Sunteți pe pagina 1din 16

HEAT LOAD CALCULATIONS FOR AC SYSTEM FOR 4x115MW VARAHI PROJECT

Outside Summer Cond.


####
WETBULB
DRY
BULB
0
####
TEMPERATURE
C
RELATIVE
HUMIDITY
(%):
HUMIDITY
RATIO ####
####
gms/kg OF
DRY AIR
DAILY
TEMPERATURE
####
RANGE

Desired Condition
#REF!
TEMP. (F)
HUMIDITY
CFM
PER(%)
SQ. FT #REF!
FLR. AREAAIR PER #REF!
FRESH
PERSON (CFM)RATIO #REF!
HUMIDITY
gms/kg OF DRY AIR #REF!

Factors
Bi pass factor
Safety Factor
Fan Heat Gain
Duct Leakage
Return Air Heat

#REF!
#REF!
#REF!
#REF!
#REF!

Factors
People (sens)
People (lat.)
light
Equip.
ADP

#REF!
#REF!
#REF!
#REF!
#REF!

Factors
Walls (u)
Roof (u)
Daily range
Temp. Correc.

#####
#####
#####
#####

Sun Gain Factors


####
North Wall
####
East Wall
####
South Wall
####
West Wall
####
Roof

Partion temp (wall/roof)

Vent. Room temp


Diff. Temp
Floor Factor
Part. Wall Factor

####
####
####
####

ANNEXURE - 01
AIR CONDITIONING SYSTEM - 1 (23+ 2 DEG C & RH 55+ 5%)

Heat Load
Sl.
No.

Department Name

Drawing No.

Equipment
(KW)

People
(Nos.)

Dispatcher Control Room - D1


AT EL. +561.6 & +562.1M

Tranformer-1 Room

Transformer-2 Room

28.00
28.00

Transformer-3 Room

28.00

Transformer-4 Room

28.00

Transformer-5 Room

28.00

Transformer-6 Room

28.00

Battery Room 220V DC

1.00

ANTE Room - 1

ANTE Room - 2

10 Ventilation Room

0.50

11 cable cellar

102.00

AT EL. +565.6M
1

Battery Room

1.00

IMCC-05-CH-01 (68)

20.50

IMCC-05-CH-02 (11)

3.30

ANTE ROOM

Battery charger Room

IMCC-04-CH-01 (31)

9.30

HT MCC -02 (40)

20.00

CMCC-04-CH-01 (7)

2.10

CMCC-05-CH-01 (17)

10 PDB-04-CH-01 (10)

1.00

IS-0-EE-669-114E006, Rev.1

5.10
2.00

11 PCC-04-CH

10.80

12 PCC-05-CH

9.00

13 PCC-06-CH

9.00

14 ANTE ROOM
15 GENTS & LADIES TOILET

0.10

16 ELDB-1

0.20

17 ELDB-2

0.20

18 MLDB TRAFO-2

2.00

19 MLDB TRAFO-3

2.00

20 MLDB-06-CH-01

2.00

21 MLDB TRAFO-4

2.00

22 CMCP (9)

2.70

23 IMCP (13)

3.90

24 PDB-08-RM-01

0.40

AT EL. +565.6M
1

ENGG STATION

1.00

GAS CYLINDER ROOM

0.20

CONTROL ROOM

1.50

ELECTRIAL SHIFT OFFICE ROOM

0.50

GENTS & LADIES TOILET

0.10

Remarks

Type of AC Unit
envisaged (Bidder to
suggest the system)

IS-0-EE-669-114E006, Rev.1

Dispatcher Control Room - D2


AT EL. +561.6 & +562.1M

Tranformer-1 Room

28.00

Transformer-2 Room

28.00

Transformer-3 Room

28.00

Transformer-4 Room

28.00

Transformer-4 Room

28.00

Ventilation Room

0.50

GENTS & LADIES TOILET

0.10

ANTE ROOM

ANTE ROOM

10 Cable cellar

27.00

AT EL. +565M
1

IMCC-03-CH-01 (26)

7.80

IMCC-03-CH-02 (45)

13.50

IMCC-02-CH-01 (51)

15.30

IMCC-02-CH-02 (30)

9.00

CMCC-02-CH-01 (13)

3.90

PDB-02-CH-01 (1)

PDB-03-CH-01 (4)

ELDB-1

IS-0-EE-669-114E007, Rev.1

0.20
0.80
0.20

PCC-02-CH

9.00

10 PCC-03-CH

10.50

11 TRAFO-1 MLDB

2.00

12 MLDB-03-CH-01

0.20

13 TRAFO-2 MLDB

2.00

14 Ventilation Room

0.50

15 ANTE ROOM
16 BATTERY ROOM

1.00

17 IMCP

0.30

AT EL. +571.1M

2TR. Window A/C Units

GAS CYLINDER ROOM

0.20

Electrical Shift Office Room

0.50

LADIES TOILET

0.10

GENTS TOILET

0.10

CONTROL ROOM

1.50

Dispatcher Control Room - D3


AT EL. +561.6 & +562.1M

TRAFO-1

TRAFO-2

28.00
28.00

TRAFO-3

28.00

TRAFO-4

28.00

Ventilation Room

0.50

Store Room

0.20

GENTS & LADIES TOILET

0.10

ANTE ROOM

ANTE ROOM

10 Cable cellar

80.00

AT EL. +565.6M
1

HT-MCC-02 (31)

15.50

MLDB TRAFO-1

2.00

MLDB-07-RM-01

0.20

MLDB TRAFO-2

0.20

ELDB - 1

0.20

MLDB TRAFO-5

2.00

MLDB-08-RM-02

0.20

MLDB TRAFO-6

2.00

ELDB-2

0.20

10 MLDB TRAFO-5

2.00

11 MLDB-08-RM-02

0.20

12 MLDB TRAFO-6

2.00

13 ELDB-2

0.20

14 MLDB TRAFO-5

2.00

15 MLDB-08-RM-02

0.20

16 MLDB TRAFO-6

2.00

17 DCDB

18 Battery charger

19 PDB-08-RM-01 (4)

0.8

20 PCC-07-RM
21 220V DC Battery room
22 PCC-08-RM
23 CMCC-08-RM-01 (12)
24 Ventilation Room

9.7
IS-0-EE-669-114E008, Rev.1

1
11.2
3.6
1

25 Electrical Shift Office Room

0.5

26 GENTS & LADIES TOILET

0.1

27 PDB-07-RM-01

0.2

AT EL. +571.1M
1

UPS Battery Room

Ladies & Gents toilet

0.1

Pantry

0.2

Corridor

0.2

IS-0-EE-669-114E008, Rev.1

AT EL. +575.1M
1

IMCC-07-RM-03 (20)

0.6

IMCC-08-RM-01 (21)

6.3

IMCC-07-RM-01 (28)

8.4

IMCC-07-RM-02 (32)

9.6

CCVM

0.5

IMCP-07, RM-01

0.3

IMCP-08, RM-01

0.3

IMCP-08, RM-02

0.3

IMCP-08, RM-03

0.3

10 IMCP-08, RM-04

0.3

11 UPS

0.5

12 RIO

0.5

13 PACKAGE AC ROOM

14 GAS CYLINDER ROOM

0.1

15 GENTS TOILET

0.1

16 CORRIDOR

0.2

CONFERENCE ROOM WITH FALSE


17
CEILING

1.5

18 ENGG STATION
DESPATCHER CONTROL ROOM WITH
19
FALSE CEILING & AC (25 Deg)

1
1.5

ANNEXURE - 01
AIR CONDITIONING SYSTEM - 1 (23+ 2 DEG C & RH 55+ 5%)

Heat Load
Sl.
No.

Department Name

Drawing No.

Equipment
(KW)

People
(Nos.)

4 Dispatcher Control Room - D4


AT EL. +561.6 & +562.1M
1 TRAFO-1

28.00

2 TRAFO-2

28.00

3 TRAFO-3

28.00

4 TRAFO-4

28.00

5 Ventilation Room

0.50

6 ANTE ROOM
7 ANTE ROOM
8 Cable cellar

29.00

AT EL. +565.6M
1 IMCP-03, RM-01

0.30

2 IMCP-03, RM-02

0.30

3 IMCP-03, RM-03

0.30

4 IMCP-03, RM-04

0.30

5 IMCP-03, RM-05

0.30

6 IMCP-03, RM-06

0.30

7 IMCP-03, RM-07

0.30

8 IMCP-03, RM-08

0.30

9 IMCP-03, RM-09

0.30

10 IMCP-03, RM-10

0.30

11 RIO

0.50

12 UPS
13 BATTERY ROOM
14 PDB-03-RM-01 (14)

0.50
IS-0-EE-669-114E011, Rev.1

1.00
2.80

15 CMCC-4-RM-01 (13)

3.90

16 ELDB

0.20

17 MLDB TRAFO

2.00

18 MLDB-03-RM-01

0.20

19 MLDB TRAFO

2.00

20 PCC-03-RM

10.50

21 PCC-04-RM

9.00

22 IMCC-04-RM-01 (18)

5.40

23 IMCP-04, RM-01

0.30

24 IMCP-04, RM-02

0.30

25 IMCP-04, RM-03

0.30

26 IMCP-04, RM-04

0.30

27 IMCP-04, RM-05

0.30

28 IMCP-04, RM-06

0.30

AT EL. +571.1M
1 PKG AC ROOM

1.00

2 ENGG STATION

1.00

DESPATCHER CONTROL ROOM WITH


3
FALSE CEILING & AC (25 Deg)

1.50

4 GAS CYLINDER ROOM

0.10

Remarks

Type of AC Unit
envisaged (Bidder to
suggest the system)

IS-0-EE-669-114E011, Rev.1

5 Electrical Shift Office Room

0.50

6 GENTS & LADIES TOILET

0.10

5 Dispatcher Control Room - D5


AT EL. +561.6 & +562.1M
1 Tranformer-1 Room

28.00

2 Transformer-2 Room

28.00

3 Transformer-3 Room

28.00

4 Transformer-4 Room

28.00

5 Transformer-4 Room

28.00

6 Ventilation Room

0.50

7 GENTS & LADIES TOILET

0.10

8 ANTE ROOM
9 ANTE ROOM
10 Cable cellar

25.00

AT EL. +565M
1 IMCC-09-RM-01 (47)

14.10

2 IMCC-10-RM-01 (31)

9.30

3 IMCC-10-RM-02 (30)

9.00

4 IMCC-10-RM-03 (42)

12.60

5 CMCC-09-RM-01 (15)
6 PDB-10-RM-01 (7)

4.50
IS-0-EE-669-114E010, Rev.1

1.40

7 PDB-03-CH-01

0.00

8 ELDB-1

0.20

9 PCC-02-CH

9.00

10 PCC-03-CH

10.20

11 TRAFO-1 MLDB

2.00

12 MLDB-03-CH-01

0.20

13 TRAFO-2 MLDB

2.00

14 Ventilation Room

0.50

15 ANTE ROOM
16 BATTERY ROOM

1.00

AT EL. +571.1M
1 GAS CYLINDER ROOM

0.20

2 Electrical Shift Office Room

0.50

3 LADIES TOILET

0.10

4 GENTS TOILET

0.10

5 CONTROL ROOM

1.50

2TR. Window A/C Units

6 Dispatcher Control Room - D6


AT EL. +561.6 & +562.1M
1 TRAFO-1

28.00

2 TRAFO-2

28.00

3 TRAFO-3

28.00

4 TRAFO-4

28.00

5 TRAFO-5

28.00

6 TRAFO-6

28.00

7 Ventilation Room

0.50

10 ANTE ROOM
11 ANTE ROOM
12 Cable cellar

45.00

AT EL. +565.6M
1 IMCC-02-RM-01 (41)

12.30

2 IMCP-02-RM-01

0.30

3 RIO

0.50

4 UPS

0.50

5 BATTERY ROOM

1.00

6 PKG AC ROOM

1.00

7 Electrical Shift Office Room

0.50

8 GENTS & LADIES TOILET

0.10

9 CMCC-02-RM-01 (25)

7.50

10 CMCC-05-RM-01 (21)

6.30

11 PDB-02-RM-01 (5)
12 MLDB, TRAFO-1
13 MLDB-06-RM-01

1.00
IS-0-EE-669-114E002, Rev.1

2.00
0.20

14 MLDB, TRAFO-2

2.00

15 ELDB-1

0.2

16 PCC-02-RM

17 PCC-05-RM

8.2

18 PCC-06-RM

8.9

19 TRAFO-1, MLDB

20 MLDB-06-RM-01

0.2

21 TRAFO-2, MLDB

22 ELDB-2

0.2

23 Ventilation Room

0.5

24 IMCC-05-RM-WT01

25 IMCC-05-RM-WT02

26 IMCC-06-RM-WT03

27 IMCC-06-RM-WT04

28 PDB-06-RM-01 (24)

4.8

AT EL. +571.1M
1 GAS CYLINDER ROOM

0.2

2 GENTS & LADIES TOILET

0.1

DESPATCHER CONTROL ROOM WITH


3
FALSE CEILING & AC (25 Deg)

1.5

4 ENGG STATION

0.5

5 PACKAGE A/C ROOM

35DEG

ANNEXURE - 01
AIR CONDITIONING SYSTEM - 1 (35 DEG C max & RH 70 % max)

Heat Load
Sl.
No.

Department Name

Drawing No.

Equipment
(KW)

People
(Nos.)

1 MCC ROOM- 1,2,3,4


AT EL. +561.6 (GROUND FLR)
1 RIO

0.50

2 RIO

0.50

3 PLC

1.00

4 PLC

1.00

5 UPS

0.50

6 UPS BATTERY ROOM


7 PACKAGE A/C ROOM

1.00
IS-3-EL-669-114E020, Rev.0

1.00

8 IMCC

0.00

9 HYD. POWER PACK

1.00

10
FIRST FLOOR
1 CONTROL CABIN

0.50

1 ECR ROOM E-1


AT EL. +561.6 & +562.1M
1 TRAFO-1

28.00

2 TRAFO-2

28.00

3 TRAFO-3

28.00

4 TRAFO-4

28.00

5 TRAFO-5

28.00

6 TRAFO-6

28.00

7 Ventilation Room

0.50

8 ANTE ROOM
9 ANTE ROOM
10 GENTS & LADIES TOILET

0.10

11 BATTERY ROOM
12 Cable cellar

42.00

Remarks

Type of AC Unit
envisaged (Bidder to
suggest the system)

AT EL. +565.6
1 PCC-07-CH

8.90

2 PCC-11-RM

9.30

3 PCC-12-RM

10.00

4 CMCC-11-RM-01(24)

7.20

5 ELDB-1

0.20

6 TRAFO-1, MLDB

2.00

7 MLDB-11-RM-01

0.20

8 TRAFO-2, MLDB

2.00

9 TRAFO-3, MLDB

2.00

10 MLDB-07-CH-01

0.20

11 TRAFO-4, MLDB

2.00

12 CMCP-12, RM-01
13 CMCP-12, RM-02

IS-0-EE-669-114E002, Rev.1

0.30
0.30

14 CMCP-12, RM-03

0.30

16 CMCP-12, RM-04

0.30

17 CMCP-12, RM-05

0.30

18 CMCP-12, RM-06

0.30

19 CMCP-12, RM-07

0.30

20 CMCP-12, RM-08

0.30

21 CMCP-12, RM-09

0.30

22 IMCP-11, RM-01

0.00

23 IMCP-11, RM-02

0.00

24 IMCP-11, RM-03

0.00

25 IMCP-11, RM-04

0.00

26 IMCP-11, RM-05

0.00

27 IMCP-11, RM-06

0.00

28 IMCP-12, RM-01

0.30

29 IMCP-12, RM-02

0.30

30 IMCP-7, RM-01

0.30

31 IMCP-7, RM-02

0.30

32 IMCP-7, RM-03

0.30

33 IMCP-7, RM-04

0.30

34 IMCC-12-RM-01 (10)

3.00

35 IMCC-07-CH-01 (13)

3.90

36 IMCC-07-CH-02 (8)

2.40

37 IMCC-10-RM-01

0.30

38 ELECTRICAL SHIFT OFFICE ROOM

0.50

39 IMCC-10-RM-(4)

1.20

AT EL. +565.6
1 PACKAGE A/C ROOM

1.00

1 ECR ROOM E-2


AT EL. +561.6 & +562.1M
1 TRAFO-1

28.00

2 TRAFO-2

28.00

3 BATTERY ROOM

1.00

4 Ventilation Room

0.50

5 ANTE ROOM

15.00

6 cable cellar
AT EL. +565.6

0.30

1 IMCP-02, LD-01

2 IMCP-02, LD-02

0.50

3 RIO
4 UPS

IS-0-EE-669-114E003, Rev.1

0.50

2TR. Window A/C Units

5 IMCC-02-LD-01 (45)
6 PACKAGE A/C ROOM

IS-0-EE-669-114E003, Rev.1

13.50
1.00

7 TRAFO-1, MLDB

8 MLDB-02-LD-01

0.2

9 TRAFO-2, MLDB

10 CMCC-02-LD-01(17)

5.1

11 DCDB

0.5

12 BAT. CHARGER

13 PDB-02-LD-01

0.2

14 PCC-02-LD

9.2

15 HT STAND ALONE PNL

0.5

16 ELECTRICAL SHIFT OFFICE ROOM

0.5

17 VENTILATION ROOM

0.5

ANNEXURE - 01
AIR CONDITIONING SYSTEM - 1 (35 DEG C max & RH 70 % max)

Heat Load
Sl.
No.

Department Name

Mechanical GA with Load Data of


1
Convyr J47C1 (Tunnel)

AT EL. -7.8 M

NMDC/BHEL/01/55/DE/-/116

Mechanical GA with Load Data of


Convyr J59C1 (Tunnel)
AT EL.

NMDC/BHEL/01/55/DE/-/147

Mechanical GA with Load Data of


Convyr J60C1 (Tunnel)
AT EL.

NMDC/BHEL/01/55/DE/-/152

GA of Conveyor Tunnel for J1C1/C2


(Tunnel)
AT EL.

Drawing No.

GA of Conveyor Tunnel for J2C1/C2


(Tunnel)
AT EL.

NMDC/BHEL/01/35/DE/-/3962

NMDC/BHEL/01/35/DE/-/3965

Equipment
(KW)

People
(Nos.)

Remarks

Type of AC Unit
envisaged (Bidder to
suggest the system)

BUILDINGS

1 WORKERS REST ROOM WITH TOILET

NMDC/BHEL/01/35/DE/-/4140

2 AREA SUB STORES

3 AREA REPAIR SHOP

4 ELECTRICAL REPAIR SHOP

5 PUMP HOUSES

6 LABORATORY

MEC/11/20/Q6QZ/CTS/
RMHS/001