NOTES:

CASE NO. 1:
MULTI TRAINS (1 & 2 ON-SKID FUEL VALVE SCHEMES)
KNOCK-OUT DRUM VENT (SEE NOTE-4) SAFETY SHUTDOWN VALVE VENT (SEE NOTE-4)

PARTICLES FILTER

ON-SKID FUEL CONTROL VALVES (SEE NOTE 3) COALESCER FILTER BLOW DOWN (SEE NOTE-1) SAFETY SHUTDOWN VALVE

1. AUTOMATIC BLOW OFF TO THE BLOW DOWN SYSTEM DURING START UP, FOR FUEL WARM UP, AND EMERGENCY SHUT DOWN. 2. TYPE AND PHYSICAL LOCATION IS DEPENDENT ON APPLICATION.

FUEL GAS SUPER HEATER (SEE NOTE-2)

VENT

3. CGT MANUFACTURER SUPPLIED FUEL CONTROL VALVES. 4. AUTOMATIC VENT TO FLARE DURING EMERGENCY SHUTDOWN.

PLOT LIMIT SAFETY SHUTDOWN VALVE GAS SUPPLY SYSTEM PRESSURE CONTROL STATION

FLOW METER

STRAINER

CGT SKID DRAIN

PARTICLES FILTER SAFETY SHUTDOWN VALVE VENT (SEE NOTE-4)

ON-SKID FUEL CONTROL VALVES (SEE NOTE 3) COALESCER FILTER BLOW DOWN (SEE NOTE-1)

FUEL GAS SUPER HEATER (SEE NOTE-2)

VENT

TO PRESSURE SEWER

LIQUID LEVEL CONTROL STATION

FLOW METER

STRAINER

TO OTHER CGT TRAINS DRAIN

CGT SKID

CASE NO. 2
SINGLE TRAIN (ONE ON-SKID FUEL VALVE SCHEME)

KNOCK-OUT DRUM VENT (SEE NOTE-4)

PARTICLES FILTER

ON-SKID FUEL CONTROL VALVES (SEE NOTE 3) COALESCER FILTER BLOW DOWN (SEE NOTE-1) SAFETY SHUTDOWN VALVE

FUEL GAS SUPER HEATER (SEE NOTE-2)

VENT

PLOT LIMIT SAFETY SHUTDOWN VALVE GAS SUPPLY SYSTEM PRESSURE CONTROL STATION

FLOW METER

STRAINER

CGT SKID DRAIN

TO PRESSURE SEWER

LIQUID LEVEL CONTROL STATION

CASE NO. 3
SINGLE TRAIN (TWO ON-SKID FUEL VALVE SCHEME)
KNOCK-OUT DRUM VENT (SEE NOTE-4) PARTICLES FILTER COALESCER FILTER BLOW DOWN (SEE NOTE-1) ON-SKID FUEL CONTROL VALVES (SEE NOTE 3)

FUEL GAS SUPER HEATER (SEE NOTE-2)

VENT

SCALE:

TYPICAL INSTALLATION DRAWING


REVISION VALIDATION

PLOT LIMIT SAFETY SHUTDOWN VALVE GAS SUPPLY SYSTEM PRESSURE CONTROL STATION

FLOW METER

STRAINER

THIS REVISION NO.

01

IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

714120-0305-001

CGT SKID DRAIN

DESIGN CERTIFICATION
(DESIGN AGENCY)
ENGG./DATE

REVIEW FOR KEY DRAWINGS


REQUIRED (SAUDI ARAMCO)

OTHER
BY/DATE

CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE

REV.NO. DATE

REVISION DESCRIPTION

01

12/21/04

DRAWING UPDATED AND CHANGED SIZE FROM "D" TO "A" SIZE THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED

JOB ORDER/EWO NO.

TYPICAL SCHEMATIC GAS TURBINE


TO PRESSURE SEWER LIQUID LEVEL CONTROL STATION

DRAWING TYPE

SCM

FUEL TREATMENT FACILITIES FOR COMBUSTION

STD. DWG.
PLANT NO. INDEX

SAUDI ARABIA
DRAWING NUMBER
SHT. NO. REV. NO.

990
CopyrightSaudi Aramco 2009. All rights reserved.

AA-036006 001 01
VECTOR
CADD-04

Saudi Aramco 2615 ENG. (09/03)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO

S-ar putea să vă placă și