c ROADWAY ROCK CUT EARTH CUT 3n OR MORE THEORETICAL GRADE LINE SUBGRADE SURFACE
SEE NOTE 4
EARTH SLOPE
SEE NOTE 4
12 m
SEE NOTE 7
SEE NOTE 2
ROCK SLOPE
SEE NOTE 2
EMBANKMENT
TRANSVERSE - TRANSITIONS
LONGITUDINAL - TRANSITIONS
GENERAL NOTES
EMBANKMENT SHALL BE BROUGHT UP BY 1.2 m STAGE ALONG WITH THE BENCHING AND COMPACTED PARALLEL TO THE BENCHES. A. 1. THE INTENT OF THE TRANSITIONS IS TO OBTAIN UNIFORM BEARING
AND MATERIAL BOTH TRANSVERSELY AND LONGITUDINALLY.
NOTES:
2. THE QUANITY OF BENCHING TO BE PAID FOR SHALL BE DETERMINED BY USING A FIXED VOLUME OF 1.5 CUBIC METER PER LINEAR METER OF BENCH MULTIPLIED BY THE MEASURED LENGTH OF THE BENCH
A PLANE 1.2 m BELOW THE EDGES OF PAVEMENT OR A PLANE CONNECTING THE DITCH INVERTS, WHICHEVER IS HIGHER.
1.2 m
3. 4.
THE HATCHED AREA DOES NOT NECESSARILY COINCIDE WITH THE SUBGRADE AREA.
THE TRANSITION AREAS SHALL BE BACKFILLED WITH THE SUBGRADE AREA MATERIAL
REGARDLESS OF THE WIDTH OF THE BENCH. PAYMENT SHALL BE MADE UNDER THE APPROPRIATE ITEM OR ITEMS FOR EXCAVATION AND
BACKFILL.
B. VARIES
BENCHES SHALL BE CONSTRUCTED AS DESIGNED EXCEPT AS MODIFIED BY THE ENGINEER WITH THE APPROVAL OF THE REGIONAL GEOTECHNICAL ENGINEER.
THE LOWER LIMITS OF THE HATCHED AREAS IN CUT ARE THE LOWER PAYMENT LINES FOR EXCAVATION.
THE UNDERDRAIN INSTALLATION IS OPTIONAL (A.O.B.E.) THE CONFIGURATION SHALL BE A.O.B.E. AND PAYMENT SHALL BE MADE UNDER THE APPROPRIATE PAY ITEMS.
7.
THE DEPTH IS DETERMINED BY A LINE 1.2 m BELOW THE EDGES OF PAVEMENT OR A LINE CONNECTING THE DITCH INVERTS, WHICHEVER IS HIGHER.