REQUEST FOR INSPECTION (RFI)

CLIENT KIMANIS POWER SDN. BHD PROJECT NAMEKimanis Power Project for 300MW Combined Cycle Power Plant PROJECT NO. 10-0523 PAGE 1 OF 1 DATE 09.03.2013
ITP Activity

RECORD NO.:

RFI-ST-F8006

UNIT OF SUBJECT: CIRCUIT BREAKER - FOUNDATION NUT LEVEL CHECK - B1 275KV

RECEIVED BY `

ContractorHWSR OwnerHWSR

DATE AND TIME

LOCATION 275kV SWITCHYARD

INSPECTION ITEM FOUNDATION - NUT LEVEL CHECK

REMARKS

For H & W Point


Owner will dispatch Mr. .to inspects. Owner will not dispatch inspector to inspect.

Notes

Owner inspection result AcceptableReject Notes


Signature

. Date

PREPARED BY HILMAN (ABB M) 9.03.13 CONTRACTOR DATE

CHECKED BY CONTRACTOR DATE

ACKNOWLEDGE BY OWNER DATE

Noteall requisition for H & W point shall submit 24 hours before inspection. S & R point shall submit inspection record after complete inspection work. Should the inspection required urgently, phone call or special request will be sufficient