COMPLETE BUSINESS PROCESS INVOLVES FOLLOWING MAIN ACTIVITIES STUDY OF TENDER DOC.

. , SITE VISIT, COLLECTION AND STUDY OF SITE DATA . PROCESS OPTIMISATION & SELECTION OF POWER PLANT EQUIPMENTS. SUBMISSION OF OFFER BY THE MARKETTING GROUP ( RECEIPT OF ORDER ) DESIGN , MANUFACTURE & SUPPLY OF MAIN EQUIPMENTS FROM VARIOUS BHEL MANUFACTURING UNITS TO SITE. BASIC DESIGN / SIZING , PROCUREMENT & SUPPLY TO SITE OF THE BALANCE OF PLANT ( BOP ) EQUIPMENTS FROM VENDORS WORKS . ERECTION & COMMISSIONING BY THE ERECTION AGENCY OF THE PLANT BUILDINGS, EQUIPMENTS AND FACILITIES AT SITE. CONDUCTING PERFORMANCE GUARANTEE OF PLANT / EQUIPMENTS. COMMERCIAL CLOSURE & HANDING OVER OF THE PLANT TO CUSTOMER . ALL ACTIVITIES REQUIRE COMPLETION AS PER AGREED SCHEDULE.
TEMP. SITE OFFICE OF BHEL CONSTR. GROUP

BHEL MANUF. UNITS

PLANT AREA - BY CUSTOMER

1
VENDORS WORKS

SELECTION OF MAIN POWER GENERATING EQUIPMENTS WITH ITS INTEGRAL SYSTEMS


STEAM TURBINE , GENERATOR & BOILER - ( FUELS AVAILABLITY - COAL / OIL / PET- COKE FOR BOILER ) GAS TURBINE , GENERATOR & HRSG - ( FUELS AVAILABLITY GAS / LIQUID FOR GAS TURBINE ) HYDRO TURBINE GENERATOR - ( AVAILABLITY - WATER HEADS / DAMS ) NUCLEAR STEAM TURBINE , GENERATOR - ( AVAILABLITY - NUCLEAR FUEL REACTOR & STEAM GENERATOR ) PRIMARY INVOLVEMENT OF ENGG. GROUP PRODUCT ENGINEERING. PROCESS OPTIMISATION , SYSTEM INTEGRATION , SELECTION OF BOP EQUIPMENTS FOR MECH., ELECTR. & C&I SYSTEMS EQUIPMENTS SELECTION & ENGG. ACTIVITIES TO SUIT THE OPTIMISED PROCESS NEEDS OF THE POWER PLANT. SYSTEM INTEGRATION ACTIVITIES. PRIMARY INVOLVEMENT OF ENGG. GROUP PROJECT ENGG. DIV. ( PLANT SYSTEMS INTEGRATORS )
2

STEAM TURBINE BASED POWER PLANT


300 tph / 100 bar, @535 Deg-C

BD ST 100 MW GR -11 kV CW@ 42C CONDENSER


0.095 bar@ 45 Deg-C

TR TRNSM. GRID 132 kV

D/A
CW@ 33C

STEAM GENERATOR ( BOILER )

PUMP

PARAMETERS INDICATED
ARE TYPICAL

STEAM TURBINE GENERATOR UNIT

BUS DUCT FROM GENERATOR

BUS DUCT-TRANSFORMER - SW. YARD.

GAS TURBINE BASED POWER PLANT- Simple Cycle Typical 26 MW - AT 38 C, 60% RH, 50 m above MSL
Gas
s

575 C BLOCK DIAGRAM 1100 C

ENERGY DIAGRAM POWER (25.3 %) EXHAUST HEAT LOSS THRU STACK ( 71. 2% )

FUEL TO GT (100 %)

GAS TURBINE

GAS TURBINE BASED POWER PLANT- Co-Generation Cycle

Gas

HEAT RECOVERY STEAM GENERATOR ( HRSG )

575 C BLOCK DIAGRAM

135 C

ENERGY DIAGRAM POWER (24.3%) STEAM OUTPUT TO PROCESS (40.6 %)

STACK LOSSES (29.9%)

FUEL TO GT (92.8 %)

GAS TURBINE

EXHAUST HEAT (65.4%)

HEAT RECOVERY STEAM GENERATOR

MISCL. LOSSES (3.1%)

FUEL 7.2%)

MISC. & RADIATION LOSSES IN HRSG ( 2 .1% )

GAS TURBINE BASED POWER PLANT- Combined Cycle


Gas
HEAT RECOVERY STEAM GENERATOR ( HRSG )

135 C BLOCK DIAGRAM


575 C

ENERGY DIAGRAM

POWER = 37.6 %

POWER = 20.1 %

Plant Perf. optimisation GT- PRO

GAS TURBINE

LOSSES IN GT = 0..5 % STEAM TURBINE

FUEL Q =100 %

LOSSES IN STEAM TURBINE = 0.3 %

LOSSES IN STEAM GENERATOR = 0.2 %

CONDENSER OF STEAM TURBINE= 29.9 % THRU STACK OF STEAM GENERATOR = 11.4 %

STG BUILDING

PIPING

BY-PASS STACK

HRSG UNIT

GT AIR FILTER

GAS TURBINE GENERATOR

FR 6 FA GAS TURBINE UNIT

FR 6 FA GT Based 100 MW Combined Cycle Power Plant

SWITCH YARD AREA

STG UNIT

FUEL SYSTEMS ( BOP ) FOR GAS TURBINE

LIQUID FUEL STORAGE TANKS

LIQUID FUEL FORWARDING SKID


2.8 3.8 barg

17 30 barg

GAS TURBINE ( SHOWN WITHOUT ENCLOSURE )

GAS FUEL DISTRIBUTION POINT GAS CONDITIONING SKID

GAS BOOSTER COMPRESSOR SYSTEM

MECHANICAL BOP & PIPING SYSTEMS

MECHANICAL EQUIPMENTS,
INTER CONNECTING PIPING & PIPE RACKS

COOLING TOWER

DM PLANT

PDMS CEASER / CAEPIPE

PIPING DESIGN STRESS ANALYSIS & ISOMETRIC DRGS. BOILER FEED PUMPS PIPING ON PIPE RACK

ELECTRICAL BOP SYSTEMS


SWITCH YARD

ELECTRICAL LOADS MOV s PUMPS / Other EL. DRIVES

INTERCONNECTING CABLING BUS DUCTS & TRANSFORMERS

HT & LT PMCC ROOM

PLANT DIGITAL CONTROL SYSTEM ( DCS )


ELECTRICAL CONTROL SYSTEM

10

CONTROL & INSTRUMENTATIONS

BOP SYSTEMS

D-I/O A-I/O

M /Box

PLANT DIGITAL CONTROL SYSTEM ( DCS )

FIELD INSTRUMENTATION

DIGITAL CONTROL SYSTEM PANELS

DCS CONSOLES IN CENTRAL CONTROL ROOM

LARGE VIDEO SCREEN

11

SOIL INVESTIGATION AT SITE

CIVIL ENGG.
STAAD.Pro

STRUC. CONSTRUCTION AT SITE

STRUCTURAL ANALYSIS

STARTING OF 140 MW POWER PLANT IN DESERT SITE AT QARN ALAM ( OMAN )

COMPLETED 140 MW POWER PLANT AT QARN ALAM ( OMAN )

CONSTRUCTION OF POWER PLANT BLDG. ( SITE SUPPORT )

PIPE RACK STRUCTURES

12
100 m MULTI-FLUE RCC STACK

PERFORMANCE GUARANTEE TEST BY DESIGNERS AT SITES

PG-TEST UNDER PROGRESS AT 100 MW COMBINED CYCLE POWER PLANT AT KOVILKALAPPAL ( TAMILNADU )

TYPICAL PG TEST DATA


S - CYCLE REF. O/P (MW) HR (Kcal/kWh) AuxPower (kw) O/P (MW) C- CYCLE HR (Kcal/kWh) AuxPower (kw)

Guarntee PG-Test Result

70.250 74.778

2565.0 2265.6

2967.0 2265.6

107.8800 110.5173

1670.00 1630.49

5102.00 4384.89

GAS TURBINES UNDER COMMISSIONING FROM 600 kms AWAY REMOTE CONTROL STATION AT YIBAL( OMAN ) 13

WHAT A DESIGNER SHALL ENDEAVOR :


CONTINUOUS UPGARADATION OF ENGG. EXPERTISE & AWARENESS OF LATEST ENGG. ADVANCEMENTS. CONVERSANT WITH DESIGN CODES REQUIRED FOR COMPLIANCES( ASME, API , BS, DIN, ISO , IEC , IEEE , NEMA, NFPA, HTRI, HIS, IS ( BIS ), TAC, OISD, IBR,

Indian Electricity Rules, HSE Regulations etc. )


FAMILIARITY WITH THE TECHNICAL REQUIREMENTS SPECIFIED BY CUSTOMER IN THE PROJECT TENDER SPECIFICATION DOCUMENTS. APTITUDE FOR CALCULATIONS, DOCUMENTATION WORK & EYE FOR DETAILS.

CONTINUOUS ENHANCEMENT OF DOC. DRAFTING METHODS, COMMUNICATION SKILLS.


DISCIPLINED ATTITUDE IN ENGG. DOCUMENTATION PREPARATION DRGS. & DOC. RELEASE FOR MANUFACTURING ( To Shop / To Vendor ) DRGS. & DOC. RELEASE FOR CONSTRUCTIONS AT SITE. DOCUMENTATION CONTROL METHODS.

APTITUDE FOR LEARNING FROM EXPERIENCES. KM, TO SHARE LEARNING.