MEZCLA CONCRETO 1:2:4 2500 PSI - 17,5 Mpa

Unidad: M3
ITEM: BASICO

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
AGUA
LTS

160

12.00

1,920.00

M3

0.52

23,000.00

11,960.00

M3

0.94

33,200.00

31,208.00

GLN

0.1

7,700.00

770.00

KLS

260

468.00

121,680.00

GLN

0.006

45,000.00

270.00

SUBTOTAL MATERIALES

167,808.00

11,253.00
SUBTOTAL MANO DE
OBRA

12,378.30

ARENA GRUESA
GRAVA TRITURADA DE 3/4
GASOLINA CORRIENTE
CEMENTO GRIS CONQUISTADOR
ACEITE MOTOR 4 TIEMPOS

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC

1.1

12,378.30

EQUIPO
MEZCLADORA DE 9 PIES CUBICOS
DIA

0.06

36,540.00

2,192.40

GLB

2.4

1,250.00

3,000.00

SUBTOTAL EQUIPO

5,192.40

185,378.70

185,379.00

HERRAMIENTA MENOR

COSTO
DIRECTO

MORTERO 1:2

Unidad: M3
ITEM: BASICO

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
AGUA
LTS

250

12.00

3,000.00

M3

0.97

23,000.00

22,310.00

KLS

510

468.00

238,680.00

SUBTOTAL MATERIALES

263,990.00

11,253.00
SUBTOTAL MANO DE
OBRA

16,879.50

1,250.00

1,250.00

SUBTOTAL EQUIPO

1,250.00

282,119.50

282,120.00

ARENA MEDIANA
CEMENTO GRIS CONQUISTADOR

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC

1.5

16,879.50

EQUIPO
HERRAMIENTA MENOR
GLB

COSTO
DIRECTO

MORTERO 1:4

Unidad: M3
ITEM: BASICO

DESCRIPCION

UND

MATERIALES
ARENA FINA

M3

CANT.

1.16

DESP.%

PRECIO UNIT

23,000.00

VALOR TOTAL

26,680.00
AGUA
LTS

185

12.00

2,220.00

KLS

364

468.00

170,352.00

SUBTOTAL MATERIALES

199,252.00

11,253.00
SUBTOTAL MANO DE
OBRA

16,879.50

1,250.00

1,250.00

SUBTOTAL EQUIPO

1,250.00

217,381.50

217,382.00

CEMENTO GRIS CONQUISTADOR

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC

1.5

16,879.50

EQUIPO
HERRAMIENTA MENOR
GLB

COSTO
DIRECTO

MEZCLA CONCRETO 1:2:3 3100 PSI - 22,0 Mpa

Unidad: M3
ITEM: BASICO

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
AGUA
LTS

190

12.00

2,280.00

M3

0.56

23,000.00

12,880.00

M3

0.84

33,200.00

27,888.00

GLN

0.1

7,700.00

770.00

KLS

350

468.00

163,800.00

ARENA GRUESA
GRAVA TRITURADA DE 3/4
GASOLINA CORRIENTE
CEMENTO GRIS CONQUISTADOR

ACEITE MOTOR 4 TIEMPOS


GLN

0.006

45,000.00

270.00

SUBTOTAL MATERIALES

207,888.00

11,253.00
SUBTOTAL MANO DE
OBRA

12,378.30

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC

1.1

12,378.30

EQUIPO
MEZCLADORA DE 9 PIES CUBICOS
DIA

0.06

36,540.00

2,192.40

GLB

2.7

1,250.00

3,375.00

SUBTOTAL EQUIPO

5,567.40

225,833.70

225,834.00

HERRAMIENTA MENOR

COSTO
DIRECTO

CAMPAMENTO TABLA 18 M2

Unidad: UND
ITEM: 1.01

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
BALASTRO DE RIO CANTO RODADO-ARENA
M3

19,000.00

38,000.00

UND

2,000.00

12,000.00

UND

20,880.00

41,760.00

UND

14

353.00

4,942.00

UND
LBS

23
4

2,400.00
2,000.00

55,200.00

BISAGRA 3x2" COBRIZ


CANDADO YALE 110-30
GANCHO P/TEJA ASB. MADERA
GUADUA [TACO] 2.50-3M
PUNTILLA 2 CC

0.35

8,028.00
TABLA 1x10x3M OTOBO
UND

77

7,100.00

546,700.00

UND

14

22,667.00

317,338.00

UND

2,750.00

5,500.00

SUBTOTAL MATERIALES

1,029,468.00

20,616.00
SUBTOTAL MANO DE
OBRA

350,472.00

TEJA ONDULIT #6
PORTACANDADO

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

17

350,472.00

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3

6,000.00

12,000.00

GLB

1,250.00

3,750.00

SUBTOTAL EQUIPO

15,750.00

1,395,690.00

1,395,690.00

HERRAMIENTA MENOR

COSTO
DIRECTO

LOCALIZACION-REPLANTEO CERRAMIENTO-VARIO

Unidad: ML
ITEM: 1.02

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
LISTON 2 x2x3M. OTOBO
UND

0.05

3,500.00

175.00

LBS

0.01

2,000.00

20.00

ROL

0.01

2,500.00
SUBTOTAL MATERIALES

25.00

PUNTILLA 2 CC
PIOLA GRUESA 50 METROS

220.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

0.015

20,616.00

309.24

HC

0.015

44,127.00
SUBTOTAL MANO DE
OBRA

661.90

1,250.00

125.00

SUBTOTAL EQUIPO

125.00

1,316.14

1,316.00

M.O. TOPOGRAFIA 1 CADENERO-1 TOP

971.14

EQUIPO
HERRAMIENTA MENOR
GLB

0.1

COSTO
DIRECTO

PROTECCCION MALLA FIBRA TEJIDA

Unidad: ML
ITEM: 1.03

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ALAMBRE GALVANIZADO # 18 U
KG

0.03

3,136.64

94.09

M2

3,150.00

3,150.00

SUBTOTAL MATERIALES

3,244.09

14,990.00
SUBTOTAL MANO DE
OBRA

1,499.00

1,250.00
SUBTOTAL EQUIPO

191.25

MALLA FIBRA TEJIDA H=2.10M VERDE 65GR/M2

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.1

1,499.00

EQUIPO
HERRAMIENTA MENOR
GLB

0.153

191.25
COSTO
DIRECTO

4,934.34

EXCAVACION A MAQUINA SIN RETIRO

4,934.00

Unidad: M3
ITEM: 1.04

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

84,100.00

2,523.00

SUBTOTAL EQUIPO

2,523.00

2,523.00

2,523.00

EQUIPO
RETROEXCAVADORA JD-510
HRS

0.03

COSTO
DIRECTO

EXCAVACION TIERRA A MANO

Unidad: M3
ITEM: 1.05

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

5,627.00
SUBTOTAL MANO DE
OBRA

8,440.50

1,250.00

212.50

SUBTOTAL EQUIPO

212.50

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

1.5

8,440.50

EQUIPO
HERRAMIENTA MENOR
GLB

0.17

COSTO
DIRECTO

8,653.00

RETIRO ESCOMBROS A MAQUINA <=10KM.

8,653.00

Unidad: M3
ITEM: 1.06

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

EQUIPO
VOLQUETA 5 M3
VJE

0.26

40,600.00

10,556.00

HRS

0.05

82,000.00

4,100.00

SUBTOTAL EQUIPO

14,656.00

14,656.00

14,656.00

RETROEXCAVADORA CARGADORA

COSTO
DIRECTO

SOLADO ESPESOR E=0.05M 3000 PSI 210 MPA

Unidad: M2
ITEM: 2.01

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

225,834.00

13,550.04

SUBTOTAL MATERIALES

13,550.04

14,990.00
SUBTOTAL MANO DE
OBRA

5,996.00

6,000.00

540.00

MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
M3

0.06

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.4

5,996.00

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3

0.09

HERRAMIENTA MENOR
GLB

0.03

COSTO
DIRECTO

1,250.00

37.50

SUBTOTAL EQUIPO

577.50

20,123.54

20,124.00

ZAPATA CONCRETO 3000 PSI INC. FORMALETA

Unidad: M3
ITEM: 2.02

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
CUARTON 2"x4"x3M OTOBO
UND

0.1

8,000.00

800.00

LBS

0.2

2,000.00

400.00

UND

0.115

7,100.00

816.50

M3

1.05

225,834.00

237,125.70

SUBTOTAL MATERIALES

239,142.20

14,990.00
SUBTOTAL MANO DE
OBRA

44,220.50

PUNTILLA 2.1/2 CC 104 UND/LB


TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

2.95

44,220.50

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3

1.5

6,000.00

9,000.00

GLB

0.03

1,250.00

37.50

SUBTOTAL EQUIPO

9,037.50

292,400.20

292,400.00

HERRAMIENTA MENOR

COSTO
DIRECTO

PANTALLA EN CONCRETO 3100PSI E=10-30CM FORM. MET.

UNIDAD: M3
ITEM: 2.03

DESCRIPCION

UND

CANT.

DESP.%

VALOR TOTAL

PRECIO UNIT

MATERIALES
CUARTON 2"x4"x3M OTOBO
UND

1.55

8,000.00

12,400.00

LBS

0.15

2,000.00

300.00

UND

3.1

7,100.00

22,010.00

M3

1.05

225,834.00

237,125.70

SUBTOTAL MATERIALES

271,835.70

26,243.00
SUBTOTAL- MANO DE
OBRA

157,458.00

PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC

157,458.00

EQUIPO
VIBRADOR ELECTRICO
DIA

0.04

32,712.00

1,308.48

M3

1.5

6,000.00

9,000.00

GLB

0.831

1,250.00

1,038.75

DIA

170.00

850.00

DIA

128.00

640.00

DIA

0.88

75,000.00

66,000.00

U/D

714.00

1,428.00

SUBTOTAL- EQUIPO

80,265.23

VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS


HERRAMIENTA MENOR
TACO METALICO EXTENSION DE 2.OM A 3.30MT
CERCHA METALICA DE 3MTS
FORMALETA METALICA
ANDAMIO METALICO TUBULAR

COSTO
DIRECTO

509,558.93

ACERO REFUERZO FLEJADO 60000 PSI 420Mpa

509,559.00

Unidad: KLS
ITEM: 2.04

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ALAMBRE NEGRO # 18
KLS

0.03

0.03

3,100.00

93.02

UND

0.03

0.03

2,552.00

76.58

KLS

1.03

2,650.00

2,729.50

SUBTOTAL MATERIALES

2,899.10

5,627.00
SUBTOTAL MANO DE
OBRA

225.08

3,124.18

3,124.00

SEGUETA SIN MARCO


HIERR.DE 60000 PSI 420 MPA

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.04

COSTO
DIRECTO

PROTECCION DE TALUDES (Tablestaca)

225.08

Unidad: M2
ITEM: 2.05

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

600.00

201.00

MATERIALES
TAPON GALV .1/2 AGUA-GAS
UND

0.335

PUNTILLA 2 CC
LBS

0.2

2,000.00

400.00

UND

4,106.00

12,318.00

1.3

2,240.00

2,912.00

SUBTOTAL MATERIALES

15,831.00

20,616.00
SUBTOTAL MANO DE
OBRA

4,123.20

1,250.00

192.50

SUBTOTAL EQUIPO

192.50

20,146.70

20,147.00

TABLA 1x05x3M OTOBO [1C]


CUARTON 2"x4"x3M
ML

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

0.2

4,123.20

EQUIPO
HERRAMIENTA MENOR
GLB

0.154

COSTO
DIRECTO

RELLENO ROCA MUERTA COMPACTADO-SALTARIN

Unidad: M3
ITEM: 3.01

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ROCA MUERTA (SIN TRANSPORTE)
M3

1.3

5,500.00

7,150.00

GLN

0.05

7,700.00

385.00

GLN

0.01

45,000.00

450.00

SUBTOTAL MATERIALES

7,985.00

GASOLINA CORRIENTE
ACEITE MOTOR 4 TIEMPOS

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE

HC

0.6

11,253.00

6,751.80
SUBTOTAL MANO DE
OBRA

6,751.80

EQUIPO
VIBROCOMPACTADOR SALTARIN
DIA

0.08

42,000.00

3,360.00

M3

1.3

6,000.00

7,800.00

GLB

0.1

1,250.00

125.00

SUBTOTAL EQUIPO

11,285.00

26,021.80

26,022.00

VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS


HERRAMIENTA MENOR

COSTO
DIRECTO

RELLENO GRAVA TRITURADA-POLVILLO [S.COM]

Unidad: M3
ITEM: 3.03

DESCRIPCION

UND

PRECIO UNIT

VALOR TOTAL

33,200.00

33,209.96

SUBTOTAL MATERIALES

33,209.96

5,627.00
SUBTOTAL MANO DE
OBRA

3,376.20

6,000.00

6,000.00

0.05

1,250.00

62.50

SUBTOTAL EQUIPO

6,062.50

CANT.

DESP.%

MATERIALES
GRAVA TRITURADA DE 3/4
M3

0.03

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.6

3,376.20

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
HERRAMIENTA MENOR
GLB

COSTO
DIRECTO

42,648.66

ANDEN CONCRETO 10CM 3000 PSI

42,649.00

Unidad: M2
ITEM: 3.04

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ANTISOL ROJO
KLS

0.2

9,900.00

1,980.00

UND

3,500.00

3,500.00

LBS

0.05

2,000.00

100.00

UND

0.5

7,100.00

3,550.00

M3

0.1

225,834.00

22,583.40

SUBTOTAL MATERIALES

31,713.40

20,616.00
SUBTOTAL MANO DE
OBRA

4,123.20

1,250.00

125.00

SUBTOTAL EQUIPO

125.00

35,961.60

35,962.00

LISTON 2 x2x3M. OTOBO


PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

0.2

4,123.20

EQUIPO
HERRAMIENTA MENOR
GLB

0.1

COSTO
DIRECTO

CANAL CONCRETO PISO 20X20X08 CM

Unidad: ML

ITEM: 3.05
DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ACEITE QUEMADO
GLN

0.06

660.00

39.60

LBS

0.2

2,000.00

400.00

UND

0.4

5,600.00

2,240.00

UND

0.58

4,106.00

2,381.48

UND

0.95

1,400.00

1,330.00

M3

0.068

225,834.00

15,356.71

SUBTOTAL MATERIALES

21,747.79

14,990.00
SUBTOTAL MANO DE
OBRA

14,990.00

1,250.00

371.25

SUBTOTAL EQUIPO

371.25

37,109.04

37,109.00

PUNTILLA 1.1/2 CC 363 UND/LB


TABLA 1x08x3M OTOBO [1C] LARGO=3ML-CORTADA
TABLA 1x05x3M OTOBO [1C]
VARETA 1"x1"x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

14,990.00

EQUIPO
HERRAMIENTA MENOR
GLB

0.297

COSTO
DIRECTO

TUB.PVC 3 SANI.

Unidad: ML
ITEM: 3.06

DESCRIPCION
MATERIALES

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

SOLDADURA PVC 1/ 2 GLN


UND

0.003

48,100.00

151.51

11,057.12

11,278.26

2,070.60

693.65

SUBTOTAL MATERIALES

12,123.42

15,927.00
SUBTOTAL MANO DE
OBRA

6,370.80

18,494.22

18,494.00

TUBO SANIT PVC 3


ML
UNION SAN PVC 3"
UND

0.335

MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC

0.4

COSTO
DIRECTO

GEOTEXTIL NO TEJIDO

6,370.80

Unidad: M2
ITEM: 3.07

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

2,400.00

2,472.00

SUBTOTAL MATERIALES

2,472.00

5,627.00
SUBTOTAL MANO DE
OBRA

844.05

1,250.00

50.00

SUBTOTAL EQUIPO

50.00

MATERIALES
GEOTEXTIL NO TEJ. REF 1600
M2

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.15

844.05

EQUIPO
HERRAMIENTA MENOR
GLB

0.04

COSTO
DIRECTO

3,366.05

GEODREN PLANAR

3,366.00

UNIDAD: ML
ITEM: 3.08

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
GEODREN PLANAR TB 160 MM
ML

55,302.00

55,302.00

SUBTOTAL MATERIALES

55,302.00

5,627.00
SUBTOTAL- MANO DE
OBRA

1,125.40

1,250.00

50.00

SUBTOTAL- EQUIPO

50.00

56,477.40

56,477.00

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.2

1,125.40

EQUIPO
HERRAMIENTA MENOR
GLB

0.04

COSTO
DIRECTO

LOCALIZACION-REPLANTEO CERRAMIENTO-VARIO

Unidad: ML

DESCRIPCION

UND

MATERIALES
LISTON 2 x2x3M. OTOBO

UND

CANT.

0.05

DESP.%

PRECIO UNIT

3,500.00

ITEM: 4.01
VALOR TOTAL

175.00
PUNTILLA 2 CC
LBS

0.01

2,000.00

20.00

ROL

0.01

2,500.00

25.00

SUBTOTAL MATERIALES

220.00

PIOLA GRUESA 50 METROS

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

0.015

20,616.00

309.24

HC

0.015

44,127.00
SUBTOTAL MANO DE
OBRA

661.90

1,250.00

125.00

SUBTOTAL EQUIPO

125.00

1,316.14

1,316.00

M.O. TOPOGRAFIA 1 CADENERO-1 TOP

971.14

EQUIPO
HERRAMIENTA MENOR
GLB

0.1

COSTO
DIRECTO

PROTECCCION MALLA FIBRA TEJIDA

Unidad: ML
ITEM: 4.02

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ALAMBRE GALVANIZADO # 18 U
KG

0.03

3,136.64

94.09

M2

3,150.00

3,150.00

SUBTOTAL MATERIALES

3,244.09

MALLA FIBRA TEJIDA H=2.10M VERDE 65GR/M2

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI

HC

0.1

14,990.00

1,499.00
SUBTOTAL MANO DE
OBRA

1,499.00

1,250.00

191.25

SUBTOTAL EQUIPO

191.25

4,934.34

4,934.00

EQUIPO
HERRAMIENTA MENOR
GLB

0.153

COSTO
DIRECTO

EXCAVACION TIERRA A MANO


DESCRIPCION

Unidad: M3
UND

CANT.

DESP.%

PRECIO UNIT

ITEM: 4.03
VALOR TOTAL

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

1.5

5,627.00
SUBTOTAL MANO DE
OBRA

8,440.50

1,250.00

212.50

SUBTOTAL EQUIPO

212.50

8,653.00

8,653.00

8,440.50

EQUIPO
HERRAMIENTA MENOR
GLB

0.17

COSTO
DIRECTO

RETIRO ESCOMBROS A MAQUINA <=10KM.

Unidad: M3
ITEM: 4.04

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

EQUIPO
VOLQUETA 5 M3
VJE

0.26

40,600.00

10,556.00

HRS

0.05

82,000.00

4,100.00

SUBTOTAL EQUIPO

14,656.00

14,656.00

14,656.00

RETROEXCAVADORA CARGADORA

COSTO
DIRECTO

SOLADO ESPESOR E=0.05M 3000 PSI 210 MPA


DESCRIPCION

Unidad: M2
UND

CANT.

DESP.%

PRECIO UNIT

ITEM: 4.05
VALOR TOTAL

225,834.00

13,550.04

SUBTOTAL MATERIALES

13,550.04

14,990.00
SUBTOTAL MANO DE
OBRA

5,996.00

MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
M3

0.06

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.4

5,996.00

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3

0.09

6,000.00

540.00

GLB

0.03

1,250.00

37.50

SUBTOTAL EQUIPO

577.50

HERRAMIENTA MENOR

COSTO
DIRECTO

20,123.54

ZAPATA CONCRETO 3000 PSI INC. FORMALETA

20,124.00

Unidad: M3
ITEM: 4.06

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
CUARTON 2"x4"x3M OTOBO
UND

0.1

8,000.00

800.00

LBS

0.2

2,000.00

400.00

UND

0.115

7,100.00

816.50

M3

1.05

225,834.00

237,125.70

SUBTOTAL MATERIALES

239,142.20

14,990.00
SUBTOTAL MANO DE
OBRA

44,220.50

PUNTILLA 2.1/2 CC 104 UND/LB


TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

2.95

44,220.50

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3

1.5

6,000.00

9,000.00

GLB

0.03

1,250.00

37.50

SUBTOTAL EQUIPO

9,037.50

292,400.20

292,400.00

HERRAMIENTA MENOR

COSTO
DIRECTO

PANTALLA EN CONCRETO 3100 PSI E=10-30CM FORM. MET.

UNIDAD: M3
ITEM: 4.07

DESCRIPCION

UND

CANT.

DESP.%

VALOR TOTAL

PRECIO UNIT

MATERIALES
CUARTON 2"x4"x3M OTOBO
UND

1.55

8,000.00

12,400.00

LBS

0.15

2,000.00

300.00

UND

3.1

7,100.00

22,010.00

M3

1.05

225,834.00

237,125.70

SUBTOTAL MATERIALES

271,835.70

26,243.00
SUBTOTAL- MANO DE
OBRA

157,458.00

PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC

157,458.00

EQUIPO
VIBRADOR ELECTRICO
DIA

0.04

32,712.00

1,308.48

M3

1.5

6,000.00

9,000.00

GLB

0.831

1,250.00

1,038.75

DIA

170.00

850.00

DIA

128.00

640.00

DIA

0.88

75,000.00

66,000.00

U/D

714.00

1,428.00

SUBTOTAL- EQUIPO

80,265.23

509,558.93

509,559.00

VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS


HERRAMIENTA MENOR
TACO METALICO EXTENSION DE 2.OM A 3.30MT
CERCHA METALICA DE 3MTS
FORMALETA METALICA
ANDAMIO METALICO TUBULAR

COSTO
DIRECTO

ACERO REFUERZO FLEJADO 60000 PSI 420Mpa

Unidad: KLS
ITEM: 4.08

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ALAMBRE NEGRO # 18
KLS

0.03

0.03

3,100.00

93.02

UND

0.03

0.03

2,552.00

76.58

KLS

1.03

2,650.00

2,729.50

SUBTOTAL MATERIALES

2,899.10

5,627.00
SUBTOTAL MANO DE
OBRA

225.08

3,124.18

3,124.00

SEGUETA SIN MARCO


HIERR.DE 60000 PSI 420 MPA

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.04

COSTO
DIRECTO

ANCLAJE HIERRO ,3/8"-PERF. ,1/2" 10-15C

225.08

Unidad: PTO
ITEM: 4.09

DESCRIPCION
MATERIALES
ANCHORFIX-4 600CM3 ADHESIVO EPOXICO
ANCLAJES
HIERRO .3/8" 60.000 [6M]
BROCA TUGSTENO 3/4"-50CM PARA CONCRETO

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

UND

0.04

92,800.00

3,712.00

KLS
UND

0.3
0.004

2,650.00
297,450.00

795.00

1,189.80
SUBTOTAL MATERIALES

5,696.80

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.14

14,990.00

2,098.60

HC

0.11

15,927.00
SUBTOTAL MANO DE
OBRA

1,751.97

M.O. CARP.TALLER 1 AYUDANTE-1 OFI

3,850.57

EQUIPO
TALADRO PERCUTOR TIPO HILTI
DIA

0.04

50,000.00

2,000.00

GLB

0.462

1,250.00

577.50

SUBTOTAL EQUIPO

2,577.50

12,124.87

12,125.00

HERRAMIENTA MENOR

COSTO
DIRECTO

PROTECCION DE TALUDES (Tablestaca)


DESCRIPCION

Unidad: M2
UND

CANT.

DESP.%

PRECIO UNIT

ITEM: 4.10
VALOR TOTAL

MATERIALES
TAPON GALV .1/2 AGUA-GAS
UND

0.335

600.00

201.00

LBS

0.2

2,000.00

400.00

UND

4,106.00

12,318.00

1.3

2,240.00

2,912.00

SUBTOTAL MATERIALES

15,831.00

PUNTILLA 2 CC
TABLA 1x05x3M OTOBO [1C]
CUARTON 2"x4"x3M
ML

MANO DE OBRA

M.O. ALBANILERIA 2 AYUDANTE-1 OFI


HC

0.2

20,616.00
SUBTOTAL MANO DE
OBRA

4,123.20

1,250.00

192.50

SUBTOTAL EQUIPO

192.50

20,146.70

20,147.00

4,123.20

EQUIPO
HERRAMIENTA MENOR
GLB

0.154

COSTO
DIRECTO

RELLENO ROCA MUERTA COMPACTADO-SALTARIN


DESCRIPCION

Unidad: M3
UND

CANT.

DESP.%

PRECIO UNIT

ITEM: 4.11
VALOR TOTAL

MATERIALES
ROCA MUERTA (SIN TRANSPORTE)
M3

1.3

5,500.00

7,150.00

GLN

0.05

7,700.00

385.00

GLN

0.01

45,000.00

450.00

SUBTOTAL MATERIALES

7,985.00

11,253.00
SUBTOTAL MANO DE
OBRA

6,751.80

GASOLINA CORRIENTE
ACEITE MOTOR 4 TIEMPOS

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE
HC

0.6

6,751.80

EQUIPO
VIBROCOMPACTADOR SALTARIN
DIA

0.08

42,000.00

3,360.00

M3

1.3

6,000.00

7,800.00

VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS

HERRAMIENTA MENOR
GLB

0.1

COSTO
DIRECTO

1,250.00

125.00

SUBTOTAL EQUIPO

11,285.00

26,021.80

26,022.00

RELLENO GRAVA TRITURADA-POLVILLO [S.COM]


DESCRIPCION

Unidad: M3
UND

PRECIO UNIT

ITEM: 4.12
VALOR TOTAL

33,200.00

33,209.96

SUBTOTAL MATERIALES

33,209.96

5,627.00
SUBTOTAL MANO DE
OBRA

3,376.20

6,000.00

6,000.00

0.05

1,250.00

62.50

SUBTOTAL EQUIPO

6,062.50

42,648.66

42,649.00

CANT.

DESP.%

MATERIALES
GRAVA TRITURADA DE 3/4
M3

0.03

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.6

3,376.20

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3
HERRAMIENTA MENOR
GLB

COSTO
DIRECTO

GEOTEXTIL NO TEJIDO
DESCRIPCION

Unidad: M2
UND

CANT.

DESP.%

PRECIO UNIT

ITEM: 4.13
VALOR TOTAL

2,400.00

2,472.00

SUBTOTAL MATERIALES

2,472.00

5,627.00
SUBTOTAL MANO DE
OBRA

844.05

1,250.00

50.00

SUBTOTAL EQUIPO

50.00

3,366.05

3,366.00

MATERIALES
GEOTEXTIL NO TEJ. REF 1600
M2

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.15

844.05

EQUIPO
HERRAMIENTA MENOR
GLB

0.04

COSTO
DIRECTO

TUB.PVC 2 SANI.

Unidad: ML
ITEM: 4.14

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
SOLDADURA PVC 1/ 2 GLN
UND

0.03

48,100.00

1,515.15

7,403.12

7,773.27

1,436.08

481.08

SUBTOTAL MATERIALES

9,769.50

TUBO SANIT PVC 2"


ML
UNION SAN PVC 2
UND

0.335

MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC

0.4

COSTO
DIRECTO

15,927.00
SUBTOTAL MANO DE
OBRA

6,370.80

16,140.30

16,140.00

TUB.PVC 4 SANI.

6,370.80

Unidad: ML
ITEM: 4.15

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
LIMPIADOR PVC 760 GRMS
UND

0.02

26,000.00

546.00

UND

0.02

48,100.00

1,010.10

15,409.44

15,871.72

SUBTOTAL MATERIALES

17,427.82

15,927.00
SUBTOTAL MANO DE
OBRA

1,927.16

19,354.98

19,355.00

SOLDADURA PVC 1/ 2 GLN


TUBO SANIT PVC 4"
ML

MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC

0.121

COSTO
DIRECTO

TEE SANITARIA PVC 4"

1,927.16

Unidad: UND
ITEM: 4.16

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
TEE SAN PVC 4 DOB
UND

COSTO
DIRECTO

24,393.64

24,393.64

SUBTOTAL MATERIALES

24,393.64

24,393.64

24,394.00

REDUCCION SANITARIA PVC 4X2

Unidad: UND
ITEM: 4.17

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

4,600.00

4,600.00

SUBTOTAL MATERIALES

4,600.00

4,600.00

4,600.00

MATERIALES
BUJE SAN PVC 4 x2 S SANITARIA
UND

COSTO
DIRECTO

ANDEN CONCRETO 10CM 3000 PSI

Unidad: M2
ITEM: 4.18

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
LISTON 1 x4x3M. OTOBO
UND

0.335

1,572.00

526.62

LBS

0.05

2,000.00

100.00

PUNTILLA 1.1/2 CC 363 UND/LB

MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa


M3

0.1

225,834.00

22,583.40

SUBTOTAL MATERIALES

23,210.02

14,990.00
SUBTOTAL MANO DE
OBRA

10,493.00

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.7

10,493.00

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3

0.15

6,000.00

900.00

GLB

0.101

1,250.00

126.25

SUBTOTAL EQUIPO

1,026.25

34,729.27

34,729.00

HERRAMIENTA MENOR

COSTO
DIRECTO

CANAL CONCRETO PISO 20x12x08 CM


DESCRIPCION

Unidad: ML
UND

CANT.

DESP.%

PRECIO UNIT

ITEM: 4.20
VALOR TOTAL

MATERIALES
ACEITE QUEMADO
GLN

0.05

660.00

33.00

LBS

0.2

2,000.00

400.00

UND

0.335

5,600.00

1,876.00

UND

0.335

4,106.00

1,375.51

UND

0.8

1,400.00

1,120.00

M3

0.06

225,834.00
SUBTOTAL MATERIALES

13,550.04

PUNTILLA 1.1/2 CC 363 UND/LB


TABLA 1x08x3M OTOBO [1C] LARGO=3ML-CORTADA
TABLA 1x05x3M OTOBO [1C]
VARETA 1"x1"x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

18,354.55
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.9

14,990.00
SUBTOTAL MANO DE
OBRA

13,491.00

1,250.00

372.50

SUBTOTAL EQUIPO

372.50

32,218.05

32,218.00

13,491.00

EQUIPO
HERRAMIENTA MENOR
GLB

0.298

COSTO
DIRECTO

CANAL CONCRETO CORONA 40X30X10

UNIDAD: ML
ITEM: 4.21

DESCRIPCION

UND

CANT.

DESP.%

VALOR TOTAL

PRECIO UNIT

MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
M3

0.08

225,834.00

18,066.72

UND

0.8

1,400.00

1,120.00

ML

0.335

1,858.00

622.43

UND

0.335

5,600.00

1,876.00

LBS

0.2

2,000.00

400.00

GLN

0.05

660.00

33.00

SUBTOTAL MATERIALES

22,118.15

14,990.00

13,491.00

VARETA 1"x1"x3M OTOBO


TABLA 1x10x3M OTOBO
TABLA 1x08x3M OTOBO [1C] LARGO=3ML-CORTADA
PUNTILLA 1.1/2 CC 363 UND/LB
ACEITE QUEMADO

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.9

SUBTOTAL- MANO DE
OBRA

13,491.00

1,250.00

372.50

SUBTOTAL- EQUIPO

372.50

35,981.65

35,982.00

EQUIPO
HERRAMIENTA MENOR
GLB

0.298

COSTO
DIRECTO

VIGA CIMIENTO ENLACE H=20-40 CMS

Unidad: M3
ITEM: 4.22

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
PUNTILLA 2 CC
LBS

2,000.00

2,000.00

UND

5.5

8,816.00

48,488.00

UND

2.67

1,800.00

4,806.00

M3

1.05

225,834.00

237,125.70

SUBTOTAL MATERIALES

292,419.70

20,616.00
SUBTOTAL MANO DE
OBRA

121,634.40

TABLA 1X10x3M OTOBO [2C]


VARETA 2"x2"x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

5.9

121,634.40

EQUIPO
VIBRADOR ELECTRICO
DIA

0.05

32,712.00

1,635.60

M3

1.5

6,000.00
SUBTOTAL EQUIPO

9,000.00

VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS

10,635.60
COSTO
DIRECTO

424,689.70

COLUMNA CONCRETO 3000 PSI

424,690.00

Unidad: M3
ITEM: 4.23

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ANTISOL BLANCO
KLS

5,980.00

11,960.00

KLS

12,296.00

24,592.00

KLS

0.2

5,570.00

1,114.00

UND

5.67

8,000.00

45,360.00

LBS

2,000.00

16,000.00

UND

7,100.00

35,500.00

UND

4.33

1,800.00

7,794.00

M3

1.05

225,834.00

237,125.70

SUBTOTAL MATERIALES

379,445.70

26,243.00
SUBTOTAL MANO DE
OBRA

199,446.80

SEPAROL DESFORMALETEANTE TARRO 15 KLS


SIKAMENT NS SUPERPLASTIFIC TARRO DE 25 KLS
CUARTON 2"x4"x3M OTOBO
PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
VARETA 2"x2"x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC

7.6

199,446.80

EQUIPO
VIBRADOR ELECTRICO
DIA

0.1

32,712.00

3,271.20

M3

1.5

6,000.00

9,000.00

VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS

HERRAMIENTA MENOR
GLB

0.332

1,250.00

415.00

DIA

24

170.00

4,080.00

U/D

714.00

2,856.00

SUBTOTAL EQUIPO

19,622.20

598,514.70

598,515.00

TACO METALICO EXTENSION DE 2.OM A 3.30MT


ANDAMIO METALICO TUBULAR

COSTO
DIRECTO

MURO LAD.SOGA LIMPIO 1C

Unidad: M2
ITEM: 4.24

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

445.00

23,834.20

217,382.00

7,608.37

SUBTOTAL MATERIALES

31,442.57

14,990.00
SUBTOTAL MANO DE
OBRA

9,293.80

MATERIALES
LAD.PRENS.LIMPIO 6.5X12X24
UND

52

MORTERO 1:4
M3

0.035

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.62

9,293.80

EQUIPO
HERRAMIENTA MENOR
GLB

0.198

1,250.00

247.50

U/D

0.1

714.00

71.40

SUBTOTAL EQUIPO

318.90

ANDAMIO METALICO TUBULAR

COSTO
DIRECTO

41,055.27

ESCALERA CONCRETO 3000 PSI

41,055.00

Unidad: M3
ITEM: 4.25

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
ALAMBRE NEGRO # 18
KLS

3,100.00

3,100.00

UND

2.5

8,000.00

20,000.00

UND

2,400.00

12,000.00

LBS

0.72

2,000.00

1,440.00

UND

6.7

7,100.00

47,570.00

M3

1.03

225,834.00

232,609.02

SUBTOTAL MATERIALES

316,719.02

26,243.00
SUBTOTAL MANO DE
OBRA

262,430.00

CUARTON 2"x4"x3M OTOBO


GUADUA [TACO] 2.50-3M
PUNTILLA 2 CC
TABLA 1x10x3M OTOBO
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa

MANO DE OBRA
M.O. ALBANILERIA 3 AYUDANTE-1 OFI
HC

10

262,430.00

EQUIPO
VIBRADOR ELECTRICO
DIA

0.5

32,712.00

16,356.00

M3

1.5

6,000.00

9,000.00

GLB

0.02

1,250.00

25.00

SUBTOTAL EQUIPO

25,381.00

VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS


HERRAMIENTA MENOR

COSTO

604,530.02

DIRECTO

604,530.00

CAMARA INSPECCION TIPO I H=2.01-2.50 MTS

Unidad: UND
ITEM: 4.26

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

7,100.00

17,750.00

MATERIALES
TABLA 1x10x3M OTOBO
UND

2.5

KLS

66.5

2,650.00

181,511.75

KLS

2,650.00

13,647.50

M3

4.84

225,834.00

1,093,036.56

M3

0.02

282,120.00

5,642.40

SUBTOTAL MATERIALES

1,311,588.21

20,616.00
SUBTOTAL MANO DE
OBRA

268,008.00

15,000.00

30,000.00

SUBTOTAL EQUIPO

30,000.00

1,609,596.21

1,609,596.00

HIERR.DE 60000 PSI 420 MPA


HIERR.DE 37000 PSI 259 MPA U
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa
MORTERO 1:2

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

13

268,008.00

EQUIPO
FORM.MET.CAM.DE INSPECCION
UND

COSTO
DIRECTO

TUB.PVC 8 SANI.NOVAFO

Unidad: ML
ITEM: 4.27

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

34,095.88

34,095.88

SUBTOTAL MATERIALES

34,095.88

34,095.88

34,096.00

MATERIALES
TUB PVC 8" SANIT NOVAFORT NOVAFORT 200MM
ML

COSTO
DIRECTO

MANEJO DE AGUAS RESIDUALES

Unidad: ML
ITEM: 4.28

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

5,627.00
SUBTOTAL MANO DE
OBRA

5,627.00

5,627.00

5,627.00

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

COSTO
DIRECTO

JUNTA DILATACION DOS LADOS SEGUN DIS

5,627.00

Unidad: ML
ITEM: 4.29

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
SOLDADURA 6011 1/8" VARILLA
KLS

0.5

6,199.04

3,192.50

UND

0.35

67,700.00

24,168.90

ANGULO 2 x 1/ 4 TIRA DE 6 METROS

HIERR.DE 60000 PSI 420 MPA


KLS

3.4

2,650.00

9,010.00

SUBTOTAL MATERIALES

36,371.40

MANO DE OBRA
M.O. HIDROSANIT. 1 AYUDANTE-1 OFI
HC

0.2

15,927.00

3,185.40

HC

0.4

14,990.00
SUBTOTAL MANO DE
OBRA

5,996.00

M.O. ALBANILERIA 1 AYUDANTE-1 OFI

9,181.40

EQUIPO
SOLDADOR ELECTRICO
DIA

0.1

27,000.00

2,700.00

GLB

0.03

1,250.00

37.50

SUBTOTAL EQUIPO

2,737.50

48,290.30

48,290.00

HERRAMIENTA MENOR

COSTO
DIRECTO

RETIRO DE SALDOS EN SITIO

Unidad: M3
ITEM: 4.30

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

5,627.00
SUBTOTAL MANO DE
OBRA

3,938.90

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.7

3,938.90

EQUIPO
CARRETA TIPO BUGUI
DIA

0.07

2,500.00

175.00

GLB

0.4

1,250.00

500.00

SUBTOTAL EQUIPO

675.00

HERRAMIENTA MENOR

COSTO
DIRECTO

4,613.90

ANDEN CONCRETO 10CM 2500 PSI

4,614.00

Unidad: M2
ITEM: 4.31

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

MATERIALES
LISTON 1 x4x3M. OTOBO
UND

0.335

1,572.00

526.62

LBS

0.05

2,000.00

100.00

M3

0.1

185,379.00

18,537.90

SUBTOTAL MATERIALES

19,164.52

14,990.00
SUBTOTAL MANO DE
OBRA

10,493.00

PUNTILLA 1.1/2 CC 363 UND/LB


MEZCLA CONCRETO 1:2.5:4 2500 PSI-17.5MPa

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI
HC

0.7

10,493.00

EQUIPO
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS
M3

0.15

6,000.00

900.00

GLB

0.404

1,250.00

505.00

SUBTOTAL EQUIPO

1,405.00

31,062.52

31,063.00

HERRAMIENTA MENOR

COSTO
DIRECTO

MALLA ELECTROSOLDADA M-0.84

Unidad: KLS
ITEM: 4.32

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

2,950.00

3,097.50

SUBTOTAL MATERIALES

3,097.50

20,616.00
SUBTOTAL MANO DE
OBRA

618.48

1,250.00

500.00

SUBTOTAL EQUIPO

500.00

4,215.98

4,216.00

MATERIALES
MALLA ELEC.M-0.84 / DO84 ESPAC 15X15 1.34K/M2
KLS

1.05

MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE-1 OFI
HC

0.03

618.48

EQUIPO
HERRAMIENTA MENOR
GLB

0.4

COSTO
DIRECTO

TRANSLADO RED ELECTRICA

UNIDAD: GLB

DESCRIPCION

VALOR TOTAL

ITEM: 4.33
UND

CANT.

DESP.%

PRECIO UNIT

MATERIALES
CABLE ACSR NUMERO 2 CONDUC PRIM O SECUND
ML

300

2,320.00

696,000.00

ML

300

3,248.00

974,400.00

916,400.00
SUBTOTAL MATERIALES

916,400.00

CABLE ACERO 3/8" CABLE ACERO RED CHILENA 3/8"


POSTE CONCRET 13x1050KG CONJUNTO PRIMARIO
UND

2,586,800.00
MANO DE OBRA
TRAMITES Y PAGOS DE DERECHOS
GLB

5,881,532.00

5,881,532.00

HC

12

77,639.00
SUBTOTAL- MANO DE
OBRA

931,668.00
6,813,200.00

50,000.00

600,000.00

SUBTOTAL- EQUIPO

600,000.00

10,000,000.00

10,000,000.00

M.O. ELECTRICAS 3 AYUD-1 OFI-1 PROF

EQUIPO
CARRO GRUA 5 TONELADAS
HRS

12

COSTO
DIRECTO

DEMOL.MURO CONCRETO E=15CM

Unidad: M2
ITEM: 5.01

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

5,627.00
SUBTOTAL MANO DE
OBRA

8,440.50

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

1.5

8,440.50

EQUIPO
COMPRESOR DE DOS MARTILLOS
HRS

0.25

89,500.00

22,375.00

GLB

0.478

1,250.00

597.50

SUBTOTAL EQUIPO

22,972.50

31,413.00

31,413.00

HERRAMIENTA MENOR

COSTO
DIRECTO

DEMOL.ANDEN E=0.10 +RETIRO

Unidad: M2
ITEM: 5.02

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

5,627.00
SUBTOTAL MANO DE
OBRA

2,250.80

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

0.4

2,250.80

EQUIPO
VOLQUETA 5 M3
VJE

0.03

40,600.00

1,218.00

GLB

0.1

1,250.00

125.00

SUBTOTAL EQUIPO

1,343.00

3,593.80

3,594.00

HERRAMIENTA MENOR

COSTO
DIRECTO

DEMOL.LOSA MACIZA C. E>=20CMS

Unidad: M2
ITEM: 5.03

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

5,627.00
SUBTOTAL MANO DE
OBRA

12,379.40

89,500.00
1,250.00

34,905.00

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

2.2

12,379.40

EQUIPO
COMPRESOR DE DOS MARTILLOS
HERRAMIENTA MENOR

HRS
GLB

0.39
0.742

927.50

COSTO
DIRECTO

SUBTOTAL EQUIPO

35,832.50

48,211.90

48,212.00

DEMOL.VIGA CANAL

Unidad: ML
ITEM: 5.04

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

5,627.00
SUBTOTAL MANO DE
OBRA

11,254.00

1,250.00

620.00

SUBTOTAL EQUIPO

620.00

11,874.00

11,874.00

MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE
HC

11,254.00

EQUIPO
HERRAMIENTA MENOR
GLB

0.496

COSTO
DIRECTO

RETIRO ESCOMBROS A MAQUINA <=10KM.

Unidad: M3
ITEM: 5.05

DESCRIPCION

UND

CANT.

DESP.%

PRECIO UNIT

VALOR TOTAL

40,600.00

10,556.00

EQUIPO
VOLQUETA 5 M3
VJE

0.26

RETROEXCAVADORA CARGADORA
HRS

0.05

COSTO
DIRECTO

82,000.00

4,100.00

SUBTOTAL EQUIPO

14,656.00

14,656.00

14,656.00