Sunteți pe pagina 1din 7

THE CALCULATION OF W18 ( ESAL )

Max Axle Load Limit Design Life Annual growth rate 8.16 10 6.8 ton years %/year

Load ( ton ) Vehicle Type Total Front Kips


2.206 4.500 5.250 5.250 6.750 6.225 13.650 13.787 -

Middle (Ton)
-

Behind (Ton)
1 3.96 4.62 4.62 5.94 5.478 12.012 18.75 10.742

ADT (Veh/day/2 ways)

W18 E GR ( ESAL )

(Ton) (Ton)
Sedan,Jeep,STW Oplet,Suburban,Mini Bus Micro Truck,Mobil Hantaran Bus Kecil Bus Besar Truk 2 Sumbu Kecil Truk 2 Sumbu Besar Truk 3 Sumbu Truk gandengan Truk Semi Trailler 2 6 7 7 9 8.3 18.2 25 31.4 26.2 1 2.04 2.38 2.38 3.06 2.822 6.188 6.25 4.716

Kips
23.696

Kips
2.206 8.735 10.191 10.191 13.103 12.084 26.497 41.360 23.696 1377 580 658 14 273 376 521 53 0 54 6.5817 TOTAL 13.6866 887755.78 9,051,345.17 0.0008 0.0524 0.0944 0.0944 0.2817 0.1924 5.5142 2.8541 13.6866 13.6866 13.6866 13.6866 13.6866 13.6866 13.6866 13.6866 2651.15 75898.88 155229.88 3302.76 192088.91 180662.64 7175914.08 377841.09

10.403 10.742

CALCULATION OF FLEXIBLE PAVEMENT PURWODADI - GEYER ( STA.0+00 UNTIL STA. 1+850)


Formula Log Wt =
Zr x S0 + 9,36 Log (SN + 1) - 0,20 + (Log (DPSI/(4,2-1,5))/(0,4+(1094/(SN+1)^5,19)) + 2,32 Log MR - 8,07

Design Life Annual growth rate Zr (Deviation Standard) S0 (Standard Error) P0 ( Initial Service ability Index) Pt (Final Service ability Index) DPSI Swell Vr (potential vertical rise) Ps ( Swell probability) a (swell rate constant) t (design life) DPSI Total CBR MR (Modulus Resilient) m ( Drainage Coefficient ) Wt Log Wt SN (Structural Number ) Design New Road (Widening) ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm ) Base A, thickness ( cm ) CTB UCS 1000 psi Design Overlay Existing Pavement AC, thickness ( cm ) Base - 1, thickness ( cm ) Base - 2, thickness ( cm ) Base - 3, thickness ( cm ) Thickness of Overlay ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm )

= = = = = = = = = = = = = = = = = =

10 6.8 -1.645 0.45 4.2 2.5 0.000 0 100 0.1 10 1.700 3.03 4545 1.0 5,430,807 6.735 5.65

Year % ( Realibility = 95 %) ( between 0.4 - 0.50 ) ( New road) ( Artery Road ) 0.00335*Vr*Ps*(1-e^at) inchi % (Medium supply of moisture content) years % psi ( 5 - 25 % and fair quality ) (in the recidential area)

Controle inchi

6.739 = 14.351 cm

= = = = =

4 5 6 0 33

a1 a2 a3 a4 a5

= = = = =

0.4 0.4 0.36 0.14 0.26

= = = = = = =

15.6 30 16 31.4 4 4 0

a1 a2 a3 a4 a1 a2 a3

= = = = = = =

0.30 0.10 0.09 0.06 0.4 0.4 0.36

Condition = 1 CBR = CBR = CBR = 28.88 17.73 7.6

CALCULATION OF FLEXIBLE PAVEMENT PURWODADI - GEYER ( STA.1+850 UNTIL STA. 3+800)


Formula Log Wt =
Zr x S0 + 9,36 Log (SN + 1) - 0,20 + (Log (DPSI/(4,2-1,5))/(0,4+(1094/(SN+1)^5,19)) + 2,32 Log MR - 8,07

Design Life Annual growth rate Zr (Deviation Standard) S0 (Standard Error) P0 ( Initial Service ability Index) Pt (Final Service ability Index) DPSI Swell Vr (potential vertical rise) Ps ( Swell probability) a (swell rate constant) t (design life) DPSI Total CBR MR (Modulus Resilient) m ( Drainage Coefficient ) Wt Log Wt SN (Structural Number ) Design New Road (Widening) ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm ) Base A, thickness ( cm ) CTB UCS 1000 psi Design Overlay Existing Pavement AC, thickness ( cm ) Base - 1, thickness ( cm ) Base - 2, thickness ( cm ) Base - 3, thickness ( cm ) Thickness of Overlay ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm )

= = = = = = = = = = = = = = = = = =

10 6.8 -1.645 0.45 4.2 2.5 0.237 1.12 100 0.1 10 1.463 3.03 4545 1.0 5,430,807 6.735 5.91

Year % ( Realibility = 95 %) ( between 0.4 - 0.50 ) ( New road) ( Artery Road ) 0.00335*Vr*Ps*(1-e^at) inchi % (Medium supply of moisture content) years % psi ( 5 - 25 % and fair quality ) (in the recidential area)

Controle inchi

6.738743 = 15.0114 cm

= = = = =

4 6 0 0 42

a1 a2 a3 a4 a5

= = = = =

0.4 0.4 0.36 0.14 0.26

= = = = = = =

15.6 30 16 31.4 4 6 0

a1 a2 a3 a4 a1 a2 a3

= = = = = = =

0.30 0.10 0.09 0.06 0.4 0.4 0.36

Condition =1 CBR = CBR = CBR = 28.88 17.73 7.6

CALCULATION OF FLEXIBLE PAVEMENT PURWODADI - GEYER ( STA.3+800 UNTIL STA. 8+200)


Formula Log Wt =
Zr x S0 + 9,36 Log (SN + 1) - 0,20 + (Log (DPSI/(4,2-1,5))/(0,4+(1094/(SN+1)^5,19)) + 2,32 Log MR - 8,07

Design Life Annual growth rate Zr (Deviation Standard) S0 (Standard Error) P0 ( Initial Service ability Index) Pt (Final Service ability Index) DPSI Swell Vr (potential vertical rise) Ps ( Swell probability) a (swell rate constant) t (design life) DPSI Total CBR MR (Modulus Resilient) m ( Drainage Coefficient ) Wt Log Wt SN (Structural Number ) Design New Road (Widening) ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm ) Base A, thickness ( cm ) CTB UCS 1000 psi Design Overlay Existing Pavement AC, thickness ( cm ) Base - 1, thickness ( cm ) Base - 2, thickness ( cm ) Base - 3, thickness ( cm ) Thickness of Overlay ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm )

= = = = = = = = = = = = = = = = = =

10 4.1 -1.645 0.45 4.2 2.5 0.237 1.12 100 0.1 10 1.463 90 135000 1.0 59,034,243 7.771 2.45

Year % ( Realibility = 95 %) ( between 0.4 - 0.50 ) ( New road) ( Artery Road ) 0.00335*Vr*Ps*(1-e^at) inchi % (Medium supply of moisture content) years % psi ( 5 - 25 % and fair quality ) (in the recidential area)

Controle inchi

7.803 = 6.223 cm

= = = = =

4 6 3 0 4

a1 a2 a3 a4 a5

= = = = =

0.4 0.4 0.36 0.14 0.26

= = = = = = =

15.6 30 16 31.4 4 6 -24

a1 a2 a3 a4 a1 a2 a3

= = = = = = =

0.30 0.10 0.09 0.06 0.4 0.4 0.36

Condition =1 CBR = CBR = CBR = 28.88 17.73 7.6

(as Levelling)

CALCULATION OF FLEXIBLE PAVEMENT AMBARAWA SOUTHERN RING ROAD


Formula Log Wt =

Zr x S0 + 9,36 Log (SN + 1) - 0,20 + (Log (DPSI/(4,2-1,5))/(0,4+(1094/(SN+1)^5,19)) + 2,32 Log MR - 8,07

Design Life Annual growth rate Zr (Deviation Standard) S0 (Standard Error) P0 ( Initial Service ability Index) Pt (Final Service ability Index) DPSI Swell Vr (potential vertical rise) Ps ( Swell probability) a (swell rate constant) t (design life) DPSI Total CBR LPA-A MR (Modulus Resilient) CBR LPA-B MR (Modulus Resilient) CBR Subgrade MR (Modulus Resilient) m ( Drainage Coefficient ) Wt Log Wt SN1 (HMA ) SN2 (LPA-A ) SN3 (LPA-B) Design New Road (Widening) ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm ) Base A, thickness ( cm ) Base B, thickness ( cm )

= = = = = = = = = = = = = = = = = = = = = = = =

10 6.8 -1.645 0.45 4.2 2.5 0.000 0 100 0.1 10 1.700 90 29,487.31 60 18,050.42 8.22 8,117.66 1.0 59,034,243 7.771 4.26 0.780 1.440 6.480 4.00 8.00 12.00 15 30

Year % ( Realibility = 95 %) ( between 0.4 - 0.50 ) ( New road) ( Artery Road ) 0.00335*Vr*Ps*(1-e^at) inchi % (Medium supply of moisture content) years % psi % psi % psi ( 5 - 25 % and fair quality )

Controle inchi inchi inchi

7.772 = = =

3.205 10.8204 1.9812 3.6576

3.667 cm cm cm 10.920 2.100 3.658

= = = = =

a1 a2 a3 a4 a5

= = = = =

0.42 0.42 0.49 0.14 0.12

SN = SN = SN = SN = SN =

1.680 3.360 5.880 2.100 3.658 10.920

Dihitung oleh : Regional Team Semarang

CALCULATION OF FLEXIBLE PAVEMENT PURWODADI - GEYER ( GEYER UNTIL GEMOLONG)


Formula Log Wt =
Zr x S0 + 9,36 Log (SN + 1) - 0,20 + (Log (DPSI/(4,2-1,5))/(0,4+(1094/(SN+1)^5,19)) + 2,32 Log MR - 8,07

Design Life Annual growth rate Zr (Deviation Standard) S0 (Standard Error) P0 ( Initial Service ability Index) Pt (Final Service ability Index) DPSI Swell Vr (potential vertical rise) Ps ( Swell probability) a (swell rate constant) t (design life) DPSI Total CBR MR (Modulus Resilient) m ( Drainage Coefficient ) Wt Log Wt SN (Structural Number ) Design New Road (Widening) ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm ) Base B, thickness ( cm ) CTB with UCS 1000 psi Design Overlay Existing Pavement AC, thickness ( cm ) Base - 1, thickness ( cm ) Base - 2, thickness ( cm ) Base - 3, thickness ( cm ) Thickness of Overlay ACWC, thickness ( cm ) AC Binder, thickness ( cm ) AC Base, thickness ( cm )

= = = = = = = = = = = = = = = = = =

10 6.8 -1.645 0.45 4.2 2.5 0.197 0.84 100 0.12 10 1.503 3.43 5145 1.0

Year % ( Realibility = 95 %) ( between 0.4 - 0.50 ) ( New road) ( Artery Road ) 0.00335*Vr*Ps*(1-e^at) inchi % (Medium supply of moisture content) years % psi ( 5 - 25 % and fair quality )

9,051,345 6.957 Controle 6.05 inchi

6.965613 =

15.367

cm

= = = = =

4 5 5 0 38

a1 a2 a3 a4 a5

= = = = =

0.4 0.4 0.36 0.14 0.26

= = = = = = =

13.75 38.75 10 17.5 4 6 4

a1 a2 a3 a4 a1 a2 a3

= = = = = = =

0.30 0.10 0.09 0.06 0.4 0.4 0.36

Condition = CBR = CBR = CBR =

(as ATBL)

AVEMENT IL GEMOLONG)

g (DPSI/(4,2-1,5))/(0,4+(1094/(SN+1)^5,19))

1 25 17.5 7.5

(as ATBL)

S-ar putea să vă placă și