EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-152 3 June 2013 2 June 2013

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 = 11.00 12.00 13.00 Cloudy (C), 14.00 15.00 16.00 17.00 18.00

Working Date Working Time


19.00 20.00 21.00

22.00

23.00

24.00

Symbols Yesterday No. Description Normal Time man hours Over Time man hours

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Area Description Welding M/C 300 Amp. Unit ea ea ea Unit Q'ty 8 16 12 Q'ty No. 4 5 6 No. 1 2 3 4 5 HOLIDAY NO ACTIVITY 6 7 8 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Area Shop Shop Shop Shop Shop Shop Shop Shop Unit Set Joint Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 1 No. 1 2 3 4 5 6 7 8 Activities (Tomorrow) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Reactor Area Shop Shop Shop Shop Shop Shop Shop Unit Set Joint Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct Description Indirect A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 4 1 No. 7 8 9 Crane 100T. Crane 50T. Trailer Description 3 3 7 4 2 5 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 10 11 39 21 8 2 80 88 312 168 64 16 40 24 24 56 32 16 10 11 39 21 8 2 5 3 3 7 4 2 134 Unit ea ea ea 80 88 312 168 64 16 40 24 24 56 32 16 1,072 Q'ty 2 2 2 4 Indirect 1 1 3 2 1 1 8 8 24 16 8 8 16 16 16 32 1 1 3 2 1 1 2 2 2 4 8 8 24 16 8 8 16 16 16 32

EQUIPMENT AND MACHINERY REPORT

Welding Plug Handrail For Trim Cooler Shop

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1