20,147.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
0.2
4,123.20
EQUIPO
HERRAMIENTA MENOR
GLB
0.154
COSTO
DIRECTO
Unidad: M3
ITEM: 3.01
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ROCA MUERTA (SIN TRANSPORTE)
M3
1.3
5,500.00
7,150.00
GLN
0.05
7,700.00
385.00
GLN
0.01
45,000.00
450.00
SUBTOTAL MATERIALES
7,985.00
GASOLINA CORRIENTE
ACEITE MOTOR 4 TIEMPOS
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC
0.6
11,253.00
6,751.80
SUBTOTAL MANO DE
OBRA
6,751.80
EQUIPO
VIBROCOMPACTADOR SALTARIN
DIA
0.08
42,000.00
3,360.00
M3
1.3
6,000.00
7,800.00
GLB
0.1
1,250.00
125.00
SUBTOTAL EQUIPO
11,285.00
26,021.80
26,022.00
COSTO
DIRECTO
Unidad: M3
ITEM: 3.03
DESCRIPCION
UND
PRECIO UNIT
VALOR TOTAL
33,200.00
33,209.96
SUBTOTAL MATERIALES
33,209.96
5,627.00
SUBTOTAL MANO DE
OBRA
3,376.20
6,000.00
6,000.00
0.05
1,250.00
62.50
SUBTOTAL EQUIPO
6,062.50
CANT.
DESP.%
MATERIALES
GRAVA TRITURADA DE 3/4
M3
0.03
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.6
3,376.20
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
HERRAMIENTA MENOR
GLB
COSTO
DIRECTO
42,648.66
42,649.00
Unidad: M2
ITEM: 3.04
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ANTISOL ROJO
KLS
0.2
9,900.00
1,980.00
UND
3,500.00
3,500.00
LBS
0.05
2,000.00
100.00
UND
0.5
7,100.00
3,550.00
M3
0.1
225,834.00
22,583.40
SUBTOTAL MATERIALES
31,713.40
20,616.00
SUBTOTAL MANO DE
OBRA
4,123.20
1,250.00
125.00
SUBTOTAL EQUIPO
125.00
35,961.60
35,962.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
0.2
4,123.20
EQUIPO
HERRAMIENTA MENOR
GLB
0.1
COSTO
DIRECTO
Unidad: ML
ITEM: 3.05
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ACEITE QUEMADO
GLN
0.06
660.00
39.60
LBS
0.2
2,000.00
400.00
UND
0.4
5,600.00
2,240.00
UND
0.58
4,106.00
2,381.48
UND
0.95
1,400.00
1,330.00
M3
0.068
225,834.00
15,356.71
SUBTOTAL MATERIALES
21,747.79
14,990.00
SUBTOTAL MANO DE
OBRA
14,990.00
1,250.00
371.25
SUBTOTAL EQUIPO
371.25
37,109.04
37,109.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
14,990.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.297
COSTO
DIRECTO
TUB.PVC 3 SANI.
Unidad: ML
ITEM: 3.06
DESCRIPCION
MATERIALES
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
0.003
48,100.00
151.51
11,057.12
11,278.26
2,070.60
693.65
SUBTOTAL MATERIALES
12,123.42
15,927.00
SUBTOTAL MANO DE
OBRA
6,370.80
18,494.22
18,494.00
0.335
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC
0.4
COSTO
DIRECTO
GEOTEXTIL NO TEJIDO
6,370.80
Unidad: M2
ITEM: 3.07
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
2,400.00
2,472.00
SUBTOTAL MATERIALES
2,472.00
5,627.00
SUBTOTAL MANO DE
OBRA
844.05
1,250.00
50.00
SUBTOTAL EQUIPO
50.00
MATERIALES
GEOTEXTIL NO TEJ. REF 1600
M2
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.15
844.05
EQUIPO
HERRAMIENTA MENOR
GLB
0.04
COSTO
DIRECTO
3,366.05
GEODREN PLANAR
3,366.00
UNIDAD: ML
ITEM: 3.08
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
GEODREN PLANAR TB 160 MM
ML
55,302.00
55,302.00
SUBTOTAL MATERIALES
55,302.00
5,627.00
SUBTOTAL- MANO DE
OBRA
1,125.40
1,250.00
50.00
SUBTOTAL- EQUIPO
50.00
56,477.40
56,477.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.2
1,125.40
EQUIPO
HERRAMIENTA MENOR
GLB
0.04
COSTO
DIRECTO
LOCALIZACION-REPLANTEO CERRAMIENTO-VARIO
Unidad: ML
DESCRIPCION
UND
MATERIALES
LISTON 2 x2x3M. OTOBO
UND
CANT.
0.05
DESP.%
PRECIO UNIT
3,500.00
ITEM: 4.01
VALOR TOTAL
175.00
PUNTILLA 2 CC
LBS
0.01
2,000.00
20.00
ROL
0.01
2,500.00
25.00
SUBTOTAL MATERIALES
220.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
0.015
20,616.00
309.24
HC
0.015
44,127.00
SUBTOTAL MANO DE
OBRA
661.90
1,250.00
125.00
SUBTOTAL EQUIPO
125.00
1,316.14
1,316.00
971.14
EQUIPO
HERRAMIENTA MENOR
GLB
0.1
COSTO
DIRECTO
Unidad: ML
ITEM: 4.02
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ALAMBRE GALVANIZADO # 18 U
KG
0.03
3,136.64
94.09
M2
3,150.00
3,150.00
SUBTOTAL MATERIALES
3,244.09
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.1
14,990.00
1,499.00
SUBTOTAL MANO DE
OBRA
1,499.00
1,250.00
191.25
SUBTOTAL EQUIPO
191.25
4,934.34
4,934.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.153
COSTO
DIRECTO
Unidad: M3
UND
CANT.
DESP.%
PRECIO UNIT
ITEM: 4.03
VALOR TOTAL
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
1.5
5,627.00
SUBTOTAL MANO DE
OBRA
8,440.50
1,250.00
212.50
SUBTOTAL EQUIPO
212.50
8,653.00
8,653.00
8,440.50
EQUIPO
HERRAMIENTA MENOR
GLB
0.17
COSTO
DIRECTO
Unidad: M3
ITEM: 4.04
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
EQUIPO
VOLQUETA 5 M3
VJE
0.26
40,600.00
10,556.00
HRS
0.05
82,000.00
4,100.00
SUBTOTAL EQUIPO
14,656.00
14,656.00
14,656.00
RETROEXCAVADORA CARGADORA
COSTO
DIRECTO
Unidad: M2
UND
CANT.
DESP.%
PRECIO UNIT
ITEM: 4.05
VALOR TOTAL
225,834.00
13,550.04
SUBTOTAL MATERIALES
13,550.04
14,990.00
SUBTOTAL MANO DE
OBRA
5,996.00
MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
M3
0.06
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.4
5,996.00
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
0.09
6,000.00
540.00
GLB
0.03
1,250.00
37.50
SUBTOTAL EQUIPO
577.50
HERRAMIENTA MENOR
COSTO
DIRECTO
20,123.54
20,124.00
Unidad: M3
ITEM: 4.06
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
CUARTON 2"x4"x3M OTOBO
UND
0.1
8,000.00
800.00
LBS
0.2
2,000.00
400.00
UND
0.115
7,100.00
816.50
M3
1.05
225,834.00
237,125.70
SUBTOTAL MATERIALES
239,142.20
14,990.00
SUBTOTAL MANO DE
OBRA
44,220.50
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
2.95
44,220.50
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
1.5
6,000.00
9,000.00
GLB
0.03
1,250.00
37.50
SUBTOTAL EQUIPO
9,037.50
292,400.20
292,400.00
HERRAMIENTA MENOR
COSTO
DIRECTO
UNIDAD: M3
ITEM: 4.07
DESCRIPCION
UND
CANT.
DESP.%
VALOR TOTAL
PRECIO UNIT
MATERIALES
CUARTON 2"x4"x3M OTOBO
UND
1.55
8,000.00
12,400.00
LBS
0.15
2,000.00
300.00
UND
3.1
7,100.00
22,010.00
M3
1.05
225,834.00
237,125.70
SUBTOTAL MATERIALES
271,835.70
26,243.00
SUBTOTAL- MANO DE
OBRA
157,458.00
PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC
157,458.00
EQUIPO
VIBRADOR ELECTRICO
DIA
0.04
32,712.00
1,308.48
M3
1.5
6,000.00
9,000.00
GLB
0.831
1,250.00
1,038.75
DIA
170.00
850.00
DIA
128.00
640.00
DIA
0.88
75,000.00
66,000.00
U/D
714.00
1,428.00
SUBTOTAL- EQUIPO
80,265.23
509,558.93
509,559.00
COSTO
DIRECTO
Unidad: KLS
ITEM: 4.08
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ALAMBRE NEGRO # 18
KLS
0.03
0.03
3,100.00
93.02
UND
0.03
0.03
2,552.00
76.58
KLS
1.03
2,650.00
2,729.50
SUBTOTAL MATERIALES
2,899.10
5,627.00
SUBTOTAL MANO DE
OBRA
225.08
3,124.18
3,124.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.04
COSTO
DIRECTO
225.08
Unidad: PTO
ITEM: 4.09
DESCRIPCION
MATERIALES
ANCHORFIX-4 600CM3 ADHESIVO EPOXICO
ANCLAJES
HIERRO .3/8" 60.000 [6M]
BROCA TUGSTENO 3/4"-50CM PARA CONCRETO
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
UND
0.04
92,800.00
3,712.00
KLS
UND
0.3
0.004
2,650.00
297,450.00
795.00
1,189.80
SUBTOTAL MATERIALES
5,696.80
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.14
14,990.00
2,098.60
HC
0.11
15,927.00
SUBTOTAL MANO DE
OBRA
1,751.97
3,850.57
EQUIPO
TALADRO PERCUTOR TIPO HILTI
DIA
0.04
50,000.00
2,000.00
GLB
0.462
1,250.00
577.50
SUBTOTAL EQUIPO
2,577.50
12,124.87
12,125.00
HERRAMIENTA MENOR
COSTO
DIRECTO
Unidad: M2
UND
CANT.
DESP.%
PRECIO UNIT
ITEM: 4.10
VALOR TOTAL
MATERIALES
TAPON GALV .1/2 AGUA-GAS
UND
0.335
600.00
201.00
LBS
0.2
2,000.00
400.00
UND
4,106.00
12,318.00
1.3
2,240.00
2,912.00
SUBTOTAL MATERIALES
15,831.00
PUNTILLA 2 CC
TABLA 1x05x3M OTOBO [1C]
CUARTON 2"x4"x3M
ML
MANO DE OBRA
0.2
20,616.00
SUBTOTAL MANO DE
OBRA
4,123.20
1,250.00
192.50
SUBTOTAL EQUIPO
192.50
20,146.70
20,147.00
4,123.20
EQUIPO
HERRAMIENTA MENOR
GLB
0.154
COSTO
DIRECTO
Unidad: M3
UND
CANT.
DESP.%
PRECIO UNIT
ITEM: 4.11
VALOR TOTAL
MATERIALES
ROCA MUERTA (SIN TRANSPORTE)
M3
1.3
5,500.00
7,150.00
GLN
0.05
7,700.00
385.00
GLN
0.01
45,000.00
450.00
SUBTOTAL MATERIALES
7,985.00
11,253.00
SUBTOTAL MANO DE
OBRA
6,751.80
GASOLINA CORRIENTE
ACEITE MOTOR 4 TIEMPOS
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC
0.6
6,751.80
EQUIPO
VIBROCOMPACTADOR SALTARIN
DIA
0.08
42,000.00
3,360.00
M3
1.3
6,000.00
7,800.00
HERRAMIENTA MENOR
GLB
0.1
COSTO
DIRECTO
1,250.00
125.00
SUBTOTAL EQUIPO
11,285.00
26,021.80
26,022.00
Unidad: M3
UND
PRECIO UNIT
ITEM: 4.12
VALOR TOTAL
33,200.00
33,209.96
SUBTOTAL MATERIALES
33,209.96
5,627.00
SUBTOTAL MANO DE
OBRA
3,376.20
6,000.00
6,000.00
0.05
1,250.00
62.50
SUBTOTAL EQUIPO
6,062.50
42,648.66
42,649.00
CANT.
DESP.%
MATERIALES
GRAVA TRITURADA DE 3/4
M3
0.03
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.6
3,376.20
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
HERRAMIENTA MENOR
GLB
COSTO
DIRECTO
GEOTEXTIL NO TEJIDO
DESCRIPCION
Unidad: M2
UND
CANT.
DESP.%
PRECIO UNIT
ITEM: 4.13
VALOR TOTAL
2,400.00
2,472.00
SUBTOTAL MATERIALES
2,472.00
5,627.00
SUBTOTAL MANO DE
OBRA
844.05
1,250.00
50.00
SUBTOTAL EQUIPO
50.00
3,366.05
3,366.00
MATERIALES
GEOTEXTIL NO TEJ. REF 1600
M2
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.15
844.05
EQUIPO
HERRAMIENTA MENOR
GLB
0.04
COSTO
DIRECTO
TUB.PVC 2 SANI.
Unidad: ML
ITEM: 4.14
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
SOLDADURA PVC 1/ 2 GLN
UND
0.03
48,100.00
1,515.15
7,403.12
7,773.27
1,436.08
481.08
SUBTOTAL MATERIALES
9,769.50
0.335
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC
0.4
COSTO
DIRECTO
15,927.00
SUBTOTAL MANO DE
OBRA
6,370.80
16,140.30
16,140.00
TUB.PVC 4 SANI.
6,370.80
Unidad: ML
ITEM: 4.15
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
LIMPIADOR PVC 760 GRMS
UND
0.02
26,000.00
546.00
UND
0.02
48,100.00
1,010.10
15,409.44
15,871.72
SUBTOTAL MATERIALES
17,427.82
15,927.00
SUBTOTAL MANO DE
OBRA
1,927.16
19,354.98
19,355.00
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC
0.121
COSTO
DIRECTO
1,927.16
Unidad: UND
ITEM: 4.16
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
TEE SAN PVC 4 DOB
UND
COSTO
DIRECTO
24,393.64
24,393.64
SUBTOTAL MATERIALES
24,393.64
24,393.64
24,394.00
Unidad: UND
ITEM: 4.17
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
4,600.00
4,600.00
SUBTOTAL MATERIALES
4,600.00
4,600.00
4,600.00
MATERIALES
BUJE SAN PVC 4 x2 S SANITARIA
UND
COSTO
DIRECTO
Unidad: M2
ITEM: 4.18
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
LISTON 1 x4x3M. OTOBO
UND
0.335
1,572.00
526.62
LBS
0.05
2,000.00
100.00
0.1
225,834.00
22,583.40
SUBTOTAL MATERIALES
23,210.02
14,990.00
SUBTOTAL MANO DE
OBRA
10,493.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.7
10,493.00
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
0.15
6,000.00
900.00
GLB
0.101
1,250.00
126.25
SUBTOTAL EQUIPO
1,026.25
34,729.27
34,729.00
HERRAMIENTA MENOR
COSTO
DIRECTO
Unidad: ML
UND
CANT.
DESP.%
PRECIO UNIT
ITEM: 4.20
VALOR TOTAL
MATERIALES
ACEITE QUEMADO
GLN
0.05
660.00
33.00
LBS
0.2
2,000.00
400.00
UND
0.335
5,600.00
1,876.00
UND
0.335
4,106.00
1,375.51
UND
0.8
1,400.00
1,120.00
M3
0.06
225,834.00
SUBTOTAL MATERIALES
13,550.04
18,354.55
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.9
14,990.00
SUBTOTAL MANO DE
OBRA
13,491.00
1,250.00
372.50
SUBTOTAL EQUIPO
372.50
32,218.05
32,218.00
13,491.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.298
COSTO
DIRECTO
UNIDAD: ML
ITEM: 4.21
DESCRIPCION
UND
CANT.
DESP.%
VALOR TOTAL
PRECIO UNIT
MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
M3
0.08
225,834.00
18,066.72
UND
0.8
1,400.00
1,120.00
ML
0.335
1,858.00
622.43
UND
0.335
5,600.00
1,876.00
LBS
0.2
2,000.00
400.00
GLN
0.05
660.00
33.00
SUBTOTAL MATERIALES
22,118.15
14,990.00
13,491.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.9
SUBTOTAL- MANO DE
OBRA
13,491.00
1,250.00
372.50
SUBTOTAL- EQUIPO
372.50
35,981.65
35,982.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.298
COSTO
DIRECTO
Unidad: M3
ITEM: 4.22
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
PUNTILLA 2 CC
LBS
2,000.00
2,000.00
UND
5.5
8,816.00
48,488.00
UND
2.67
1,800.00
4,806.00
M3
1.05
225,834.00
237,125.70
SUBTOTAL MATERIALES
292,419.70
20,616.00
SUBTOTAL MANO DE
OBRA
121,634.40
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
5.9
121,634.40
EQUIPO
VIBRADOR ELECTRICO
DIA
0.05
32,712.00
1,635.60
M3
1.5
6,000.00
SUBTOTAL EQUIPO
9,000.00
10,635.60
COSTO
DIRECTO
424,689.70
424,690.00
Unidad: M3
ITEM: 4.23
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ANTISOL BLANCO
KLS
5,980.00
11,960.00
KLS
12,296.00
24,592.00
KLS
0.2
5,570.00
1,114.00
UND
5.67
8,000.00
45,360.00
LBS
2,000.00
16,000.00
UND
7,100.00
35,500.00
UND
4.33
1,800.00
7,794.00
M3
1.05
225,834.00
237,125.70
SUBTOTAL MATERIALES
379,445.70
26,243.00
SUBTOTAL MANO DE
OBRA
199,446.80
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC
7.6
199,446.80
EQUIPO
VIBRADOR ELECTRICO
DIA
0.1
32,712.00
3,271.20
M3
1.5
6,000.00
9,000.00
HERRAMIENTA MENOR
GLB
0.332
1,250.00
415.00
DIA
24
170.00
4,080.00
U/D
714.00
2,856.00
SUBTOTAL EQUIPO
19,622.20
598,514.70
598,515.00
COSTO
DIRECTO
Unidad: M2
ITEM: 4.24
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
445.00
23,834.20
217,382.00
7,608.37
SUBTOTAL MATERIALES
31,442.57
14,990.00
SUBTOTAL MANO DE
OBRA
9,293.80
MATERIALES
LAD.PRENS.LIMPIO 6.5X12X24
UND
52
MORTERO 1:4
M3
0.035
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.62
9,293.80
EQUIPO
HERRAMIENTA MENOR
GLB
0.198
1,250.00
247.50
U/D
0.1
714.00
71.40
SUBTOTAL EQUIPO
318.90
COSTO
DIRECTO
41,055.27
41,055.00
Unidad: M3
ITEM: 4.25
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
ALAMBRE NEGRO # 18
KLS
3,100.00
3,100.00
UND
2.5
8,000.00
20,000.00
UND
2,400.00
12,000.00
LBS
0.72
2,000.00
1,440.00
UND
6.7
7,100.00
47,570.00
M3
1.03
225,834.00
232,609.02
SUBTOTAL MATERIALES
316,719.02
26,243.00
SUBTOTAL MANO DE
OBRA
262,430.00
MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC
10
262,430.00
EQUIPO
VIBRADOR ELECTRICO
DIA
0.5
32,712.00
16,356.00
M3
1.5
6,000.00
9,000.00
GLB
0.02
1,250.00
25.00
SUBTOTAL EQUIPO
25,381.00
COSTO
604,530.02
DIRECTO
604,530.00
Unidad: UND
ITEM: 4.26
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
7,100.00
17,750.00
MATERIALES
TABLA 1x10x3M OTOBO
UND
2.5
KLS
66.5
2,650.00
181,511.75
KLS
2,650.00
13,647.50
M3
4.84
225,834.00
1,093,036.56
M3
0.02
282,120.00
5,642.40
SUBTOTAL MATERIALES
1,311,588.21
20,616.00
SUBTOTAL MANO DE
OBRA
268,008.00
15,000.00
30,000.00
SUBTOTAL EQUIPO
30,000.00
1,609,596.21
1,609,596.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
13
268,008.00
EQUIPO
FORM.MET.CAM.DE INSPECCION
UND
COSTO
DIRECTO
TUB.PVC 8 SANI.NOVAFO
Unidad: ML
ITEM: 4.27
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
34,095.88
34,095.88
SUBTOTAL MATERIALES
34,095.88
34,095.88
34,096.00
MATERIALES
TUB PVC 8" SANIT NOVAFORT NOVAFORT 200MM
ML
COSTO
DIRECTO
Unidad: ML
ITEM: 4.28
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
5,627.00
SUBTOTAL MANO DE
OBRA
5,627.00
5,627.00
5,627.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
COSTO
DIRECTO
5,627.00
Unidad: ML
ITEM: 4.29
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
SOLDADURA 6011 1/8" VARILLA
KLS
0.5
6,199.04
3,192.50
UND
0.35
67,700.00
24,168.90
3.4
2,650.00
9,010.00
SUBTOTAL MATERIALES
36,371.40
MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC
0.2
15,927.00
3,185.40
HC
0.4
14,990.00
SUBTOTAL MANO DE
OBRA
5,996.00
9,181.40
EQUIPO
SOLDADOR ELECTRICO
DIA
0.1
27,000.00
2,700.00
GLB
0.03
1,250.00
37.50
SUBTOTAL EQUIPO
2,737.50
48,290.30
48,290.00
HERRAMIENTA MENOR
COSTO
DIRECTO
Unidad: M3
ITEM: 4.30
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
5,627.00
SUBTOTAL MANO DE
OBRA
3,938.90
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.7
3,938.90
EQUIPO
CARRETA TIPO BUGUI
DIA
0.07
2,500.00
175.00
GLB
0.4
1,250.00
500.00
SUBTOTAL EQUIPO
675.00
HERRAMIENTA MENOR
COSTO
DIRECTO
4,613.90
4,614.00
Unidad: M2
ITEM: 4.31
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
MATERIALES
LISTON 1 x4x3M. OTOBO
UND
0.335
1,572.00
526.62
LBS
0.05
2,000.00
100.00
M3
0.1
185,379.00
18,537.90
SUBTOTAL MATERIALES
19,164.52
14,990.00
SUBTOTAL MANO DE
OBRA
10,493.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC
0.7
10,493.00
EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
0.15
6,000.00
900.00
GLB
0.404
1,250.00
505.00
SUBTOTAL EQUIPO
1,405.00
31,062.52
31,063.00
HERRAMIENTA MENOR
COSTO
DIRECTO
Unidad: KLS
ITEM: 4.32
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
2,950.00
3,097.50
SUBTOTAL MATERIALES
3,097.50
20,616.00
SUBTOTAL MANO DE
OBRA
618.48
1,250.00
500.00
SUBTOTAL EQUIPO
500.00
4,215.98
4,216.00
MATERIALES
MALLA ELEC.M-0.84 / DO84 ESPAC 15X15 1.34K/M2
KLS
1.05
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC
0.03
618.48
EQUIPO
HERRAMIENTA MENOR
GLB
0.4
COSTO
DIRECTO
UNIDAD: GLB
DESCRIPCION
VALOR TOTAL
ITEM: 4.33
UND
CANT.
DESP.%
PRECIO UNIT
MATERIALES
CABLE ACSR NUMERO 2 CONDUC PRIM O SECUND
ML
300
2,320.00
696,000.00
ML
300
3,248.00
974,400.00
916,400.00
SUBTOTAL MATERIALES
916,400.00
2,586,800.00
MANO DE OBRA
TRAMITES Y PAGOS DE DERECHOS
GLB
5,881,532.00
5,881,532.00
HC
12
77,639.00
SUBTOTAL- MANO DE
OBRA
931,668.00
6,813,200.00
50,000.00
600,000.00
SUBTOTAL- EQUIPO
600,000.00
10,000,000.00
10,000,000.00
EQUIPO
CARRO GRUA 5 TONELADAS
HRS
12
COSTO
DIRECTO
Unidad: M2
ITEM: 5.01
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
5,627.00
SUBTOTAL MANO DE
OBRA
8,440.50
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
1.5
8,440.50
EQUIPO
COMPRESOR DE DOS MARTILLOS
HRS
0.25
89,500.00
22,375.00
GLB
0.478
1,250.00
597.50
SUBTOTAL EQUIPO
22,972.50
31,413.00
31,413.00
HERRAMIENTA MENOR
COSTO
DIRECTO
Unidad: M2
ITEM: 5.02
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
5,627.00
SUBTOTAL MANO DE
OBRA
2,250.80
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
0.4
2,250.80
EQUIPO
VOLQUETA 5 M3
VJE
0.03
40,600.00
1,218.00
GLB
0.1
1,250.00
125.00
SUBTOTAL EQUIPO
1,343.00
3,593.80
3,594.00
HERRAMIENTA MENOR
COSTO
DIRECTO
Unidad: M2
ITEM: 5.03
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
5,627.00
SUBTOTAL MANO DE
OBRA
12,379.40
89,500.00
1,250.00
34,905.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
2.2
12,379.40
EQUIPO
COMPRESOR DE DOS MARTILLOS
HERRAMIENTA MENOR
HRS
GLB
0.39
0.742
927.50
COSTO
DIRECTO
SUBTOTAL EQUIPO
35,832.50
48,211.90
48,212.00
DEMOL.VIGA CANAL
Unidad: ML
ITEM: 5.04
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
5,627.00
SUBTOTAL MANO DE
OBRA
11,254.00
1,250.00
620.00
SUBTOTAL EQUIPO
620.00
11,874.00
11,874.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC
11,254.00
EQUIPO
HERRAMIENTA MENOR
GLB
0.496
COSTO
DIRECTO
Unidad: M3
ITEM: 5.05
DESCRIPCION
UND
CANT.
DESP.%
PRECIO UNIT
VALOR TOTAL
40,600.00
10,556.00
EQUIPO
VOLQUETA 5 M3
VJE
0.26
RETROEXCAVADORA CARGADORA
HRS
0.05
COSTO
DIRECTO
82,000.00
4,100.00
SUBTOTAL EQUIPO
14,656.00
14,656.00
14,656.00