Sunteți pe pagina 1din 82

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

ANLISIS DE PRECIOS UNITARIOS


ITEM
1.1

NOMBRE

UN

ESTRUCTURA RA4-001 (E.P.M. suspensin BT)

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

AISLADOR DE PORCELANA TIPO CARRETE

UN

1.00

PERCHA

UN

1.00

TORNILLO PARA AISLADOR TIPO CARRETE DE 81mm

UN

1.00

CONECTOR DE COMPRENSIN TIPO DERIVACIN DE ALUMINIO

UN

3.00

CINTA AUTOFUNDENTE

ML

1.00

CINTA PLASTICA

ML

0.50

UN

REND.

DIA

0.125

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

0.002

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

1.2

UN

ESTRUCTURA RA4-002 (E.P.M ngulo BT)

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

PERCHA

UN

1.00

AISLADOR DE PORCELANA TIPO CARRETE 81mm

UN

1.00

TORNILLO DE 15.9mm(5/8) X 200mm

UN

1.00

CONECTOR DE COMPRENSIN TIPO DERIVACIN DE ALUMINIO

UN

3.00

CINTA AUTOFUNDENTE

ML

1.00

CINTA PLASTICA

ML

0.50

UN

REND.

DIA

0.125

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.3

NOMBRE

UN

ESTRUCTURA RA4-003 (E.P.M. Terminal BT)

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

PERCHA ACANALADA

UN

1.00

AISLADOR DE PORCELANA TIPO CARRETE 81mm

UN

1.00

TORNILLO DE 15.9mm(5/8) X 200mm

UN

1.00

CONECTOR DE COMPRENSIN TIPO DERIVACIN DE ALUMINIO

UN

2.00

CINTA AUTOFUNDENTE

ML

1.00

CINTA PLASTICA

ML

0.50

UN

REND.

DIA

0.188

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.4

NOMBRE

UN

ESTRUCTURA RA4-004 (E.P.M. Referencia BT)

UN

I. MATERIALES
UN

CANT.

PERCHA

DESCRIPCION

UN

2.00

AISLADOR DE PORCELANA TIPO CARRETE 81mm

UN

2.00

TORNILLO DE 15.9mm(5/8) X 200mm

UN

1.00

CONECTOR DE COMPRENSIN TIPO DERIVACIN DE ALUMINIO

UN

3.00

CINTA AUTOFUNDENTE

ML

1.00

CINTA PLASTICA

ML

1.00

UN

REND.

DIA

0.188

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
5.1

NOMBRE

UN

NORMA RA5-201 LUMINARIA DE SODIO DE 70W - 240V

UN

I. MATERIALES
DESCRIPCION

UN

CONECTOR DE COMPRESION UNIVERSAL

UN

CANT.
2.00

CABLE COBRE DUPLEX N 14 THW-600V NEGRO

ML

12.00

TORNILLO DE CARRUAJE 5/8x 8CON TUERCA

UN

2.00

BRAZO GALVANIZADO PARA LUMINARIA

UN

1.00

BOMBILLO DE SODIO TUBULAR 70W E-27

UN

1.00

LUMINARIA DE SODIO A.P. 70W E-27 CON BASE

UN

1.00

FOTOCELDA FISHER PIERCE 220V

UN

1.00

CINTA PLASTICA DE VILO 600 VAC

UN

1.00

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

UN

REND.

DIA

0.19

III. TRANSPORTE
DESCRIPCION

UN.

TRANSPORTE DE ESTRUCTURA

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
4.1

NOMBRE

UN

RA6-001 INSTALACIN DE VIENTO CONVENCIONAL

UN

I. MATERIALES
UN

CANT.

BLOQUE DE ANCLAJE

DESCRIPCION

UN

1.00

VARILLA DE ANCLAJE

UN

1.00

GUARDACABOS

UN

1.00

CABLE SUPER GX DE 1/4"

ML

15.00

UN

REND.

DIA

0.08

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.072

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

2.1

UN

CONDUCTOR PARA MT

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

CONDUCTOR ACSR N 2 AWG SUMI Y TEND.

ML

1.00

UN

REND.

DIA

0.01

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (CC)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE CABLE

IV. EQUIPOS Y HERRAMIENTAS

UN.

GL

REND.

DESCRIPCION
HERRAMIENTA MENOR

UN.

CANT.

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

2.3

UN

CABLE DE GUARDA

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

CABLE DE ACERO SUPER GX 1/4"

ML

1.00

DESCRIPCIN

UN

REND.

DIA

0.01

II. MANO DE OBRA

CUADRILLA (CC)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE CABLE

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

TOTAL COSTO DIRECTO

0.002

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

2.2

UN

CONDUCTOR PARA BT

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

CABLE TRIPLEX 2X35 MM+35 MM (2X2+ 1X2)

ML

1.00

UN

REND.

DIA

0.01

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (CC)

III. TRANSPORTE
DESCRIPCION

UN.

TRANSPORTE DE CABLE

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
3.1

NOMBRE

UN
POSTERIA

UN

I. MATERIALES
DESCRIPCION
POSTE DE CONCRETO DE 12m - 510KG

UN

CANT.

UN

1.00

UN

REND.

UND

0.10

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (DD)

III. TRANSPORTE
UN.

CANT

TRANSPORTE DE POSTE

DESCRIPCION

KG

805

CARGUE Y DESCARGUE

KG

805

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

1.000

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

3.2

UN
POSTERIA

UN

I. MATERIALES
DESCRIPCION
POSTE DE CONCRETO DE 10m - 510KG

UN

CANT.

UN

1.00

UN

REND.

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (DD)

UND

0.10

III. TRANSPORTE
UN.

CANT

TRANSPORTE DE POSTE

DESCRIPCION

KG

805

CARGUE Y DESCARGUE

KG

805

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

1.000

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

3.3

UN
POSTERIA

UN

I. MATERIALES
DESCRIPCION
POSTE DE CONCRETO DE 8m - 510KG

UN

CANT.

UN

1.00

UN

REND.

UND

0.10

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (DD)

III. TRANSPORTE
UN.

CANT

TRANSPORTE DE POSTE

DESCRIPCION

KG

805

CARGUE Y DESCARGUE

KG

805

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION

UN.

HERRAMIENTA MENOR

CANT.

1.000

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

6.1

UN
ACOMETIDA

UN

I. MATERIALES
UN

CANT.

ANCLAJE TIPO CUA PARA ACOMETIDA

DESCRIPCION

UN

2.00

SOPORTE DE ALUMINIO PARA ANCLAJE TIPO CUA

UN

2.00

TORNILLO GOLOSO DE 1/4 X 1 1/2EN ACERO

UN

1.00

CINTA BAND-IT AC INOX 3/4X 70Cm

UN

1.00

HEBILLA PARA CINTA BAND IT 5/8

ML

1.00

CABLE CONCENTRICO 1XN8 AWG

UN

15.00

UN

REND.

DIA

499186.97

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

IV. EQUIPOS Y HERRAMIENTAS

UN.

GL

REND.

DESCRIPCION
HERRAMIENTA MENOR

UN.

CANT.

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

1.5

UN

CAJAS PORTABORNERAS

UN

I. MATERIALES
UN

CANT.

CAJA PORTABORNERA 4 USUARIOS

DESCRIPCION

UN

1.00

CABLE ENCAUCHETADO 3 N 6 AWG

UN

1.50

ACCESORIOS DE AJUSTE

GL

1.00

CINTA AUTOFUNDENTE

ML

1.00

UN

REND.

DIA

499186.97

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

IV. EQUIPOS Y HERRAMIENTAS

UN.

GL

REND.

DESCRIPCION
HERRAMIENTA MENOR

UN.

CANT.

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

7.1

UN

PLANTA ELECTRICA DE 50KVA

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

PLANTA ELCTRICA 50KVA CON CABINA

UN

1.00

CABLE DE COBRE #1/0 THHN ENCAUCHETADO

ML

70.00

TUBERA DE 2" PVC

ML

7.00

TUBO GALBANIZADO EMT 2" Y UNION

ML

8.00

CURVA PVC 2"

UN

1.00

CAPACETE PARA TUBERIA DE 2"

UN

1.00

CINTA BANDIT ACERO ACERO INOXIDABLE 1/2"X 70cm

ML

II. MANO DE OBRA


DESCRIPCIN

UN

REND.

INSTALACIN DE PLANTA ELCTRICA, CUAD (GG)

UND

3.50

INSTALACIN ACOMETIDA DE PLANTA A POSTE

UND

2.00

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE PLANTA ELCTRICA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

TOTAL COSTO DIRECTO

0.002

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

7.2

UN

PLANTA ELECTRICA DE 37.5 KVA

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

PLANTA ELCTRICA 37KVA CON CABINA

UN

1.00

CABLE DE COBRE #1/0 THHN ENCAUCHETADO

ML

70.00

TUBERA DE 2" PVC

ML

7.00

TUBO GALBANIZADO EMT 2" Y UNION

ML

8.00

CURVA PVC 2"

UN

1.00

CAPACETE PARA TUBERIA DE 2"

UN

1.00

CINTA BANDIT ACERO ACERO INOXIDABLE 1/2"X 70cm

ML

II. MANO DE OBRA


DESCRIPCIN

UN

REND.

INSTALACIN DE PLANTA ELCTRICA, CUAD (GG)

UND

3.50

INSTALACIN ACOMETIDA DE PLANTA A POSTE

UND

2.00

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE PLANTA ELCTRICA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

UN

NORMA RA6-010 PUESTA A TIERRA

6.2

UN

I. MATERIALES
UN

CANT.

VARILLA DE PUSTA A TIERRA

DESCRIPCION

UN

1.00

CALE DE COBRE DESNUDO N 4 AWG

UN

8.00

CONECTOR PARA VARILLA DE PUESTA ATIERRA

UN

1.00

CONECTOR BIMETALICO

UN

1.00

TUBO GALVANIZADO DE 1/2"

UN

6.00

CINTA BANDIT 1/2" 70 cm

ML

3.00

UN

REND.

DIA

0.08

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE PUESTA ATIERRA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION

HERRAMIENTA MENOR

0.072

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
0.1

NOMBRE

UN

APERTURA DE TROCHA

UN

I. MATERIALES
UN

CANT.

HERRAMIENTA MENOR

DESCRIPCION

GL

1.00

SIERRA

GL

2.00

MACHETE

GL

4.00

HACHA

GL

3.00

EQUIPO DE SEGURIDAD

GL

1.00

UN

REND.

DIA

5.00

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (FF) DE APERTURA DE TROCHA

III. TRANSPORTE
DESCRIPCION

UN.

TRANSPORTE DE TRANSFERENCIA

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
0.2

NOMBRE

UN

REPLANTEO DE REDES DE BAJA Y MEDIA TENSIN

UN

I. MATERIALES
DESCRIPCION
HERRAMIENTA MENOR

II. MANO DE OBRA

UN

CANT.

GL

1.00

DESCRIPCIN

CUADRILLA(EE) DE REPLANTEO Y TOPOGRAFIA

UN

REND.

DIA

3.00

III. TRANSPORTE
DESCRIPCION

UN.

REND.

TRANSPORTE DE TRANSFERENCIA

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

UN.

CANT.

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
4.2

NOMBRE

UN

RA6-002 INSTALACIN DE VIENTO FAROL

UN

I. MATERIALES
UN

CANT.

BLOQUE DE ANCLAJE

DESCRIPCION

UN

1.00

VARILLA DE ANCLAJE

UN

1.00

GUARDACABOS

UN

1.00

CABLE SUPER GX DE 1/4"

ML

15.00

APOYO PARA VIENTO

UN

1.00

UN

REND.

DIA

0.10

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.072

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

8.1

UN

CASETA Y TRAMPA DE GRASA

UN

I. MATERIALES
UN

CANT.

CONSTRUCION CASETA PARA PLANTAS

DESCRIPCION

GL

1.00

CONSTRUCION TRAMPA DE GRASA PARA CASETA

GL

1.00

UN

REND.

DIA

3.00

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA(EE) DE REPLANTEO Y TOPOGRAFIA

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE TRANSFERENCIA

UN.

REND.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

UN.

CANT.

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

7.1

UN

TRANSFORMADOR DE 25 KVA

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

TRANSFORMADOR DE 25 KVA

UN

1.00

Fusible Media Tensin 13.2 KV. De 3 Amp. Tipo HDO

ML

2.00

Cable de Cobre Aislado No. 1/0 AWG - THW

ML

6.00

Cruceta metlica 2400mm. 2 1/2" x 2 1/2" x 3/16"

GL

1.00

Diagonal Recta Metlica de 68 cm

GL

1.00

Collarn de 2 Salidas Dimetro de 5" a 7"

UN

2.00

Collarn para Transformador de 8" a 10"

UN

2.00

Cinta de Acero Inoxidable Bandit de 5/8"

ML

6.00

Hebilla de Acero Inoxidable cinta Bandit de 5/8"

UN

6.00

Varilla cooper weld de 5/8" x 2.44 mts (Enchaquetada)

UN

1.00

Perno de mquina 1/2" x 1 1/2"

UN

6.00

Perno de mquina 5/8" x 10"

UN

2.00

Conector para Lnea Viva

UN

2.00

Arandela de presin 5/8"

UN

2.00

Cable de Acero Galvanizado de 3/8"

ML

15.00

Tubo Conduit Metalico Galvanizado de 1" por 3 mts.

UN

1.00

Pararrayos Tipo Lnea de 12 KV., 10 KA

UN

2.00

Cortacircuitos 15 KV 100 AMP IMC

UN

2.00

Conector RETIE acero galvanizado cobre ponchado

UN

1.00

Anillo de cable de cobre 1/0 con conector para PT (4m)

UN

1.00

II. MANO DE OBRA


DESCRIPCIN

INSTALACIN DE TRANSFORMADOR

UN

REND.

UND

1.00

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE TRANSFORMADOR

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM

NOMBRE

7.2

UN

TRANSFORMADOR DE 15 KVA

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

TRANSFORMADOR DE 15 KVA

UN

1.00

Fusible Media Tensin 13.2 KV. De 3 Amp. Tipo HDO

ML

2.00

Cable de Cobre Aislado No. 1/0 AWG - THW

ML

6.00

Cruceta metlica 2400mm. 2 1/2" x 2 1/2" x 3/16"

GL

1.00

Diagonal Recta Metlica de 68 cm

GL

1.00

Collarn de 2 Salidas Dimetro de 5" a 7"

UN

2.00

Collarn para Transformador de 8" a 10"

UN

2.00

Cinta de Acero Inoxidable Bandit de 5/8"

ML

6.00

Hebilla de Acero Inoxidable cinta Bandit de 5/8"

UN

6.00

Varilla cooper weld de 5/8" x 2.44 mts (Enchaquetada)

UN

1.00

Perno de mquina 1/2" x 1 1/2"

UN

6.00

Perno de mquina 5/8" x 10"

UN

2.00

Conector para Lnea Viva

UN

2.00

Arandela de presin 5/8"

UN

2.00

Cable de Acero Galvanizado de 3/8"

ML

15.00

Tubo Conduit Metalico Galvanizado de 1" por 3 mts.

UN

1.00

Pararrayos Tipo Lnea de 12 KV., 10 KA

UN

2.00

Cortacircuitos 15 KV 100 AMP IMC

UN

2.00

Conector RETIE acero galvanizado cobre ponchado

UN

1.00

Anillo de cable de cobre 1/0 con conector para PT (4m)

UN

1.00

II. MANO DE OBRA


DESCRIPCIN

INSTALACIN DE TRANSFORMADOR

UN

REND.

UND

1.00

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE TRANSFORMADOR

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.1

NOMBRE

UN

ESTRUCTURA RA2-031 (E.P.M. suspensin MT)

UN

I. MATERIALES
UN

CANT.

TORNILLO DE 15.9mm(5/8) X 250mm

DESCRIPCION

UN

2.00

TIRANTA METALICA

ML

1.00

AISLADOR DE PORCELANA TIPO PIN PARA 15 KV

UN

3.00

AISLADOR DE PORCELANA TIPO PIN PARA NEUTRO

UN

1.00

CRUCETA ANGULAR DE 2400mm (al centro)

UN

1.00

ESPIGO PARA CRUCETA METALICA (Le =38mm)

UN

3.00

OJAL DE SUSPENSION

UN

1.00

ESLABON EN U DE 12.7mm

UN

1.00

GRAPA DE SUSPENSION (segn calibre)

UN

1.00

BAYONETA SENCILLA DE 1500mm (3"X3"X1/4")

UN

1.00

TORNILLO DE 15.9X300mm(5/8X10)

UN

2.00

TORNILLO DE 15.9X200mm(5/8X10)

UN

1.00

ESPIGO PARA AISLADOR 15KV EN CRUCETA METALICA

UN

1.00

TORNILLO DE 15.9mm(5/8) X 38mm

UN

2.00

II. MANO DE OBRA

DESCRIPCIN

CUADRILLA (AA)

UN

REND.

DIA

0.125

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

0.002

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.2

NOMBRE

UN

ESTRUCTURA RA2-032 (E.P.M ngulo MT)

UN

I. MATERIALES
UN

CANT.

TORNILLO DE 15.9mm(5/8) X 200mm

DESCRIPCION

UN

1.00

TIRANTA METALICA (CRUCETA DE 2400mm)

ML

1.00

AISLADOR DE PORCELANA TIPO PIN PARA 15 KV

UN

4.00

AISLADOR DE PORCELANA TIPO PIN PARA NEUTRO

UN

1.00

CRUCETA ANGULAR DE 2400mm

UN

2.00

TORNILLO DE 15.9mm(5/8) X 38mm

UN

1.00

OJAL DE SUSPENSION

UN

1.00

ESLABON EN U DE 12.7mm

UN

1.00

GRAPA DE SUSPENSION (segn calibre)

UN

1.00

BAYONETA SENCILLA DE 1500mm (3"X3"X1/4")

UN

1.00

ESPIGO PARA CRUCETA METALICA (Le =38mm)

UN

3.00

UN

REND.

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

DIA

0.125

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.3

NOMBRE

UN

ESTRUCTURA RA2-033 (E.P.M. Terminal MT)

UN

I. MATERIALES
UN

CANT.

TORNILLO DE 15.9mm(5/8) X 200mm

DESCRIPCION

UN

1.00

TIRANTA METALICA (CRUCETA DE 2400mm)

ML

1.00

ESLABON

UN

2.00

AISLADOR DE PORCELANA TIPO SUSPENSION DE 165mm O POLIMERICO

UN

2.00

GRAPA TERMINAL TIPO RECTA

UN

2.00

CRUCETA ANGULAR DE 2400mm

UN

1.00

OJAL DE SUSPENSION

UN

1.00

ESLABON EN U DE 12.7mm

UN

1.00

GRAPA DE SUSPENSION (segn calibre)

UN

1.00

BAYONETA SENCILLA DE 1500mm (3"X3"X1/4")

UN

1.00

TORNILLO DE 15.9mm(5/8) X 38mm

UN

1.00

UN

REND.

DIA

0.188

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.4

NOMBRE

UN

ESTRUCTURA RA2-034 (E.P.M. Referencia MT)

UN

I. MATERIALES
UN

CANT.

CONECTOR DE COMPRESION TIPO DERIVACION DE "CU"

DESCRIPCION

UN

2.00

TORNILLO DE 15.9mm(5/8) X 200mm

UN

2.00

TIRANTA METALICA

ML

1.00

ESLABON

UN

6.00

AISLADOR DE PORCELANA TIPO SUSPENSION DE 165mm O POLIMERICO

UN

2.00

GRAPA TERMINAL TIPO RECTA

UN

2.00

CRUCETA ANGULAR DE 2400mm

UN

1.00

ESPIGO PARA CRUCETA METALICA (Le =38mm)

UN

3.00

AISLADOR DE PORCELANA TIPO PIN PARA 15KVA

UN

2.00

OJAL DE SUSPENSION

UN

1.00

ESLABON EN U DE 12.7mm

UN

1.00

GRAPA DE SUSPENSION (segn calibre)

UN

1.00

BAYONETA SENCILLA DE 1500mm (3"X3"X1/4")

UN

1.00

TORNILLO DE 15.9mm(5/8) X 38mm

UN

1.00

UN

REND.

DIA

0.188

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

UN.

REND.

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.5

NOMBRE

UN

ESTRUCTURA RA2-006(E.P.M. Pararrayo MT)

UN

I. MATERIALES
DESCRIPCION

UN

CANT.

TIRANTA METALICA (CRUCETA DE 1500mm)

ML

2.00

ANILLO 230mm

UN

2.00

TORNILLO DE 15.9mm(5/8) X 250mm

UN

1.00

PUESTA A TIERRA

UN

3.00

CONECTOR DE COMPRESION TIPO DERIVACION DE "CU"

UN

1.00

DPS OXIDO METALICO: 12KV MCOV, 10.2KV, 10KV (con sus herrajes)

UN

2.00

CRUCETA DE 2400mm

UN

1.00

TORNILLO DE 15.9mm(5/8) X 38mm

UN

1.00

INSTALACION DE ESTRIBO

UN

1.00

ALAMBRE DE ACERO RECUBIERTO DE COBRE No 4 (cubierto)

1.00

UN

REND.

DIA

0.188

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

UN.

REND.

TRANSPORTE DE ESTRUCTURA

GL

UN.

CANT.

IV. EQUIPOS Y HERRAMIENTAS


DESCRIPCION
HERRAMIENTA MENOR

0.002

TOTAL COSTO DIRECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC


ANLISIS DE PRECIOS UNITARIOS
ITEM
1.6

NOMBRE

UN

ESTRUCTURA RA2-007 (E.P.M. Aisladores MT)

UN

I. MATERIALES
UN

CANT.

CONECTOR TRANSVERSAL UNIVERSAL

DESCRIPCION

UN

2.00

TORNILLO DE 15.9mm(5/8) X 250mm

UN

5.00

FUSIBLE PARA CORTACIRCUITO, TIPO T

UN

2.00

CRUCETA DE 2400mm

UN

2.00

CORTACIRCUITO PRIMARIO 100A O 200A - 15 KV

UN

2.00

TORNILLO DE 15.9mm(5/8) X 38mm

UN

6.00

TIRANTA METALICA (CRUCETA DE 2400mm)

ML

1.00

BARRAJE O ALAMBRE DE "AL" RECUBIERTO DE " CU"

16.00

INSTALACION DE ESTRIBO

UN

4.00

UN

REND.

DIA

0.188

II. MANO DE OBRA


DESCRIPCIN

CUADRILLA (AA)

III. TRANSPORTE
DESCRIPCION

TRANSPORTE DE ESTRUCTURA

IV. EQUIPOS Y HERRAMIENTAS

UN.

GL

REND.

DESCRIPCION
HERRAMIENTA MENOR

TOTAL COSTO DIRECTO

UN.
%

CANT.
0.002

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

2,500.00

2,500.00

6,500.00

6,500.00

3,000.00

3,000.00

6,000.00

18,000.00

10,000.00

10,000.00

1500.00 $

750.00

SUBTOTAL

JORNAL

40,750.00

VALOR UNIT

499,186.97

62398.37
0.00
0.00
$

JORNAL

62,398.37

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

103148.37

206.30
0.00
0.00

SUBTOTAL

206.30

106,354.67

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

6,000.00

6,000.00

2,500.00

2,500.00

3,000.00

3,000.00

6,000.00

18,000.00

10,000.00

10,000.00

1500.00 $

750.00

SUBTOTAL

JORNAL

40,250.00

VALOR UNIT
0.00

499,186.97

62398.37
0.00
0.00
$

JORNAL

62,398.37

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

102648.37

205.30
0.00
0.00

SUBTOTAL

205.30

105,853.67

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

6,500.00

6,500.00

2,500.00

2,500.00

3,000.00

3,000.00

6,000.00

12,000.00

10,000.00

10,000.00

1500.00 $

750.00

SUBTOTAL

JORNAL

34,750.00

VALOR UNIT
0.00

499,186.97

93597.56
0.00
0.00
$

JORNAL

93,597.56

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

128347.56

256.70
0.00
0.00

SUBTOTAL

256.70

131,604.25

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

6,500.00

13,000.00

2,500.00

5,000.00

3,000.00

3,000.00

6,000.00

18,000.00

10,000.00

10,000.00

1500.00 $

SUBTOTAL

1,500.00

JORNAL

37,500.00

VALOR UNIT
0.00

499,186.97

93597.56
0.00
0.00
$

JORNAL

93,597.56

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

131097.56

262.20
0.00
0.00

SUBTOTAL

262.20

134,359.75

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

13,000.00

26,000.00

500.00

6,000.00

3,000.00

6,000.00

12,000.00

12,000.00

12,000.00

12,000.00

160,000.00

160,000.00

24,000.00

24,000.00

1500.00 $

1,500.00

SUBTOTAL

247,500.00

JORNAL

VALOR UNIT
0.00

499186.97

93597.56
0.00
0.00
$

JORNAL

93,597.56

VALOR UNIT
0.00

8000

8000.00
0.00

SUBTOTAL

PRECIO UNIT.

8,000.00

VALOR UNIT

341097.56

682.20
0.00
0.00

SUBTOTAL

682.20

349,779.75

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

40,000.00

40,000.00

23,000.00

23,000.00

2,000.00

2,000.00

1,600.00

24,000.00

SUBTOTAL

JORNAL

89,000.00

VALOR UNIT
0.00

499186.97

39934.96
0.00
0.00
$

39,934.96

JORNAL

VALOR UNIT
0.00

30000

30000.00
0.00

SUBTOTAL

PRECIO UNIT.

30,000.00

VALOR UNIT

128934.96

9283.32
0.00
0.00

SUBTOTAL

9,283.32

168,218.27

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

1,600.00

SUBTOTAL

VALOR UNIT
$

1,600.00

JORNAL

1,600.00

VALOR UNIT
0.00

781597.72

7815.98
0.00
0.00
$

JORNAL

7,815.98

VALOR UNIT
0.00

900

900.00
0.00

SUBTOTAL

900.00

PRECIO UNIT.

VALOR UNIT

9415.98

18.83
0.00
0.00

SUBTOTAL

18.83

10,334.81

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

1,600.00

SUBTOTAL

VALOR UNIT
$

1,600.00

JORNAL

1,600.00

VALOR UNIT
0.00

781597.72

7815.98
0.00
0.00
$

JORNAL

7,815.98

VALOR UNIT
0.00

900

900.00
0.00

SUBTOTAL

PRECIO UNIT.

900.00

VALOR UNIT

9415.98

18.83
0.00
0.00

SUBTOTAL

18.83

10,334.81

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

15,000.00

SUBTOTAL

VALOR UNIT
$

15,000.00

JORNAL

15,000.00

VALOR UNIT
0.00

781597.72

7815.98
0.00
0.00
$

JORNAL

7,815.98

VALOR UNIT
0.00

900

900.00
0.00

SUBTOTAL

PRECIO UNIT.

900.00

VALOR UNIT

22815.98

45.63
0.00
0.00

SUBTOTAL

45.63

23,761.61

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

600,000.00

SUBTOTAL

VALOR UNIT
$

600,000.00

JORNAL

600,000.00

VALOR UNIT
0.00

448165.95

44816.60
0.00
0.00
$

JORNAL

44,816.60

VALOR UNIT

200

161000.00

60

48300.00
0.00

SUBTOTAL

PRECIO UNIT.

209,300.00

VALOR UNIT

10000.00

10000.00
0.00
0.00

SUBTOTAL

10,000.00

864,116.60

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

550,000.00

SUBTOTAL

JORNAL

VALOR UNIT
$

550,000.00

550,000.00

VALOR UNIT

0.00
448165.95

44816.60
0.00
0.00
$

JORNAL

44,816.60

VALOR UNIT

200

161000.00

60

48300.00
0.00

SUBTOTAL

PRECIO UNIT.

209,300.00

VALOR UNIT

10000.00

10000.00
0.00
0.00

SUBTOTAL

10,000.00

814,116.60

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

500,000.00

SUBTOTAL

VALOR UNIT
$

500,000.00

JORNAL

500,000.00

VALOR UNIT
0.00

448165.95

44816.60
0.00
0.00
$

JORNAL

44,816.60

VALOR UNIT

200

161000.00

60

48300.00
0.00

SUBTOTAL

209,300.00

PRECIO UNIT.

VALOR UNIT

10000.00

10000.00
0.00
0.00

SUBTOTAL

10,000.00

764,116.60

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

7,500.00

15,000.00

3,500.00

7,000.00

200.00

200.00

7,000.00

7,000.00

1,500.00

1,500.00

7,000.00

105,000.00

120,700.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

0.13

64894.31
0.00
0.00
$

JORNAL

64,894.31

VALOR UNIT
0.00

12000

12000.00
0.00

SUBTOTAL

12,000.00

PRECIO UNIT.

VALOR UNIT

185594.31

371.19
0.00
0.00

SUBTOTAL

371.19

197,965.50

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

120,000.00

120,000.00

20,000.00

30,000.00

12,000.00

12,000.00

10,000.00

10,000.00

172,000.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

0.13

62398.37
0.00
0.00
$

JORNAL

62,398.37

VALOR UNIT
0.00

10000

10000.00
0.00

SUBTOTAL

10,000.00

PRECIO UNIT.

VALOR UNIT

234398.37

468.80
0.00
0.00

SUBTOTAL

468.80

244,867.17

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

39,000,000.00

39,000,000.00

17,000.00

1,190,000.00

25,000.00

175,000.00

13,000.00

104,000.00

3,500.00

3,500.00

7,000.00

7,000.00

4,000.00

16,000.00

40,495,500.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

734205.17

2569718.11

781597.72

1563195.44
0.00
$

JORNAL

4,132,913.56

VALOR UNIT
0.00

3,000,000.00

3,000,000.00

3,000,000.00

0.00
SUBTOTAL

PRECIO UNIT.

VALOR UNIT

44628413.56

89256.83
0.00
0.00

SUBTOTAL

89,256.83

47,717,670.38

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

34,000,000.00

34,000,000.00

17,000.00

1,190,000.00

25,000.00

175,000.00

13,000.00

104,000.00

3,500.00

3,500.00

7,000.00

7,000.00

4,000.00

16,000.00

35,495,500.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

734205.17

2569718.11

781597.72

1563195.44
0.00
$

JORNAL

4,132,913.56

VALOR UNIT
0.00

3000000

3000000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000,000.00

VALOR UNIT

39628413.56

79256.83
0.00
0.00

SUBTOTAL

79,256.83

42,707,670.38

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

80,000.00

80,000.00

6,000.00

48,000.00

6,000.00

6,000.00

5,000.00

5,000.00

6,000.00

36,000.00

4,000.00

12,000.00

187,000.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

499186.97

39,934.96
0.00
0.00

JORNAL

39,934.96

VALOR UNIT
0.00

3,000.00

3,000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

226934.96

16339.32
0.00
0.00

SUBTOTAL

16,339.32

246,274.27

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

6,000.00

6,000.00

1,000.00

2,000.00

500.00

2,000.00

500.00

1,500.00

1,500.00

1,500.00

13,000.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

851224.58

4256122.92
0.00
0.00
$

JORNAL

4,256,122.92

VALOR UNIT
0.00

150000

150000.00
0.00

SUBTOTAL

PRECIO UNIT.

150,000.00

VALOR UNIT

4269122.92

8538.25

0.00
0.00
SUBTOTAL

8,538.25

4,427,661.16

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

6,000.00

SUBTOTAL

VALOR UNIT
$

6,000.00

6,000.00

JORNAL

VALOR UNIT
0.00

698255.03

2094765.08
0.00
0.00
$

JORNAL

2,094,765.08

VALOR UNIT
0.00
0.00
0.00

SUBTOTAL

PRECIO UNIT.

VALOR UNIT

2100765.08

4201.53

0.00
0.00
SUBTOTAL

4,201.53

2,104,966.61

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

40,000.00

40,000.00

23,000.00

23,000.00

2,000.00

2,000.00

2,000.00

30,000.00

15,000.00

15,000.00

110,000.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

499186.97

51915.45
0.00
0.00

JORNAL

51,915.45

VALOR UNIT
0.00

30000

30000.00
0.00

SUBTOTAL

PRECIO UNIT.

30,000.00

VALOR UNIT

161915.45

11657.91
0.00
0.00

SUBTOTAL

11,657.91

203,573.36

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

32,108,038.00

32,108,038.00

9,310,974.00

9,310,974.00

41,419,012.00

SUBTOTAL

JORNAL

VALOR UNIT
0.00

0.00

0.00
0.00
0.00
$

JORNAL

VALOR UNIT
0.00
0.00

0.00
SUBTOTAL

PRECIO UNIT.

VALOR UNIT

41419012.00

82838.02
0.00

0.00
SUBTOTAL

82,838.02

41,501,850.02

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

2,600,000.00

2,600,000.00

17,000.00

34,000.00

25,000.00

150,000.00

68,000.00

68,000.00

35,000.00

35,000.00

14,000.00

28,000.00

14,000.00

28,000.00

5,000.00

30,000.00

1,000.00

6,000.00

90,000.00

90,000.00

1,000.00

6,000.00

5,000.00

10,000.00

8,000.00

16,000.00

300.00

600.00

3,000.00

45,000.00

30,000.00

30,000.00

80,000.00

160,000.00

165,000.00

330,000.00

5,000.00

5,000.00

$
SUBTOTAL

JORNAL

3,671,600.00

VALOR UNIT
0.00

734205.17

734205.17
0.00

JORNAL

734,205.17

VALOR UNIT
0.00

300,000.00

300,000.00
0.00

SUBTOTAL

PRECIO UNIT.

300,000.00

VALOR UNIT

4405805.17

8811.61
0.00
0.00

SUBTOTAL

8,811.61

4,714,616.79

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

2,100,000.00

2,100,000.00

17,000.00

34,000.00

25,000.00

150,000.00

68,000.00

68,000.00

35,000.00

35,000.00

14,000.00

28,000.00

14,000.00

28,000.00

5,000.00

30,000.00

1,000.00

6,000.00

90,000.00

90,000.00

1,000.00

6,000.00

5,000.00

10,000.00

8,000.00

16,000.00

300.00

600.00

3,000.00

45,000.00

30,000.00

30,000.00

80,000.00

160,000.00

165,000.00

330,000.00

5,000.00

5,000.00

SUBTOTAL

$
$

3,171,600.00

JORNAL

VALOR UNIT
0.00

734205.17

734205.17

JORNAL

734,205.17

VALOR UNIT
0.00

300,000.00

300,000.00

300,000.00

0.00
SUBTOTAL

PRECIO UNIT.

VALOR UNIT

3905805.17

7811.61
0.00
0.00

SUBTOTAL

7,811.61

4,213,616.79

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

3,000.00

6,000.00

35,000.00

35,000.00

15,000.00

45,000.00

6,000.00

6,000.00

68,000.00

68,000.00

6,000.00

18,000.00

12,000.00

12,000.00

10,000.00

10,000.00

42,000.00

42,000.00

60,000.00

60,000.00

3,000.00

6,000.00

3,000.00

3,000.00

6,000.00

6,000.00

3000.00 $

6,000.00

SUBTOTAL

323,000.00

JORNAL

VALOR UNIT

499,186.97

62398.37
0.00
0.00

JORNAL

62,398.37

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

385398.37

770.80
0.00
0.00

SUBTOTAL

770.80

389,169.17

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

3,000.00

3,000.00

35,000.00

35,000.00

15,000.00

60,000.00

6,000.00

6,000.00

68000.00 $

136,000.00

3000.00 $

3,000.00

12000.00 $

12,000.00

10000.00 $

10,000.00

42000.00 $

42,000.00

120000.00 $

120,000.00

6000.00 $

18,000.00

SUBTOTAL

JORNAL

445,000.00

VALOR UNIT
0.00

499,186.97

62398.37
0.00
0.00
$

JORNAL

62,398.37

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

507398.37

1014.80
0.00
0.00

SUBTOTAL

1,014.80

511,413.17

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

3,000.00

3,000.00

35,000.00

35,000.00

6,000.00

12,000.00

15,000.00

30,000.00

14000.00 $

28,000.00

68000.00 $

68,000.00

12000.00 $

12,000.00

10000.00 $

10,000.00

42000.00 $

42,000.00

120000.00 $

120,000.00

3000.00 $

3,000.00

SUBTOTAL

JORNAL

363,000.00

VALOR UNIT
0.00

499,186.97

93597.56
0.00
0.00

JORNAL

93,597.56

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

456597.56

913.20
0.00
0.00

SUBTOTAL

913.20

460,510.75

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT
$

VALOR UNIT

6,500.00

2,500.00

5,000.00

35,000.00

35,000.00

6,000.00

36,000.00

30,000.00

60,000.00

14,000.00

28,000.00

68,000.00

68,000.00

6,000.00

18,000.00

15,000.00

30,000.00

12,000.00

12,000.00

10,000.00

10,000.00

42,000.00

42,000.00

120,000.00

120,000.00

3,000.00

3,000.00

480,000.00

SUBTOTAL

JORNAL

13,000.00

VALOR UNIT
0.00

499,186.97

93597.56
0.00
0.00
$

93,597.56

JORNAL

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

573597.56

1147.20
0.00
0.00

SUBTOTAL

1,147.20

577,744.75

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

35,000.00

70,000.00

2,500.00

5,000.00

3,000.00

3,000.00

6,000.00

18,000.00

10,000.00

10,000.00

80,000.00

160,000.00

68,000.00

68,000.00

3,000.00

3,000.00

6,000.00

6,000.00

5000.00 $

5,000.00

SUBTOTAL

JORNAL

348,000.00

VALOR UNIT
0.00

499,186.97

93597.56
0.00
0.00
$

JORNAL

93,597.56

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

PRECIO UNIT.

3,000.00

VALOR UNIT

441597.56

883.20
0.00
0.00

SUBTOTAL

883.20

445,480.75

CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

PRECIO UNIT

VALOR UNIT

85,000.00

170,000.00

3,000.00

15,000.00

6,000.00

12,000.00

68,000.00

136,000.00

165,000.00

330,000.00

3,000.00

18,000.00

35,000.00

35,000.00

5,000.00

80,000.00

6000.00 $

24,000.00

SUBTOTAL

JORNAL

820,000.00

VALOR UNIT
0.00

499,186.97

93597.56
0.00
0.00
$

JORNAL

93,597.56

VALOR UNIT
0.00

3000

3000.00
0.00

SUBTOTAL

3,000.00

PRECIO UNIT.

VALOR UNIT

913597.56

1827.20
0.00
0.00

SUBTOTAL

1,827.20

918,424.75

INTERCONEXION ELECTRICA ENTRE PUE

ITEM
0.
0.1
0.2
1.
1.A
1.1
1.2
1.3
1.4
1.5
1.B
1.1
1.2
1.3
1.4
1.5
1.6
2.
2.1
2.2
2.3
3.
3.1
3.2
3.3
4.
4.1
4.2
5.
5.1
6.
6.1
6.2
7
7.1
7.2
8
8.1

DESCRIPCIN
UND
REPLANTEO Y APERTURA DE TROCHA
Apertura de trocha
KM
Replanteo red de baja y media tension
KM
MATERIALES POR ESTRUCTURA
ESTRUCTURA DE BAJA TENSIN
Estructura RA4-001 (E.P.M. suspensin)
UN
Estructura RA4-002 (E.P.M. ngulo)
UN
Estructura RA4-003 (E.P.M. Terminal)
UN
Estructura RA4-004 (E.P.M. Referencia)
UN
Sumin. Instalacin de caja portabornera
UN
ESTRUCTURA DE MEDIA TENSIN
Estructura RA2-031 (E.P.M. suspensin MT)
UN
Estructura RA2-032 (E.P.M. Angulo MT)
UN
Estructura RA2-033 (E.P.M. Terminal MT)
UN
Estructura RA2-034 (E.P.M. Referencia MT)
UN
Estructura RA2-006 (E.P.M. Instalacion pararrayos MT)
UN
Estructura RA2-007 (E.P.M. Aisladores MT)
UN
CONDUCTOR DE BAJA Y MEDIA TENSIN.
Sumin. e instalacin cable ACSR N 2 AWG
M
Sumin. e instalacin cable triplex 2x35 mm+35 mm (2x2+ 1x2)
M
Sumin. e instalacin cable de acero super GX 1/4"
M
POSTERA DE CONCRETO
Suministro e hincada de postes 12m - 510kg
UN
Suministro e hincada de postes 10m - 510kg
UN
Suministro e hincada de postes 8m - 510kg
UN
VIENTOS PARA RED DE BAJA TENSIN
Vientos convencional, cable super GX
UN
Viento farol
UN
LUMINARIA DE SODIO DE 70W - 240V
Suministro e Instalacin de lmparas de 70W-220V
UN
ACOMETIDAS Y PUESTA A TIERRA
Suministro e Instacin de acometidas
UN
Suministro e Instalacin de puesta a tierra
UN
TRANSFORMADORES
UN
Suministro e Instalacin de transformador de 25 KVA
UN
Suministro e Instalacin de transformador de 15 KVA
CERTIFICACION DE RETIE
CERTIFICADOS
UN
TOTALES

SUMINISTRO E INSTALACIN DE MATERIALES


MANO DE OBRA
TRANSPORTE DE MATERIALES

SUMINISTRO MATERIALES
CANT
V/UNIT
1
2

0
1
7
0
8

$
$
$
$
$

40,750.00
40,250.00
34,750.00
37,500.00
172,000.00

6
9
4
4
6
6

$
$
$
$
$
$

323,000.00
445,000.00
363,000.00
480,000.00
348,000.00
820,000.00

5000
200
2500

$
$
$

1,600.00
15,000.00
1,600.00

23
23
23

$
$
$

600,000.00
550,000.00
500,000.00

25
0

$
$

89,000.00
110,000.00

247,500.00

15
3

$
$

120,700.00
187,000.00

1
2

$
$

3,671,600.00
3,171,600.00

4,500,000.00

A.

B.
C.
D.

EQUIPO Y HERRAMIENTAS EN LA OBRA


TOTAL DE COSTOS DIRECTOS
ADMINISTRACIN (12% COSTOS DIRECTOS)
IMPREVISTOS(5% COSTOS DIRECTOS)
UTILIDAD (7% COSTOS DIRECTOS)
I.V.A. (16% SOBRE UTILIDAD)
TOTAL DE COSTOS INDIRECTOS
INTERVENTORA TCNICA (6%)
INTERVENTORA ADMINISTRATIVA (4%)
(A+B+C+D) TOTAL COSTO DEL PROYECTO

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

MINISTRO MATERIALES

MANO DE OBRA
V/UNIT
SUB-TOTAL

SUB-TOTAL
$
$

4,256,122.92 $
2,094,765.08 $

TRANSPORTE MATERIALES
V/UNIT
SUB-TOTAL

4,256,122.92
4,189,530.15

$
$
$
$
$

40,250.00
243,250.00
1,376,000.00

$
$
$
$
$

62,398.37
62,398.37
93,597.56
93,597.56
62,398.37

$
$
$
$
$

62,398.37
655,182.90
499,186.97

$
$
$
$
$

3,000.00
3,000.00
3,000.00
3,000.00
10,000.00

$
$
$
$
$

3,000.00
21,000.00
80,000.00

$
$
$
$
$
$

1,938,000.00
4,005,000.00
1,452,000.00
1,920,000.00
2,088,000.00
4,920,000.00

$
$
$
$
$
$

62,398.37
62,398.37
93,597.56
93,597.56
93,597.56
93,597.56

$
$
$
$
$
$

11,628,000.00
36,045,000.00
5,808,000.00
7,680,000.00
12,528,000.00
29,520,000.00

$
$
$
$
$
$

3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00

$
$
$
$
$
$

18,000.00
27,000.00
12,000.00
12,000.00
18,000.00
18,000.00

$
$
$

8,000,000.00 $
3,000,000.00 $
4,000,000.00 $

7,815.98 $
7,815.98 $
7,815.98 $

39,079,886.12 $
1,563,195.44 $
19,539,943.06 $

900.00 $
900.00 $
900.00 $

4,500,000.00
180,000.00
2,250,000.00

$
$
$

13,800,000.00 $
12,650,000.00 $
11,500,000.00 $

44,816.60 $
44,816.60 $
44,816.60 $

1,030,781.69 $
1,030,781.69 $
1,030,781.69 $

209,300.00 $
209,300.00 $
209,300.00 $

4,813,900.00
4,813,900.00
4,813,900.00

$
$

2,225,000.00 $
$

39,934.96 $
51,915.45 $

998,373.95 $
$

30,000.00 $
30,000.00 $

750,000.00
-

1,980,000.00 $

93,597.56 $

748,780.46 $

8,000.00 $

64,000.00

$
$

1,810,500.00 $
561,000.00 $

64,894.31 $
39,934.96 $

973,414.60 $
119,804.87 $

12,000.00 $
3,000.00 $

180,000.00
9,000.00

$
$

3,671,600.00 $
6,343,200.00 $

734,205.17 $
734,205.17 $

734,205.17 $
1,468,410.35 $

300,000.00 $
300,000.00 $

300,000.00
600,000.00

$
$

4,500,000.00
92,023,800.00

$
$
$

92,023,800.00
181,189,780.42
23,483,700.00

$ 181,189,780.42

$ 23,483,700.00

$
$
$
$
$
$
$
$
$
$

1,225,941.54
297,923,221.96
35,750,786.63 $
14,896,161.10 $
20,854,625.54
3,336,740.09
74,838,313.36
22,365,692.12
14,910,461.41
410,037,688.84

73,026,940.17
39,087,526.72

HOC
EQUIPO Y HERRAMIENTA
V/UNIT
SUB-TOTAL

TOTAL PROYECTO
SUB-TOTAL

$
$

13,000.00 $
6,000.00 $

13,000.00
12,000.00

$
$

4,269,122.92
4,201,530.15

$
$
$
$
$

206.30
205.30
256.70
262.20
468.80

$
$
$
$
$

205.30
1,796.87
3,750.37

$
$
$
$
$

105,853.67
921,229.77
1,958,937.35

$
$
$
$
$
$

770.80
1,014.80
913.20
1,147.20
883.20
1,827.20

$
$
$
$
$
$

4,624.78
9,133.17
3,652.78
4,588.78
5,299.17
10,963.17

$
$
$
$
$
$

13,588,624.78
40,086,133.17
7,275,652.78
9,616,588.78
14,639,299.17
34,468,963.17

$
$
$

18.83 $
45.63 $
18.83 $

94,159.77
9,126.39
47,079.89

$
$
$

51,674,045.89
4,752,321.84
25,837,022.95

$
$
$

10,000.00 $
10,000.00 $
10,000.00 $

230,000.00
230,000.00
230,000.00

$
$
$

19,874,681.69
18,724,681.69
17,574,681.69

$
$

9,283.32 $
11,657.91 $

232,082.92
-

$
$

4,205,456.87
-

682.20 $

5,457.56

2,798,238.02

$
$

371.19 $
16,339.32 $

5,567.83
49,017.95

$
$

2,969,482.43
738,822.82

$
$

8,811.61 $
7,811.61 $

8,811.61
15,623.22

$
$

4,714,616.79
8,427,233.57

4,500,000.00

297,923,221.96

$ 1,225,941.54

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIE


CRONOGRAMA DE ACTIVIDADES Y FLUJO DE FONDOS
ITEM
1
2

13

4269122.919

1S

1.04%

REPLANTEO DE REDES

4201530.153

1S

1.02%
5.73%

HOLLADA Y HINCADA DE POSTERIA

41,732,345.07

3S

10.18%

REGADA, TENDIDO Y TENSIONADO DE CONDUCTORES

75,333,390.68

1S

18.37%

VESTIDAS DE ESTRUCTURAS DE BT Y MT

122,452,282.64

2S

29.86%

INSTALACIN DE VIENTOS

3,455,456.87

2S

0.84%

CONEXIN DE LUMINARIAS DE SODIO 70W

2,734,238.02

1S

0.67%

INSTALACIN DE ACOMETIDAS

3,519,305.25

1S

0.86%

SUMINISTRO E INSTALACIN DE SISTEMA DE MEDIDA

0S

0.00%

CERTIFICACION DE RETIE

4,500,000.00

0S

1.10%

INSTALACIN DE TRANSFORMADORES

12,241,850.36

1S

2.99%

INSTALACIN DE TRANSFERENCIA ELCTRICA Y PUESTA


EN SERVICIO.

3S

0.00%

11
12

APERTURA DE TROCHA

1S

9
10

23,483,700.00

7
8

DURACIN

COST.$

TRANSPORTE DE MATERIALES

ACTIVIDAD

INTERVENTORIA TCNICA Y ADMINISTRATIVA(10%)

37,276,153.53

5M

9.09%

A.I.U. TOTAL 24%

71,501,573.27

5M

17.44%

IVA SOBRE UTILIDADES (16%)

3,336,740.09

410,037,688.84

0.81%

FLUJO DE FONDOS
PARCIAL FLUJO DE FONDOS
TOTAL FLUJO DE FONDOS

100.00%

UENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

DADES Y FLUJO DE FONDOS

1
4,269,122.92

4,201,530.15

MESES
3

$ 23,483,700.00
$

41,732,345.07

75,333,390.68

81,634,855.09 $ 40,817,427.55

1,727,728.44

1,727,728.44

2,734,238.02

3,519,305.25

3,375,000.00

$ 1,125,000.00

1,748,835.77

$ 6,995,343.06

$ 3,497,671.53
$

$ 18,638,076.77

4,659,519.19

4,659,519.19

7,669,044.74

357,888.75

2,244,797.18 $

58,619,363.33

255,435,432.27 $

72,127,395.01

58,619,363.33

314,054,795.59 $

386,182,190.61

48,102,796.63 $ 12,941,408.41

$ 4,659,519.19

$ 4,659,519.19

$ 1,948,882.33 $

603,932.39 $

90,947.84 $

14,819,692.43 $
401,001,883.03

839,441.17
39,173.92

9,035,805.81
410,037,688.84

INTERCONEXION ELECTRICA ENTRE PUENTE PAIMADO - CHINTADO CORREGIMIENTOS DE ATRATO - CHOC

LISTA DE CUADRILLAS
CUADRILLA DE VESTIDA DE ESTRUCTURA, VIENTOS Y LUMINARIAS O DESMONTE (AA)

CANT
0
1
1
2

RECURSO
CAPATAZ
OFICIAL
LINIERO
AYUDANTE

FACTOR(S.
MINIMO)

JORNAL
BSICO

4.8
97,572
4.2
85,376
3.6
73,179
2.2
44,721
TOTAL CUADRILLA (AA)

PRESTACIONES
(VR. ADICIONES)

PRESTACIONES(
VR. EFECTIVO)

158.28%
158.35%
158.56%
167.43%

197.18%
197.18%
197.18%
208.57%

CUADRILLA DE HINCADA Y APLOMADA DE POSTERA O DESHINCADA(BB)

CANT
0
5
1
2

FACTOR(S.
JORNAL
MINIMO)
BSICO
RECURSO
OPER. GRUA
4.8
97,572
AYUD. INCADA
2.4
48,786
LINIERO
3.6
73,179
AYUDANTE
2.2
44,721
TOTAL CUADRILLA (BB)

PRESTACIONES
(VR. ADICIONES)

PRESTACIONES(
VR. EFECTIVO)

158.28%
158.35%
158.56%
167.43%

197.18%
208.57%
197.18%
208.57%

CUADRILLA DE TENDIDO O DESMONTE DE CONDUCTORES (CC)

CANT
0
1
2
3

RECURSO
CAPATAZ
OFICIAL
LINIERO
AYUDANTE

FACTOR(S.
MINIMO)

JORNAL
BSICO

4.8
97,572
5
101,638
3.5
71,147
2.5
50,819
TOTAL CUADRILLA (CC)

PRESTACIONES
(VR. ADICIONES)

PRESTACIONES(
VR. EFECTIVO)

158.28%
158.35%
158.56%
158.56%

197.18%
197.18%
197.18%
197.18%

CUADRILLA PARA HOYADA Y CIMENTACIN DE POSTES Y VIENTOS (DD)

CANT
1
3

RECURSO
OFICIAL
AYUDANTE

FACTOR(S.
MINIMO)

JORNAL
BSICO

4.2
85,376
2.2
44,721
TOTAL CUADRILLA (DD)

CUADRILLA DE REPLANTEO Y TOPOGRAFIA (EE)

PRESTACIONES
(VR. ADICIONES)
158.35%
167.43%

PRESTACIONES(
VR. EFECTIVO)
197.18%
208.57%

CANT
2
1
2

RECURSO
CADENERO
TOPOGRAFO
DIBUJANTE

FACTOR(S.
MINIMO)

JORNAL
BSICO

3
60,983
5.4
109,769
3
60,983
TOTAL CUADRILLA (EE)

PRESTACIONES
(VR. ADICIONES)

PRESTACIONES(
VR. EFECTIVO)

158.56%
158.35%
158.56%

197.52%
197.18%
197.52%

CUADRILLA DE APERTURA DE TROCHA (FF)

CANT
1
1
5

RECURSO
TOPOGRAFO
OFICIAL
AYUDANTE

FACTOR(S.
MINIMO)

JORNAL
BSICO

5.4
109,769
4.2
85,376
2.2
44,721
TOTAL CUADRILLA (FF)

PRESTACIONES
(VR. ADICIONES)

PRESTACIONES(
VR. EFECTIVO)

158.35%
158.35%
167.43%

197.18%
197.26%
208.57%

CUADRILLA DE MONTAJE DE PLANTA ELCTRICA Y TANSFERENCIA (GG)

CANT
1
1
2

RECURSO
TECNICO

OFICIAL
AYUDANTE

FACTOR(S.
MINIMO)

JORNAL
BSICO

6.5
132,129
4.2
85,376
3.6
73,179
TOTAL CUADRILLA (GG)

PRESTACIONES
(VR. ADICIONES)
158.35%
158.35%
167.43%

PRESTACIONES(
VR. EFECTIVO)
197.18%
197.26%
208.57%

DO CORREGIMIENTOS DE ATRATO - CHOC

SALARIO MINIMO =

VALOR
HORA
0
21,043
18,037
23,318

VALOR
HORA
0
63,596
18,037
23,318

VALOR
HORA
0
25,051
35,072
37,577

VALOR
HORA
21,043
34,978

J.TOTAL
0
168,344
144,295
186,548
499,187

J.TOTAL
0
508,767
144,295
186,548
839,610

J.TOTAL
0
200,410
280,574
300,615
781,598

J.TOTAL
168,344
279,822
448,166

589,500

VALOR
HORA
60,227
27,055
30,113

VALOR
HORA
27,055
21,052
58,296

VALOR
HORA
32,567
21,052
38,158

J.TOTAL
240,906
216,442
240,906
698,255

J.TOTAL
216,442
168,412
466,370
851,225

J.TOTAL
260,533
168,412
305,260
734,205