The Electrical Design works included: Site layout and Single Line Diagram Cable design and specification DNO & Client Substation design & Switchgear specification Earthing Survey and design, using CDEGS software
Protection grading studies were undertaken using ERACs software; this requirement ensures suitable settings for the system protective devices, within the High Voltage network, are set up correctly. g2 Energy also completed the G59/2 protection commissioning works, all being witnessed and approved by SPEN; this being a UK requirement for projects that wish to connect into the grid and export. To date, g2 Energy have successfully connected 24 single site 500kW Wind Turbines to the national electricity grid, with a number of additional projects currently in construction, due to be completed by mid 2013.