SIMPLY SUPPORTED TUBULAR FRAMED SHADE WITH FABRIC ROOF Project: Structural Data: Span 7.

5 m Height of pole "L" 3m Column Dia (Assumed) 88.9 mm Eaves height of shaded Frame 3m 2 Purlin / lateral tie spacing = m Pitch of Shade 2.5 m Bay Width ( C/c of poles) 7.5 m Member Properties Diameter Thickness L eaves ht 1 Main Pole 88.9 3.2 mm 1 2 Pyramidal memb 76.1 3.2 mm 3 Chord ROPE 8mm 4 Bottom Tie mm 5 Lateral Tie mm f Tension rope at ends8 mm Loadings
Dead loads:

Car park Shade 7.5m span x 7.5m bays

3
SPAN c/c

Section

pyramid memb

at end bays

Self wt of members By design program Air Permeablity 20% Wt of fabric in ( 0.84 Kg/ Sqm) Kn/sqm 0.008 with air permeability Fabric shade load on Pyramid = Fabric Load on frame=
Wind loads: ( CP.3 )

bay width

0.008 kn/m 0.000 kn/m Steel cable

Basic Wind Speed " V" Km/hr 100 28.00 m/sec Vs = V x S1 x S2 x S3 = 21.84 m/sec S1 = 1 S2* = 0.78 * Class B (horiz dim < 50m & ht < 5m S3 = 1
Dynamic Wind Pressure "q"

0.292 Kn/sq.m
PLAN

Wind Pressure Coefficients Cp Roof Angle Wind Angle = Cp +ve (Down ward) all values of f Cp = Cp -ve (Upward) when f =0.5, Cp = Wind force on Frame (Down ward) +ve force = (Up ward) - ve force =

33.69 0 0.9

O O

for f=0,Cp = -1.15 for f=1 ,Cp = (F = Cp x q x Bay width ) 0.279 Kn/m -0.357 Kn/m 0.082 Kn on the mid column OR 0.024 Kn/m L/D ratio =

-1 -1.3

Wind angle 0 deg

Frictional drag (0.025x As x q) =

As = Roof Plan area

Horizontal force on column = Cfn = 1.2 K= 0.76

33.75