Sunteți pe pagina 1din 13

M/S SHAH ZAMAN (Pvt)Ltd.

C-TYPE APARTMENT FOR FGEHF IN SECTOR G-11, ISLAMABAD.

PACKAGE - VI
BLOCK NO. 03 (G+3)
Footing Steel Summary
S#

Footing

No. of Footing

M1

721.341

Grade 60

M2

3506.341

Grade 60

M3

1820.817

Grade 60

M4

1278.814

Grade 60

M5

776.269

Grade 60

F1

158.222

Grade 60

F2

214.617

Grade 60

F3

Grade 60

F4

Grade 60

Total

Weght in Footing(Kg)

Grade 60

8476.420

Grade 60

Total Steel
Item

Grade 60 (Ton)

Grade 40 (Ton)

Footings

8.4764

Stem Columns

2.2594

0.153

10.736

0.153

Total

CONTRACTOR

CONSULTANT

M/S SHAH ZAMAN (Pvt.) Ltd.

FOOTING SHEDULE BLOCK # 03 (G+3)


Package - VI
Footing :

M 1 (2 No.)

Size :

Drawing No. 2662/323/C/06G110

Description

11'-3" X 12'-3" X 1'-6"

Dated: 20-02-07

Revision: O

No. Of
Bars

Length Of
One Bar

No Of
Items

Total Length

6"

25

11.92

596

6"

23

12.92

594.32

10'-11"

6"

25

11.92

596

11'-11"

6"

23

12.92

594.32

Bar #

Spacing

Shape Of bar

(i) X Bars

#4

6" c/c

6"

10'-11"

(ii) Y Bars

#4

6" c/c

6" 11'-11"

(i) X Bars

#4

6" c/c

6"

(ii) Y Bars

#4

6" c/c

6"

Bottom Bars

Top Bars

SUMMARY
Bar #

G.Length

#4

2380.64

Unit
Total Weight (Lbs)
Weight

T.W in Kgs

Grade

0.668

1590.268

721.341

Grade-60

#5

1.043

0.000

0.000

Grade-60

#6

1.502

0.000

0.000

Grade-60

#8

2.67

0.000

0.000

Grade-60

Contractor's Representative

Consultant's Representative

M/S SHAH ZAMAN (Pvt.) Ltd.

FOOTING SHEDULE BLOCK # 03 (G+3)


Package - VI
Footing :

M 2 (1 No.)

Size : 16'-0" X 52'-6" X 1'-6"

Drawing No. 2662/323/C/06G110

Description

Bar #

Spacing

(i) X Bars

#6

4" c/c

(ii) Y Bars

#4

5" c/c

(iii) Y Bars

#4

5" c/c

(i) X Bars

#4

6" c/c

(ii) Y Bars

#4

6" c/c

(iii) Y Bars

#4

5" c/c

Dated: 20-02-07

Shape Of bar

Revision: O

No. Of
Bars

Length Of
One Bar

No Of
Items

Total Length

159

16.67

2650.53

38

36.25

1377.50

38

18.92

718.96

105

16.67

1750.35

32

32.75

1048.00

32

22.42

717.44

Bottom Bars
6"

15'-8"

35'-9"
6"

6"

6"

18'-5"

Top Bars
6"

15'-8"

32'-3"
6"

6"

6"

22'-11"
SUMMARY

Unit
Total Weight (Lbs)
Weight

Bar #

G.Length

#4

5612.25

0.668

#5

#6

2650.53

#8

Contractor's Representative

T.W in Kgs

Grade

3748.983

1700.528

Grade-60

1.043

0.000

0.000

Grade-60

1.502

3981.096

1805.813

Grade-60

2.67

0.000

0.000

Grade-60

Consultant's Representative

M/S SHAH ZAMAN (Pvt.) Ltd.

FOOTING SHEDULE BLOCK # 03 (G+3)


Package - VI
Footing :

M 3 ( 2 No.)

Size :

Drawing No. 2662/323/C/06G110

Description

15'-0" X 16'-0" X 2'-0"

Dated: 20-02-07

Revision: O

No. Of
Bars

Length Of
One Bar

No Of
Items

Total Length

6"

48

15.67

1504.32

15'-8"

6"

45

16.67

1500.3

6"

14'-8"

6"

48

15.67

1504.32

6"

15'-8"

6"

45

16.67

1500.3

Bar #

Spacing

Shape Of bar

(i) X Bars

#4

4" c/c

6"

14'-8"

(ii) Y Bars

#4

4" c/c

6"

(i) X Bars

#4

4" c/c

(ii) Y Bars

#4

4" c/c

Bottom Bars

Top Bars

SUMMARY
Bar #

G.Length

#4

6009.24

Unit
Total Weight (Lbs)
Weight

T.W in Kgs

Grade

0.668

4014.172

1820.817

Grade-60

#5

1.043

0.000

0.000

Grade-60

#6

1.502

0.000

0.000

Grade-60

#8

2.67

0.000

0.000

Grade-60

Contractor's Representative

Consultant's Representative

M/S SHAH ZAMAN (Pvt.) Ltd.

FOOTING SHEDULE BLOCK # 03 (G+3)


Package - VI
Footing :

M 4 ( 2 No.)

Size :

Drawing No. 2662/323/C/06G110

Description

12'-9" X 13'-9" X 1'-6"

Dated: 20-02-07

Revision: O

No. Of
Bars

Length Of
One Bar

No Of
Items

Total Length

6"

28

13.42

751.52

13'-5"

6"

26

14.42

749.84

6"

12'-5"

6"

28

13.42

751.52

6"

13'-5"

6"

39

14.42

1124.76

Bar #

Spacing

Shape Of bar

(i) X Bars

#5

6" c/c

6"

12'-5"

(ii) Y Bars

#5

6" c/c

6"

(i) X Bars

#4

6" c/c

(ii) Y Bars

#4

4" c/c

Bottom Bars

Top Bars

SUMMARY
Unit
Total Weight (Lbs)
Weight

Bar #

G.Length

T.W in Kgs

Grade

#4

1876.28

0.668

1253.355

568.518

Grade-60

#5

1501.36

1.043

1565.918

710.296

Grade-60

#6

1.502

0.000

0.000

Grade-60

#8

2.67

0.000

0.000

Grade-60

Contractor's Representative

Consultant's Representative

M/S SHAH ZAMAN (Pvt.) Ltd.

FOOTING SHEDULE BLOCK # 03 (G+3)


Package - VI
Footing :

M 5 ( 1 No.)

Size :

Drawing No. 2662/323/C/06G110

Description

11'-6" X 17'-6" X 2'-0"

Dated: 20-02-07

Revision: O

No. Of
Bars

Length Of
One Bar

No Of
Items

Total Length

6"

53

12.17

645.01

17'-2"

6"

35

18.17

635.95

6"

11'-2"

6"

53

12.17

645.01

6"

17'-2"

6"

35

18.17

635.95

Bar #

Spacing

Shape Of bar

(i) X Bars

#4

4" c/c

6"

11'-2"

(ii) Y Bars

#4

4" c/c

6"

(i) X Bars

#4

4" c/c

(ii) Y Bars

#4

4" c/c

Bottom Bars

Top Bars

SUMMARY
Unit
Total Weight (Lbs)
Weight

Bar #

G.Length

T.W in Kgs

Grade

#4

2561.92

0.668

1711.363

776.269

Grade-60

#5

1.043

0.000

0.000

Grade-60

#6

1.502

0.000

0.000

Grade-60

#8

2.67

0.000

0.000

Grade-60

Contractor's Representative

Consultant's Representative

M/S SHAH ZAMAN (Pvt.) Ltd.

FOOTING SHEDULE BLOCK # 03 (G+3)


Package - VI
Footing :

F 1 ( 1 No.)

Size :

Drawing No. 2662/323/C/06G110

Description

9'-0" X 9'-0" X 1'-6"

Dated: 20-02-07

Bar #

Spacing

(i) X Bars

#4

4" c/c

6"

8'-8"

(ii) Y Bars

#4

4" c/c

6"

8'-8"

Revision: O

No. Of
Bars

Length Of
One Bar

No Of
Items

Total Length

6"

27

9.67

261.09

6"

27

9.67

261.09

Shape Of bar

Bottom Bars

Top Bars

SUMMARY
Unit
Total Weight (Lbs)
Weight

Bar #

G.Length

T.W in Kgs

Grade

#4

522.18

0.668

348.816

158.222

Grade-60

#5

1.043

0.000

0.000

Grade-60

#6

1.502

0.000

0.000

Grade-60

#8

2.67

0.000

0.000

Grade-60

Contractor's Representative

Consultant's Representative

M/S SHAH ZAMAN (Pvt.) Ltd.

FOOTING SHEDULE BLOCK # 03 (G+3)


Package - VI
Footing :

F 2 ( 1 No.)

Size :

Drawing No. 2662/323/C/06G110

Description

6'-0" X 9'-0" X 2'-0"

Dated: 20-02-07

Bar #

Spacing

(i) X Bars

#4

4" c/c

6"

5'-8"

(ii) Y Bars

#4

4" c/c

6"

8'-8"

Revision: O

No. Of
Bars

Length Of
One Bar

No Of
Items

Total Length

6"

27

6.67

360.18

6"

18

9.67

348.12

Shape Of bar

Bottom Bars

Top Bars

SUMMARY
Unit
Total Weight (Lbs)
Weight

Bar #

G.Length

T.W in Kgs

Grade

#4

708.3

0.668

473.144

214.617

Grade-60

#5

1.043

0.000

0.000

Grade-60

#6

1.502

0.000

0.000

Grade-60

#8

2.67

0.000

0.000

Grade-60

Contractor's Representative

Consultant's Representative

M /s SHAH ZAMAN(Pvt.)Ltd.
STEM COLUMNS SHEDULE FOR BLOCK NO. 03 (G+3)
DRAWING NO._2662/323/C/06G108,109

DATED._20-02-2007.

REVISION. ____0___

PLINTH LEVEL.__1796.00

Item

Description

Bar#

Spacing

Stem Col Ht.

C1

at M 1
C9"x18"
Stirrups
Stirrups

#8
#6
#3
#3

4.5" c/c
4.5" c/c

C2

at M 1
9"x18"
Stirrups

#6
#3
#3

C9

at F1
9"x18"
Stirrups

C4

Shape of Bar

No.of Bars

Cut length

1.25
1.25
1.25
1.25

4
2
4
4

10.58
9.58
3.88
1.13

2
2
2
2

84.64
38.32
31
9

4.5" c/c
4.5" c/c

1.25
1.25
1.25

8
4
4

9.58
3.04
3.04

2
2
2

#6
#8
#3
#3

4.5" c/c
4.5" c/c

1.25
1.25
1.25
1.25

2
4
4
4

9.58
10.58
3.875
1.125

1
1
1
1

153.28
24.3
24.3
0
19.16
42.32
15.5
4.5

at F2
9"x24"
Stirrups

#8
#3
#3

4.5" c/c
4.5" c/c

0.75
0.75
0.75

8
3
3

10.58
4.88
2.54

2
2
2

169.28
29.25
15.24

C4

at M2
9"x24"
Stirrups

#8
#3
#3

4.5" c/c
4.5" c/c

2.25
2.25
2.25

8
7
7

10.58
4.88
2.54

2
2
2

169.28
68.25
35.56

C2

at M2
9"x24"
Stirrups

#6
#3
#3

4.5" c/c
4.5" c/c

2.25
2.25
2.25

8
7
7

9.58
3.04
3.04

4
4
4

306.56
85.12
85.12

C3

at M2
9"x24"
Stirrups
Stirrups

#8
#6
#3
#3

4.5" c/c
4.5" c/c

1.25
1.25
1.25
1.25

4
6
4
4

10.58
9.58
4.88
1.13

2
2
2
2

84.64
114.96
39
9
0

3/4"

1"

Dia of Bar

3/8"

Length

475.2
0.376
178.6777
81.04768
0.081048

Unit Weight in lbs


Total Weight in lbs
Total Weight in Kgs
Total Weight in Tonns

1/2"

0.668

5/8"

1.043

632.28
550.16
1.502
2.67
949.6846 1468.927
430.7741 666.301
0.430774 0.666301

No. of Items Total Length

Wt in tons
Grade_40

0.081048

Grade_60

1.097075

Weight

CONTRACTOR

Pg._______of______

CONSULTANT

CONTRACTOR

Pg._______of______

CONSULTANT

M /s SHAH ZAMAN(Pvt.)Ltd.
STEM COLUMNS SHEDULE FOR BLOCK NO. 03 (G+3)
DRAWING NO._2662/323/C/06G108,109

DATED._20-02-2007.

REVISION. ____0___

PLINTH LEVEL.__1796.00

Item

Description

Bar#

Spacing

C6

at M2
(9" X 27")
Stirrups
Stirrups

#8
#6
#3
#3

4.5" c/c
4.5" c/c

C1

at M3
( 9" X 18")
Stirrups
Stirrups

#8
#6
#3
#3

C3

at M3
(9" X 24")
Stirrups
Stirrups

C9

Shape of Bar

No.of Bars

Cut length

2.25
2.25
2.25
2.25

4
6
7
7

10.58
9.58
5.375
1.125

2
2
2
2

4.5" c/c
4.5" c/c

0.75
0.75
0.75
0.75

4
2
3
3

10.58
9.58
3.875
1.125

2
2
2
2

84.64
114.96
75.25
15.75
0
84.64
38.32
23.25
6.75

#8
#6
#3
#3

4.5" c/c
4.5" c/c

0.75
0.75
0.75
0.75

4
6
3
3

10.58
9.58
4.875
1.125

2
2
2
2

84.64
114.96
29.25
6.75

at M3
(9" X 18")
Stirrups
Stirrups

#8
#6
#3
#3

4.5" c/c
4.5" c/c

1.75
1.75
1.75
1.75

4
2
6
6

10.58
9.58
3.88
1.13

2
2
2
2

84.64
38.32
46.5
13.5

C8

at M3
Stirrups

#6
#3

4.5" c/c

0.75
0.75

6
6

9.58
3.625

2
2

C1

at M4

#8
#6
#3
#3

4.5" c/c
4.5" c/c

1.25
1.25
1.25
1.25

4
2
4
4

10.58
9.58
3.875
1.125

2
2
2
2

114.96
43.5
0
84.64
38.32
31
9
0
0
0

3/4"

1"

Dia of Bar

3/8"

Length

300.5
0.376
112.99
51.251
0.0513

Unit Weight in lbs


Total Weight in lbs
Total Weight in Kgs
Total Weight in Tonns

1/2"

5/8"

0.668

1.043

459.84
423.2
1.502
2.67
690.6797 1129.944
313.2902 512.5392
0.31329 0.512539

No. of Items Total Length

Wt in tons
Grade_40

0.051251

Grade_60

0.825829

Weight

CONTRACTOR

Pg._______of______

CONSULTANT

CONTRACTOR

Pg._______of______

CONSULTANT

M /s SHAH ZAMAN(Pvt.)Ltd.
STEM COLUMNS SHEDULE FOR BLOCK NO. 03 (G+3)

DRAWING NO._2662/323/C/06G108,109

DATED._20-02-2007.

REVISION. ____0___

PLINTH LEVEL.__1796.00

Item

Description

Bar#

Spacing

C2

at M4
( 9" X 18")

#6
#3
#3

4.5" c/c
4.5" c/c

C7

at M5

#8
#6
#3
#3
#3
#3

4.5" c/c
4.5" c/c
4.5" c/c
4.5" c/c

a
b
c
d

Dia of Bar

3/8"

Length

120.39
0.376
45.267
20.533
0.0205

Unit Weight in lbs


Total Weight in lbs
Total Weight in Kgs
Total Weight in Tonns

Shape of Bar

No.of Bars

Cut length

1.25
1.25
1.25

8
4
4

9.58
3.04
3.04

2
2
2

153.28
24.32
24.32

0.75
0.75
0.75
0.75
0.75
0.75

6
6
3
3
3
3

10.58
9.58
4.63
2.79
3.42
1.13

2
2
2
2
2
2

126.96
114.96
27.75
16.75
20.5
6.75

3/4"

1"

1/2"

5/8"

0.668

1.043

268.24
126.96
1.502
2.67
402.8965 338.9832
182.7526 153.7618
0.182753 0.153762

No. of Items Total Length

Wt in tons
Grade_40

0.020533

Grade_60

0.336514

Weight

CONTRACTOR

Pg._______of______

CONSULTANT

S-ar putea să vă placă și