Sunteți pe pagina 1din 1

1

10

11

12

13

14 Sheet of

15

BUILDING AND CONSTRUCTION AUTHORITY


APPROVED UNDER SECTION 5 / SECTION 5A OF THE BUILDING CONTROL ACT (CHAPTER 29)

A Project Reference No:

for Commissioner of Building Control B B

10

11

12
26500

13

14

15

5300
C

5300

5300

5300

5300
C 00UEL

TOS+7.700m 152UC30
CH S

152UC30

152UC30

152UC30

152UC30

. 1 68

.3 3x6

KEY PLAN
6 .3

3x 68.

HS . 3C

1 68

.3 x

C HS

TOS+5.000m 152UC30
E

152UC30

152UC30

152UC30

152UC30
E

16

8. 3

x6

.3 C

HS

610UB101

610UB101

610UB101

610UB101

610UB101

610UB101

8 16

.3 x

C 6. 3

HS

8 16

.3 x

C 6. 3

HS

0.000m

FOR REVIEW
Project title

PROPOSED ERECTION OF POWER GENERATION PLANT ON LOT 01962A PT MK 34 AT JURONG ISLAND HIGHWAY, JURONG ISLAND FOR M/S GMR ENERGY (SINGAPORE) PTE LTD
OWNER

GMR Energy (Singapore) Pte Ltd


H
OWNERS REPRESENTATIVE

#40-02/03 Singapore Land Tower 50 Raffles Place 048623 Singapore

FUEL OIL PUMP SHELTER- ELEVATION ALONG GRID A - 00UEL


SCALE 1:50
EPC CONTRACTORS

Parsons Brinckerhoff Pte Ltd


300 Beach Road, #04-01 The Concourse Singapore 199555

Siemens Pte Ltd


Siemens Centre 60 MacPherson Road Singapore 348615

Siemens AG
E F ES PM Kaiserleistrae 10 63067 Offenbach, Germany

Pte, Ltd.

AG, Energy Sector

Samsung C&T Corporation


Engineering & Construction Group 3 Church Street, #21-01 Samsung Hub Singapore 149483
SUBSUPPLIER

55 East Monroe Street Chicago, Illinois 60603-5780 USA


Stampfen/Stamp

111 Somerset Road #12-05 TripleOne Somerset Singapore 238164

K
Projekt/Project PKZ/PC

NOTES:
1. FOR GENERAL NOTES, REFER TO DWG No. SIN154-05U-CEB010-010551. 2. ALL DIMENSIONS ARE IN MILLIMETERS (mm) AND ELEVATIONS ARE IN METERS (m). 3. LEVELS: EL 0.00m = POWERPLANT FFL 0.00m =GL + 0.30m = +103.700 = +5.422 CD 4. CONTRACTOR SHALL ENSURE THAT STEEL FRAMES ARE SUFFICIENTLY RESTRAINED AGAINST LATERAL FORCES WITH TEMPORARY PROPPING OR STRUCTURES DURING CONSTRUCTION PRIOR TO INSTALLATION OF BRACING MEMBERS IN THE PERMANENT STAGE. 5. STEEL STRUCTURES SHALL BE COMPLETELY ERECTED, BRACED, AND GROUTED BEFORE COMMISSIONING THE CRANE OR INSTALLATION OF ROOF CLADDING.

GMR ENERGY CCPP


UNID DCC/UA Type

SIN154 CLC031
Zhl-Nr. Serial no. Inhaltskennzeichen Contents code

443569454
Variante Variant Ursprung-Nr. Origin no.

erstellt mit Created with

Abtlg. Dept.

- 25NOV11
Index Rev. Gewicht Weight Datum gezeich. Drawn bearb. Coord. geprft Checked Datum Date

ECV
bearb. Coord. Format Format Name Mastab Scale

GP
geprft Checked

ISSUED FOR SCT REVIEW


nderungshinweise/Details of revision Spez. Specs.

1:50

Titel/Title

11NOV11 11NOV11 11NOV11

ECV SJK GP

Copyright (C) Siemens All Rights Reserved


Handhabung Handling

FUEL OIL PUMP SHELTER STEELWORK ELEVATIONS - 00UEL SHEET 1


Zeichnungs-Nr. Drawing no. Index/Rev.

Tekla Structures

SCALE OF METERS 1:50


1 2 3 4 5 6 7 8 9 10 11 12 13

SAMSUNG C&T
14

SIN154-00UEL-CLC031-017331
15
Blatt-Nr. Sheet no.

1/5

S-ar putea să vă placă și