PLANILLA DE METRADOS

Item
01

Descripcin

Und.

Metrado

CONSTRUCCION DE PABELLON "A"

01.01

ESTRUCTURAS BLOQUE "I"

01.01.01

OBRAS PRELIMINARES

01.01.01.01

GIGANTOGRAFA DIGITAL DE 3.60 X 2.40 m

1.00

01.01.01.02

MOVILIZACION y DESMOVILIZACION DE EQUIPO

glb

1.00

01.01.01.03

CERCO PROVISIONAL DE SEGURIDAD DE OBRA

glb

1.00

01.01.01.04

DESMONTAJE DE COBERTURA DE ETERNIT

m2

612.50

m3

255.85

Descripcin

L (m)

B (m)

SITUACION ACTUAL

50.87

10.47

por techo inclin. Area CAD (m)

1.15
TOTAL

01.01.01.05

DEMOLICION DE MUROS DE ADOBE


Descripcin

sit. actual

01.01.01.06

612.50
612.50 m

L (m)

B (m)

cantidad

h (m)

Volumen (m)

muros long.

49.82

0.50

2.00

2.99

148.96

muros transersales

6.00

0.50

7.00

3.79

79.59

puertas (-)

1.05

0.50

6.00

2.00

6.30

ventanas (-)

1.00

2.00

21.00

0.50

21.00

42.00

TOTAL

255.85 m

54.60 m

DEMOLICION DE PISOS DE CONCRETO, INCLUYE FALSO PISO


Descripcin
SITUACION ACTUAL, inc. Vereda

L (m)

B (m)

Area CAD (m)

51.75

10.37

536.60

10.38

1.13

5.86

TOTAL

542.46 m

Area (m)

12.60

m2

542.46

01.01.01.07

DESMONTAJE DE PUERTAS

m2

12.60

01.01.01.08

DESMONTAJE DE VENTANAS

m2

42.00

01.01.01.09

LIMPIEZA DE TERRENO MANUAL

m2

571.18

m2

571.18

01.01.01.10

L (m)

B (m)

Area CAD (m)


265.02

Bloque I

25.12

10.55

ESCALERA

3.90

10.55

41.15

Bloque II

25.12

10.55

265.02

TOTAL

571.18 m

TRAZO DE NIVELES Y REPLANTEO

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

A (m)

B (m)

hexc (m)

Volumen (m)

Area
nivelacion(m)

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

TOTAL

157.80 m

63.12 m

Descripcin Zapatas

EJE A

EJE B

EJE C

EJE D

EJE E

EJE F

EJE G

m3

EXCAVACION PARA ZAPATAS y VIGAS RIOSTRAS DE CIMENTACION HASTA 2.00m TERRENO NORMAL

188.54

L (m)

b (m)

hexc (m)

Volumen (m)

Tramo 1-2

0.00

0.000

0.00

0.00

Area
Nivelacion(m)
0.00

Tramo 2-3

1.60

0.500

1.00

0.80

0.80

Tramo 1-2

1.60

0.500

1.00

0.80

0.80

Tramo 2-3

1.60

0.500

1.00

0.80

0.80

Tramo 1-2

1.60

0.500

1.00

0.80

0.80

Tramo 2-3

1.60

0.500

1.00

0.80

0.80

Tramo 1-2

1.60

0.500

1.00

0.80

0.80

Tramo 2-3

1.60

0.500

1.00

0.80

0.80

Tramo 1-2

1.60

0.500

1.00

0.80

0.80

Tramo 2-3

1.60

0.500

1.00

0.80

0.80

Tramo A-B

1.80

0.500

1.00

0.90

0.90

Tramo B-C

2.70

0.500

1.00

1.35

1.35

Tramo C-D

2.45

0.500

1.00

1.23

1.23

Tramo D-E

2.73

0.500

1.00

1.37

1.37

Tramo E-F

2.48

0.500

1.00

1.24

1.24

Tramo F-G

1.60

0.500

1.00

0.80

0.80

0.00

0.00

Vigas Riostras
EJE A
EJE B
EJE C
EJE D
EJE E

EJE 3

EJE 1

EJE G

EJE 2

Tramo A-B

0.00

0.000

0.00

0.00

0.00

Tramo B-C

2.70

0.500

1.00

1.35

1.35

Tramo C-D

2.45

0.500

1.00

1.23

1.23

Tramo D-E

2.73

0.500

1.00

1.37

1.37

Tramo E-F

2.48

0.500

1.00

1.24

1.24

Tramo F-G

1.60

0.500

1.00

0.80

0.80

Tramo 1-2

1.40

0.500

1.00

0.70

0.70

Tramo 2-3

1.40

0.500

1.00

0.70

0.70

Tramo A-B

1.80

0.500

1.00

0.90

0.90

Tramo B-C

2.70

0.500

1.00

1.35

1.35

Tramo D-E

2.53

0.500

1.00

1.27

1.27

TOTAL

24.98 m

24.98 m

cimientos corridos
BLOQUE A

01.01.02.02

ESCALERA CC1

b (m)

L (m)

hexc (m)

Volumen (m)

0.40

12.00

1.20

5.76

TOTAL

5.76 m

m3

EXCAVACION PARA CUNETAS


Descripcin
BLOQUE A

L (m)

B (m)

hexc (m)

Volumen (m)

34.00

0.40

0.40

5.44

TOTAL

5.44 m

5.44

01.01.02.03

RELLENO CON MATERIAL PROPIO


Descripcin
Volumen Excavado en zapatas y vigas riostras

9.47
12.62

Vol.OVER (Mejoramiento de suelo de Fundacin)

25.25

Volumen de Afirmado en Vigas Riostras de Cimentacin

19.98

Volumen de C en Zapatas

37.87

Volumen de C Vigas Riostras de Cimentacin

20.15

Volumen de Sobrecimientos e = 0.25m

4.43

Volumen de Sobrecimientos e = 0.15m

5.60

Total

61.15 m

ELIMINACION DE MATERIAL EXCEDENTE (A MANO USANDO CARRETILLA, DISTANCIA PROMEDIO DE 30M)

188.54

Volumen proveniente de demolicion muros adobe y pisos

310.10

Vol. De relleno (-)

01.01.02.05

01.01.03.01

NIVELACION INTERIOR Y APISONADO


Ubicacin

Area (CAD)

PARA VIGAS RIOSTRAS DE CIMENTACIN

24.98

PARA ZAPATAS

63.12

EN FALSO PISO BLOQUE I Y ESCALERA

300.50

EN FALSO PISO BLOQUE II

262.50

PIEDRA GRANDE "OVER" Dimetro Mn. 4", Mx. 8"


Area nivelacion

h(m)

Volumen (m)

63.12

0.40

25.25

Total

25.25

AFIRMADO PARA MEJORAMIENTO DE SUELO DE FUNDACION, e = 20 cm


Descripcin

Area nivelacion

h(m)

Volumen (m)

63.12

0.20

12.62

Total

12.62

PARA ZAPATAS

AFIRMADO PARA VIGAS RIOSTRAS DE CIMENTACIN e = 20 cm (DOS CAPAS)


Descripcin

Area nivelacion

h(m)

PARA VIGAS RIOSTRAS DE CIMENTACIN 1 CAPA

24.98

0.20

PARA VIGAS RIOSTRAS DE CIMENTACIN 2 CAPA

24.98

0.20

Total
01.01.03.04

Descripcin

25.25

m2

63.12

m2

49.95

m2

1,126.00

m3

9.47

Area nivelacion
563.00
563.00

EN FALSO PISO aulas y veredas, escalera 2 capa


Total

01.01.04.01

m3

49.95

AFIRMADO PARA MEJORAMIENTO DE SUELO EN PISOS, e = 20 cm (DOS CAPAS)

EN FALSO PISO aulas y veredas, escalera 1 capa

01.01.04

563.00

MEJORAMIENTO DE SUELO DE FUNDACION

Descripcin

01.01.03.03

651.10

651.10

PARA ZAPATAS

01.01.03.02

m2

61.15
524.98 m

Total
01.01.03

524.98

Volumen (m)

Volumen Excavado en zapatas y vigas riostras

Total

m3

188.54

Vol. Afirmado (Mejoramiento de suelo de Fundacin)

Descripcin

61.15

Volumen (m)

Vol.Solado Concreto (Mejoramiento de suelo de Fundacin)

01.01.02.04

m3

1126.00

OBRAS DE CONCRETO SIMPLE


CONCRETO f'c=140 kg/cm e= 0.15 m, SOLADO
Descripcin
PARA ZAPATAS

Area nivelacion

h(m)

Volumen (m)

63.12

0.15

9.47

Total

9.47

01.01.04.02

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 10 CM


Descripcin

01.01.04.03
01.01.04.04.01

EJE A-A
EJE E-E
EJE G-G

EJE J-J
EJE N-N
EJE P-P

01.01.04.04.02

EJE 1-1

EJE 3-3

EJE 1-1

EJE 3-3

m3

33.51

m3

4.43

m3

5.60

310.30
Total

310.30

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA


Descripcin

310.30

Area nivelacion

EN FALSO PISO aulas y veredas, escalera

01.01.04.03

m2

b (m)

L (m)

hc

ESCALERA CC1

0.50

5.80

0.60

Volumen (m)
1.74

MURO PERIMETRAL

0.50

99.86

0.60

29.96

CC2

0.50

7.24

0.50

1.81

Total

33.51

SOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.25 m
Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

Total

4.43

35.40

CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.15 m


Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

2.31

0.50

0.17

2.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

2.31

0.50

0.17

2.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

2.46

0.50

0.18

2.46

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

3.31

0.50

0.25

3.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

3.31

0.50

0.25

3.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

3.46

0.50

0.26

3.46

J-K

0.15

2.46

0.50

0.18

2.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

2.31

0.50

0.17

2.31

N-O

0.15

2.31

0.50

0.17

2.31

O-P

0.15

3.46

0.50

0.26

3.46

J-K

0.15

3.46

0.50

0.26

3.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

3.31

0.50

0.25

3.31

N-O

0.15

3.31

0.50

0.25

3.31

O-P

0.15

3.46

0.50

0.26

3.46

Total

5.60

74.64

01.01.04.04.03
01.01.04.04
01.01.04.05.01

01.01.04.05.02

01.01.04.05.03

01.01.05
01.01.05.01
01.01.05.01.01

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

110.09

m3

1.35

m2

47.49

15.30

m3

37.87

kg

1,666.07

CUNETAS
CONCRETO f'c=175 kg/cm2 PARA CUNETAS

Descripcin

L (m)

e (m)

Area Cuneta
(m)

Volumen (m)

BLOQUE I

67.84

0.10

0.11

0.71

BLOQUE II

58.04

0.10

0.11

0.64

TOTAL

1.35

ENCOFRADO Y DESENCOFRADO CUNETAS

Descripcin

L (m)

h (m)

BLOQUE I

67.84

0.35

Area Cuneta
(m)
47.49

BLOQUE II

58.04

0.35

40.63

TOTAL

47.49

JUNTAS ASFALTICAS EN CUNETAS, e = 1"

Descripcin

L (m)

cantidad (m)

h (m)

BLOQUE I

67.84

17.00

0.90

Area Cuneta
(m)
15.30

BLOQUE II

58.04

15.00

0.90

13.50

TOTAL

15.30

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
Descripcin
PARA ZAPATAS

01.01.05.01.02

m2

ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS

Area nivelacion

h(m)

Volumen (m)

63.12

0.60

37.87

Total

37.87

01.01.05.02
01.01.05.02.01

VIGAS RIOSTRAS DE CIMENTACIN


CONCRETO f'c=175 kg/cm2 PARA VIGAS DE CIMENTACION
Vigas Riostras

EJE A
EJE E
EJE G
EJE H
EJE I

EJE 1

EJE 3

EJE J-J
EJE N-N
EJE P-P

EJE 1

EJE 3

L (m)

b (m)

h (m)

Volumen (m)

Area encof (m2)

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.46

0.300

0.50

0.52

3.46

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.31

0.300

0.50

0.50

3.31

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

TOTAL

20.15 m

134.31 m2

m3

20.15

01.01.05.02.02

ENCOFRADO Y DESENCOFRADO EN VIGAS RIOSTRAS DE CIMENTACION

m2

134.31

01.01.05.02.03

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS RIOSTRAS DE CIMENTACION

kg

2,351.49

01.01.05.03
01.01.05.03.01

PLACAS Y COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2

1.80

m3

Descripcin Columnas

Area (m)

Permetro (m)

CANTIDAD

h (m)

Area de
Encofrado (m)

C3

0.09

4.35

20.00

4.05

87.00

1.80

TOTAL

87.00 m

1.80 m

Volumen (m)

01.01.05.03.03

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

87.00

01.01.05.03.04

ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS

kg

4,843.63

m3

2.15

01.01.05.04
01.01.05.04.01

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2

Descripcin

L (m)

b (m)

h (m)

V-102

4.230

0.300

0.400

V-103

4.500

0.300

0.500

V-A

3.800

0.300

0.300

V-B

4.200

0.300

0.250

Ai (m)

Af (m)

Area Encofrado
(m)

4.653
5.850
3.420
3.360
3.360
TOTAL

20.64 m

Volumen
(m)

0.508
0.675
0.342
0.315
0.315
2.15 m

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

20.64

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS

kg

6,414.52

m3

49.34

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
Factor para Techo
inclinado 00%

Descripcin Losa Aligerada

Area CAD(m)

1.000

espesor (m)

SECRETARIA

15.438

15.44

0.200

AULA 202

15.438

15.44

0.200

SALA DE PROFESORES

15.438

15.44

0.200

Voladizo

29.16

29.16

0.200

TUTORIA

15.438

15.44

0.200

TOPICO

15.438

15.44

0.200

BIBLIOTECA

61.752

61.75

0.200

TOTAL

168.10 m

Descripcin Losa Aligerada techo

Area (m)

Factor para Techo


inclinado 20%

1.020

espesor (m)

AULA 1

41.74

42.57

0.200

AULA 2

41.74

42.57

0.200

AULA 3

41.74

42.57

0.200

Voladizo Aula 1

9.72

9.91

0.200

Voladizo Aula 2

9.72

9.91

0.200

Voladizo Aula 3

9.72

9.91

0.200

AULA 4

41.74

42.57

0.200

AULA 5

41.74

42.57

0.200

AULA 6

42.57

0.200

Voladizo Aula 4

41.74
9.72

9.91

0.200

Voladizo Aula 5

9.72

9.91

0.200

Voladizo Aula 6

9.72

9.91

0.200

TOTAL

314.87 m

Dimensiones

N Lad / m

Area (m)

Cantidad Lad.

Volumen Total

Vol. Lad.

Vol. Ladrillos

Vol.
Concreto

0.30x0.30x0.15

8.333

168.100

1401.000

33.620

0.014

18.914

14.706

0.30x0.30x0.12

8.333

314.875

2624.000

62.975

0.011

28.339

34.636

TOTAL

482.974

4,025.000

TOTAL

49.34 m

LADRILLO HUECO

ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS


Descripcin (Bordes o Frisos)

Largo

Peralte

Area (m)

Borde aligerado AULAS

92.360

0.200

18.472

120.920

0.170

20.556

3.800

0.200

0.760

30.400

0.170

Borde alig. ESCALERA

BLOQUE II, 1 NIVEL

Area Total de Aligerado FONDO

527.93

kg

5,538.48

5.168
482.974

TOTAL
ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS

m2

527.93 m

BLOQUE II, 1 NIVEL

LADRILLO HUECO DE ARCILLA 15x30x30 PARA TECHO ALIGERADO h = 0.20

1,401.00

LADRILLO HUECO DE ARCILLA 12x30x30 PARA TECHO ALIGERADO h = 0.17

2,624.00

ESCALERAS
CONCRETO EN ESCALERAS f'c=210 kg/cm2
Descripcin

Cimiento Escalera
Area Lateral Tramo Inicial
Area Descanso 1

m3
Area

L (m)

Volumen (m)

0.350

1.800

0.630

0.744

1.800

1.340

0.310

1.800

0.558

5.32

Area Lateral Tramo Intermedio


Area Descanso 2
Area Lateral Tramo Final

0.690

1.800

1.242

0.310

1.800

0.558

0.550

1.800

0.990

TOTAL

5.32 m

ENCOFRADO Y DESENCOFRADO EN ESCALERAS

BLOQUE II, 2 NIVEL

23.83

m2

Descripcin

Cantidad

B (m)

L (m)

Area Parc.

Area Total

Fondo de Tramo Inicial


Area Lateral Tramo Inicial
Contrapasos Tramo Inicial
fondo descanso 1
fondo tramo intermedio
Area Lateral Tramo Intermedio
Contrapasos Tramo Iintermedio
fondo descanso 2
Fondo de Tramo Final
Area Lateral Tramo Final
Contrapasos Tramo Final

1.00

1.80

1.58

2.84

2.84

0.69

1.38

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.58

2.84

2.84

0.55

1.10

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.87

3.37

3.37

0.00

0.00

2.00
7.00

1.80

0.19

0.34

2.39

TOTAL

23.83 m

ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS

kg

297.85

CURADO DE OBRAS DE CONCRETO CON ADITIVO (ANTISOL)

m2

793.71

110.48

6.00

ESTRUCTURAS METALICAS Y TECHADOS


CANALETA DE PLANCHA GALVANIZADA D=6"
Descripcin

Longitud (m)

Lado Posterior BLOQUE I

25.120

Lado Frontal BLOQUE I

25.120

Lado Posterior Escalera

5.000

Lado Frontal Escalera

5.000

Lado Posterior BLOQUE II

25.120

Lado Frontal BLOQUE II

25.120

TOTAL

110.48 m

CONO DE PLANCHA GALVANIZADA e = 0.30mm


COBERTURA DE TEJA ANDINA (1.14 x 0.72 x 5mm)

m2
Factor para
Techo inclinado
20%

Descripcin

b (m)

L (m)

Area (m)

1.020

594.32

01.01.05.04.02

BLOQUE I, 1 NIVEL

Cobertura en BLOQUE I

10.55

25.12

265.02

Cobertura en Escalera

10.55

5.00

52.75

270.26
53.79

Cobertura en BLOQUE II

10.55

25.12

265.02

270.26

TOTAL

594.32 m

CUMBRERA PARA TEJA ANDINA

55.24

VIGUETAS DE MADERA DE 1" x 2", PARA TECHO

1,160.04

m2

0.00

Descripcin

L (m)

Cantidad

Lviga (m)

Cobertura en BLOQUE I

25.12

21.00

527.52

Cobertura en Escalera

5.00

21.00

105.00

Cobertura en BLOQUE II

25.12

21.00
TOTAL

527.52
1160.04 m

ARQUITECTURA
ALBAILERIA
MUROS DE LADRILLO DE ARCILLA DE CABEZA, Mezcla 1:4 x 1.5 cm

BLOQU I, 2 NIVEL

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Muro Eje A, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje C, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje L, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro EjeNE, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

3.00

0.00

1.00

Area Vano(m)

Area (m)

BLOQUE II, 1 NIVEL

BLOQU II, 2 NIVEL

0.00
TOTAL

MUROS DE LADRILLO DE ARCILLA DE SOGA CON MEZCLA 1:4 X 1.5 cm

0.00 m
578.28

m2

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje A-A, Entre Eje 1-1 y Eje 8-8

0.15

3.00

5.85

1.00

Eje A-A, Entre Eje 2-2 y Eje 6-6

0.15

2.40

2.00

1.00

4.80

01.01.05.04.03

Eje A-A, Entre Eje 3-3 y Eje 8-8

0.15

1.20

14.65

1.00

17.58

01.01.05.04.04

Eje B-B, Entre Eje 2-2 y Eje 7-7

0.15

3.00

5.58

1.00

16.74

Eje C-C, Entre Eje 1-1 y Eje 3-3

0.15

3.00

6.25

1.00

18.75

Area Vano(m)

Area (m)

17.55

01.01.05.05

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.15

3.00

9.25

1.00

27.75

01.01.05.05.01

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.15

1.20

11.30

1.00

13.56

Eje D-D, Entre Eje 2-2 y Eje 3-3

0.15

2.40

1.00

1.00

2.40

Eje 1-1, Entre Eje B-B y Eje D-D

0.15

3.00

6.50

1.00

19.50

Eje 2-2, Entre Eje A-A y Eje D-D

0.15

3.00

5.80

1.00

17.40

Eje 3-3, Entre Eje A-A y Eje D-D

0.15

3.00

5.41

1.00

16.23

Eje 4-4, Entre Eje A-A y Eje D-D

0.15

3.00

6.10

1.00

18.30

Eje 5-5, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

Eje 6-6, Entre Eje A-A y Eje B-B

0.15

3.00

1.70

1.00

5.10

Eje 7-7, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

Eje 8-8, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

1 PLANTA

Eje A-A, Entre Eje 1-1 y Eje 8-8

2 PLANTA

3 PLANTA

0.15

3.00

6.00

1.00

18.00

Eje A-A, Entre Eje 1-1 y Eje 8-8

0.15

1.20

19.05

1.00

22.86

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.15

3.00

4.35

1.00

13.05

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.15

1.20

18.05

1.00

21.66

Eje 1-1, Entre Eje A-A y Eje D-D

0.15

3.00

7.08

1.00

21.24

Eje 4-4, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

Eje 6-6, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

Eje 8-8, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

Eje A-A, Entre Eje 1-1 y Eje 8-8

0.15

3.00

6.00

1.00

18.00

Eje A-A, Entre Eje 1-1 y Eje 8-8

0.15

1.20

19.05

1.00

22.86

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.15

3.00

4.35

1.00

13.05

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.15

1.20

18.05

1.00

21.66

Eje 1-1, Entre Eje A-A y Eje D-D

0.15

3.00

7.08

1.00

21.24

Eje 4-4, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

Eje 6-6, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

21.00

Eje 8-8, Entre Eje A-A y Eje D-D

0.15

3.00

7.00

1.00

1 Planta

21.00
TOTAL

578.28 m

2 Y 3 Planta
PARAPETO DE LADRILLO DE ARCILLA DE SOGA, Mezcla 1:4 x 1.5 cm

92.28

m2

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje 1`-1`, Entre Eje A`-A` y Eje D`-D`

0.15

1.20

28.50

1.00

34.20

Eje D`-D`, Entre Eje 1`-1` y Eje 8`-8`

0.15

1.20

9.95

1.00

11.94

1 Planta

Eje 1`-1`, Entre Eje A`-A` y Eje D`-D`

0.15

1.20

28.50

1.00

34.20

2 Planta

Eje D`-D`, Entre Eje 1`-1` y Eje 8`-8`

0.15

1.20

9.95

1.00

01.01.05.05.02

Area Vano(m)

Area (m)

1 Planta
2 Planta

76.90
JUNTA CON TEKNOPORT e = 1"

m2

01.01.05.05.03
01.01.05.05.04
01.01.05.05.05

11.94
92.28 m

TOTAL

Descripcin

Longitud (m)

Ancho (m)

Cantidad

Area (m)

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

0.00

01.01.05.06

Tramo E-F-1

0.15

01.01.05.06.01

Tramo F-G-1

0.15

Tramo A-B-3

0.15

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

Tramo E-F-1

0.15

Tramo F-G-1

0.15

Tramo A-B-3

0.15

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

1 PLANTA

0.15

1 PLANTA

0.2

Escalera 1

01.01.05.06.02

Escalera 1
Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

01.01.06

Tramo N-O-3

0.15

01.01.06.01

Tramo O-P-3

0.15

Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

Tramo N-O-3

0.15

Tramo O-P-3

0.15

TOTAL

0.00 m

01.01.05.06.03
01.01.05.06.04

01.01.06.02
01.01.06.03

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA

Descripcin

01.01.06.04

Longitud (m)

m2

Ancho (m)

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

578.28

PARAPETO DE LADRILLO DE ARCILLA DE SOGA


PARAPETO DE LADRILLO DE ARCILLA DE SOGA (Parte Superior)
76.900

92.28
0.150

11.54

682.10

TOTAL

01.01.06.05

682.10 m

TARRAJEO EN EXTERIORES
correas para fijar teja

Descripcin

Longitud (m)

Ancho (m)

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

578.28

PARAPETO DE LADRILLO DE ARCILLA DE SOGA

670.56

m2

#REF!

m2

#REF!

m2

11.02

429.40

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

92.28
670.56 m

TOTAL

01.02

m2

01.02.01
01.02.01.01

TARRAJEO DE SUPERFICIE Y ARISTAS DE COLUMNAS


Descripcin Columnas
area de encofrado de columnas

Area (m)
87.00

area de encofrado de columnas conf. Y parapeto


#REF!
1 PLANTA
TOTAL
#REF!
Aulas 101, 102 y
Escaleras
TARRAJEO DE SUPERFICIE Y ARISTAS DE VIGAS
Descripcin vigas

Area (m)

area de encofrado de vigas

20.64

area de encofrado de vigas confinamiento


2 PLANTA
Aulas 201, 202 y
TOTAL
Escaleras

#REF!
#REF!

TARRAJEO DE SUPERFICIE Y ARISTAS DE ESCALERA

Descripcin

1 PLANTA
Aulas 101, 102 y
Escaleras

Cantidad

Area Lateral Tramo Inicial

2.00

Contrapasos Tramo Inicial

9.00

Area Lateral Tramo Final

2.00

Contrapasos Tramo Final

9.00

B (m)

L (m)

1.85

Area Cad

Area

1.08

2.17

0.20

1.85

3.33
1.09

2.19

TOTAL

11.02 m

0.20

3.33

VESTIDURA DE DERRAMES EN VANOS (PUERTAS, VENTANAS)

Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Ancho
Derrame

Puerta -1

1.10

2.30

1.00

0.15

5.70

Puerta -2

1.00

2.30

6.00

0.15

33.60

Puerta -3

0.80

2.30

3.00

0.15

16.20

Puerta -4

0.90

2.30

1.00

0.15

5.50

Puerta -5

2.00

2.30

1.00

0.15

6.60

Puerta 2

1.00

2.30

3.00

0.15

16.80

Puerta 2

1.00

2.30

3.00

0.15

16.80

V-1

1.00

2.40

0.60

3.00

0.15

9.60

V-2

2.70

1.20

1.80

2.00

0.15

18.00

V-3

1.35

1.20

1.80

6.00

0.15

37.80

V-4

2.55

1.20

1.80

2.00

0.15

17.40

V-5

3.50

1.20

1.80

1.00

0.15

10.60

V-2

2.70

1.20

1.80

2.00

0.15

18.00

V-6

3.20

1.20

1.80

8.00

0.15

80.00

V-7

3.05

1.20

1.80

2.00

0.15

19.40

V-2

2.70

1.20

1.80

2.00

0.15

18.00

V-6

3.20

1.20

1.80

8.00

0.15

80.00

V-7

3.05

1.20

1.80

2.00

0.15
TOTAL

19.40
429.40 m

2 PLANTA
Aulas 201, 202 y
Escaleras

01.02.01.02

PRIMER NIVEL

Derrame (m)

PRIMER NIVEL

VESTIDURA DE SUPERFICIE FONDO DE ESCALERA CON MORTERO 1:4 X 1.5 cm

PRIMER NIVEL

Descripcin

Cantidad

B (m)

L Cad (m)

Area

Fondo de Tramo Inicial

1.00

1.85

4.05

7.48

Fondo de Tramo Final

1.00

1.85

4.45
TOTAL

8.23
15.72 m

BRUAS

SEGUNDO NIVEL

SEGUNDO NIVEL

Descripcin

Seccin

C - A1

Cantidad
2.00

h1 (m)
2.61

h2 (m)
2.70

Brua (m)
10.62

C - B1

Rectangular

2.00

2.61

2.70

10.62

C - C1

2.00

2.61

2.70

10.62

C - D1

Rectangular

2.00

2.61

2.70

10.62

C - E1

2.00

2.61

2.70

C - F1

Rectangular

2.00

2.61

2.70

10.62

C - G1

2.00

2.61

2.70

10.62

C - A2

Rectangular

2.00

2.61

3.70

12.62

m2

15.72

824.16

TERCER NIVEL

TERCER NIVEL

C - E2

Rectangular

2.00

2.61

3.70

12.62

C - G2

Rectangular

2.00

2.61

3.70

12.62

C - A3

2.00

2.61

2.70

10.62

C - B3

Rectangular

2.00

2.61

2.70

10.62

C - C3

2.00

2.61

2.70

10.62

C - D3

Rectangular

2.00

2.61

2.70

10.62

C - E3

2.00

2.61

2.70

10.62

C - F3

Rectangular

2.00

2.61

2.70

10.62

C - G3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

01.02.01.03

SEGUNDO NIVEL

TERCER NIVEL

01.02.01.04

1 PLANTA
Aulas 101, 102 y
Escaleras

C - J1

2.00

2.61

2.70

10.62

C - K1

Rectangular

2.00

2.61

2.70

10.62

C - L1

2.00

2.61

2.70

10.62

C - M1

Rectangular

2.00

2.61

2.70

10.62

C - N1

2.00

2.61

2.70

C - O1

Rectangular

2.00

2.61

2.70

10.62

C - P1

2.00

2.61

2.70

10.62

C - J2

Rectangular

2.00

2.61

3.70

12.62

C - N2

Rectangular

2.00

2.61

3.70

12.62

C - P2

Rectangular

2.00

2.61

3.70

12.62

C - J3

2.00

2.61

2.70

10.62

C - K3

Rectangular

2.00

2.61

2.70

10.62

C - L3

2.00

2.61

2.70

10.62

C - M3

Rectangular

2.00

2.61

2.70

10.62

C - N3

2.00

2.61

2.70

10.62

C - O3

Rectangular

2.00

2.61

2.70

10.62

C - P3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

1 PLANTA
Aulas 101, 102 y
Escaleras
TOTAL

824.16 m

CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

Descripcin
Area Planta Aligerado BLOQUE I Y
ESCALERA
Area Planta Aligerado BLOQUE I Y
ESCALERA
2 PLANTA
Aulas 201, 202 y
Escaleras

TOTAL

m2

797.28

33.20

m2

0.00

m2

770.82

m2

770.82

m2

0.00

253.45

168.0995
314.874653
482.97 m

PISOS Y PAVIMENTOS

Descripcin

Area (m)

PERIMETRO
ZOCALO(m)

Entre Eje A-A, Eje D-D Y Eje 1-1 , Eje 8-8

228.44

128.92

Entre Eje A-A, Eje D-D Y Eje 1-1 , Eje 8-8

228.44

95.22

Voladizo

42.75

38.32

Escalera

13.23

14.70

Entre Eje A-A, Eje D-D Y Eje 1-1 , Eje 8-8

228.44

95.22

Voladizo

42.75

38.32

Escalera

13.23

14.70

TOTAL

797.28 m

425.40 m

JUNTAS ASFALTICAS e = 1/2"


1 PLANTA
BLOQUE II

482.97

Area

PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO

JUNTA SISMICA

m2

Longitud (m)

Cantidad

junta (m)

Junta de 0.90m

Descripcin

1.00

14.00

14.00

Junta de 1.60m

1.60

12.00
TOTAL

33.20 m

19.20

ESTRADO PARA DOCENTE


ENCOFRADO Y DESENCOFRADO PARA ESTRADO DE DOCENTE

2 PLANTA
BLOQUE II

Descripcin

Cantidad

Perimetro (m)

h (m)

Area Total(m)

ESTRADO

1.00

0.00

0.17

0.00

ESTRADO SUM

1.00

0.45

0.00

TOTAL

0.00 m

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 12 CM


Descripcin

Cantidad

Area CAD (m)

h (m)

Volumen(m)

1 Planta

1.00

228.44

0.05

11.42

2 Planta

1.00

271.19

0.05

13.56

3 Planta

1.00

271.19

0.05

TOTAL

770.82 m

13.56
38.54 m

PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO


01.02.02
01.02.02.01

Descripcin

Area CAD (m)

Cantidad

Area Total

1 Planta

228.44

1.00

228.44

2 Planta

271.19

1.00

271.19

3 Planta

271.19

1.00

271.19

TOTAL

770.82 m

RELLENO CON BLOQUES DE TECKNOPORT 0.12 x 0.30 x 1.20 m

01.02.02.02

Descripcin

Area CAD (m)

Cantidad

Estrado 2 Planta

0.00

6.00

Area Total
0.00

TOTAL

0.00 m

CONTRAZOCALOS
CONTRAZOCALO CEMENTO SIN COLOREAR H = 30 cm

Descripcin

Area (m)

Eje A-A, Entre Eje 1-1 y Eje 8-8

1.17

PERIMETRO
ZOCALO(m)
5.85

01.02.02.03

01.02.02.04

01.02.02.05

Escalera

01.02.02.06

Puertas 1 Planta

Puertas 2 Planta

Eje A-A, Entre Eje 2-2 y Eje 6-6

0.40

2.00

Eje A-A, Entre Eje 3-3 y Eje 8-8

2.93

14.65

Eje B-B, Entre Eje 2-2 y Eje 7-7

1.12

5.58

Eje C-C, Entre Eje 1-1 y Eje 3-3

1.25

6.25

Eje D-D, Entre Eje 1-1 y Eje 8-8

1.85

9.25

Eje D-D, Entre Eje 1-1 y Eje 8-8

2.26

11.30

Eje D-D, Entre Eje 2-2 y Eje 3-3

0.20

1.00

Eje 1-1, Entre Eje B-B y Eje D-D

1.30

6.50

Eje 2-2, Entre Eje A-A y Eje D-D

1.16

5.80

Eje 3-3, Entre Eje A-A y Eje D-D

1.08

5.41

Eje 4-4, Entre Eje A-A y Eje D-D

1.22

6.10

Eje 5-5, Entre Eje A-A y Eje D-D

1.40

7.00

Eje 6-6, Entre Eje A-A y Eje B-B

0.34

1.70

Eje 7-7, Entre Eje A-A y Eje D-D

1.40

7.00

Eje 8-8, Entre Eje A-A y Eje D-D

1.40

7.00

Eje A-A, Entre Eje 1-1 y Eje 8-8

1.20

6.00

Eje A-A, Entre Eje 1-1 y Eje 8-8

3.81

19.05

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.87

4.35

Eje D-D, Entre Eje 1-1 y Eje 8-8

3.61

18.05

Eje 1-1, Entre Eje A-A y Eje D-D

1.42

7.08

Eje 4-4, Entre Eje A-A y Eje D-D

1.40

7.00

Eje 6-6, Entre Eje A-A y Eje D-D

1.40

7.00

Eje 8-8, Entre Eje A-A y Eje D-D

1.40

7.00

Eje A-A, Entre Eje 1-1 y Eje 8-8

1.20

6.00

Eje A-A, Entre Eje 1-1 y Eje 8-8

3.81

19.05

Eje D-D, Entre Eje 1-1 y Eje 8-8

0.87

4.35

Eje D-D, Entre Eje 1-1 y Eje 8-8

3.61

18.05

Eje 1-1, Entre Eje A-A y Eje D-D

1.42

7.08

Eje 4-4, Entre Eje A-A y Eje D-D

1.40

7.00

Eje 6-6, Entre Eje A-A y Eje D-D

1.40

7.00

Eje 8-8, Entre Eje A-A y Eje D-D

1.40

7.00

TOTAL

50.69 m

253.45 m

Puertas 3 Planta
CARPINTERIA DE MADERA
1 Planta

PUERTA VENTANA DE TABLERO CON OJO DE BUEY 1.00 x 2.76 m, Hvent. = 0.56m (Incluye Cerradura)

pza

12.00

PUERTA DE TABLERO 0.90 x 2.20 m, (Incluye Cerradura)

pza

2.00

m2

175.14

CARPINTERIA METALICA
VENTANA DE FIERRO
2 Planta

3 Planta

01.02.02.07

Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Area Total(m)

V-1

1.00

2.40

0.60

3.00

1.80

V-2

2.70

1.20

1.80

2.00

9.72

V-3

1.35

1.20

1.80

6.00

14.58

V-4

2.55

1.20

1.80

2.00

9.18

V-5

3.50

1.20

1.80

1.00

6.30

V-2

2.70

1.20

1.80

2.00

9.72

V-6

3.20

1.20

1.80

8.00

46.08

V-7

3.05

1.20

1.80

2.00

10.98

V-2

2.70

1.20

1.80

2.00

9.72

V-6

3.20

1.20

1.80

8.00

46.08

V-7

3.05

1.20

1.80

2.00
TOTAL

10.98
175.14 m

01.02.02.08

7.94

PASAMANOS CON CUBIERTA DE ALUMINIO

13.72

TUBO DE FIERRO 1 1/2" EN PARAPETO PARA AULAS

47.74

kg

0.00

33.98

BARANDA DE TUBO CUADRADO EN ESCALERA


Descripcin

Longitud

Tramo Inclinado Inicial Izquierdo

2.94

Tramo Inclinado Inicial Derecho

2.87

Descanso Interseccin Tramo Inicial con Tramo Final

0.10

Tramo Inclinado Final Izquierdo

3.10

Tramo Inclinado Final Derecho

2.91

Tramo de llegada Final Izquierdo


TOTAL

Pasamano

Pasamano

1.80
13.72 m

BLOQUE I

Unicacin

Long. (m)

Cantidad

Longitud (m)

Eje D'- D'

23.87

1.00

23.87

Eje D'- D'

23.87

1.00
TOTAL

23.87
47.74 m

ACERO fy=4200 kg/cm GRADO 60 PARA ARRIOSTRE DE PARAPETO

BLOQUE II

Long. (m)

Unicacin

Long.
Parapeto (m)

Cantidad

f 1/4"

Peso (kg)

Tramo A-B Lateral

1.45

0.00

0.70

0.00

Tramo A-B

3.06

0.00

0.70

0.00

Tramo B-C

2.91

0.00

0.70

0.00

Tramo C-D

2.91

0.00

0.70

0.00

Tramo D-E

2.91

0.00

0.70

0.00

Tramo E-F

2.91

0.00

0.70

0.00

Tramo F-G

3.06

0.00

0.70

0.00

Tramo H-I

2.90

0.00

0.70

0.00

Tramo O-P Lateral

1.45

0.00

0.70

0.00

Tramo O-P

3.06

0.00

0.70

0.00

Tramo N-O

2.91

0.00

0.70

0.00

Tramo M-N

2.91

0.00

0.70

0.00

Tramo L-M

2.91

0.00

0.70

0.00

Tramo K-L

2.91

0.00

0.70

0.00

Tramo J-K

3.06

0.00

0.70

0.00

TOTAL

0.00 kg

CANTONERAS DE ALUMINIO EN ESCALERAS

Descripcin

Cantidad

L cantonera (m)

L (m)

01.02.03

Tramo derecho

2.00

9.69

19.38

01.02.03.01

Tramo izquierdo

2.00

7.20

14.60

TOTAL

33.98 m

1 Planta
VIDRIOS, CRISTALES Y SIMILARES
2 Planta

VIDRIOS SEMIDOBLES NACIONALES

01.02.04

p2

Descripcin

Area (m)

Area Ventanas

175.14

1,885.19

TOTAL

1,885.19

01.02.04.01

1,885.19

Area (pie)

PINTURA
1 Planta
2 Planta

m2

#REF!

PINTURA LATEX EN MUROS INTERIORES

m2

#REF!

PINTURA LATEX EN MUROS EXTERIORES

m2

#REF!

PINTURA ANTICORROSIVA Y ESMALTE EN VENTANAS

m2

58.38

47.26

PINTURA LATEX BLANCA EN CIELORRASO Y VIGAS


Descripcin

Area CAD (m)

Area 1 Planta de Aligerado

168.10 m

Area Techo Aligerado

314.87 m

Planta de Amarre, en Voladizo y de confinamiento


Vigas3Portantes,
TOTAL

#REF!
#REF!

01.02.04.02

TUBERAS PARA EVACUACIN DE AGUAS DE LLUVIA


TUBERIA DE PVC SAL 4" (Montante Aguas de Lluvia)
01.02.05
01.02.05.01

01.02.05.02

Descripcin

Longitud

Tuberia Frontal Escalera

1.70

Tuberia Posterior Escalera

15.52

Tuberia Frontal Aulas

15.02

Tuberia Posteior Aulas

15.02

TOTAL

47.26 m

CODO DE PVC SAL DE 4" x 90

pza

7.00

CODO DE PVC SAL DE 4" x 45

pza

22.00

TUBERIA DE PVC SAL DE 4" (Evacuacin aguas de Lluvia)

14.50

m3

0.45

m3

0.51

m2

1.92

0.70

SALIDA PARA CENTRO DE LUZ

pto

96.00

SALIDA PARA BRAQUETE

pto

10.00

SALIDA TOMACORRIENTE

pto

57.00

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 20mm (3/4")

712.22

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 13mm (5/8")

294.05

CAJAS DE TRANSICIN DE AGUAS DE LLUVIA


EXCAVACION DE ZANJA PARA CAJA DE TRANSICIN

01.02.05.03

Ubicacin Caja de Transicin de Aguas


de Lluvia

Area (m)

h (m)

Volumen (m)

Lado derecho BLOQUE II

0.64

0.70

0.45

CONCRETO f'c=175 kg/cm2 PARA CAJA DE TRANSICION

Ubicacin Caja de Transicin de Aguas Area CAD Secc.


Transversal (m)
de Lluvia
Lado derecho BLOQUE II

Longitud (m)

Volumen (m)

2.80

0.51

0.18

ENCOFRADO Y DESENCOFRADO PARA CAJA DE TRANSICIN


01.02.05.04
Ubicacin Caja de Transicin de Aguas
de Lluvia

Area (m)

Lado Izquierdo Aula 102, Interior

1.92

REJILLA PARA CAJA DE TRANSICIN DE AGUAS DE LLUVIA


01.02.06
01.02.06.01

Descripcin

L (m)

Lado Izquierdo Aula 102, Interior

0.7

INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y FUERZA

CANALIZACIONES Y/O TUBERAS

1 Planta

1 Planta

TUBERIA FIERRO GALVANIZADO PARA POZO A TIERRA

9.88

CONDUCTORES Y/O CABLES


CABLE ELECTRICO TW AWG-MCM # 10 -5.3 mm2

40.20

CABLE ELECTRICO TW AWG-MCM # 12 -4.0 mm2

922.79

CABLE ELECTRICO TW AWG-MCM # 14 -2.5 mm2

1,939.88

CABLE ELECTRICO TW AWG-MCM # 16 -1.5 mm2

9.52

TABLEROS Y LLAVES DE INTERRUPCION

2 Planta

TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 6 CIRCUITOS

4.00

LLAVE INTERRUPTOR THERMOMAGNETICO DE 2 X 15 A

15.00

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 20 A

3.00

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 40 A

4.00

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 60 A

2.00

ARTEFACTO ADOSADO CON FLUORESCENTE 2 x 40w

62.00

LAMPARA INCANDESCENTE DE 1OO W

pza

29.00

ARTEFACTOS

2 Planta

FLUORESCENTE CIRCULAR 40 W

pza

4.00

BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 1OO W

10.00

TIMBRE PARA FORMACIN

1.00

1.00

6.00

'SILLA DE ESCRITORIO

13.00

'SILLAS PARA TUTORIA-SALA DE PROFESORES

31.00

01.02.07

ESCRITORIOS

5.00

01.02.07.01

CARPETAS UNIPERSONALES

210.00

01.02.07.02

PUPITRES

6.00

01.02.08

SILLAS PARA PUPITRES

6.00

01.02.08.01

MESAS PARA BIBLIOTECA

9.00

SILLAS DE MADERA PARA BIBLIOTECA

36.00

glb

1.00

glb

1.00

1.00

POZO CONEXION A TIERRA


POZO CONEXION A TIERRA
3 Planta

VARIOS
PIZARRA
PIZARRA ACRILICA CON MARCO DE ALUMINIO 4 x 1.40m
MOBILIARIO

EQUIPOS DE PROTECCION PERSONAL


EQUIPOS DE PROTECCION PERSONAL
FLETE
1 Planta

FLETE
PLACA RECORDATORIA
PLACA RECORDATORIA
LIMPIEZA GENERAL Y ENTREGA DE OBRA

2 Planta

3 Planta

01.02.08.02

01.02.08.03

LIMPIEZA GENERAL DE OBRA

m2

2,303.00

01.02.08.04

2 PLANTA
2 PLANTA

01.02.08.05

2 PLANTA
PRIMERA PLANTA

2 PLANTA
SEGUNDA PLANTA

01.02.08.06

01.02.09
01.02.09.01

01.02.10
01.02.10.01

01.02.10.02
01.02.10.03
01.02.10.04
01.02.11
01.02.11.01

01.02.11.02
01.02.11.03
01.02.11.04
01.02.12
01.02.12.01

01.02.12.02

01.02.12.03

01.02.12.04

01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03

01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.03.04
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.03.05.04
01.03.05.05
01.03.06
01.03.06.01
02.07
02.07.01
02.07.01.01
02.07.02
02.07.02.01
02.07.02.02
02.07.02.03
02.07.02.04
02.07.02.05
02.07.02.06
02.07.02.07
02.07.02.07
02.07.03
02.07.03.01
02.07.04
02.07.04.01
02.07.05
02.07.05.01
02.07.06
02.07.06.01

02.01.10
02.01.10.01
02.01.10.02
02.01.10.02.02
02.01.10.02.03

02.01.11
02.01.11.01

02.01.11.02
02.01.11.02.01

02.01.11.02.02

02.01.11.02.03

02.01.11.03

02.01.11.03.03

02.01.11.03.04
02.02
02.02.01

02.02.02

02.02.03

02.02.04

02.03

02.04.08.01

02.04.08.04
02.04.08.05

02.04.08.02

PLANILLA DE METRADOS
Item
01

Descripcin

Und.

Metrado

CONSTRUCCION DE PABELLON "B"

01.01

ESTRUCTURAS BLOQUE "I"

01.01.01

OBRAS PRELIMINARES

01.01.01.01

GIGANTOGRAFA DIGITAL DE 3.60 X 2.40 m

1.00

01.01.01.02

MOVILIZACION y DESMOVILIZACION DE EQUIPO

glb

1.00

01.01.01.03

CERCO PROVISIONAL DE SEGURIDAD DE OBRA

glb

1.00

01.01.01.04

DESMONTAJE DE COBERTURA DE ETERNIT

m2

612.50

m3

255.85

Descripcin

L (m)

B (m)

SITUACION ACTUAL

50.87

10.47

por techo inclin. Area CAD (m)

1.15
TOTAL

01.01.01.05

DEMOLICION DE MUROS DE ADOBE


Descripcin

sit. actual

01.01.01.06

612.50
612.50 m

L (m)

B (m)

cantidad

h (m)

Volumen (m)

muros long.

49.82

0.50

2.00

2.99

148.96

muros transersales

6.00

0.50

7.00

3.79

79.59

puertas (-)

1.05

0.50

6.00

2.00

6.30

ventanas (-)

1.00

2.00

21.00

0.50

21.00

42.00

TOTAL

255.85 m

54.60 m

DEMOLICION DE PISOS DE CONCRETO, INCLUYE FALSO PISO


Descripcin
SITUACION ACTUAL, inc. Vereda

L (m)

B (m)

Area CAD (m)

51.75

10.37

536.60

10.38

1.13

5.86

TOTAL

542.46 m

Area (m)

12.60

m2

542.46

01.01.01.07

DESMONTAJE DE PUERTAS

m2

12.60

01.01.01.08

DESMONTAJE DE VENTANAS

m2

42.00

01.01.01.09

LIMPIEZA DE TERRENO MANUAL

m2

571.18

m2

571.18

01.01.01.10

L (m)

B (m)

Area CAD (m)


265.02

Bloque I

25.12

10.55

ESCALERA

3.90

10.55

41.15

Bloque II

25.12

10.55

265.02

TOTAL

571.18 m

TRAZO DE NIVELES Y REPLANTEO

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

A (m)

B (m)

hexc (m)

Volumen (m)

Z-1

1.80

1.80

2.50

8.10

Area
nivelacion(m)
3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

18.00

1.80

2.50

81.00

32.40

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

TOTAL

238.80 m

95.52 m

Descripcin Zapatas

EJE A

EJE B

EJE C

EJE D

EJE E

EJE F

EJE G

m3

EXCAVACION PARA ZAPATAS y VIGAS RIOSTRAS DE CIMENTACION HASTA 2.00m TERRENO NORMAL

261.38

L (m)

b (m)

hexc (m)

Volumen (m)

Tramo 1-2

1.50

0.500

1.00

0.75

Area
Nivelacion(m)
0.75

Tramo 2-3

1.35

0.500

1.00

0.68

0.68

Tramo 1-2

1.50

0.500

1.00

0.75

0.75

Tramo 2-3

1.35

0.500

1.00

0.68

0.68

Tramo 1-2

1.50

0.500

1.00

0.75

0.75

Tramo 2-3

1.35

0.500

1.00

0.68

0.68

Tramo 1-2

1.30

0.500

1.00

0.65

0.65

Tramo 2-3

1.15

0.500

1.00

0.58

0.58

Tramo 1-2

1.50

0.500

1.00

0.75

0.75

Tramo 2-3

1.35

0.500

1.00

0.68

0.68

Tramo A-B

1.98

0.500

1.00

0.99

0.99

Tramo B-C

0.60

0.500

1.00

0.30

0.30

Tramo C-D

2.86

0.500

1.00

1.43

1.43

Tramo D-E

2.96

0.500

1.00

1.48

1.48

Tramo E-F

2.94

0.500

1.00

1.47

1.47

Tramo F-G

2.06

0.500

1.00

1.03

1.03

Tramo A-B

1.98

0.500

1.00

0.99

0.99

Tramo B-C

3.10

0.500

1.00

1.55

1.55

Tramo C-D

2.86

0.500

1.00

1.43

1.43

Tramo D-E

2.96

0.500

1.00

1.48

1.48

Tramo E-F

2.94

0.500

1.00

1.47

1.47

Tramo F-G

2.06

0.500

1.00

1.03

1.03

Tramo 1-2

2.00

0.500

1.00

1.00

1.00

TOTAL

22.58 m

22.58 m

Vigas Riostras
EJE A
EJE B
EJE C
EJE E
EJE G

EJE 3

EJE 1

EJE 2

01.01.02.02

m3

EXCAVACION PARA CUNETAS


Descripcin
BLOQUE B

L (m)

B (m)

hexc (m)

Volumen (m)

29.00

0.40

0.40

4.64

TOTAL

4.64 m

4.64

01.01.02.03

RELLENO CON MATERIAL PROPIO


Descripcin

261.38

Vol.Solado Concreto (Mejoramiento de suelo de Fundacin)

14.33

Vol. Afirmado (Mejoramiento de suelo de Fundacin)

19.10

Vol.OVER (Mejoramiento de suelo de Fundacin)

38.21

Volumen de Afirmado en Vigas Riostras de Cimentacin

18.06

Volumen de C en Zapatas

57.31

Volumen de C Vigas Riostras de Cimentacin

20.15

Volumen de Sobrecimientos e = 0.25m

4.43

Volumen de Sobrecimientos e = 0.15m

01.01.02.04

ELIMINACION DE MATERIAL EXCEDENTE (A MANO USANDO CARRETILLA, DISTANCIA PROMEDIO DE 30M)


Descripcin

261.38
310.10

Vol. De relleno (-)


Total
NIVELACION INTERIOR Y APISONADO
Ubicacin

Area (CAD)

PARA VIGAS RIOSTRAS DE CIMENTACIN

22.58

PARA ZAPATAS

95.52

EN FALSO PISO BLOQUE I Y ESCALERA

300.50

EN FALSO PISO BLOQUE II

262.50

PIEDRA GRANDE "OVER" Dimetro Mn. 4", Mx. 8"


Area nivelacion

h(m)

Volumen (m)

95.52

0.40

38.21

Total

38.21

AFIRMADO PARA MEJORAMIENTO DE SUELO DE FUNDACION, e = 20 cm


Descripcin

Area nivelacion

h(m)

Volumen (m)

95.52

0.20

19.10

Total

19.10

PARA ZAPATAS

AFIRMADO PARA VIGAS RIOSTRAS DE CIMENTACIN e = 20 cm (DOS CAPAS)


Descripcin

Area nivelacion

h(m)

PARA VIGAS RIOSTRAS DE CIMENTACIN 1 CAPA

22.58

0.20

PARA VIGAS RIOSTRAS DE CIMENTACIN 2 CAPA

22.58

0.20

Total
01.01.03.04

Descripcin

38.21

m2

95.52

m2

45.15

m2

1,126.00

m3

14.33

Area nivelacion
563.00
563.00

EN FALSO PISO aulas y veredas, escalera 2 capa


Total

01.01.04.01

m3

45.15

AFIRMADO PARA MEJORAMIENTO DE SUELO EN PISOS, e = 20 cm (DOS CAPAS)

EN FALSO PISO aulas y veredas, escalera 1 capa

01.01.04

563.00

MEJORAMIENTO DE SUELO DE FUNDACION

Descripcin

01.01.03.03

681.10

681.10

PARA ZAPATAS

01.01.03.02

m2

96.82
569.58 m

Total

01.01.03.01

569.58

Volumen (m)

Volumen proveniente de demolicion muros adobe y pisos

01.01.03

m3

5.60
96.82 m

Volumen Excavado en zapatas y vigas riostras

01.01.02.05

96.82

Volumen (m)

Volumen Excavado en zapatas y vigas riostras

Total

m3

1126.00

OBRAS DE CONCRETO SIMPLE


CONCRETO f'c=140 kg/cm e= 0.15 m, SOLADO
Descripcin
PARA ZAPATAS

Area nivelacion

h(m)

Volumen (m)

95.52

0.15

14.33

Total

14.33

01.01.04.02

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 10 CM


Descripcin

01.01.04.03
01.01.04.04.01

EJE A-A
EJE E-E
EJE G-G

EJE J-J
EJE N-N
EJE P-P

01.01.04.04.02

EJE 1-1

EJE 3-3

EJE 1-1

EJE 3-3

m3

1.91

m3

4.43

m3

5.60

563.00
Total

563.00

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA


Descripcin

563.00

Area nivelacion

EN FALSO PISO aulas y veredas, escalera

01.01.04.03

m2

b (m)

L (m)

hc

Volumen (m)

ESCALERA CC1

0.40

1.65

0.70

0.46

CC2

0.40

7.24

0.50

1.45

Total

1.91

SOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.25 m
Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

Total

4.43

35.40

CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.15 m


Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

2.31

0.50

0.17

2.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

2.31

0.50

0.17

2.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

2.46

0.50

0.18

2.46

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

3.31

0.50

0.25

3.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

3.31

0.50

0.25

3.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

3.46

0.50

0.26

3.46

J-K

0.15

2.46

0.50

0.18

2.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

2.31

0.50

0.17

2.31

N-O

0.15

2.31

0.50

0.17

2.31

O-P

0.15

3.46

0.50

0.26

3.46

J-K

0.15

3.46

0.50

0.26

3.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

3.31

0.50

0.25

3.31

N-O

0.15

3.31

0.50

0.25

3.31

O-P

0.15

3.46

0.50

0.26

3.46

Total

5.60

74.64

01.01.04.04.03
01.01.04.04
01.01.04.05.01

01.01.04.05.02

01.01.04.05.03

01.01.05
01.01.05.01
01.01.05.01.01

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

110.09

m3

1.35

m2

47.49

15.30

m3

57.31

kg

1,666.07

CUNETAS
CONCRETO f'c=175 kg/cm2 PARA CUNETAS

Descripcin

L (m)

e (m)

Area Cuneta
(m)

Volumen (m)

BLOQUE I

67.84

0.10

0.11

0.71

BLOQUE II

58.04

0.10

0.11

0.64

TOTAL

1.35

ENCOFRADO Y DESENCOFRADO CUNETAS

Descripcin

L (m)

h (m)

BLOQUE I

67.84

0.35

Area Cuneta
(m)
47.49

BLOQUE II

58.04

0.35

40.63

TOTAL

47.49

JUNTAS ASFALTICAS EN CUNETAS, e = 1"

Descripcin

L (m)

cantidad (m)

h (m)

BLOQUE I

67.84

17.00

0.90

Area Cuneta
(m)
15.30

BLOQUE II

58.04

15.00

0.90

13.50

TOTAL

15.30

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
Descripcin
PARA ZAPATAS

01.01.05.01.02

m2

ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS

Area nivelacion

h(m)

Volumen (m)

95.52

0.60

57.31

Total

57.31

01.01.05.02
01.01.05.02.01

VIGAS RIOSTRAS DE CIMENTACIN


CONCRETO f'c=175 kg/cm2 PARA VIGAS DE CIMENTACION
Vigas Riostras

EJE A
EJE E
EJE G
EJE H
EJE I

EJE 1

EJE 3

EJE J-J
EJE N-N
EJE P-P

EJE 1

EJE 3

L (m)

b (m)

h (m)

Volumen (m)

Area encof (m2)

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.46

0.300

0.50

0.52

3.46

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.31

0.300

0.50

0.50

3.31

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

TOTAL

20.15 m

134.31 m2

m3

20.15

01.01.05.02.02

ENCOFRADO Y DESENCOFRADO EN VIGAS RIOSTRAS DE CIMENTACION

m2

134.31

01.01.05.02.03

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS RIOSTRAS DE CIMENTACION

kg

2,351.49

01.01.05.03
01.01.05.03.01

PLACAS Y COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2

m3

Descripcin Columnas

Area (m)

Permetro (m)

h (m)

C - A1

0.21

2.00

6.66

Area de
Encofrado (m)
13.32

C - B1

0.15

1.60

6.66

10.66

1.00

C - C1

0.26

3.00

6.66

19.98

1.70

C - D1

0.15

1.60

6.66

10.66

1.00

C - E1

0.26

3.00

6.66

19.98

1.70

C - F1

0.15

1.60

6.66

10.66

1.00

C - G1

0.21

2.00

6.66

13.32

1.40

C - H1

0.13

1.50

7.49

11.24

0.94

C - I1

0.13

1.50

7.49

11.24

0.94

C - A2

0.12

1.40

7.25

10.15

0.87

C - E2

0.12

1.40

7.25

10.15

0.87

C - G2

0.12

1.40

7.25

10.15

0.87

C - H1'

0.10

1.30

7.91

10.28

0.79

C - I1'

0.10

1.30

7.91

10.28

0.79

C - A3

0.21

2.00

6.66

13.32

1.40

C - B3

0.15

1.60

6.66

10.66

1.00

C - C3

0.26

3.00

6.66

19.98

1.70

C - D3

0.15

1.60

6.66

10.66

1.00

C - E3

0.26

3.00

6.66

19.98

1.70

C - F3

0.15

1.60

6.66

10.66

1.00

C - G3

0.21

2.00

6.66

13.32

1.40

C - H3

0.13

1.50

7.16

10.74

0.90

C - I3

0.13

1.50

7.16

10.74

0.90

falsa columna

0.05

0.60

1.80

1.08

0.08

Volumen (m)
1.40

C - J1

0.21

2.00

6.66

13.32

1.40

C - K1

0.15

1.60

6.66

10.66

1.00

C - L1

0.26

3.00

6.66

19.98

1.70

C - M1

0.15

1.60

6.66

10.66

1.00

C - N1

0.26

3.00

6.66

19.98

1.70

C - O1

0.15

1.60

6.66

10.66

1.00

C - P1

0.21

2.00

6.66

13.32

1.40

C - J2

0.12

1.40

7.25

10.15

0.87

C - N2

0.12

1.40

7.25

10.15

0.87

C - P2

0.12

1.40

7.25

10.15

0.87

C - J3

0.21

2.00

6.66

13.32

1.40

C - K3

0.15

1.60

6.66

10.66

1.00

C - L3

0.26

3.00

6.66

19.98

1.70

C - M3

0.15

1.60

6.66

10.66

1.00

C - N3

0.26

3.00

6.66

19.98

1.70

C - O3

0.15

1.60

6.66

10.66

1.00

C - P3

0.21

2.00

6.66

13.32

1.40

falsa columna

0.07

0.30

1.80

0.54

0.12

TOTAL

521.31 m

47.43 m

47.43

01.01.05.03.02

BLOQUE I, 1 NIVEL

BLOQU I, 2 NIVEL

BLOQUE II, 1 NIVEL

BLOQU II, 2 NIVEL

CONCRETO f'c=175 kg/cm2 PARA COLUMNAS DE CONFINAMIENTO

5.22

m3

Descripcin

Area (m)

Permetro (m)

h (m)

Cantidad

Col. Conf. Eje1, Tramo AB

0.030

0.550

2.16

2.00

Area de
Encofrado (m)
1.04

Col. Conf. Eje1, Tramo BC

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo CD

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo DE

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo EF

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo FG

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo AB

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo BC

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo CD

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo DE

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo EF

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje1, Tramo AB

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo BC

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo CD

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo DE

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo EF

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo FG

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo AB

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo BC

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo CD

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo DE

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo EF

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.46

0.07

Col. Parapeto Eje3, Tramo AB

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo BC

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo CD

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo DE

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo EF

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.61

0.07

Col. Parapeto Eje3, Tramo GH

0.030

0.550

1.10

2.00

0.61

0.07

Volumen (m)
0.13

Col. Conf. Eje1, Tramo JK

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo KL

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo LM

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo MN

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo NO

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo OP

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo JK

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo KL

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo LM

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo MN

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo NO

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje1, Tramo JK

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo KL

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo LM

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo MN

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo NO

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo OP

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo JK

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo KL

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo LM

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo MN

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo NO

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.46

0.07

Col. Parapeto Eje3, Tramo JK

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo KL

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo LM

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo MN

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo NO

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.61

0.07

TOTAL

43.70 m

5.22 m

01.01.05.03.03

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

565.01

01.01.05.03.04

ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS

kg

8,769.26

m3

52.04

01.01.05.04
01.01.05.04.01

BLOQUE I, 1 NIVEL

BLOQUE I, 2 NIVEL

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2

Descripcin

L (m)

b (m)

h (m)

V 101 - 1-2 - A

2.950

0.300

0.450

V 101 - 2-3 - A

2.950

0.300

0.450

V 102 - 1-3 - B

6.300

0.300

0.450

V 102 - 1-3 - C

6.300

0.300

0.450

V 102 - 1-3 - D

6.300

0.300

0.450

V 101 - 1-2 - E

2.950

0.300

0.450

V 101 - 2-3 - E

2.950

0.300

0.450

V 102 - 1-3 - F

6.300

0.300

0.450

V 101 - 1-2 - G

2.950

0.300

0.450

V 101 - 2-3 - G

2.950

0.300

0.450

V 103 - 1-1' - H

2.125

0.250

0.400

V 104 - 1'-3 - H

3.775

0.250

0.400

V 103 - 1-1' - I

2.125

0.250

0.400

V 104 - 1'-3 - I

3.775

0.250

0.400

VA 101 - AB - 1

3.460

0.250

0.300

VA 102 - BC - 1

3.310

0.250

0.300

VA 102 - CD - 1

3.310

0.250

0.300

VA 101 - DE - 1

3.310

0.250

0.300

VA 101 - EF- 1

3.310

0.250

0.300

VA 101 - FG- 1

3.460

0.250

0.300

V 105 - HI- 1

3.300

0.250

0.400

V 104 - HI- 1'

3.300

0.250

0.400

V ESCALERA

3.300

0.250

0.400

VA 101 - AB - 3

3.460

0.250

0.300

VA 102 - BC - 3

3.310

0.250

0.300

VA 102 - CD - 3

3.310

0.250

0.300

VA 101 - DE - 3

3.310

0.250

0.300

VA 101 - EF- 3

3.310

0.250

0.300

VA 101 - FG- 3

3.460

0.250

0.300

VA 103 - HI- 3

3.300

0.250

0.400

VV - 101 - A

1.600

0.300

0.450

VV - 101 - B

1.600

0.300

0.450

VV - 101 - C

1.600

0.300

0.450

VV - 101 - D

1.600

0.300

0.450

VV - 101 - E

1.600

0.300

0.450

VV - 101 - F

1.600

0.300

0.450

VV - 101 - G

1.600

0.300

0.450

VV - 102 - H

1.600

0.250

0.400

VV - 102 - I

1.600

0.250

0.400

V 201 - 1-2 - A

3.700

0.300

0.450

V 201 - 2-3 - A

3.700

0.300

0.450

V 202 - 1-3 - B

3.700

0.300

0.450

V 202 - 2-3 - B

3.700

0.300

0.450

V 201 - 1-2 - C

3.700

0.300

0.450

V 201 - 2-3 - C

3.700

0.300

0.450

V 201 - 1-2 - D

3.700

0.300

0.450

V 201 - 2-3 - D

3.700

0.300

0.450

V 202 - 1-2 - E

3.700

0.300

0.450

V 202 - 2-3 - E

3.700

0.300

0.450

V 202 - 1-2 - F

3.700

0.300

0.450

V 202 - 2-3 - F

3.700

0.300

0.450

V 202 - 1-2 - G

3.700

0.300

0.450

V 202 - 2-3 - G

3.700

0.300

0.450

V 203 - 1-1' - H

2.630

0.250

0.400

V 203 - 1'-3 - H

4.310

0.250

0.400

V 204 - 1-1' - I

2.630

0.250

0.400

Ai (m)

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.100
0.100

Af (m)

0.060
0.060
0.060
0.060
0.060
0.060
0.060
0.050
0.050

Area Encofrado
(m)

3.540
3.540
7.560
7.560
7.560
3.540
3.540
7.560
3.540
3.540
2.231
3.964
2.231
3.964
2.941
2.814
2.814
2.814
2.814
2.941
3.465
3.465
3.465
2.941
2.814
2.814
2.814
2.814
2.941
3.465
1.920
1.920
1.920
1.920
1.920
1.920
1.920
1.680
1.680
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
2.762
4.526
2.762

Volumen
(m)

0.398
0.398
0.851
0.851
0.851
0.398
0.398
0.851
0.398
0.398
0.213
0.378
0.213
0.378
0.260
0.248
0.248
0.248
0.248
0.260
0.330
0.330
0.330
0.260
0.248
0.248
0.248
0.248
0.260
0.330
0.156
0.156
0.156
0.156
0.156
0.156
0.156
0.120
0.120
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.263
0.431
0.263

BLOQUE I, 2 NIVEL

BLOQUE II, 1 NIVEL

V 204 - 1'-3 - I

4.310

0.250

0.400

VA 201 - AB - 1

3.460

0.250

0.300

VA 202 - BC - 1

3.310

0.250

0.300

VA 202 - CD - 1

3.310

0.250

0.300

VA 201 - DE - 1

3.310

0.250

0.300

VA 201 - EF - 1

3.310

0.250

0.300

VA 201 - FG - 1

3.460

0.250

0.300

VA 203 - HI - 1

3.300

0.250

0.300

VA 201 - AB - 3

3.460

0.250

0.300

VA 202 - BC - 3

3.310

0.250

0.300

VA 202 - CD - 3

3.310

0.250

0.300

VA 201 - DE - 3

3.310

0.250

0.300

VA 201 - EF - 3

3.310

0.250

0.300

VA 201 - FG - 3

3.460

0.250

0.300

VA 203 - HI - 3

3.300

0.250

0.300

V Cumb. AE - 2

16.900

0.350

0.170

V Cumb. EG - 2

7.630

0.350

0.170

V Cumb. HI - 1

3.300

0.250

0.400

VV - 201 - A

1.800

0.300

0.450

VV - 201 - B

1.800

0.300

0.450

VV - 201 - C

1.800

0.300

0.450

VV - 201 - D

1.800

0.300

0.450

VV - 201 - E

1.800

0.300

0.450

VV - 201 - F

1.800

0.300

0.450

VV - 201 - G

1.800

0.300

0.450

VV - 203 - H

1.800

0.300

0.450

VV - 203 - I

1.800

0.300

0.450

VV - 202 - A

1.100

0.300

0.450

VV - 202 - B

1.100

0.300

0.450

VV - 202 - C

1.100

0.300

0.450

VV - 202 - D

1.100

0.300

0.450

VV - 202 - E

1.100

0.300

0.450

VV - 202 - F

1.100

0.300

0.450

VV - 202 - G

1.100

0.300

0.450

VV - 204 - H

1.100

0.300

0.450

VV - 204 - I

1.100

0.300

0.450

V 101 - 1-2 - A

2.950

0.300

0.450

V 101 - 2-3 - A

2.950

0.300

0.450

V 102 - 1-3 - B

6.300

0.300

0.450

V 102 - 1-3 - C

6.300

0.300

0.450

V 102 - 1-3 - D

6.300

0.300

0.450

V 101 - 1-2 - E

2.950

0.300

0.450

V 101 - 2-3 - E

2.950

0.300

0.450

V 102 - 1-3 - F

6.300

0.300

0.450

V 101 - 1-2 - G

2.950

0.300

0.450

V 101 - 2-3 - G

2.950

0.300

0.450

VA 101 - AB - 1

3.460

0.250

0.300

VA 102 - BC - 1

3.310

0.250

0.300

VA 102 - CD - 1

3.310

0.250

0.300

VA 101 - DE - 1

3.310

0.250

0.300

VA 101 - EF- 1

3.310

0.250

0.300

VA 101 - FG- 1

3.460

0.250

0.300

VA 101 - AB - 3

3.460

0.250

0.300

VA 102 - BC - 3

3.310

0.250

0.300

VA 102 - CD - 3

3.310

0.250

0.300

VA 101 - DE - 3

3.310

0.250

0.300

VA 101 - EF- 3

3.310

0.250

0.300

VA 101 - FG- 3

3.460

0.250

0.300

VV - 101 - A

1.600

0.300

0.450

VV - 101 - B

1.600

0.300

0.450

VV - 101 - C

1.600

0.300

0.450

VV - 101 - D

1.600

0.300

0.450

VV - 101 - E

1.600

0.300

0.450

VV - 101 - F

1.600

0.300

0.450

VV - 101 - G

1.600

0.300

0.450

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051

4.526
2.941
2.814
2.814
2.814
2.814
2.941
2.805
2.941
2.814
2.814
2.814
2.814
2.941
2.805
11.661
5.265
3.465
2.160
2.160
2.160
2.160
2.160
2.160
2.160
2.160
2.160
1.320
1.320
1.320
1.320
1.320
1.320
1.320
1.320
1.320

0.431
0.260
0.248
0.248
0.248
0.248
0.260
0.248
0.260
0.248
0.248
0.248
0.248
0.260
0.248
1.006
0.454
0.330
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102

0.060
0.060
0.060
0.060
0.060
0.060
0.060

3.540
3.540
7.560
7.560
7.560
3.540
3.540
7.560
3.540
3.540
2.941
2.814
2.814
2.814
2.814
2.941
2.941
2.814
2.814
2.814
2.814
2.941
1.920
1.920
1.920
1.920
1.920
1.920
1.920

0.398
0.398
0.851
0.851
0.851
0.398
0.398
0.851
0.398
0.398
0.260
0.248
0.248
0.248
0.248
0.260
0.260
0.248
0.248
0.248
0.248
0.260
0.156
0.156
0.156
0.156
0.156
0.156
0.156

BLOQUE II, 2 NIVEL

V 201 - 1-2 - A

3.700

0.300

0.450

V 201 - 2-3 - A

3.700

0.300

0.450

V 202 - 1-3 - B

3.700

0.300

0.450

V 202 - 2-3 - B

3.700

0.300

0.450

V 201 - 1-2 - C

3.700

0.300

0.450

V 201 - 2-3 - C

3.700

0.300

0.450

V 201 - 1-2 - D

3.700

0.300

0.450

V 201 - 2-3 - D

3.700

0.300

0.450

V 202 - 1-2 - E

3.700

0.300

0.450

V 202 - 2-3 - E

3.700

0.300

0.450

V 202 - 1-2 - F

3.700

0.300

0.450

V 202 - 2-3 - F

3.700

0.300

0.450

V 202 - 1-2 - G

3.700

0.300

0.450

V 202 - 2-3 - G

3.700

0.300

0.450

VA 201 - AB - 1

3.460

0.250

0.300

VA 202 - BC - 1

3.310

0.250

0.300

VA 202 - CD - 1

3.310

0.250

0.300

VA 201 - DE - 1

3.310

0.250

0.300

VA 201 - EF - 1

3.310

0.250

0.300

VA 201 - FG - 1

3.460

0.250

0.300

VA 201 - AB - 3

3.460

0.250

0.300

VA 202 - BC - 3

3.310

0.250

0.300

VA 202 - CD - 3

3.310

0.250

0.300

VA 201 - DE - 3

3.310

0.250

0.300

VA 201 - EF - 3

3.310

0.250

0.300

VA 201 - FG - 3

3.460

0.250

0.300

V Cumb. AE - 2

16.900

0.350

0.170

V Cumb. EG - 2

7.630

0.350

0.170

VV - 201 - A

1.800

0.300

0.450

VV - 201 - B

1.800

0.300

0.450

VV - 201 - C

1.800

0.300

0.450

VV - 201 - D

1.800

0.300

0.450

VV - 201 - E

1.800

0.300

0.450

VV - 201 - F

1.800

0.300

0.450

VV - 201 - G

1.800

0.300

0.450

VV - 202 - A

1.100

0.300

0.450

VV - 202 - B

1.100

0.300

0.450

VV - 202 - C

1.100

0.300

0.450

VV - 202 - D

1.100

0.300

0.450

VV - 202 - E

1.100

0.300

0.450

VV - 202 - F

1.100

0.300

0.450

VV - 202 - G

1.100

0.300

0.450

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
TOTAL

4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
2.941
2.814
2.814
2.814
2.814
2.941
2.941
2.814
2.814
2.814
2.814
2.941
11.661
5.265
2.160
2.160
2.160
2.160
2.160
2.160
2.160
1.320
1.320
1.320
1.320
1.320
1.320
1.320

0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.260
0.248
0.248
0.248
0.248
0.260
0.260
0.248
0.248
0.248
0.248
0.260
1.006
0.454
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.102
0.102
0.102
0.102
0.102
0.102
0.102

534.04 m

52.04 m

01.01.05.04.02

BLOQUE I, 1 NIVEL

BLOQU I, 2 NIVEL

BLOQUE II, 1 NIVEL

BLOQU II, 2 NIVEL

CONCRETO f'c=175 kg/cm2 PARA VIGAS DE CONFINAMIENTO

3.82

m3

Descripcin

Area (m)

Permetro (m)

L (m)

Cantidad

Conf. Eje1, Tramo AB

0.030

0.550

3.06

1.00

Area de
Encofrado (m)
1.53

Conf. Eje1, Tramo BC

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo DE

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo EF

0.030

0.550

2.16

1.00

1.04

0.06

Conf. Eje1, Tramo FG

0.030

0.550

2.06

1.00

0.98

0.06

Conf. Eje3, Tramo AB

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo BC

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo DE

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo FG

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo AB

0.030

0.550

2.66

1.00

1.31

0.08

Conf. Eje1, Tramo BC

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo DE

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo FG

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje3, Tramo AB

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo BC

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo DE

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo FG

0.030

0.550

3.06

1.00

1.53

0.09

Volumen (m)
0.09

Conf. Eje1, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo KL

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo MN

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo NO

0.030

0.550

2.16

1.00

1.04

0.06

Conf. Eje1, Tramo OP

0.030

0.550

2.06

1.00

0.98

0.06

Conf. Eje3, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo KL

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo MN

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo OP

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo JK

0.030

0.550

2.66

1.00

1.31

0.08

Conf. Eje1, Tramo KL

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo MN

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo OP

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje3, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo KL

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo MN

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo OP

0.030

0.550

3.06

1.00

1.53

0.09

TOTAL

62.91 m

3.82 m

01.01.05.04.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

596.95

01.01.05.04.04

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS

kg

6,414.52

01.01.05.05
01.01.05.05.01

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

78.27

m3
Factor para Techo
inclinado 00%

1 PLANTA
BLOQUE I y Escalera

1 PLANTA
BLOQUE II y Escalera

2 PLANTA
BLOQUE I y Escalera

2 PLANTA
BLOQUE II y Escalera

Descripcin Losa Aligerada

Area CAD(m)

1.000

espesor (m)

AULA 201

53.710

53.71

0.200

AULA 202

53.62

53.62

0.200

AULA 203

53.71

53.71

0.200

Voladizo Aula

35.16

35.16

0.200

Escalera 1

10.76

10.76

0.200

Voladizo Escalera

5.28

5.28

0.200

AULA 203

53.710

53.71

0.200

AULA 204

53.62

53.62

0.200

AULA 205

53.71

53.71

0.200

Voladizo Aula

35.16

35.16

0.200

TOTAL

408.44 m

Descripcin Losa Aligerada techo

Area (m)

Factor para Techo


inclinado 20%

1.020

espesor (m)

AULA 201

53.71

54.77

0.170

AULA 202

53.62

54.68

0.170

AULA 203

53.71

54.77

0.170

Voladizo Aula FRONTAL

41.97

42.80

0.170

Voladizo Aula posterior

26.37

26.89

0.170

Voladizo Aulalateral

8.8725

9.05

0.170

Escalera

21.62

22.05

0.170

Voladizo Escalera posterior

5.5

5.61

0.170

Voladizo Escalera front

9.18

0.170

Voladizo Escalera lateral

8.76

8.93

0.170

AULA 201

53.71

54.77

0.170

AULA 202

53.62

54.68

0.170

AULA 203

53.71

54.77

0.170

Voladizo Aula FRONTAL

41.97

42.80

0.170

Voladizo Aula posterior

26.37

26.89

0.170

Voladizo Aulalateral

8.8725

9.05

0.170

TOTAL

531.71 m

Dimensiones

N Lad / m

Area (m)

Cantidad Lad.

Volumen Total

Vol. Lad.

Vol. Ladrillos

0.30x0.30x0.15

8.333

408.440

3404.000

81.688

0.014

45.954

90.391

0.011

LADRILLO HUECO
1 Planta

0.30x0.30x0.12

01.01.05.05.02

1 Planta

531.710

4431.000

940.150

7,835.000

ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS


Descripcin (Bordes o Frisos)

Largo

Peralte

Area (m)

Borde aligerado AULAS

92.360

0.200

18.472

120.920

0.170

20.556

3.800

0.200

0.760

30.400

0.170

2 Planta
1 Planta

8.333
TOTAL

Borde alig. ESCALERA

2 Planta

Area Total de Aligerado FONDO

Vol.
Concreto
35.734

47.855

42.536

TOTAL

78.27 m

m2

985.11

5.168
940.150

TOTAL

985.11 m

01.01.05.05.03

ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS

kg

5,538.48

01.01.05.05.04

LADRILLO HUECO DE ARCILLA 15x30x30 PARA TECHO ALIGERADO h = 0.20

3,404.00

01.01.05.05.05

LADRILLO HUECO DE ARCILLA 12x30x30 PARA TECHO ALIGERADO h = 0.17

4,431.00

01.01.05.06
01.01.05.06.01

ESCALERAS
CONCRETO EN ESCALERAS f'c=210 kg/cm2
Descripcin

Escalera 1

01.01.05.06.02

Cimiento Escalera
Area Lateral Tramo Inicial
Area Descanso 1
Area Lateral Tramo Intermedio
Area Descanso 2
Area Lateral Tramo Final

L (m)

Volumen (m)

1.800

0.630

0.744

1.800

1.340

0.310

1.800

0.558

0.690

1.800

1.242

0.310

1.800

0.558

0.550

1.800

0.990

TOTAL

5.32 m

ENCOFRADO Y DESENCOFRADO EN ESCALERAS


Descripcin

Escalera 1

Area
0.350

m3

5.32

m2

23.83

Cantidad

B (m)

L (m)

Area Parc.

Area Total

1.00

1.80

1.58

2.84

2.84

0.69

1.38

Fondo de Tramo Inicial


Area Lateral Tramo Inicial
Contrapasos Tramo Inicial
fondo descanso 1
fondo tramo intermedio
Area Lateral Tramo Intermedio
Contrapasos Tramo Iintermedio
fondo descanso 2
Fondo de Tramo Final
Area Lateral Tramo Final
Contrapasos Tramo Final

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.58

2.84

2.84

0.55

1.10

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.87

3.37

3.37

0.00

0.00

2.00
7.00

1.80

0.19

0.34

2.39

TOTAL

23.83 m

01.01.05.06.03

ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS

kg

297.85

01.01.05.06.04

CURADO DE OBRAS DE CONCRETO CON ADITIVO (ANTISOL)

m2

2,305.20

110.48

6.00

01.01.06
01.01.06.01

ESTRUCTURAS METALICAS Y TECHADOS


CANALETA DE PLANCHA GALVANIZADA D=6"
Descripcin

Longitud (m)

Lado Posterior BLOQUE I

25.120

Lado Frontal BLOQUE I

25.120

Lado Posterior Escalera

5.000

Lado Frontal Escalera

5.000

Lado Posterior BLOQUE II

25.120

Lado Frontal BLOQUE II

25.120

TOTAL

110.48 m

01.01.06.02

CONO DE PLANCHA GALVANIZADA e = 0.30mm

01.01.06.03

COBERTURA DE TEJA ANDINA (1.14 x 0.72 x 5mm)

m2

594.32

55.24

Factor para
Techo inclinado
20%

01.01.06.04

Descripcin

b (m)

L (m)

Area (m)

1.020

Cobertura en BLOQUE I

10.55

25.12

265.02

270.26

Cobertura en Escalera

10.55

5.00

52.75

53.79

Cobertura en BLOQUE II

10.55

25.12

265.02

270.26

TOTAL

594.32 m

CUMBRERA PARA TEJA ANDINA

01.01.06.05

correas para fijar teja

01.02
01.02.01
01.02.01.01

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

VIGUETAS DE MADERA DE 1" x 2", PARA TECHO


Descripcin

L (m)

Cantidad

Lviga (m)

Cobertura en BLOQUE I

25.12

21.00

527.52

Cobertura en Escalera

5.00

21.00

105.00

Cobertura en BLOQUE II

25.12

21.00

527.52

TOTAL

1160.04 m

1,160.04

m2

0.00

ARQUITECTURA
ALBAILERIA
MUROS DE LADRILLO DE ARCILLA DE CABEZA, Mezcla 1:4 x 1.5 cm

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Muro Eje A, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje C, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje L, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro EjeNE, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

3.00

0.00

1.00

Area Vano(m)

Area (m)

0.00
TOTAL

01.02.01.02

PRIMER NIVEL

SEGUNDO NIVEL

MUROS DE LADRILLO DE ARCILLA DE SOGA CON MEZCLA 1:4 X 1.5 cm

0.00 m
675.48

m2

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje 9-9, Entre Eje E-E y Eje G-G

0.15

3.00

1.85

1.00

5.55

Eje 9-9, Entre Eje E-E y Eje G-G

0.15

2.40

4.80

1.00

11.52

Eje 10-10, Entre Eje F-F y Eje G-G

0.15

3.00

1.86

1.00

5.58

Eje 11-11, Entre Eje E-E y Eje F-F

0.15

3.00

4.08

1.00

12.24

Area Vano(m)

Area (m)

Eje 12-12, Entre Eje E-E y Eje F-F

0.15

3.00

4.08

1.00

12.24

Eje 13-13, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje 14-14, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje 15-15, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje E-E, Entre Eje 9-9 y Eje 15-15

0.15

3.00

26.70

1.00

80.10

Eje F-F, Entre Eje 9-9 y Eje 10-10

0.15

3.00

4.38

1.00

13.14

Eje G-G, Entre Eje 9-9 y Eje 15-15

0.15

3.00

8.58

1.00

25.74

Eje G-G, Entre Eje 9-9 y Eje 15-15

0.15

1.20

12.65

1.00

15.18

Eje 9-9, Entre Eje E-E y Eje G-G

0.15

3.00

1.85

1.00

5.55

Eje 9-9, Entre Eje E-E y Eje G-G

0.15

2.40

4.80

1.00

11.52

Eje 10-10, Entre Eje F-F y Eje G-G

0.15

3.00

1.86

1.00

5.58

Eje 11-11, Entre Eje E-E y Eje F-F

0.15

3.00

4.08

1.00

12.24

Eje 12-12, Entre Eje E-E y Eje F-F

0.15

3.00

4.08

1.00

12.24

Eje 13-13, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje 14-14, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje 15-15, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje E-E, Entre Eje 9-9 y Eje 15-15

0.15

3.00

26.70

1.00

80.10

SEGUNDO NIVEL

TERCER NIVEL

Eje F-F, Entre Eje 9-9 y Eje 10-10

0.15

3.00

4.38

1.00

13.14

Eje G-G, Entre Eje 9-9 y Eje 15-15

0.15

3.00

8.58

1.00

25.74

Eje G-G, Entre Eje 9-9 y Eje 15-15

0.15

1.20

12.65

1.00

15.18

Eje 9-9, Entre Eje E-E y Eje G-G

0.15

3.00

1.85

1.00

5.55

Eje 9-9, Entre Eje E-E y Eje G-G

0.15

2.40

4.80

1.00

11.52

Eje 13-13, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje 14-14, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje 15-15, Entre Eje E-E y Eje G-G

0.15

3.00

6.65

1.00

19.95

Eje E-E, Entre Eje 9-9 y Eje 15-15

0.15

3.00

26.70

1.00

80.10

Eje G-G, Entre Eje 9-9 y Eje 15-15

0.15

3.00

4.50

1.00

13.50

Eje G-G, Entre Eje 9-9 y Eje 15-15

0.15

1.20

18.90

1.00

22.68
TOTAL

01.02.01.03

PARAPETO DE LADRILLO DE ARCILLA DE SOGA, Mezcla 1:4 x 1.5 cm

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje G`-G`, Entre Eje 9-9 y Eje 15-15

0.15

1.20

28.50

1.00

TERCER NIVEL

Eje G`-G`, Entre Eje 9-9 y Eje 15-15

0.15

1.20

28.50

1.00

57.00

1 PLANTA
Aulas 101, 102 y
Escaleras

68.40

m2

SEGUNDO NIVEL

01.02.01.04

675.48 m

Area Vano(m)

Area (m)

34.20

34.20
TOTAL

JUNTA CON TEKNOPORT e = 1"

68.40 m
m2

Descripcin

Longitud (m)

Ancho (m)

Cantidad

Area (m)

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

Tramo E-F-1

0.15

Tramo F-G-1

0.15

Tramo A-B-3

0.15

0.00

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

JUNTA SISMICA

1 PLANTA
BLOQUE II

2 PLANTA
BLOQUE II

01.02.02
01.02.02.01

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

Tramo E-F-1

0.15

Tramo F-G-1

0.15

Tramo A-B-3

0.15

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

1 PLANTA

0.15

1 PLANTA

0.2

Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

Tramo N-O-3

0.15

Tramo O-P-3

0.15

Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

Tramo N-O-3

0.15

Tramo O-P-3

0.15

TOTAL

0.00 m

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA

Descripcin

Longitud (m)

Ancho (m)

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

675.48

PARAPETO DE LADRILLO DE ARCILLA DE SOGA

01.02.02.02

Longitud (m)

m2

743.88

68.40
0.150

8.55

TOTAL

752.43 m

TARRAJEO EN EXTERIORES

Descripcin

752.43

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

PARAPETO DE LADRILLO DE ARCILLA DE SOGA (Parte Superior)


57.000

m2

Ancho (m)

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

675.48

PARAPETO DE LADRILLO DE ARCILLA DE SOGA

68.40
TOTAL

743.88 m

01.02.02.03

TARRAJEO DE SUPERFICIE Y ARISTAS DE COLUMNAS


Descripcin Columnas
area de encofrado de columnas
area de encofrado de columnas conf. Y parapeto
TOTAL

01.02.02.04

area de encofrado de vigas


area de encofrado de vigas confinamiento
TOTAL
01.02.02.05

Escalera

01.02.02.06

Puertas 1 Planta
Puertas 2 Planta
Puertas 3 Planta

1 Planta

2 Planta

3 Planta

01.02.02.07

m2

596.95

m2

11.02

240.40

521.31
43.70
565.01 m

Area (m)
534.04
62.91
596.95 m

TARRAJEO DE SUPERFICIE Y ARISTAS DE ESCALERA

Descripcin

565.01

Area (m)

TARRAJEO DE SUPERFICIE Y ARISTAS DE VIGAS


Descripcin vigas

m2

Cantidad

Area Lateral Tramo Inicial

2.00

Contrapasos Tramo Inicial

9.00

Area Lateral Tramo Final

2.00

Contrapasos Tramo Final

9.00

B (m)

L (m)

1.85

Area Cad

Area

1.08

2.17

0.20

1.85

3.33
1.09

2.19

TOTAL

11.02 m

0.20

3.33

VESTIDURA DE DERRAMES EN VANOS (PUERTAS, VENTANAS)

Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Ancho
Derrame

Derrame (m)

Puerta -2

1.00

2.30

2.00

0.15

11.20

Puerta -3

0.80

2.30

2.00

0.15

10.80

Puerta -2

1.00

2.30

2.00

0.15

11.20

Puerta -3

0.80

2.30

2.00

0.15

10.80

Puerta 2

1.00

2.30

3.00

0.15

16.80

V-8

2.40

2.40

0.60

2.00

0.15

12.00

V-9

3.45

1.20

1.80

1.00

0.15

10.50

V - 10

2.95

1.20

1.80

2.00

0.15

19.00

V - 11

3.30

1.20

1.80

1.00

0.15

10.20

V-8

2.40

2.40

0.60

2.00

0.15

12.00

V-9

3.45

1.20

1.80

1.00

0.15

10.50

V - 10

2.95

1.20

1.80

2.00

0.15

19.00

V - 11

3.30

1.20

1.80

1.00

0.15

10.20

V-9

3.45

1.20

1.80

1.00

0.15

10.50

V - 10

2.95

1.20

1.80

3.00

V - 11

3.30

1.20

1.80

2.00

0.15

V - 12

2.40

1.20

1.80

2.00

0.15

16.80

TOTAL

240.40 m

VESTIDURA DE SUPERFICIE FONDO DE ESCALERA CON MORTERO 1:4 X 1.5 cm

28.50
20.40

m2

Descripcin

Cantidad

B (m)

L Cad (m)

Area

Fondo de Tramo Inicial

1.00

1.85

4.05

7.48

Fondo de Tramo Final

1.00

1.85

4.45

8.23

TOTAL

15.72 m

15.72

01.02.02.08

BLOQUE I

BLOQUE II

BRUAS

m
Descripcin

Seccin

C - A1

Cantidad
2.00

h1 (m)
2.61

h2 (m)
2.70

Brua (m)
10.62

C - B1

Rectangular

2.00

2.61

2.70

10.62

C - C1

2.00

2.61

2.70

10.62

C - D1

Rectangular

2.00

2.61

2.70

10.62

C - E1

2.00

2.61

2.70

C - F1

Rectangular

2.00

2.61

2.70

10.62

C - G1

2.00

2.61

2.70

10.62

C - A2

Rectangular

2.00

2.61

3.70

12.62

C - E2

Rectangular

2.00

2.61

3.70

12.62

C - G2

Rectangular

2.00

2.61

3.70

12.62

C - A3

2.00

2.61

2.70

10.62

C - B3

Rectangular

2.00

2.61

2.70

10.62

C - C3

2.00

2.61

2.70

10.62

C - D3

Rectangular

2.00

2.61

2.70

10.62

C - E3

2.00

2.61

2.70

10.62

C - F3

Rectangular

2.00

2.61

2.70

10.62

C - G3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

C - J1

2.00

2.61

2.70

10.62

C - K1

Rectangular

2.00

2.61

2.70

10.62

C - L1

2.00

2.61

2.70

10.62

C - M1

Rectangular

2.00

2.61

2.70

10.62

C - N1

2.00

2.61

2.70

C - O1

Rectangular

2.00

2.61

2.70

10.62

C - P1

2.00

2.61

2.70

10.62

C - J2

Rectangular

2.00

2.61

3.70

12.62

C - N2

Rectangular

2.00

2.61

3.70

12.62

C - P2

Rectangular

2.00

2.61

3.70

12.62

C - J3

2.00

2.61

2.70

10.62

C - K3

Rectangular

2.00

2.61

2.70

10.62

C - L3

2.00

2.61

2.70

10.62

C - M3

Rectangular

2.00

2.61

2.70

10.62

C - N3

2.00

2.61

2.70

10.62

C - O3

Rectangular

2.00

2.61

2.70

10.62

C - P3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

TOTAL

824.16 m

824.16

01.02.03
01.02.03.01

CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

Descripcin

Area

1 Planta

Area Planta Aligerado BLOQUE I Y


ESCALERA

408.440

2 Planta

Area Planta Aligerado BLOQUE I Y


ESCALERA

531.7104578

TOTAL

940.15 m

01.02.04
01.02.04.01

1 Planta
2 Planta

3 Planta

01.02.04.02

01.02.05.01

01.02.05.02

01.02.05.03

01.02.05.04

01.02.06
01.02.06.01

1 Planta

940.15

m2

808.80

33.20

m2

0.00

m2

782.34

m2

782.34

m2

0.00

234.91

PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO

Descripcin

Area (m)

Entre Eje E-E, Eje G-G Y Eje 9-9, Eje 15-15

232.28

PERIMETRO
ZOCALO(m)
128.92

Entre Eje E-E, Eje G-G Y Eje 9-9, Eje 15-15

232.28

95.22

Voladizo

42.75

38.32

Escalera

13.23

14.70

Entre Eje E-E, Eje G-G Y Eje 9-9, Eje 15-15

232.28

95.22

Voladizo

42.75

38.32

Escalera

13.23

14.70

TOTAL

808.80 m

425.40 m

JUNTAS ASFALTICAS e = 1/2"


Descripcin

01.02.05

m2

Longitud (m)

Cantidad

junta (m)

Junta de 0.90m

1.00

14.00

14.00

Junta de 1.60m

1.60

12.00

19.20

TOTAL

33.20 m

ESTRADO PARA DOCENTE


ENCOFRADO Y DESENCOFRADO PARA ESTRADO DE DOCENTE
Descripcin

Cantidad

Perimetro (m)

h (m)

Area Total(m)

ESTRADO

1.00

0.00

0.17

0.00

ESTRADO SUM

1.00

0.45

0.00

TOTAL

0.00 m

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 12 CM


Descripcin

Cantidad

Area CAD (m)

h (m)

Volumen(m)

1 Planta

1.00

232.28

0.05

11.61

2 Planta

1.00

275.03

0.05

13.75

3 Planta

1.00

275.03

0.05

TOTAL

782.34 m

13.75
39.12 m

PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO


Descripcin

Area CAD (m)

Cantidad

Area Total

1 Planta

232.28

1.00

232.28

2 Planta

275.03

1.00

275.03

3 Planta

275.03

1.00

275.03

TOTAL

782.34 m

RELLENO CON BLOQUES DE TECKNOPORT 0.12 x 0.30 x 1.20 m


Descripcin

Area CAD (m)

Cantidad

Estrado 2 Planta

0.00

6.00

Area Total
0.00

TOTAL

0.00 m

CONTRAZOCALOS
CONTRAZOCALO CEMENTO SIN COLOREAR H = 30 cm

Descripcin

Area (m)

Eje 9-9, Entre Eje E-E y Eje G-G

0.37

PERIMETRO
ZOCALO(m)
5.85

Eje 9-9, Entre Eje E-E y Eje G-G

0.96

2.00

1 Planta

2 Planta

Eje 10-10, Entre Eje F-F y Eje G-G

0.37

14.65

Eje 11-11, Entre Eje E-E y Eje F-F

0.82

5.58

Eje 12-12, Entre Eje E-E y Eje F-F

0.82

6.25

Eje 13-13, Entre Eje E-E y Eje G-G

1.33

9.25

Eje 14-14, Entre Eje E-E y Eje G-G

1.33

11.30

Eje 15-15, Entre Eje E-E y Eje G-G

1.33

1.00

Eje E-E, Entre Eje 9-9 y Eje 15-15

5.34

6.50

Eje F-F, Entre Eje 9-9 y Eje 10-10

0.88

5.80

Eje G-G, Entre Eje 9-9 y Eje 15-15

1.72

5.41

Eje G-G, Entre Eje 9-9 y Eje 15-15

2.53

6.10

Eje 9-9, Entre Eje E-E y Eje G-G

0.37

5.85

Eje 9-9, Entre Eje E-E y Eje G-G

0.96

2.00

Eje 10-10, Entre Eje F-F y Eje G-G

0.37

14.65

Eje 11-11, Entre Eje E-E y Eje F-F

0.82

5.58

Eje 12-12, Entre Eje E-E y Eje F-F

0.82

6.25

Eje 13-13, Entre Eje E-E y Eje G-G

1.33

9.25

Eje 14-14, Entre Eje E-E y Eje G-G

1.33

11.30

Eje 15-15, Entre Eje E-E y Eje G-G

1.33

1.00

Eje E-E, Entre Eje 9-9 y Eje 15-15

5.34

6.50

Eje F-F, Entre Eje 9-9 y Eje 10-10

0.88

5.80

2 Planta

3 Planta

01.02.07

Eje G-G, Entre Eje 9-9 y Eje 15-15

1.72

5.41

Eje G-G, Entre Eje 9-9 y Eje 15-15

2.53

6.10

Eje 9-9, Entre Eje E-E y Eje G-G

0.37

6.00

Eje 9-9, Entre Eje E-E y Eje G-G

0.96

19.05

Eje 13-13, Entre Eje E-E y Eje G-G

1.33

4.35

Eje 14-14, Entre Eje E-E y Eje G-G

1.33

18.05

Eje 15-15, Entre Eje E-E y Eje G-G

1.33

7.08

Eje E-E, Entre Eje 9-9 y Eje 15-15

5.34

7.00

Eje G-G, Entre Eje 9-9 y Eje 15-15

0.90

7.00

Eje G-G, Entre Eje 9-9 y Eje 15-15

3.78

7.00

TOTAL

50.91 m

234.91 m

CARPINTERIA DE MADERA

01.02.07.01

PUERTA VENTANA DE TABLERO CON OJO DE BUEY 1.00 x 2.76 m, Hvent. = 0.56m (Incluye Cerradura)

pza

11.00

01.02.07.02

PUERTA DE TABLERO 0.90 x 2.20 m, (Incluye Cerradura)

pza

2.00

m2

88.02

7.94

13.72

01.02.08

CARPINTERIA METALICA

01.02.08.01

1 Planta

2 Planta

3 Planta

01.02.08.02

VENTANA DE FIERRO
Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Area Total(m)

V-8

2.40

2.40

0.60

2.00

2.88

V-9

3.45

1.20

1.80

1.00

6.21

V - 10

2.95

1.20

1.80

2.00

10.62

V - 11

3.30

1.20

1.80

1.00

5.94

V-8

2.40

2.40

0.60

2.00

2.88

V-9

3.45

1.20

1.80

1.00

6.21

V - 10

2.95

1.20

1.80

2.00

10.62

V-9

3.45

1.20

1.80

1.00

6.21

V - 10

2.95

1.20

1.80

3.00

15.93

V - 11

3.30

1.20

1.80

2.00

11.88

V - 12

2.40

1.20

1.80

2.00

8.64

TOTAL

88.02 m

BARANDA DE TUBO CUADRADO EN ESCALERA


Descripcin

Longitud

Tramo Inclinado Inicial Izquierdo

2.94

Tramo Inclinado Inicial Derecho

2.87

Descanso Interseccin Tramo Inicial con Tramo Final

0.10

Tramo Inclinado Final Izquierdo

3.10

Tramo Inclinado Final Derecho

2.91

Tramo de llegada Final Izquierdo

1.80

TOTAL
01.02.08.03

Pasamano

Pasamano

13.72 m

PASAMANOS CON CUBIERTA DE ALUMINIO

01.02.08.04

TUBO DE FIERRO 1 1/2" EN PARAPETO PARA AULAS


Unicacin

Long. (m)

Cantidad

Longitud (m)

2 PLANTA

Eje D'- D'

23.87

1.00

23.87

2 PLANTA

Eje D'- D'

23.87

01.02.08.05

Unicacin

Long.
Parapeto (m)

Cantidad

Tramo A-B Lateral

1.45

Tramo A-B

3.06

Tramo B-C

01.02.09.01

01.02.10
01.02.10.01

Long. (m)

f 1/4"

Peso (kg)

0.00

0.70

0.00

0.00

0.70

0.00

2.91

0.00

0.70

0.00

Tramo C-D

2.91

0.00

0.70

0.00

Tramo D-E

2.91

0.00

0.70

0.00

Tramo E-F

2.91

0.00

0.70

0.00

Tramo F-G

3.06

0.00

0.70

0.00

Tramo H-I

2.90

0.00

0.70

0.00

Tramo O-P Lateral

1.45

0.00

0.70

0.00

Tramo O-P

3.06

0.00

0.70

0.00

Tramo N-O

2.91

0.00

0.70

0.00

Tramo M-N

2.91

0.00

0.70

0.00

Tramo L-M

2.91

0.00

0.70

0.00

Tramo K-L

2.91

0.00

0.70

0.00

Tramo J-K

3.06

0.00

0.70

0.00

TOTAL

0.00 kg

2 PLANTA
SEGUNDA PLANTA

01.02.09

23.87
47.74 m

ACERO fy=4200 kg/cm GRADO 60 PARA ARRIOSTRE DE PARAPETO

2 PLANTA
PRIMERA PLANTA

01.02.08.06

1.00
TOTAL

CANTONERAS DE ALUMINIO EN ESCALERAS


Descripcin

Cantidad

L cantonera (m)

L (m)

Tramo derecho

2.00

9.69

19.38

Tramo izquierdo

2.00

7.20

14.60

TOTAL

33.98 m

47.74

kg

0.00

33.98

p2

947.44

m2

1,537.10

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES NACIONALES
Descripcin

Area (m)

Area Ventanas

88.02

Area (pie)
947.44

TOTAL

947.44

PINTURA
PINTURA LATEX BLANCA EN CIELORRASO Y VIGAS
Descripcin

Area CAD (m)

Area 1 Planta de Aligerado

408.44 m

Area Techo Aligerado

531.71 m

Vigas Portantes, de Amarre, en Voladizo y de confinamiento


TOTAL

596.95
1537.10 m

01.02.10.02

PINTURA LATEX EN MUROS INTERIORES

m2

1,412.18

01.02.10.03

PINTURA LATEX EN MUROS EXTERIORES

m2

1,308.89

01.02.10.04

PINTURA ANTICORROSIVA Y ESMALTE EN VENTANAS

m2

29.34

47.26

01.02.11
01.02.11.01

TUBERAS PARA EVACUACIN DE AGUAS DE LLUVIA


TUBERIA DE PVC SAL 4" (Montante Aguas de Lluvia)
Descripcin

Longitud

Tuberia Frontal Escalera

1.70

Tuberia Posterior Escalera

15.52

Tuberia Frontal Aulas

15.02

Tuberia Posteior Aulas

15.02

TOTAL

47.26 m

01.02.11.02

CODO DE PVC SAL DE 4" x 90

pza

7.00

01.02.11.03

CODO DE PVC SAL DE 4" x 45

pza

22.00

01.02.11.04

TUBERIA DE PVC SAL DE 4" (Evacuacin aguas de Lluvia)

14.50

m3

0.45

m3

0.51

m2

1.92

0.70

01.02.12
01.02.12.01

01.02.12.02

CAJAS DE TRANSICIN DE AGUAS DE LLUVIA


EXCAVACION DE ZANJA PARA CAJA DE TRANSICIN
Ubicacin Caja de Transicin de Aguas
de Lluvia

Area (m)

h (m)

Volumen (m)

Lado derecho BLOQUE II

0.64

0.70

0.45

CONCRETO f'c=175 kg/cm2 PARA CAJA DE TRANSICION

Ubicacin Caja de Transicin de Aguas Area CAD Secc.


Transversal (m)
de Lluvia
Lado derecho BLOQUE II
01.02.12.03

01.02.12.04

01.03
01.03.01

Longitud (m)

Volumen (m)

2.80

0.51

0.18

ENCOFRADO Y DESENCOFRADO PARA CAJA DE TRANSICIN


Ubicacin Caja de Transicin de Aguas
de Lluvia

Area (m)

Lado Izquierdo Aula 102, Interior

1.92

REJILLA PARA CAJA DE TRANSICIN DE AGUAS DE LLUVIA


Descripcin

L (m)

Lado Izquierdo Aula 102, Interior

0.7

INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y FUERZA

01.03.01.01

SALIDA PARA CENTRO DE LUZ

pto

96.00

01.03.01.02

SALIDA PARA BRAQUETE

pto

10.00

01.03.01.03

SALIDA TOMACORRIENTE

pto

57.00

01.03.02

CANALIZACIONES Y/O TUBERAS

01.03.02.01

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 20mm (3/4")

712.22

01.03.02.02

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 13mm (5/8")

294.05

01.03.02.03

TUBERIA FIERRO GALVANIZADO PARA POZO A TIERRA

9.88

01.03.03

CONDUCTORES Y/O CABLES

01.03.03.01

CABLE ELECTRICO TW AWG-MCM # 10 -5.3 mm2

40.20

01.03.03.02

CABLE ELECTRICO TW AWG-MCM # 12 -4.0 mm2

922.79

01.03.03.03

CABLE ELECTRICO TW AWG-MCM # 14 -2.5 mm2

1,939.88

01.03.03.04

CABLE ELECTRICO TW AWG-MCM # 16 -1.5 mm2

9.52

01.03.04

TABLEROS Y LLAVES DE INTERRUPCION

01.03.04.01

TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 6 CIRCUITOS

4.00

01.03.04.02

LLAVE INTERRUPTOR THERMOMAGNETICO DE 2 X 15 A

15.00

01.03.04.03

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 20 A

3.00

01.03.04.04

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 40 A

4.00

01.03.04.05

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 60 A

2.00

01.03.05

ARTEFACTOS

01.03.05.01

ARTEFACTO ADOSADO CON FLUORESCENTE 2 x 40w

62.00

01.03.05.02

LAMPARA INCANDESCENTE DE 1OO W

pza

29.00

01.03.05.03

FLUORESCENTE CIRCULAR 40 W

pza

4.00

01.03.05.04

BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 1OO W

10.00

TIMBRE PARA FORMACIN

1.00

1.00

7.00

01.03.05.05
01.03.06
01.03.06.01
02.07
02.07.01
02.07.01.01
02.07.02

POZO CONEXION A TIERRA


POZO CONEXION A TIERRA
VARIOS
PIZARRA
PIZARRA ACRILICA CON MARCO DE ALUMINIO 4 x 1.40m
MOBILIARIO

02.07.02.01

CARPETAS UNIPERSONALES PARA PRIMER AO

175.00

02.07.02.02

BANCOS DE MADERA PARA LABORATORIO

36.00

02.07.02.03

MESA PARA LABORATORIO

1.00

02.07.02.04

MESAS DE MADERA LABAORATORIO DE COMPUTO

13.00

02.07.02.05

PUPITRES DE MADERA

7.00

02.07.02.06

SILLAS DE MADERA PARA PUPITRES

7.00

02.07.02.07

SILLAS DE MADERA LABAORATORIO DE COMPUTO

36.00

glb

1.00

glb

1.00

02.07.03
02.07.03.01
02.07.04
02.07.04.01

EQUIPOS DE PROTECCION PERSONAL


EQUIPOS DE PROTECCION PERSONAL
FLETE
FLETE

02.01.03

02.01.03.02

02.01.04
02.01.05

1.1

02.01.06

02.01.07
02.01.08

02.01.10

02.01.10.01

02.01.10.02

02.01.10.02

02.01.10.02

02.01.11

02.01.11.01

02.01.11.02

02.01.11.02

02.01.11.02

02.01.11.02

02.01.11.03

02.01.11.03

02.01.11.03
02.02
02.02.01

02.02.02

02.02.03

02.02.04

02.03

02.04.08.

02.04.08.04

02.04.08.05

02.04.08.02

02.05

02.06

PLANILLA DE METRADOS
Item
01

Descripcin

Und.

Metrado

CONSTRUCCION DE PABELLON "A"

01.01

ESTRUCTURAS BLOQUE "I"

01.01.01

OBRAS PRELIMINARES

01.01.01.01

GIGANTOGRAFA DIGITAL DE 3.60 X 2.40 m

1.00

01.01.01.02

MOVILIZACION y DESMOVILIZACION DE EQUIPO

glb

1.00

01.01.01.03

CERCO PROVISIONAL DE SEGURIDAD DE OBRA

glb

1.00

01.01.01.04

DESMONTAJE DE COBERTURA DE ETERNIT

m2

612.50

m3

255.85

Descripcin

L (m)

B (m)

SITUACION ACTUAL

50.87

10.47

por techo inclin. Area CAD (m)

1.15
TOTAL

01.01.01.05

DEMOLICION DE MUROS DE ADOBE


Descripcin

sit. actual

01.01.01.06

612.50
612.50 m

L (m)

B (m)

cantidad

h (m)

Volumen (m)

muros long.

49.82

0.50

2.00

2.99

148.96

muros transersales

6.00

0.50

7.00

3.79

79.59

puertas (-)

1.05

0.50

6.00

2.00

6.30

ventanas (-)

1.00

2.00

21.00

0.50

21.00

42.00

TOTAL

255.85 m

54.60 m

DEMOLICION DE PISOS DE CONCRETO, INCLUYE FALSO PISO


Descripcin
SITUACION ACTUAL, inc. Vereda

L (m)

B (m)

Area CAD (m)

51.75

10.37

536.60

10.38

1.13

5.86

TOTAL

542.46 m

Area (m)

12.60

m2

542.46

01.01.01.07

DESMONTAJE DE PUERTAS

m2

12.60

01.01.01.08

DESMONTAJE DE VENTANAS

m2

42.00

01.01.01.09

LIMPIEZA DE TERRENO MANUAL

m2

571.18

m2

571.18

01.01.01.10

L (m)

B (m)

Area CAD (m)


265.02

Bloque I

25.12

10.55

ESCALERA

3.90

10.55

41.15

Bloque II

25.12

10.55

265.02

TOTAL

571.18 m

TRAZO DE NIVELES Y REPLANTEO

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

A (m)

B (m)

hexc (m)

Volumen (m)

Z-1

1.80

1.80

2.50

8.10

Area
nivelacion(m)
3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-2

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

TOTAL

177.90 m

71.16 m

Descripcin Zapatas

EJE A

EJE B

EJE C
EJE D

EJE E

EJE F

EJE G

m3

EXCAVACION PARA ZAPATAS y VIGAS RIOSTRAS DE CIMENTACION HASTA 2.00m TERRENO NORMAL

207.46

L (m)

b (m)

hexc (m)

Volumen (m)

Tramo 1-2

1.65

0.500

1.00

0.83

Area
Nivelacion(m)
0.83

Tramo 2-3

1.50

0.500

1.00

0.75

0.75

Tramo 1-2

1.50

0.500

1.00

0.75

0.75

Tramo 2-3

1.30

0.500

1.00

0.65

0.65

Tramo 1-2

1.50

0.500

1.00

0.75

0.75

Tramo 2-3

1.30

0.500

1.00

0.65

0.65

Tramo 1-2

1.62

0.500

1.00

0.81

0.81

Tramo 2-3

1.50

0.500

1.00

0.75

0.75

Tramo 1-2

1.62

0.500

1.00

0.81

0.81

Tramo 2-3

1.50

0.500

1.00

0.75

0.75

Tramo A-B

1.95

0.500

1.00

0.98

0.98

Tramo B-C

1.43

0.500

1.00

0.72

0.72

Tramo C-D

2.27

0.500

1.00

1.14

1.14

Tramo D-E

2.80

0.500

1.00

1.40

1.40

Tramo E-F

2.80

0.500

1.00

1.40

1.40

Tramo F-G

1.80

0.500

1.00

0.90

0.90

Tramo A-B

1.95

0.500

1.00

0.98

0.98

Tramo B-C

1.43

0.500

1.00

0.72

0.72

Tramo C-D

2.27

0.500

1.00

1.14

1.14

Tramo D-E

2.80

0.500

1.00

1.40

1.40

Tramo E-F

2.80

0.500

1.00

1.40

1.40

Tramo F-G

1.80

0.500

1.00

0.90

0.90

Tramo A-B

2.00

0.500

1.00

1.00

1.00

Tramo E-F

2.60

0.500

1.00

1.30

1.30

Tramo F-G

1.90

0.500

1.00

0.95

0.95

TOTAL

23.80 m

23.80 m

Vigas Riostras
EJE A
EJE B
EJE E
EJE F
EJE G

EJE 3

EJE 1

EJE 2

cimientos corridos
BLOQUE C

01.01.02.02

ESCALERA CC1

b (m)

L (m)

hexc (m)

Volumen (m)

0.40

12.00

1.20

5.76

TOTAL

5.76 m

m3

EXCAVACION PARA CUNETAS


Descripcin
BLOQUE C

L (m)

B (m)

hexc (m)

Volumen (m)

33.00

0.40

0.40

5.28

TOTAL

5.28 m

5.28

01.01.02.03

RELLENO CON MATERIAL PROPIO


Descripcin

207.46

Vol.Solado Concreto (Mejoramiento de suelo de Fundacin)

10.67

Vol. Afirmado (Mejoramiento de suelo de Fundacin)

14.23

Vol.OVER (Mejoramiento de suelo de Fundacin)

28.46

Volumen de Afirmado en Vigas Riostras de Cimentacin

19.04

Volumen de C en Zapatas

42.70

Volumen de C Vigas Riostras de Cimentacin

20.15

Volumen de Sobrecimientos e = 0.25m

4.43

Volumen de Sobrecimientos e = 0.15m

01.01.02.04

ELIMINACION DE MATERIAL EXCEDENTE (A MANO USANDO CARRETILLA, DISTANCIA PROMEDIO DE 30M)


Descripcin

207.46
310.10

Vol. De relleno (-)


Total
NIVELACION INTERIOR Y APISONADO
Ubicacin

Area (CAD)

PARA VIGAS RIOSTRAS DE CIMENTACIN

23.80

PARA ZAPATAS

71.16

EN FALSO PISO BLOQUE I Y ESCALERA

300.50

EN FALSO PISO BLOQUE II

262.50

PIEDRA GRANDE "OVER" Dimetro Mn. 4", Mx. 8"


Area nivelacion

h(m)

Volumen (m)

71.16

0.40

28.46

Total

28.46

AFIRMADO PARA MEJORAMIENTO DE SUELO DE FUNDACION, e = 20 cm


Descripcin

Area nivelacion

h(m)

Volumen (m)

71.16

0.20

14.23

Total

14.23

PARA ZAPATAS

AFIRMADO PARA VIGAS RIOSTRAS DE CIMENTACIN e = 20 cm (DOS CAPAS)


Descripcin

Area nivelacion

h(m)

PARA VIGAS RIOSTRAS DE CIMENTACIN 1 CAPA

23.80

0.20

PARA VIGAS RIOSTRAS DE CIMENTACIN 2 CAPA

23.80

0.20

Total
01.01.03.04

Descripcin

28.46

m2

71.16

m2

47.59

m2

1,126.00

m3

10.67

Area nivelacion
563.00
563.00

EN FALSO PISO aulas y veredas, escalera 2 capa


Total

01.01.04.01

m3

47.59

AFIRMADO PARA MEJORAMIENTO DE SUELO EN PISOS, e = 20 cm (DOS CAPAS)

EN FALSO PISO aulas y veredas, escalera 1 capa

01.01.04

563.00

MEJORAMIENTO DE SUELO DE FUNDACION

Descripcin

01.01.03.03

657.96

657.96

PARA ZAPATAS

01.01.03.02

m2

71.51
535.25 m

Total

01.01.03.01

535.25

Volumen (m)

Volumen proveniente de demolicion muros adobe y pisos

01.01.03

m3

5.60
71.51 m

Volumen Excavado en zapatas y vigas riostras

01.01.02.05

71.51

Volumen (m)

Volumen Excavado en zapatas y vigas riostras

Total

m3

1126.00

OBRAS DE CONCRETO SIMPLE


CONCRETO f'c=140 kg/cm e= 0.15 m, SOLADO
Descripcin
PARA ZAPATAS

Area nivelacion

h(m)

Volumen (m)

71.16

0.15

10.67

Total

10.67

01.01.04.02

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 10 CM


Descripcin

01.01.04.03
01.01.04.04.01

EJE A-A
EJE E-E
EJE G-G

EJE J-J
EJE N-N
EJE P-P

01.01.04.04.02

EJE 1-1

EJE 3-3

EJE 1-1

EJE 3-3

m3

1.91

m3

4.43

m3

5.60

563.00
Total

563.00

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA


Descripcin

563.00

Area nivelacion

EN FALSO PISO aulas y veredas, escalera

01.01.04.03

m2

b (m)

L (m)

hc

Volumen (m)

ESCALERA CC1

0.40

1.65

0.70

0.46

CC2

0.40

7.24

0.50

1.45

Total

1.91

SOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.25 m
Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

1-2

0.25

2.95

0.50

0.37

2.95

2-3

0.25

2.95

0.50

0.37

2.95

Total

4.43

35.40

CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.15 m


Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

2.31

0.50

0.17

2.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

2.31

0.50

0.17

2.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

2.46

0.50

0.18

2.46

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

3.31

0.50

0.25

3.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

3.31

0.50

0.25

3.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

3.46

0.50

0.26

3.46

J-K

0.15

2.46

0.50

0.18

2.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

2.31

0.50

0.17

2.31

N-O

0.15

2.31

0.50

0.17

2.31

O-P

0.15

3.46

0.50

0.26

3.46

J-K

0.15

3.46

0.50

0.26

3.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

3.31

0.50

0.25

3.31

N-O

0.15

3.31

0.50

0.25

3.31

O-P

0.15

3.46

0.50

0.26

3.46

Total

5.60

74.64

01.01.04.04.03
01.01.04.04
01.01.04.05.01

01.01.04.05.02

01.01.04.05.03

01.01.05
01.01.05.01
01.01.05.01.01

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

110.09

m3

1.35

m2

47.49

15.30

m3

42.70

kg

1,666.07

CUNETAS
CONCRETO f'c=175 kg/cm2 PARA CUNETAS

Descripcin

L (m)

e (m)

Area Cuneta
(m)

Volumen (m)

BLOQUE I

67.84

0.10

0.11

0.71

BLOQUE II

58.04

0.10

0.11

0.64

TOTAL

1.35

ENCOFRADO Y DESENCOFRADO CUNETAS

Descripcin

L (m)

h (m)

BLOQUE I

67.84

0.35

Area Cuneta
(m)
47.49

BLOQUE II

58.04

0.35

40.63

TOTAL

47.49

JUNTAS ASFALTICAS EN CUNETAS, e = 1"

Descripcin

L (m)

cantidad (m)

h (m)

BLOQUE I

67.84

17.00

0.90

Area Cuneta
(m)
15.30

BLOQUE II

58.04

15.00

0.90

13.50

TOTAL

15.30

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
Descripcin
PARA ZAPATAS

01.01.05.01.02

m2

ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS

Area nivelacion

h(m)

Volumen (m)

71.16

0.60

42.70

Total

42.70

01.01.05.02
01.01.05.02.01

VIGAS RIOSTRAS DE CIMENTACIN


CONCRETO f'c=175 kg/cm2 PARA VIGAS DE CIMENTACION
Vigas Riostras

EJE A
EJE E
EJE G
EJE H
EJE I

EJE 1

EJE 3

EJE J-J
EJE N-N
EJE P-P

EJE 1

EJE 3

L (m)

b (m)

h (m)

Volumen (m)

Area encof (m2)

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.46

0.300

0.50

0.52

3.46

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.31

0.300

0.50

0.50

3.31

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

TOTAL

20.15 m

134.31 m2

m3

20.15

01.01.05.02.02

ENCOFRADO Y DESENCOFRADO EN VIGAS RIOSTRAS DE CIMENTACION

m2

134.31

01.01.05.02.03

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS RIOSTRAS DE CIMENTACION

kg

2,351.49

01.01.05.03
01.01.05.03.01

PLACAS Y COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2

m3

Descripcin Columnas

Area (m)

Permetro (m)

h (m)

C - A1

0.21

2.00

6.66

Area de
Encofrado (m)
13.32

C - B1

0.15

1.60

6.66

10.66

1.00

C - C1

0.26

3.00

6.66

19.98

1.70

C - D1

0.15

1.60

6.66

10.66

1.00

C - E1

0.26

3.00

6.66

19.98

1.70

C - F1

0.15

1.60

6.66

10.66

1.00

C - G1

0.21

2.00

6.66

13.32

1.40

C - H1

0.13

1.50

7.49

11.24

0.94

C - I1

0.13

1.50

7.49

11.24

0.94

C - A2

0.12

1.40

7.25

10.15

0.87

C - E2

0.12

1.40

7.25

10.15

0.87

C - G2

0.12

1.40

7.25

10.15

0.87

C - H1'

0.10

1.30

7.91

10.28

0.79

C - I1'

0.10

1.30

7.91

10.28

0.79

C - A3

0.21

2.00

6.66

13.32

1.40

C - B3

0.15

1.60

6.66

10.66

1.00

C - C3

0.26

3.00

6.66

19.98

1.70

C - D3

0.15

1.60

6.66

10.66

1.00

C - E3

0.26

3.00

6.66

19.98

1.70

C - F3

0.15

1.60

6.66

10.66

1.00

C - G3

0.21

2.00

6.66

13.32

1.40

C - H3

0.13

1.50

7.16

10.74

0.90

C - I3

0.13

1.50

7.16

10.74

0.90

falsa columna

0.05

0.60

1.80

1.08

0.08

Volumen (m)
1.40

C - J1

0.21

2.00

6.66

13.32

1.40

C - K1

0.15

1.60

6.66

10.66

1.00

C - L1

0.26

3.00

6.66

19.98

1.70

C - M1

0.15

1.60

6.66

10.66

1.00

C - N1

0.26

3.00

6.66

19.98

1.70

C - O1

0.15

1.60

6.66

10.66

1.00

C - P1

0.21

2.00

6.66

13.32

1.40

C - J2

0.12

1.40

7.25

10.15

0.87

C - N2

0.12

1.40

7.25

10.15

0.87

C - P2

0.12

1.40

7.25

10.15

0.87

C - J3

0.21

2.00

6.66

13.32

1.40

C - K3

0.15

1.60

6.66

10.66

1.00

C - L3

0.26

3.00

6.66

19.98

1.70

C - M3

0.15

1.60

6.66

10.66

1.00

C - N3

0.26

3.00

6.66

19.98

1.70

C - O3

0.15

1.60

6.66

10.66

1.00

C - P3

0.21

2.00

6.66

13.32

1.40

falsa columna

0.07

0.30

1.80

0.54

0.12

TOTAL

521.31 m

47.43 m

47.43

01.01.05.03.02

BLOQUE I, 1 NIVEL

BLOQU I, 2 NIVEL

BLOQUE II, 1 NIVEL

BLOQU II, 2 NIVEL

CONCRETO f'c=175 kg/cm2 PARA COLUMNAS DE CONFINAMIENTO

5.22

m3

Descripcin

Area (m)

Permetro (m)

h (m)

Cantidad

Col. Conf. Eje1, Tramo AB

0.030

0.550

2.16

2.00

Area de
Encofrado (m)
1.04

Col. Conf. Eje1, Tramo BC

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo CD

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo DE

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo EF

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo FG

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo AB

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo BC

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo CD

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo DE

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo EF

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje1, Tramo AB

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo BC

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo CD

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo DE

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo EF

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo FG

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo AB

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo BC

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo CD

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo DE

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo EF

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.46

0.07

Col. Parapeto Eje3, Tramo AB

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo BC

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo CD

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo DE

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo EF

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.61

0.07

Col. Parapeto Eje3, Tramo GH

0.030

0.550

1.10

2.00

0.61

0.07

Volumen (m)
0.13

Col. Conf. Eje1, Tramo JK

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo KL

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo LM

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo MN

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo NO

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo OP

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo JK

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo KL

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo LM

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo MN

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo NO

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje1, Tramo JK

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo KL

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo LM

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo MN

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo NO

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo OP

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo JK

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo KL

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo LM

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo MN

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo NO

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.46

0.07

Col. Parapeto Eje3, Tramo JK

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo KL

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo LM

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo MN

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo NO

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.61

0.07

TOTAL

43.70 m

5.22 m

01.01.05.03.03

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

565.01

01.01.05.03.04

ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS

kg

8,769.26

m3

52.04

01.01.05.04
01.01.05.04.01

BLOQUE I, 1 NIVEL

BLOQUE I, 2 NIVEL

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2

Descripcin

L (m)

b (m)

h (m)

V 101 - 1-2 - A

2.950

0.300

0.450

V 101 - 2-3 - A

2.950

0.300

0.450

V 102 - 1-3 - B

6.300

0.300

0.450

V 102 - 1-3 - C

6.300

0.300

0.450

V 102 - 1-3 - D

6.300

0.300

0.450

V 101 - 1-2 - E

2.950

0.300

0.450

V 101 - 2-3 - E

2.950

0.300

0.450

V 102 - 1-3 - F

6.300

0.300

0.450

V 101 - 1-2 - G

2.950

0.300

0.450

V 101 - 2-3 - G

2.950

0.300

0.450

V 103 - 1-1' - H

2.125

0.250

0.400

V 104 - 1'-3 - H

3.775

0.250

0.400

V 103 - 1-1' - I

2.125

0.250

0.400

V 104 - 1'-3 - I

3.775

0.250

0.400

VA 101 - AB - 1

3.460

0.250

0.300

VA 102 - BC - 1

3.310

0.250

0.300

VA 102 - CD - 1

3.310

0.250

0.300

VA 101 - DE - 1

3.310

0.250

0.300

VA 101 - EF- 1

3.310

0.250

0.300

VA 101 - FG- 1

3.460

0.250

0.300

V 105 - HI- 1

3.300

0.250

0.400

V 104 - HI- 1'

3.300

0.250

0.400

V ESCALERA

3.300

0.250

0.400

VA 101 - AB - 3

3.460

0.250

0.300

VA 102 - BC - 3

3.310

0.250

0.300

VA 102 - CD - 3

3.310

0.250

0.300

VA 101 - DE - 3

3.310

0.250

0.300

VA 101 - EF- 3

3.310

0.250

0.300

VA 101 - FG- 3

3.460

0.250

0.300

VA 103 - HI- 3

3.300

0.250

0.400

VV - 101 - A

1.600

0.300

0.450

VV - 101 - B

1.600

0.300

0.450

VV - 101 - C

1.600

0.300

0.450

VV - 101 - D

1.600

0.300

0.450

VV - 101 - E

1.600

0.300

0.450

VV - 101 - F

1.600

0.300

0.450

VV - 101 - G

1.600

0.300

0.450

VV - 102 - H

1.600

0.250

0.400

VV - 102 - I

1.600

0.250

0.400

V 201 - 1-2 - A

3.700

0.300

0.450

V 201 - 2-3 - A

3.700

0.300

0.450

V 202 - 1-3 - B

3.700

0.300

0.450

V 202 - 2-3 - B

3.700

0.300

0.450

V 201 - 1-2 - C

3.700

0.300

0.450

V 201 - 2-3 - C

3.700

0.300

0.450

V 201 - 1-2 - D

3.700

0.300

0.450

V 201 - 2-3 - D

3.700

0.300

0.450

V 202 - 1-2 - E

3.700

0.300

0.450

V 202 - 2-3 - E

3.700

0.300

0.450

V 202 - 1-2 - F

3.700

0.300

0.450

V 202 - 2-3 - F

3.700

0.300

0.450

V 202 - 1-2 - G

3.700

0.300

0.450

V 202 - 2-3 - G

3.700

0.300

0.450

V 203 - 1-1' - H

2.630

0.250

0.400

V 203 - 1'-3 - H

4.310

0.250

0.400

V 204 - 1-1' - I

2.630

0.250

0.400

Ai (m)

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.100
0.100

Af (m)

0.060
0.060
0.060
0.060
0.060
0.060
0.060
0.050
0.050

Area Encofrado
(m)

3.540
3.540
7.560
7.560
7.560
3.540
3.540
7.560
3.540
3.540
2.231
3.964
2.231
3.964
2.941
2.814
2.814
2.814
2.814
2.941
3.465
3.465
3.465
2.941
2.814
2.814
2.814
2.814
2.941
3.465
1.920
1.920
1.920
1.920
1.920
1.920
1.920
1.680
1.680
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
2.762
4.526
2.762

Volumen
(m)

0.398
0.398
0.851
0.851
0.851
0.398
0.398
0.851
0.398
0.398
0.213
0.378
0.213
0.378
0.260
0.248
0.248
0.248
0.248
0.260
0.330
0.330
0.330
0.260
0.248
0.248
0.248
0.248
0.260
0.330
0.156
0.156
0.156
0.156
0.156
0.156
0.156
0.120
0.120
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.263
0.431
0.263

BLOQUE I, 2 NIVEL

BLOQUE II, 1 NIVEL

V 204 - 1'-3 - I

4.310

0.250

0.400

VA 201 - AB - 1

3.460

0.250

0.300

VA 202 - BC - 1

3.310

0.250

0.300

VA 202 - CD - 1

3.310

0.250

0.300

VA 201 - DE - 1

3.310

0.250

0.300

VA 201 - EF - 1

3.310

0.250

0.300

VA 201 - FG - 1

3.460

0.250

0.300

VA 203 - HI - 1

3.300

0.250

0.300

VA 201 - AB - 3

3.460

0.250

0.300

VA 202 - BC - 3

3.310

0.250

0.300

VA 202 - CD - 3

3.310

0.250

0.300

VA 201 - DE - 3

3.310

0.250

0.300

VA 201 - EF - 3

3.310

0.250

0.300

VA 201 - FG - 3

3.460

0.250

0.300

VA 203 - HI - 3

3.300

0.250

0.300

V Cumb. AE - 2

16.900

0.350

0.170

V Cumb. EG - 2

7.630

0.350

0.170

V Cumb. HI - 1

3.300

0.250

0.400

VV - 201 - A

1.800

0.300

0.450

VV - 201 - B

1.800

0.300

0.450

VV - 201 - C

1.800

0.300

0.450

VV - 201 - D

1.800

0.300

0.450

VV - 201 - E

1.800

0.300

0.450

VV - 201 - F

1.800

0.300

0.450

VV - 201 - G

1.800

0.300

0.450

VV - 203 - H

1.800

0.300

0.450

VV - 203 - I

1.800

0.300

0.450

VV - 202 - A

1.100

0.300

0.450

VV - 202 - B

1.100

0.300

0.450

VV - 202 - C

1.100

0.300

0.450

VV - 202 - D

1.100

0.300

0.450

VV - 202 - E

1.100

0.300

0.450

VV - 202 - F

1.100

0.300

0.450

VV - 202 - G

1.100

0.300

0.450

VV - 204 - H

1.100

0.300

0.450

VV - 204 - I

1.100

0.300

0.450

V 101 - 1-2 - A

2.950

0.300

0.450

V 101 - 2-3 - A

2.950

0.300

0.450

V 102 - 1-3 - B

6.300

0.300

0.450

V 102 - 1-3 - C

6.300

0.300

0.450

V 102 - 1-3 - D

6.300

0.300

0.450

V 101 - 1-2 - E

2.950

0.300

0.450

V 101 - 2-3 - E

2.950

0.300

0.450

V 102 - 1-3 - F

6.300

0.300

0.450

V 101 - 1-2 - G

2.950

0.300

0.450

V 101 - 2-3 - G

2.950

0.300

0.450

VA 101 - AB - 1

3.460

0.250

0.300

VA 102 - BC - 1

3.310

0.250

0.300

VA 102 - CD - 1

3.310

0.250

0.300

VA 101 - DE - 1

3.310

0.250

0.300

VA 101 - EF- 1

3.310

0.250

0.300

VA 101 - FG- 1

3.460

0.250

0.300

VA 101 - AB - 3

3.460

0.250

0.300

VA 102 - BC - 3

3.310

0.250

0.300

VA 102 - CD - 3

3.310

0.250

0.300

VA 101 - DE - 3

3.310

0.250

0.300

VA 101 - EF- 3

3.310

0.250

0.300

VA 101 - FG- 3

3.460

0.250

0.300

VV - 101 - A

1.600

0.300

0.450

VV - 101 - B

1.600

0.300

0.450

VV - 101 - C

1.600

0.300

0.450

VV - 101 - D

1.600

0.300

0.450

VV - 101 - E

1.600

0.300

0.450

VV - 101 - F

1.600

0.300

0.450

VV - 101 - G

1.600

0.300

0.450

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051

4.526
2.941
2.814
2.814
2.814
2.814
2.941
2.805
2.941
2.814
2.814
2.814
2.814
2.941
2.805
11.661
5.265
3.465
2.160
2.160
2.160
2.160
2.160
2.160
2.160
2.160
2.160
1.320
1.320
1.320
1.320
1.320
1.320
1.320
1.320
1.320

0.431
0.260
0.248
0.248
0.248
0.248
0.260
0.248
0.260
0.248
0.248
0.248
0.248
0.260
0.248
1.006
0.454
0.330
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102

0.060
0.060
0.060
0.060
0.060
0.060
0.060

3.540
3.540
7.560
7.560
7.560
3.540
3.540
7.560
3.540
3.540
2.941
2.814
2.814
2.814
2.814
2.941
2.941
2.814
2.814
2.814
2.814
2.941
1.920
1.920
1.920
1.920
1.920
1.920
1.920

0.398
0.398
0.851
0.851
0.851
0.398
0.398
0.851
0.398
0.398
0.260
0.248
0.248
0.248
0.248
0.260
0.260
0.248
0.248
0.248
0.248
0.260
0.156
0.156
0.156
0.156
0.156
0.156
0.156

BLOQUE II, 2 NIVEL

V 201 - 1-2 - A

3.700

0.300

0.450

V 201 - 2-3 - A

3.700

0.300

0.450

V 202 - 1-3 - B

3.700

0.300

0.450

V 202 - 2-3 - B

3.700

0.300

0.450

V 201 - 1-2 - C

3.700

0.300

0.450

V 201 - 2-3 - C

3.700

0.300

0.450

V 201 - 1-2 - D

3.700

0.300

0.450

V 201 - 2-3 - D

3.700

0.300

0.450

V 202 - 1-2 - E

3.700

0.300

0.450

V 202 - 2-3 - E

3.700

0.300

0.450

V 202 - 1-2 - F

3.700

0.300

0.450

V 202 - 2-3 - F

3.700

0.300

0.450

V 202 - 1-2 - G

3.700

0.300

0.450

V 202 - 2-3 - G

3.700

0.300

0.450

VA 201 - AB - 1

3.460

0.250

0.300

VA 202 - BC - 1

3.310

0.250

0.300

VA 202 - CD - 1

3.310

0.250

0.300

VA 201 - DE - 1

3.310

0.250

0.300

VA 201 - EF - 1

3.310

0.250

0.300

VA 201 - FG - 1

3.460

0.250

0.300

VA 201 - AB - 3

3.460

0.250

0.300

VA 202 - BC - 3

3.310

0.250

0.300

VA 202 - CD - 3

3.310

0.250

0.300

VA 201 - DE - 3

3.310

0.250

0.300

VA 201 - EF - 3

3.310

0.250

0.300

VA 201 - FG - 3

3.460

0.250

0.300

V Cumb. AE - 2

16.900

0.350

0.170

V Cumb. EG - 2

7.630

0.350

0.170

VV - 201 - A

1.800

0.300

0.450

VV - 201 - B

1.800

0.300

0.450

VV - 201 - C

1.800

0.300

0.450

VV - 201 - D

1.800

0.300

0.450

VV - 201 - E

1.800

0.300

0.450

VV - 201 - F

1.800

0.300

0.450

VV - 201 - G

1.800

0.300

0.450

VV - 202 - A

1.100

0.300

0.450

VV - 202 - B

1.100

0.300

0.450

VV - 202 - C

1.100

0.300

0.450

VV - 202 - D

1.100

0.300

0.450

VV - 202 - E

1.100

0.300

0.450

VV - 202 - F

1.100

0.300

0.450

VV - 202 - G

1.100

0.300

0.450

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
TOTAL

4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
2.941
2.814
2.814
2.814
2.814
2.941
2.941
2.814
2.814
2.814
2.814
2.941
11.661
5.265
2.160
2.160
2.160
2.160
2.160
2.160
2.160
1.320
1.320
1.320
1.320
1.320
1.320
1.320

0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.260
0.248
0.248
0.248
0.248
0.260
0.260
0.248
0.248
0.248
0.248
0.260
1.006
0.454
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.102
0.102
0.102
0.102
0.102
0.102
0.102

534.04 m

52.04 m

01.01.05.04.02

BLOQUE I, 1 NIVEL

BLOQU I, 2 NIVEL

BLOQUE II, 1 NIVEL

BLOQU II, 2 NIVEL

CONCRETO f'c=175 kg/cm2 PARA VIGAS DE CONFINAMIENTO

3.82

m3

Descripcin

Area (m)

Permetro (m)

L (m)

Cantidad

Conf. Eje1, Tramo AB

0.030

0.550

3.06

1.00

Area de
Encofrado (m)
1.53

Conf. Eje1, Tramo BC

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo DE

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo EF

0.030

0.550

2.16

1.00

1.04

0.06

Conf. Eje1, Tramo FG

0.030

0.550

2.06

1.00

0.98

0.06

Conf. Eje3, Tramo AB

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo BC

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo DE

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo FG

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo AB

0.030

0.550

2.66

1.00

1.31

0.08

Conf. Eje1, Tramo BC

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo DE

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo FG

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje3, Tramo AB

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo BC

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo DE

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo FG

0.030

0.550

3.06

1.00

1.53

0.09

Volumen (m)
0.09

Conf. Eje1, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo KL

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo MN

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo NO

0.030

0.550

2.16

1.00

1.04

0.06

Conf. Eje1, Tramo OP

0.030

0.550

2.06

1.00

0.98

0.06

Conf. Eje3, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo KL

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo MN

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo OP

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo JK

0.030

0.550

2.66

1.00

1.31

0.08

Conf. Eje1, Tramo KL

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo MN

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo OP

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje3, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo KL

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo MN

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo OP

0.030

0.550

3.06

1.00

1.53

0.09

TOTAL

62.91 m

3.82 m

01.01.05.04.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

596.95

01.01.05.04.04

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS

kg

6,414.52

01.01.05.05
01.01.05.05.01

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

78.27

m3
Factor para Techo
inclinado 00%

1 PLANTA
BLOQUE I y Escalera

1 PLANTA
BLOQUE II y Escalera

2 PLANTA
BLOQUE I y Escalera

2 PLANTA
BLOQUE II y Escalera

Descripcin Losa Aligerada

Area CAD(m)

1.000

espesor (m)

AULA 201

53.710

53.71

0.200

AULA 202

53.62

53.62

0.200

AULA 203

53.71

53.71

0.200

Voladizo Aula

35.16

35.16

0.200

Escalera 1

10.76

10.76

0.200

Voladizo Escalera

5.28

5.28

0.200

AULA 203

53.710

53.71

0.200

AULA 204

53.62

53.62

0.200

AULA 205

53.71

53.71

0.200

Voladizo Aula

35.16

35.16

0.200

TOTAL

408.44 m

Descripcin Losa Aligerada techo

Area (m)

Factor para Techo


inclinado 20%

1.020

espesor (m)

AULA 201

53.71

54.77

0.170

AULA 202

53.62

54.68

0.170

AULA 203

53.71

54.77

0.170

Voladizo Aula FRONTAL

41.97

42.80

0.170

Voladizo Aula posterior

26.37

26.89

0.170

Voladizo Aulalateral

8.8725

9.05

0.170

Escalera

21.62

22.05

0.170

Voladizo Escalera posterior

5.5

5.61

0.170

Voladizo Escalera front

9.18

0.170

Voladizo Escalera lateral

8.76

8.93

0.170

AULA 201

53.71

54.77

0.170

AULA 202

53.62

54.68

0.170

AULA 203

53.71

54.77

0.170

Voladizo Aula FRONTAL

41.97

42.80

0.170

Voladizo Aula posterior

26.37

26.89

0.170

Voladizo Aulalateral

8.8725

9.05

0.170

TOTAL

531.71 m

Dimensiones

N Lad / m

Area (m)

Cantidad Lad.

Volumen Total

Vol. Lad.

Vol. Ladrillos

0.30x0.30x0.15

8.333

408.440

3404.000

81.688

0.014

45.954

90.391

0.011

LADRILLO HUECO
1 Planta

0.30x0.30x0.12

01.01.05.05.02

1 Planta

531.710

4431.000

940.150

7,835.000

ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS


Descripcin (Bordes o Frisos)

Largo

Peralte

Area (m)

Borde aligerado AULAS

92.360

0.200

18.472

120.920

0.170

20.556

3.800

0.200

0.760

30.400

0.170

2 Planta
1 Planta

8.333
TOTAL

Borde alig. ESCALERA

2 Planta

Area Total de Aligerado FONDO

Vol.
Concreto
35.734

47.855

42.536

TOTAL

78.27 m

m2

985.11

5.168
940.150

TOTAL

985.11 m

01.01.05.05.03

ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS

kg

5,538.48

01.01.05.05.04

LADRILLO HUECO DE ARCILLA 15x30x30 PARA TECHO ALIGERADO h = 0.20

3,404.00

01.01.05.05.05

LADRILLO HUECO DE ARCILLA 12x30x30 PARA TECHO ALIGERADO h = 0.17

4,431.00

01.01.05.06
01.01.05.06.01

ESCALERAS
CONCRETO EN ESCALERAS f'c=210 kg/cm2
Descripcin

Escalera 1

01.01.05.06.02

Cimiento Escalera
Area Lateral Tramo Inicial
Area Descanso 1
Area Lateral Tramo Intermedio
Area Descanso 2
Area Lateral Tramo Final

L (m)

Volumen (m)

1.800

0.630

0.744

1.800

1.340

0.310

1.800

0.558

0.690

1.800

1.242

0.310

1.800

0.558

0.550

1.800

0.990

TOTAL

5.32 m

ENCOFRADO Y DESENCOFRADO EN ESCALERAS


Descripcin

Escalera 1

Area
0.350

m3

5.32

m2

23.83

Cantidad

B (m)

L (m)

Area Parc.

Area Total

1.00

1.80

1.58

2.84

2.84

0.69

1.38

Fondo de Tramo Inicial


Area Lateral Tramo Inicial
Contrapasos Tramo Inicial
fondo descanso 1
fondo tramo intermedio
Area Lateral Tramo Intermedio
Contrapasos Tramo Iintermedio
fondo descanso 2
Fondo de Tramo Final
Area Lateral Tramo Final
Contrapasos Tramo Final

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.58

2.84

2.84

0.55

1.10

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.87

3.37

3.37

0.00

0.00

2.00
7.00

1.80

0.19

0.34

2.39

TOTAL

23.83 m

01.01.05.06.03

ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS

kg

297.85

01.01.05.06.04

CURADO DE OBRAS DE CONCRETO CON ADITIVO (ANTISOL)

m2

2,305.20

110.48

6.00

01.01.06
01.01.06.01

ESTRUCTURAS METALICAS Y TECHADOS


CANALETA DE PLANCHA GALVANIZADA D=6"
Descripcin

Longitud (m)

Lado Posterior BLOQUE I

25.120

Lado Frontal BLOQUE I

25.120

Lado Posterior Escalera

5.000

Lado Frontal Escalera

5.000

Lado Posterior BLOQUE II

25.120

Lado Frontal BLOQUE II

25.120

TOTAL

110.48 m

01.01.06.02

CONO DE PLANCHA GALVANIZADA e = 0.30mm

01.01.06.03

COBERTURA DE TEJA ANDINA (1.14 x 0.72 x 5mm)

m2

594.32

55.24

Factor para
Techo inclinado
20%

01.01.06.04

Descripcin

b (m)

L (m)

Area (m)

1.020

Cobertura en BLOQUE I

10.55

25.12

265.02

270.26

Cobertura en Escalera

10.55

5.00

52.75

53.79

Cobertura en BLOQUE II

10.55

25.12

265.02

270.26

TOTAL

594.32 m

CUMBRERA PARA TEJA ANDINA

01.01.06.05

correas para fijar teja

01.02
01.02.01
01.02.01.01

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

VIGUETAS DE MADERA DE 1" x 2", PARA TECHO


Descripcin

L (m)

Cantidad

Lviga (m)

Cobertura en BLOQUE I

25.12

21.00

527.52

Cobertura en Escalera

5.00

21.00

105.00

Cobertura en BLOQUE II

25.12

21.00

527.52

TOTAL

1160.04 m

1,160.04

m2

0.00

ARQUITECTURA
ALBAILERIA
MUROS DE LADRILLO DE ARCILLA DE CABEZA, Mezcla 1:4 x 1.5 cm

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Muro Eje A, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje C, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje L, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro EjeNE, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

3.00

0.00

1.00

Area Vano(m)

Area (m)

0.00
TOTAL

01.02.01.02

PRIMER NIVEL

SEGUNDO NIVEL

MUROS DE LADRILLO DE ARCILLA DE SOGA CON MEZCLA 1:4 X 1.5 cm

0.00 m
593.24

m2

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.15

3.00

8.78

1.00

26.34

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.15

1.20

11.31

1.00

13.57

Eje I-I, Entre Eje 20-20 y Eje 21-21

0.15

3.00

3.35

1.00

10.05

Eje J-J, Entre Eje 16-16 y Eje 21-21

0.15

3.00

10.54

1.00

31.62

Eje K-K, Entre Eje 16-16 y Eje 21-21

0.15

3.00

25.38

1.00

76.14

Eje 16-16, Entre Eje H-Hy Eje K-K

0.15

3.00

4.00

1.00

12.00

Eje 16-16, Entre Eje H-Hy Eje K-K

0.15

1.20

2.00

1.00

2.40

Eje 17-17, Entre Eje H-Hy Eje K-K

0.15

3.00

6.85

1.00

20.55

Eje 18-18, Entre Eje H-Hy Eje J-J

0.15

3.00

3.50

1.00

10.50

Eje 19-19, Entre Eje H-Hy Eje J-J

0.15

3.00

4.03

1.00

12.09

Eje 20-20, Entre Eje H-Hy Eje K-K

0.15

3.00

7.00

1.00

21.00

Eje 21-21, Entre Eje H-Hy Eje K-K

0.15

3.00

1.85

1.00

5.55

Eje 21-21, Entre Eje H-Hy Eje K-K

0.15

1.20

2.00

1.00

2.40

Eje 21-21, Entre Eje H-Hy Eje K-K

0.15

2.40

2.15

1.00

5.16

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.15

3.00

3.60

1.00

10.80

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.15

1.20

18.38

1.00

22.06

Eje K-K, Entre Eje 16-16 y Eje 21-21

0.15

3.00

25.38

1.00

76.14

Eje 16-16, Entre Eje H-H y Eje K-K

0.15

3.00

6.98

1.00

20.94

Eje 17`-17`, Entre Eje H-H y Eje K-K

0.15

3.00

7.00

1.00

21.00

Eje 18-18, Entre Eje H-H y Eje K-K

0.15

3.00

7.00

1.00

21.00

Area Vano(m)

Area (m)

TERCER NIVEL

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.15

3.00

3.60

1.00

10.80

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.15

1.20

18.38

1.00

22.06

Eje K-K, Entre Eje 16-16 y Eje 21-21

0.15

3.00

25.38

1.00

76.14

Eje 16-16, Entre Eje H-H y Eje K-K

0.15

3.00

6.98

1.00

20.94

Eje 17`-17`, Entre Eje H-H y Eje K-K

0.15

3.00

7.00

1.00

21.00

Eje 18-18, Entre Eje H-H y Eje K-K

0.15

3.00

7.00

1.00

21.00
TOTAL

01.02.01.03

PARAPETO DE LADRILLO DE ARCILLA DE SOGA, Mezcla 1:4 x 1.5 cm

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje H`-H`, Entre Eje 16-16 y Eje 21-21

0.15

1.20

28.78

1.00

TERCER NIVEL

Eje H`-H`, Entre Eje 16-16 y Eje 21-21

0.15

1.20

28.78

1.00

57.56

1 PLANTA
Aulas 101, 102 y
Escaleras

69.07

m2

SEGUNDO NIVEL

01.02.01.04

593.24

Area Vano(m)

Area (m)

34.54

34.54
TOTAL

JUNTA CON TEKNOPORT e = 1"

69.07 m
m2

Descripcin

Longitud (m)

Ancho (m)

Cantidad

Area (m)

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

Tramo E-F-1

0.15

Tramo F-G-1

0.15

Tramo A-B-3

0.15

0.00

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

JUNTA SISMICA

1 PLANTA
BLOQUE II

2 PLANTA
BLOQUE II

01.02.02
01.02.02.01

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

Tramo E-F-1

0.15

Tramo F-G-1

0.15

Tramo A-B-3

0.15

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

1 PLANTA

0.15

1 PLANTA

0.2

Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

Tramo N-O-3

0.15

Tramo O-P-3

0.15

Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

Tramo N-O-3

0.15

Tramo O-P-3

0.15

TOTAL

0.00 m

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA

Descripcin

Longitud (m)

Ancho (m)

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

593.24

PARAPETO DE LADRILLO DE ARCILLA DE SOGA

01.02.02.02

Longitud (m)

m2

662.32

69.07
0.150

8.63

TOTAL

670.95 m

TARRAJEO EN EXTERIORES

Descripcin

670.95

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

PARAPETO DE LADRILLO DE ARCILLA DE SOGA (Parte Superior)


57.560

m2

Ancho (m)

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

593.24

PARAPETO DE LADRILLO DE ARCILLA DE SOGA

69.07
TOTAL

662.32 m

01.02.02.03

TARRAJEO DE SUPERFICIE Y ARISTAS DE COLUMNAS


Descripcin Columnas
area de encofrado de columnas
area de encofrado de columnas conf. Y parapeto
TOTAL

01.02.02.04

area de encofrado de vigas


area de encofrado de vigas confinamiento
TOTAL
01.02.02.05

Escalera

01.02.02.06

Puertas 1 Planta
Puertas 2 Planta
Puertas 3 Planta

1 Planta

2 Planta

3 Planta

01.02.02.07

m2

596.95

m2

11.02

434.70

521.31
43.70
565.01 m

Area (m)
534.04
62.91
596.95 m

TARRAJEO DE SUPERFICIE Y ARISTAS DE ESCALERA

Descripcin

565.01

Area (m)

TARRAJEO DE SUPERFICIE Y ARISTAS DE VIGAS


Descripcin vigas

m2

Cantidad

Area Lateral Tramo Inicial

2.00

Contrapasos Tramo Inicial

9.00

Area Lateral Tramo Final

2.00

Contrapasos Tramo Final

9.00

B (m)

L (m)

1.85

Area Cad

Area

1.08

2.17

0.20

1.85

3.33
1.09

2.19

TOTAL

11.02 m

0.20

3.33

VESTIDURA DE DERRAMES EN VANOS (PUERTAS, VENTANAS)

Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Ancho
Derrame

Puerta -2

1.10

2.30

1.00

0.15

5.70

Puerta -5

1.00

2.30

6.00

0.15

33.60

Puerta 2

1.00

2.30

3.00

0.15

16.80

Puerta 6

1.00

2.30

3.00

0.15

16.80

Puerta 7

1.00

2.30

3.00

0.15

16.80

Puerta 6

1.00

2.30

3.00

0.15

16.80

V-1

1.00

2.40

0.60

3.00

0.15

9.60

V-2

2.70

1.20

1.80

2.00

0.15

18.00

V-3

1.35

1.20

1.80

6.00

0.15

37.80

V-4

2.55

1.20

1.80

2.00

0.15

17.40

V-5

3.50

1.20

1.80

1.00

0.15

10.60

V-2

2.70

1.20

1.80

2.00

0.15

18.00

V-6

3.20

1.20

1.80

8.00

0.15

80.00

V-7

3.05

1.20

1.80

2.00

0.15

19.40

V-2

2.70

1.20

1.80

2.00

0.15

18.00

V-6

3.20

1.20

1.80

8.00

0.15

80.00

V-7

3.05

1.20

1.80

2.00

0.15

19.40

TOTAL

434.70 m

VESTIDURA DE SUPERFICIE FONDO DE ESCALERA CON MORTERO 1:4 X 1.5 cm

Derrame (m)

m2

Descripcin

Cantidad

B (m)

L Cad (m)

Area

Fondo de Tramo Inicial

1.00

1.85

4.05

7.48

Fondo de Tramo Final

1.00

1.85

4.45

8.23

TOTAL

15.72 m

15.72

01.02.02.08

BLOQUE I

BLOQUE II

BRUAS

m
Descripcin

Seccin

C - A1

Cantidad
2.00

h1 (m)
2.61

h2 (m)
2.70

Brua (m)
10.62

C - B1

Rectangular

2.00

2.61

2.70

10.62

C - C1

2.00

2.61

2.70

10.62

C - D1

Rectangular

2.00

2.61

2.70

10.62

C - E1

2.00

2.61

2.70

C - F1

Rectangular

2.00

2.61

2.70

10.62

C - G1

2.00

2.61

2.70

10.62

C - A2

Rectangular

2.00

2.61

3.70

12.62

C - E2

Rectangular

2.00

2.61

3.70

12.62

C - G2

Rectangular

2.00

2.61

3.70

12.62

C - A3

2.00

2.61

2.70

10.62

C - B3

Rectangular

2.00

2.61

2.70

10.62

C - C3

2.00

2.61

2.70

10.62

C - D3

Rectangular

2.00

2.61

2.70

10.62

C - E3

2.00

2.61

2.70

10.62

C - F3

Rectangular

2.00

2.61

2.70

10.62

C - G3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

C - J1

2.00

2.61

2.70

10.62

C - K1

Rectangular

2.00

2.61

2.70

10.62

C - L1

2.00

2.61

2.70

10.62

C - M1

Rectangular

2.00

2.61

2.70

10.62

C - N1

2.00

2.61

2.70

C - O1

Rectangular

2.00

2.61

2.70

10.62

C - P1

2.00

2.61

2.70

10.62

C - J2

Rectangular

2.00

2.61

3.70

12.62

C - N2

Rectangular

2.00

2.61

3.70

12.62

C - P2

Rectangular

2.00

2.61

3.70

12.62

C - J3

2.00

2.61

2.70

10.62

C - K3

Rectangular

2.00

2.61

2.70

10.62

C - L3

2.00

2.61

2.70

10.62

C - M3

Rectangular

2.00

2.61

2.70

10.62

C - N3

2.00

2.61

2.70

10.62

C - O3

Rectangular

2.00

2.61

2.70

10.62

C - P3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

TOTAL

824.16 m

824.16

01.02.03
01.02.03.01

CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

Descripcin

Area

1 Planta

Area Planta Aligerado BLOQUE I Y


ESCALERA

408.44

2 Planta

Area Planta Aligerado BLOQUE I Y


ESCALERA

531.7104578

TOTAL

940.15 m

01.02.04
01.02.04.01

1 Planta
2 Planta

3 Planta

01.02.04.02

01.02.05.01

01.02.05.02

01.02.05.03

01.02.05.04

01.02.06
01.02.06.01

1 Planta

940.15

m2

797.28

33.20

m2

50.76

m2

770.82

m2

770.82

m2

0.00

211.45

PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO

Descripcin

Area (m)

Entre Eje A-A, Eje D-D Y Eje 1-1 , Eje 8-8

228.44

PERIMETRO
ZOCALO(m)
128.92

Entre Eje A-A, Eje D-D Y Eje 1-1 , Eje 8-8

228.44

95.22

Voladizo

42.75

38.32

Escalera

13.23

14.70

Entre Eje A-A, Eje D-D Y Eje 1-1 , Eje 8-8

228.44

95.22

Voladizo

42.75

38.32

Escalera

13.23

14.70

TOTAL

797.28 m

425.40 m

JUNTAS ASFALTICAS e = 1/2"


Descripcin

01.02.05

m2

Longitud (m)

Cantidad

junta (m)

Junta de 0.90m

1.00

14.00

14.00

Junta de 1.60m

1.60

12.00

19.20

TOTAL

33.20 m

ESTRADO PARA DOCENTE


ENCOFRADO Y DESENCOFRADO PARA ESTRADO DE DOCENTE
Descripcin

Cantidad

Perimetro (m)

h (m)

Area Total(m)

ESTRADO

6.00

18.80

0.45

50.76

ESTRADO SUM

0.00

0.00

0.00

TOTAL

50.76 m

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 12 CM


Descripcin

Cantidad

Area CAD (m)

h (m)

Volumen(m)

1 Planta

1.00

228.44

0.05

11.42

2 Planta

1.00

271.19

0.05

13.56

3 Planta

1.00

271.19

0.05

TOTAL

770.82 m

13.56
38.54 m

PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO


Descripcin

Area CAD (m)

Cantidad

Area Total

1 Planta

228.44

1.00

228.44

2 Planta

271.19

1.00

271.19

3 Planta

271.19

1.00

271.19

TOTAL

770.82 m

RELLENO CON BLOQUES DE TECKNOPORT 0.12 x 0.30 x 1.20 m


Descripcin

Area CAD (m)

Cantidad

Estrado 2 Planta

0.00

6.00

Area Total
0.00

TOTAL

0.00 m

CONTRAZOCALOS
CONTRAZOCALO CEMENTO SIN COLOREAR H = 30 cm

Descripcin

Area (m)

Eje H-H, Entre Eje 16-16 y Eje 21-21

1.76

PERIMETRO
ZOCALO(m)
5.85

Eje H-H, Entre Eje 16-16 y Eje 21-21

2.26

2.00

1 Planta

2 Planta

3 Planta

01.02.07

Eje I-I, Entre Eje 20-20 y Eje 21-21

0.67

14.65

Eje J-J, Entre Eje 16-16 y Eje 21-21

2.11

5.58

Eje K-K, Entre Eje 16-16 y Eje 21-21

5.08

6.25

Eje 16-16, Entre Eje H-Hy Eje K-K

0.80

9.25

Eje 16-16, Entre Eje H-Hy Eje K-K

0.40

11.30

Eje 17-17, Entre Eje H-Hy Eje K-K

1.37

1.00

Eje 18-18, Entre Eje H-Hy Eje J-J

0.70

6.50

Eje 19-19, Entre Eje H-Hy Eje J-J

0.81

5.80

Eje 20-20, Entre Eje H-Hy Eje K-K

1.40

5.41

Eje 21-21, Entre Eje H-Hy Eje K-K

0.37

6.10

Eje 21-21, Entre Eje H-Hy Eje K-K

0.40

7.00

Eje 21-21, Entre Eje H-Hy Eje K-K

0.43

1.70

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.72

6.00

Eje H-H, Entre Eje 16-16 y Eje 21-21

3.68

19.05

Eje K-K, Entre Eje 16-16 y Eje 21-21

5.08

4.35

Eje 16-16, Entre Eje H-H y Eje K-K

1.40

18.05

Eje 17`-17`, Entre Eje H-H y Eje K-K

1.40

7.08

Eje 18-18, Entre Eje H-H y Eje K-K

1.40

7.00

Eje H-H, Entre Eje 16-16 y Eje 21-21

0.72

6.00

Eje H-H, Entre Eje 16-16 y Eje 21-21

3.68

19.05

Eje K-K, Entre Eje 16-16 y Eje 21-21

5.08

4.35

Eje 16-16, Entre Eje H-H y Eje K-K

1.40

18.05

Eje 17`-17`, Entre Eje H-H y Eje K-K

1.40

7.08

Eje 18-18, Entre Eje H-H y Eje K-K

1.40

7.00

TOTAL

45.88 m

211.45 m

CARPINTERIA DE MADERA

01.02.07.01

PUERTA VENTANA DE TABLERO CON OJO DE BUEY 1.00 x 2.76 m, Hvent. = 0.56m (Incluye Cerradura)

pza

12.00

01.02.07.02

PUERTA DE TABLERO 0.90 x 2.20 m, (Incluye Cerradura)

pza

2.00

m2

95.02

7.94

13.72

01.02.08

CARPINTERIA METALICA

01.02.08.01

1 Planta

2 Planta

3 Planta

01.02.08.02

VENTANA DE FIERRO
Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Area Total(m)

V - 13

2.63

1.20

1.80

1.00

4.73

V - 14

2.00

1.20

1.80

2.00

7.20

V - 15

3.28

1.20

1.80

2.00

11.81

V - 16

1.06

1.20

1.80

2.00

3.82

V - 17

0.99

2.40

0.60

1.00

0.59

V - 18

1.16

2.40

0.60

1.00

0.70

V - 19

3.13

1.20

1.80

2.00

11.27

V - 20

2.78

1.20

1.80

3.00

15.01

V - 21

3.78

1.20

1.80

1.00

6.80

V - 19

3.13

1.20

1.80

2.00

11.27

V - 20

2.78

1.20

1.80

3.00

15.01

V - 21

3.78

1.20

1.80

1.00

6.80

TOTAL

95.02 m

BARANDA DE TUBO CUADRADO EN ESCALERA


Descripcin

Longitud

Tramo Inclinado Inicial Izquierdo

2.94

Tramo Inclinado Inicial Derecho

2.87

Descanso Interseccin Tramo Inicial con Tramo Final

0.10

Tramo Inclinado Final Izquierdo

3.10

Tramo Inclinado Final Derecho

2.91

Tramo de llegada Final Izquierdo

1.80

TOTAL
01.02.08.03

Pasamano

Pasamano

13.72 m

PASAMANOS CON CUBIERTA DE ALUMINIO

01.02.08.04

TUBO DE FIERRO 1 1/2" EN PARAPETO PARA AULAS


Unicacin

Long. (m)

Cantidad

Longitud (m)

2 PLANTA

Eje H'- H'

28.65

1.00

28.65

2 PLANTA

Eje 21'- 21'

6.75

01.02.08.05

Unicacin

Long.
Parapeto (m)

Cantidad

Tramo A-B Lateral

1.45

Tramo A-B

3.06

Tramo B-C

01.02.09.01

01.02.10
01.02.10.01

Long. (m)

f 1/4"

Peso (kg)

0.00

0.70

0.00

0.00

0.70

0.00

2.91

0.00

0.70

0.00

Tramo C-D

2.91

0.00

0.70

0.00

Tramo D-E

2.91

0.00

0.70

0.00

Tramo E-F

2.91

0.00

0.70

0.00

Tramo F-G

3.06

0.00

0.70

0.00

Tramo H-I

2.90

0.00

0.70

0.00

Tramo O-P Lateral

1.45

0.00

0.70

0.00

Tramo O-P

3.06

0.00

0.70

0.00

Tramo N-O

2.91

0.00

0.70

0.00

Tramo M-N

2.91

0.00

0.70

0.00

Tramo L-M

2.91

0.00

0.70

0.00

Tramo K-L

2.91

0.00

0.70

0.00

Tramo J-K

3.06

0.00

0.70

0.00

TOTAL

0.00 kg

2 PLANTA
SEGUNDA PLANTA

01.02.09

6.75
35.40 m

ACERO fy=4200 kg/cm GRADO 60 PARA ARRIOSTRE DE PARAPETO

2 PLANTA
PRIMERA PLANTA

01.02.08.06

1.00
TOTAL

CANTONERAS DE ALUMINIO EN ESCALERAS


Descripcin

Cantidad

L cantonera (m)

L (m)

Tramo derecho

2.00

9.69

19.38

Tramo izquierdo

2.00

7.20

14.60

TOTAL

33.98 m

35.40

kg

0.00

33.98

p2

1,022.74

m2

1,537.10

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES NACIONALES
Descripcin

Area (m)

Area Ventanas

95.02

Area (pie)
1,022.74

TOTAL

1,022.74

PINTURA
PINTURA LATEX BLANCA EN CIELORRASO Y VIGAS
Descripcin

Area CAD (m)

Area 1 Planta de Aligerado

408.44 m

Area Techo Aligerado

531.71 m

Vigas Portantes, de Amarre, en Voladizo y de confinamiento


TOTAL

596.95
1537.10 m

01.02.10.02

PINTURA LATEX EN MUROS INTERIORES

m2

1,359.84

01.02.10.03

PINTURA LATEX EN MUROS EXTERIORES

m2

1,227.32

01.02.10.04

PINTURA ANTICORROSIVA Y ESMALTE EN VENTANAS

m2

31.67

47.26

01.02.11
01.02.11.01

TUBERAS PARA EVACUACIN DE AGUAS DE LLUVIA


TUBERIA DE PVC SAL 4" (Montante Aguas de Lluvia)
Descripcin

Longitud

Tuberia Frontal Escalera

1.70

Tuberia Posterior Escalera

15.52

Tuberia Frontal Aulas

15.02

Tuberia Posteior Aulas

15.02

TOTAL

47.26 m

01.02.11.02

CODO DE PVC SAL DE 4" x 90

pza

7.00

01.02.11.03

CODO DE PVC SAL DE 4" x 45

pza

22.00

01.02.11.04

TUBERIA DE PVC SAL DE 4" (Evacuacin aguas de Lluvia)

14.50

m3

0.45

m3

0.51

m2

1.92

0.70

01.02.12
01.02.12.01

01.02.12.02

CAJAS DE TRANSICIN DE AGUAS DE LLUVIA


EXCAVACION DE ZANJA PARA CAJA DE TRANSICIN
Ubicacin Caja de Transicin de Aguas
de Lluvia

Area (m)

h (m)

Volumen (m)

Lado derecho BLOQUE II

0.64

0.70

0.45

CONCRETO f'c=175 kg/cm2 PARA CAJA DE TRANSICION

Ubicacin Caja de Transicin de Aguas Area CAD Secc.


Transversal (m)
de Lluvia
Lado derecho BLOQUE II
01.02.12.03

01.02.12.04

01.03
01.03.01

Longitud (m)

Volumen (m)

2.80

0.51

0.18

ENCOFRADO Y DESENCOFRADO PARA CAJA DE TRANSICIN


Ubicacin Caja de Transicin de Aguas
de Lluvia

Area (m)

Lado Izquierdo Aula 102, Interior

1.92

REJILLA PARA CAJA DE TRANSICIN DE AGUAS DE LLUVIA


Descripcin

L (m)

Lado Izquierdo Aula 102, Interior

0.7

INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y FUERZA

01.03.01.01

SALIDA PARA CENTRO DE LUZ

pto

96.00

01.03.01.02

SALIDA PARA BRAQUETE

pto

10.00

01.03.01.03

SALIDA TOMACORRIENTE

pto

57.00

01.03.02

CANALIZACIONES Y/O TUBERAS

01.03.02.01

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 20mm (3/4")

712.22

01.03.02.02

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 13mm (5/8")

294.05

01.03.02.03

TUBERIA FIERRO GALVANIZADO PARA POZO A TIERRA

9.88

01.03.03

CONDUCTORES Y/O CABLES

01.03.03.01

CABLE ELECTRICO TW AWG-MCM # 10 -5.3 mm2

40.20

01.03.03.02

CABLE ELECTRICO TW AWG-MCM # 12 -4.0 mm2

922.79

01.03.03.03

CABLE ELECTRICO TW AWG-MCM # 14 -2.5 mm2

1,939.88

01.03.03.04

CABLE ELECTRICO TW AWG-MCM # 16 -1.5 mm2

9.52

01.03.04

TABLEROS Y LLAVES DE INTERRUPCION

01.03.04.01

TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 6 CIRCUITOS

4.00

01.03.04.02

LLAVE INTERRUPTOR THERMOMAGNETICO DE 2 X 15 A

15.00

01.03.04.03

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 20 A

3.00

01.03.04.04

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 40 A

4.00

01.03.04.05

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 60 A

2.00

01.03.05

ARTEFACTOS

01.03.05.01

ARTEFACTO ADOSADO CON FLUORESCENTE 2 x 40w

62.00

01.03.05.02

LAMPARA INCANDESCENTE DE 1OO W

pza

29.00

01.03.05.03

FLUORESCENTE CIRCULAR 40 W

pza

4.00

01.03.05.04

BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 1OO W

10.00

TIMBRE PARA FORMACIN

1.00

1.00

6.00

01.03.05.05
01.03.06
01.03.06.01
02.07
02.07.01
02.07.01.01
02.07.02

POZO CONEXION A TIERRA


POZO CONEXION A TIERRA
VARIOS
PIZARRA
PIZARRA ACRILICA CON MARCO DE ALUMINIO 4 x 1.40m
MOBILIARIO

02.07.02.01

CARPETAS UNIPERSONALES

210.00

02.07.02.02

MESAS DE MADERA PARA COMEDOR

12.00

02.07.02.03

SILLAS DE MADERA PARA COMEDOR

48.00

02.07.02.04

PUPITRES DE MADERA

6.00

02.07.02.05

SILLAS DE MADERA PARA PUPITRES

6.00

glb

1.00

glb

1.00

02.07.03
02.07.03.01
02.07.04
02.07.04.01

EQUIPOS DE PROTECCION PERSONAL


EQUIPOS DE PROTECCION PERSONAL
FLETE
FLETE

02.01.02

02.01.03

02.01.03.02

02.01.04
02.01.05

1.1

02.01.06

02.01.07
02.01.08

02.01.10

02.01.10.01

02.01.10.02

02.01.10.02

02.01.10.02

02.01.11

02.01.11.01

02.01.11.02

02.01.11.02

02.01.11.02

02.01.11.02

02.01.11.03

02.01.11.03

02.01.11.03
02.02
02.02.01

02.02.02

02.02.03

02.02.04

02.03

02.04.08.

02.04.08.04

02.04.08.05

02.04.08.02

02.05

02.06

PLANILLA DE METRADOS
Item
01

Descripcin

Und.

Metrado

CONSTRUCCION DE PABELLON "D"

01.01

ESTRUCTURAS BLOQUE "I"

01.01.01

OBRAS PRELIMINARES

01.01.01.01

GIGANTOGRAFA DIGITAL DE 3.60 X 2.40 m

1.00

01.01.01.02

MOVILIZACION y DESMOVILIZACION DE EQUIPO

glb

1.00

01.01.01.03

CERCO PROVISIONAL DE SEGURIDAD DE OBRA

glb

1.00

01.01.01.04

DESMONTAJE DE COBERTURA DE ETERNIT

m2

612.50

m3

255.85

Descripcin

L (m)

B (m)

SITUACION ACTUAL

50.87

10.47

por techo inclin. Area CAD (m)

1.15
TOTAL

01.01.01.05

DEMOLICION DE MUROS DE ADOBE


Descripcin

sit. actual

01.01.01.06

612.50
612.50 m

L (m)

B (m)

cantidad

h (m)

Volumen (m)

muros long.

49.82

0.50

2.00

2.99

148.96

muros transersales

6.00

0.50

7.00

3.79

79.59

puertas (-)

1.05

0.50

6.00

2.00

6.30

ventanas (-)

1.00

2.00

21.00

0.50

21.00

42.00

TOTAL

255.85 m

54.60 m

DEMOLICION DE PISOS DE CONCRETO, INCLUYE FALSO PISO


Descripcin
SITUACION ACTUAL, inc. Vereda

L (m)

B (m)

Area CAD (m)

51.75

10.37

536.60

10.38

1.13

5.86

TOTAL

542.46 m

Area (m)

12.60

m2

542.46

01.01.01.07

DESMONTAJE DE PUERTAS

m2

12.60

01.01.01.08

DESMONTAJE DE VENTANAS

m2

42.00

01.01.01.09

LIMPIEZA DE TERRENO MANUAL

m2

571.18

m2

571.18

01.01.01.10

L (m)

B (m)

Area CAD (m)


265.02

Bloque I

25.12

10.55

ESCALERA

3.90

10.55

41.15

Bloque II

25.12

10.55

265.02

TOTAL

571.18 m

TRAZO DE NIVELES Y REPLANTEO

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

A (m)

B (m)

hexc (m)

Volumen (m)

Z-1

1.80

1.80

2.50

8.10

Area
nivelacion(m)
3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-2

1.80

1.80

2.50

8.10

3.24

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-3

2.20

2.20

2.50

12.10

4.84

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

Z-1

1.80

1.80

2.50

8.10

3.24

TOTAL

226.20 m

90.48 m

Descripcin Zapatas

EJE A

EJE B

EJE C

EJE D

EJE E

EJE F
EJE G
EJE H

EJE I

m3

EXCAVACION PARA ZAPATAS y VIGAS RIOSTRAS DE CIMENTACION HASTA 2.00m TERRENO NORMAL

250.59

L (m)

b (m)

hexc (m)

Volumen (m)

Tramo 1-2

1.15

0.500

1.00

0.58

Area
Nivelacion(m)
0.58

Tramo 2-3

1.15

0.500

1.00

0.58

0.58

Tramo 1-2

1.10

0.500

1.00

0.55

0.55

Tramo 2-3

1.15

0.500

1.00

0.58

0.58

Tramo 1-2

1.15

0.500

1.00

0.58

0.58

Tramo 2-3

1.15

0.500

1.00

0.58

0.58

Tramo 1-2

1.16

0.500

1.00

0.58

0.58

Tramo 2-3

1.15

0.500

1.00

0.58

0.58

Tramo A-B

1.85

0.500

1.00

0.93

0.93

Tramo B-C

2.70

0.500

1.00

1.35

1.35

Tramo C-D

2.65

0.500

1.00

1.33

1.33

Tramo D-E

2.85

0.500

1.00

1.43

1.43

Tramo E-F

2.80

0.500

1.00

1.40

1.40

Tramo F-G

2.55

0.500

1.00

1.28

1.28

Tramo G-H

2.66

0.500

1.00

1.33

1.33

Tramo H-I

1.75

0.500

1.00

0.88

0.88

Tramo A-B

1.85

0.500

1.00

0.93

0.93

Tramo B-C

2.70

0.500

1.00

1.35

1.35

Tramo C-D

2.65

0.500

1.00

1.33

1.33

Tramo D-E

2.85

0.500

1.00

1.43

1.43

Tramo E-F

2.80

0.500

1.00

1.40

1.40

Tramo F-G

2.55

0.500

1.00

1.28

1.28

Tramo G-H

2.66

0.500

1.00

1.33

1.33

Tramo H-I

1.75

0.500

1.00

0.88

0.88

TOTAL

24.39 m

24.39 m

Vigas Riostras
EJE A
EJE C
EJE E
EJE G

EJE 1

EJE 3

01.01.02.02

m3

EXCAVACION PARA CUNETAS


Descripcin
BLOQUE D

L (m)

B (m)

hexc (m)

Volumen (m)

35.00

0.40

0.40

5.60

TOTAL

5.60 m

5.60

01.01.02.03

RELLENO CON MATERIAL PROPIO


Descripcin

250.59

Vol.Solado Concreto (Mejoramiento de suelo de Fundacin)

13.57

Vol. Afirmado (Mejoramiento de suelo de Fundacin)

18.10

Vol.OVER (Mejoramiento de suelo de Fundacin)

36.19

Volumen de Afirmado en Vigas Riostras de Cimentacin

19.51

Volumen de C en Zapatas

54.29

Volumen de C Vigas Riostras de Cimentacin

20.15

Volumen de Sobrecimientos e = 0.25m

0.00

Volumen de Sobrecimientos e = 0.15m

01.01.02.04

ELIMINACION DE MATERIAL EXCEDENTE (A MANO USANDO CARRETILLA, DISTANCIA PROMEDIO DE 30M)


Descripcin

250.59
310.10

Vol. De relleno (-)


Total
NIVELACION INTERIOR Y APISONADO
Ubicacin

Area (CAD)

PARA VIGAS RIOSTRAS DE CIMENTACIN

24.39

PARA ZAPATAS

90.48

EN FALSO PISO BLOQUE I Y ESCALERA

300.50

EN FALSO PISO BLOQUE II

262.50

PIEDRA GRANDE "OVER" Dimetro Mn. 4", Mx. 8"


Area nivelacion

h(m)

Volumen (m)

90.48

0.40

36.19

Total

36.19

AFIRMADO PARA MEJORAMIENTO DE SUELO DE FUNDACION, e = 20 cm


Descripcin

Area nivelacion

h(m)

Volumen (m)

90.48

0.20

18.10

Total

18.10

PARA ZAPATAS

AFIRMADO PARA VIGAS RIOSTRAS DE CIMENTACIN e = 20 cm (DOS CAPAS)


Descripcin

Area nivelacion

h(m)

PARA VIGAS RIOSTRAS DE CIMENTACIN 1 CAPA

24.39

0.20

PARA VIGAS RIOSTRAS DE CIMENTACIN 2 CAPA

24.39

0.20

Total
01.01.03.04

Descripcin

36.19

m2

90.48

m2

48.78

m2

1,126.00

m3

13.57

Area nivelacion
563.00
563.00

EN FALSO PISO aulas y veredas, escalera 2 capa


Total

01.01.04.01

m3

48.78

AFIRMADO PARA MEJORAMIENTO DE SUELO EN PISOS, e = 20 cm (DOS CAPAS)

EN FALSO PISO aulas y veredas, escalera 1 capa

01.01.04

563.00

MEJORAMIENTO DE SUELO DE FUNDACION

Descripcin

01.01.03.03

677.87

677.87

PARA ZAPATAS

01.01.03.02

m2

95.66
558.03 m

Total

01.01.03.01

558.03

Volumen (m)

Volumen proveniente de demolicion muros adobe y pisos

01.01.03

m3

5.60
95.66 m

Volumen Excavado en zapatas y vigas riostras

01.01.02.05

95.66

Volumen (m)

Volumen Excavado en zapatas y vigas riostras

Total

m3

1126.00

OBRAS DE CONCRETO SIMPLE


CONCRETO f'c=140 kg/cm e= 0.15 m, SOLADO
Descripcin
PARA ZAPATAS

Area nivelacion

h(m)

Volumen (m)

90.48

0.15

13.57

Total

13.57

01.01.04.02

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 10 CM


Descripcin

01.01.04.03
01.01.04.04.01

EJE A-A
EJE E-E
EJE G-G

EJE J-J
EJE N-N
EJE P-P

01.01.04.04.02

EJE 1-1

EJE 3-3

EJE 1-1

EJE 3-3

m3

1.91

m3

0.00

m3

5.60

563.00
Total

563.00

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA


Descripcin

563.00

Area nivelacion

EN FALSO PISO aulas y veredas, escalera

01.01.04.03

m2

b (m)

L (m)

hc

Volumen (m)

ESCALERA CC1

0.40

1.65

0.70

0.46

CC2

0.40

7.24

0.50

1.45

Total

1.91

SOBRECIMIENTOS
CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.25 m
Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

1-2

0.25

0.00

0.50

0.00

0.00

2-3

0.25

0.00

0.50

0.00

0.00

1-2

0.25

0.00

0.50

0.00

0.00

2-3

0.25

0.00

0.50

0.00

0.00

1-2

0.25

0.00

0.50

0.00

0.00

2-3

0.25

0.00

0.50

0.00

0.00

1-2

0.25

0.00

0.50

0.00

0.00

2-3

0.25

0.00

0.50

0.00

0.00

1-2

0.25

0.00

0.50

0.00

0.00

2-3

0.25

0.00

0.50

0.00

0.00

1-2

0.25

0.00

0.50

0.00

0.00

2-3

0.25

0.00

0.50

0.00

0.00

Total

0.00

0.00

CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS e = 0.15 m


Descripcin

b (m)

L (m)

hc

Volumen (m)

Area encof (m2)

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

2.31

0.50

0.17

2.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

2.31

0.50

0.17

2.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

2.46

0.50

0.18

2.46

A-B

0.15

3.46

0.50

0.26

3.46

B-C

0.15

3.31

0.50

0.25

3.31

C-D

0.15

3.31

0.50

0.25

3.31

D-E

0.15

3.31

0.50

0.25

3.31

E-F

0.15

3.31

0.50

0.25

3.31

F-G

0.15

3.46

0.50

0.26

3.46

J-K

0.15

2.46

0.50

0.18

2.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

2.31

0.50

0.17

2.31

N-O

0.15

2.31

0.50

0.17

2.31

O-P

0.15

3.46

0.50

0.26

3.46

J-K

0.15

3.46

0.50

0.26

3.46

K-L

0.15

3.31

0.50

0.25

3.31

L-M

0.15

3.31

0.50

0.25

3.31

M-N

0.15

3.31

0.50

0.25

3.31

N-O

0.15

3.31

0.50

0.25

3.31

O-P

0.15

3.46

0.50

0.26

3.46

Total

5.60

74.64

01.01.04.04.03
01.01.04.04
01.01.04.05.01

01.01.04.05.02

01.01.04.05.03

01.01.05
01.01.05.01
01.01.05.01.01

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

74.69

m3

1.35

m2

47.49

15.30

m3

54.29

kg

1,666.07

CUNETAS
CONCRETO f'c=175 kg/cm2 PARA CUNETAS

Descripcin

L (m)

e (m)

Area Cuneta
(m)

Volumen (m)

BLOQUE I

67.84

0.10

0.11

0.71

BLOQUE II

58.04

0.10

0.11

0.64

TOTAL

1.35

ENCOFRADO Y DESENCOFRADO CUNETAS

Descripcin

L (m)

h (m)

BLOQUE I

67.84

0.35

Area Cuneta
(m)
47.49

BLOQUE II

58.04

0.35

40.63

TOTAL

47.49

JUNTAS ASFALTICAS EN CUNETAS, e = 1"

Descripcin

L (m)

cantidad (m)

h (m)

BLOQUE I

67.84

17.00

0.90

Area Cuneta
(m)
15.30

BLOQUE II

58.04

15.00

0.90

13.50

TOTAL

15.30

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
Descripcin
PARA ZAPATAS

01.01.05.01.02

m2

ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS

Area nivelacion

h(m)

Volumen (m)

90.48

0.60

54.29

Total

54.29

01.01.05.02
01.01.05.02.01

VIGAS RIOSTRAS DE CIMENTACIN


CONCRETO f'c=175 kg/cm2 PARA VIGAS DE CIMENTACION
Vigas Riostras

EJE A
EJE E
EJE G
EJE H
EJE I

EJE 1

EJE 3

EJE J-J
EJE N-N
EJE P-P

EJE 1

EJE 3

L (m)

b (m)

h (m)

Volumen (m)

Area encof (m2)

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo 1-2

3.78

0.300

0.50

0.57

3.78

Tramo 2-3

2.13

0.300

0.50

0.32

2.13

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.46

0.300

0.50

0.52

3.46

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo A-B

3.46

0.300

0.50

0.52

3.46

Tramo B-C

3.31

0.300

0.50

0.50

3.31

Tramo C-D

3.31

0.300

0.50

0.50

3.31

Tramo D-E

3.31

0.300

0.50

0.50

3.31

Tramo E-F

3.31

0.300

0.50

0.50

3.31

Tramo F-G

3.31

0.300

0.50

0.50

3.31

Tramo H-I

3.30

0.300

0.50

0.50

3.30

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo 1-2

2.95

0.300

0.50

0.44

2.95

Tramo 2-3

2.95

0.300

0.50

0.44

2.95

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

Tramo J-K

3.46

0.300

0.50

0.52

3.46

Tramo K-L

3.31

0.300

0.50

0.50

3.31

Tramo L-M

3.31

0.300

0.50

0.50

3.31

Tramo M-N

3.31

0.300

0.50

0.50

3.31

Tramo N-O

3.31

0.300

0.50

0.50

3.31

Tramo O-P

3.46

0.300

0.50

0.52

3.46

TOTAL

20.15 m

134.31 m2

m3

20.15

01.01.05.02.02

ENCOFRADO Y DESENCOFRADO EN VIGAS RIOSTRAS DE CIMENTACION

m2

134.31

01.01.05.02.03

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS RIOSTRAS DE CIMENTACION

kg

2,351.49

01.01.05.03
01.01.05.03.01

PLACAS Y COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2

m3

Descripcin Columnas

Area (m)

Permetro (m)

h (m)

C - A1

0.21

2.00

6.66

Area de
Encofrado (m)
13.32

C - B1

0.15

1.60

6.66

10.66

1.00

C - C1

0.26

3.00

6.66

19.98

1.70

C - D1

0.15

1.60

6.66

10.66

1.00

C - E1

0.26

3.00

6.66

19.98

1.70

C - F1

0.15

1.60

6.66

10.66

1.00

C - G1

0.21

2.00

6.66

13.32

1.40

C - H1

0.13

1.50

7.49

11.24

0.94

C - I1

0.13

1.50

7.49

11.24

0.94

C - A2

0.12

1.40

7.25

10.15

0.87

C - E2

0.12

1.40

7.25

10.15

0.87

C - G2

0.12

1.40

7.25

10.15

0.87

C - H1'

0.10

1.30

7.91

10.28

0.79

C - I1'

0.10

1.30

7.91

10.28

0.79

C - A3

0.21

2.00

6.66

13.32

1.40

C - B3

0.15

1.60

6.66

10.66

1.00

C - C3

0.26

3.00

6.66

19.98

1.70

C - D3

0.15

1.60

6.66

10.66

1.00

C - E3

0.26

3.00

6.66

19.98

1.70

C - F3

0.15

1.60

6.66

10.66

1.00

C - G3

0.21

2.00

6.66

13.32

1.40

C - H3

0.13

1.50

7.16

10.74

0.90

C - I3

0.13

1.50

7.16

10.74

0.90

falsa columna

0.05

0.60

1.80

1.08

0.08

Volumen (m)
1.40

C - J1

0.21

2.00

6.66

13.32

1.40

C - K1

0.15

1.60

6.66

10.66

1.00

C - L1

0.26

3.00

6.66

19.98

1.70

C - M1

0.15

1.60

6.66

10.66

1.00

C - N1

0.26

3.00

6.66

19.98

1.70

C - O1

0.15

1.60

6.66

10.66

1.00

C - P1

0.21

2.00

6.66

13.32

1.40

C - J2

0.12

1.40

7.25

10.15

0.87

C - N2

0.12

1.40

7.25

10.15

0.87

C - P2

0.12

1.40

7.25

10.15

0.87

C - J3

0.21

2.00

6.66

13.32

1.40

C - K3

0.15

1.60

6.66

10.66

1.00

C - L3

0.26

3.00

6.66

19.98

1.70

C - M3

0.15

1.60

6.66

10.66

1.00

C - N3

0.26

3.00

6.66

19.98

1.70

C - O3

0.15

1.60

6.66

10.66

1.00

C - P3

0.21

2.00

6.66

13.32

1.40

falsa columna

0.07

0.30

1.80

0.54

0.12

TOTAL

521.31 m

47.43 m

47.43

01.01.05.03.02

BLOQUE I, 1 NIVEL

BLOQU I, 2 NIVEL

BLOQUE II, 1 NIVEL

BLOQU II, 2 NIVEL

CONCRETO f'c=175 kg/cm2 PARA COLUMNAS DE CONFINAMIENTO

5.22

m3

Descripcin

Area (m)

Permetro (m)

h (m)

Cantidad

Col. Conf. Eje1, Tramo AB

0.030

0.550

2.16

2.00

Area de
Encofrado (m)
1.04

Col. Conf. Eje1, Tramo BC

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo CD

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo DE

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo EF

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo FG

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo AB

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo BC

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo CD

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo DE

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo EF

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje1, Tramo AB

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo BC

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo CD

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo DE

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo EF

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo FG

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo AB

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo BC

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo CD

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo DE

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo EF

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.46

0.07

Col. Parapeto Eje3, Tramo AB

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo BC

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo CD

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo DE

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo EF

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo FG

0.030

0.550

1.10

2.00

0.61

0.07

Col. Parapeto Eje3, Tramo GH

0.030

0.550

1.10

2.00

0.61

0.07

Volumen (m)
0.13

Col. Conf. Eje1, Tramo JK

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo KL

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo LM

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo MN

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo NO

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo OP

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo JK

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo KL

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo LM

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo MN

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo NO

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje1, Tramo JK

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo KL

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo LM

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo MN

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo NO

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje1, Tramo OP

0.030

0.550

2.16

2.00

1.04

0.13

Col. Conf. Eje3, Tramo JK

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo KL

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo LM

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo MN

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo NO

0.030

0.550

1.10

2.00

0.46

0.07

Col. Conf. Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.46

0.07

Col. Parapeto Eje3, Tramo JK

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo KL

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo LM

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo MN

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo NO

0.030

0.550

1.10

1.00

0.61

0.03

Col. Parapeto Eje3, Tramo OP

0.030

0.550

1.10

2.00

0.61

0.07

TOTAL

43.70 m

5.22 m

01.01.05.03.03

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

565.01

01.01.05.03.04

ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS

kg

8,769.26

m3

52.04

01.01.05.04
01.01.05.04.01

BLOQUE I, 1 NIVEL

BLOQUE I, 2 NIVEL

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2

Descripcin

L (m)

b (m)

h (m)

V 101 - 1-2 - A

2.950

0.300

0.450

V 101 - 2-3 - A

2.950

0.300

0.450

V 102 - 1-3 - B

6.300

0.300

0.450

V 102 - 1-3 - C

6.300

0.300

0.450

V 102 - 1-3 - D

6.300

0.300

0.450

V 101 - 1-2 - E

2.950

0.300

0.450

V 101 - 2-3 - E

2.950

0.300

0.450

V 102 - 1-3 - F

6.300

0.300

0.450

V 101 - 1-2 - G

2.950

0.300

0.450

V 101 - 2-3 - G

2.950

0.300

0.450

V 103 - 1-1' - H

2.125

0.250

0.400

V 104 - 1'-3 - H

3.775

0.250

0.400

V 103 - 1-1' - I

2.125

0.250

0.400

V 104 - 1'-3 - I

3.775

0.250

0.400

VA 101 - AB - 1

3.460

0.250

0.300

VA 102 - BC - 1

3.310

0.250

0.300

VA 102 - CD - 1

3.310

0.250

0.300

VA 101 - DE - 1

3.310

0.250

0.300

VA 101 - EF- 1

3.310

0.250

0.300

VA 101 - FG- 1

3.460

0.250

0.300

V 105 - HI- 1

3.300

0.250

0.400

V 104 - HI- 1'

3.300

0.250

0.400

V ESCALERA

3.300

0.250

0.400

VA 101 - AB - 3

3.460

0.250

0.300

VA 102 - BC - 3

3.310

0.250

0.300

VA 102 - CD - 3

3.310

0.250

0.300

VA 101 - DE - 3

3.310

0.250

0.300

VA 101 - EF- 3

3.310

0.250

0.300

VA 101 - FG- 3

3.460

0.250

0.300

VA 103 - HI- 3

3.300

0.250

0.400

VV - 101 - A

1.600

0.300

0.450

VV - 101 - B

1.600

0.300

0.450

VV - 101 - C

1.600

0.300

0.450

VV - 101 - D

1.600

0.300

0.450

VV - 101 - E

1.600

0.300

0.450

VV - 101 - F

1.600

0.300

0.450

VV - 101 - G

1.600

0.300

0.450

VV - 102 - H

1.600

0.250

0.400

VV - 102 - I

1.600

0.250

0.400

V 201 - 1-2 - A

3.700

0.300

0.450

V 201 - 2-3 - A

3.700

0.300

0.450

V 202 - 1-3 - B

3.700

0.300

0.450

V 202 - 2-3 - B

3.700

0.300

0.450

V 201 - 1-2 - C

3.700

0.300

0.450

V 201 - 2-3 - C

3.700

0.300

0.450

V 201 - 1-2 - D

3.700

0.300

0.450

V 201 - 2-3 - D

3.700

0.300

0.450

V 202 - 1-2 - E

3.700

0.300

0.450

V 202 - 2-3 - E

3.700

0.300

0.450

V 202 - 1-2 - F

3.700

0.300

0.450

V 202 - 2-3 - F

3.700

0.300

0.450

V 202 - 1-2 - G

3.700

0.300

0.450

V 202 - 2-3 - G

3.700

0.300

0.450

V 203 - 1-1' - H

2.630

0.250

0.400

V 203 - 1'-3 - H

4.310

0.250

0.400

V 204 - 1-1' - I

2.630

0.250

0.400

Ai (m)

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.100
0.100

Af (m)

0.060
0.060
0.060
0.060
0.060
0.060
0.060
0.050
0.050

Area Encofrado
(m)

3.540
3.540
7.560
7.560
7.560
3.540
3.540
7.560
3.540
3.540
2.231
3.964
2.231
3.964
2.941
2.814
2.814
2.814
2.814
2.941
3.465
3.465
3.465
2.941
2.814
2.814
2.814
2.814
2.941
3.465
1.920
1.920
1.920
1.920
1.920
1.920
1.920
1.680
1.680
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
2.762
4.526
2.762

Volumen
(m)

0.398
0.398
0.851
0.851
0.851
0.398
0.398
0.851
0.398
0.398
0.213
0.378
0.213
0.378
0.260
0.248
0.248
0.248
0.248
0.260
0.330
0.330
0.330
0.260
0.248
0.248
0.248
0.248
0.260
0.330
0.156
0.156
0.156
0.156
0.156
0.156
0.156
0.120
0.120
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.263
0.431
0.263

BLOQUE I, 2 NIVEL

BLOQUE II, 1 NIVEL

V 204 - 1'-3 - I

4.310

0.250

0.400

VA 201 - AB - 1

3.460

0.250

0.300

VA 202 - BC - 1

3.310

0.250

0.300

VA 202 - CD - 1

3.310

0.250

0.300

VA 201 - DE - 1

3.310

0.250

0.300

VA 201 - EF - 1

3.310

0.250

0.300

VA 201 - FG - 1

3.460

0.250

0.300

VA 203 - HI - 1

3.300

0.250

0.300

VA 201 - AB - 3

3.460

0.250

0.300

VA 202 - BC - 3

3.310

0.250

0.300

VA 202 - CD - 3

3.310

0.250

0.300

VA 201 - DE - 3

3.310

0.250

0.300

VA 201 - EF - 3

3.310

0.250

0.300

VA 201 - FG - 3

3.460

0.250

0.300

VA 203 - HI - 3

3.300

0.250

0.300

V Cumb. AE - 2

16.900

0.350

0.170

V Cumb. EG - 2

7.630

0.350

0.170

V Cumb. HI - 1

3.300

0.250

0.400

VV - 201 - A

1.800

0.300

0.450

VV - 201 - B

1.800

0.300

0.450

VV - 201 - C

1.800

0.300

0.450

VV - 201 - D

1.800

0.300

0.450

VV - 201 - E

1.800

0.300

0.450

VV - 201 - F

1.800

0.300

0.450

VV - 201 - G

1.800

0.300

0.450

VV - 203 - H

1.800

0.300

0.450

VV - 203 - I

1.800

0.300

0.450

VV - 202 - A

1.100

0.300

0.450

VV - 202 - B

1.100

0.300

0.450

VV - 202 - C

1.100

0.300

0.450

VV - 202 - D

1.100

0.300

0.450

VV - 202 - E

1.100

0.300

0.450

VV - 202 - F

1.100

0.300

0.450

VV - 202 - G

1.100

0.300

0.450

VV - 204 - H

1.100

0.300

0.450

VV - 204 - I

1.100

0.300

0.450

V 101 - 1-2 - A

2.950

0.300

0.450

V 101 - 2-3 - A

2.950

0.300

0.450

V 102 - 1-3 - B

6.300

0.300

0.450

V 102 - 1-3 - C

6.300

0.300

0.450

V 102 - 1-3 - D

6.300

0.300

0.450

V 101 - 1-2 - E

2.950

0.300

0.450

V 101 - 2-3 - E

2.950

0.300

0.450

V 102 - 1-3 - F

6.300

0.300

0.450

V 101 - 1-2 - G

2.950

0.300

0.450

V 101 - 2-3 - G

2.950

0.300

0.450

VA 101 - AB - 1

3.460

0.250

0.300

VA 102 - BC - 1

3.310

0.250

0.300

VA 102 - CD - 1

3.310

0.250

0.300

VA 101 - DE - 1

3.310

0.250

0.300

VA 101 - EF- 1

3.310

0.250

0.300

VA 101 - FG- 1

3.460

0.250

0.300

VA 101 - AB - 3

3.460

0.250

0.300

VA 102 - BC - 3

3.310

0.250

0.300

VA 102 - CD - 3

3.310

0.250

0.300

VA 101 - DE - 3

3.310

0.250

0.300

VA 101 - EF- 3

3.310

0.250

0.300

VA 101 - FG- 3

3.460

0.250

0.300

VV - 101 - A

1.600

0.300

0.450

VV - 101 - B

1.600

0.300

0.450

VV - 101 - C

1.600

0.300

0.450

VV - 101 - D

1.600

0.300

0.450

VV - 101 - E

1.600

0.300

0.450

VV - 101 - F

1.600

0.300

0.450

VV - 101 - G

1.600

0.300

0.450

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051

4.526
2.941
2.814
2.814
2.814
2.814
2.941
2.805
2.941
2.814
2.814
2.814
2.814
2.941
2.805
11.661
5.265
3.465
2.160
2.160
2.160
2.160
2.160
2.160
2.160
2.160
2.160
1.320
1.320
1.320
1.320
1.320
1.320
1.320
1.320
1.320

0.431
0.260
0.248
0.248
0.248
0.248
0.260
0.248
0.260
0.248
0.248
0.248
0.248
0.260
0.248
1.006
0.454
0.330
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102
0.102

0.060
0.060
0.060
0.060
0.060
0.060
0.060

3.540
3.540
7.560
7.560
7.560
3.540
3.540
7.560
3.540
3.540
2.941
2.814
2.814
2.814
2.814
2.941
2.941
2.814
2.814
2.814
2.814
2.941
1.920
1.920
1.920
1.920
1.920
1.920
1.920

0.398
0.398
0.851
0.851
0.851
0.398
0.398
0.851
0.398
0.398
0.260
0.248
0.248
0.248
0.248
0.260
0.260
0.248
0.248
0.248
0.248
0.260
0.156
0.156
0.156
0.156
0.156
0.156
0.156

BLOQUE II, 2 NIVEL

V 201 - 1-2 - A

3.700

0.300

0.450

V 201 - 2-3 - A

3.700

0.300

0.450

V 202 - 1-3 - B

3.700

0.300

0.450

V 202 - 2-3 - B

3.700

0.300

0.450

V 201 - 1-2 - C

3.700

0.300

0.450

V 201 - 2-3 - C

3.700

0.300

0.450

V 201 - 1-2 - D

3.700

0.300

0.450

V 201 - 2-3 - D

3.700

0.300

0.450

V 202 - 1-2 - E

3.700

0.300

0.450

V 202 - 2-3 - E

3.700

0.300

0.450

V 202 - 1-2 - F

3.700

0.300

0.450

V 202 - 2-3 - F

3.700

0.300

0.450

V 202 - 1-2 - G

3.700

0.300

0.450

V 202 - 2-3 - G

3.700

0.300

0.450

VA 201 - AB - 1

3.460

0.250

0.300

VA 202 - BC - 1

3.310

0.250

0.300

VA 202 - CD - 1

3.310

0.250

0.300

VA 201 - DE - 1

3.310

0.250

0.300

VA 201 - EF - 1

3.310

0.250

0.300

VA 201 - FG - 1

3.460

0.250

0.300

VA 201 - AB - 3

3.460

0.250

0.300

VA 202 - BC - 3

3.310

0.250

0.300

VA 202 - CD - 3

3.310

0.250

0.300

VA 201 - DE - 3

3.310

0.250

0.300

VA 201 - EF - 3

3.310

0.250

0.300

VA 201 - FG - 3

3.460

0.250

0.300

V Cumb. AE - 2

16.900

0.350

0.170

V Cumb. EG - 2

7.630

0.350

0.170

VV - 201 - A

1.800

0.300

0.450

VV - 201 - B

1.800

0.300

0.450

VV - 201 - C

1.800

0.300

0.450

VV - 201 - D

1.800

0.300

0.450

VV - 201 - E

1.800

0.300

0.450

VV - 201 - F

1.800

0.300

0.450

VV - 201 - G

1.800

0.300

0.450

VV - 202 - A

1.100

0.300

0.450

VV - 202 - B

1.100

0.300

0.450

VV - 202 - C

1.100

0.300

0.450

VV - 202 - D

1.100

0.300

0.450

VV - 202 - E

1.100

0.300

0.450

VV - 202 - F

1.100

0.300

0.450

VV - 202 - G

1.100

0.300

0.450

0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135

0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
0.051
TOTAL

4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
4.440
2.941
2.814
2.814
2.814
2.814
2.941
2.941
2.814
2.814
2.814
2.814
2.941
11.661
5.265
2.160
2.160
2.160
2.160
2.160
2.160
2.160
1.320
1.320
1.320
1.320
1.320
1.320
1.320

0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.260
0.248
0.248
0.248
0.248
0.260
0.260
0.248
0.248
0.248
0.248
0.260
1.006
0.454
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.102
0.102
0.102
0.102
0.102
0.102
0.102

534.04 m

52.04 m

01.01.05.04.02

BLOQUE I, 1 NIVEL

BLOQU I, 2 NIVEL

BLOQUE II, 1 NIVEL

BLOQU II, 2 NIVEL

CONCRETO f'c=175 kg/cm2 PARA VIGAS DE CONFINAMIENTO

3.82

m3

Descripcin

Area (m)

Permetro (m)

L (m)

Cantidad

Conf. Eje1, Tramo AB

0.030

0.550

3.06

1.00

Area de
Encofrado (m)
1.53

Conf. Eje1, Tramo BC

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo DE

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo EF

0.030

0.550

2.16

1.00

1.04

0.06

Conf. Eje1, Tramo FG

0.030

0.550

2.06

1.00

0.98

0.06

Conf. Eje3, Tramo AB

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo BC

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo DE

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo FG

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo AB

0.030

0.550

2.66

1.00

1.31

0.08

Conf. Eje1, Tramo BC

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo DE

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo FG

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje3, Tramo AB

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo BC

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo CD

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo DE

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo EF

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo FG

0.030

0.550

3.06

1.00

1.53

0.09

Volumen (m)
0.09

Conf. Eje1, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo KL

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo MN

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo NO

0.030

0.550

2.16

1.00

1.04

0.06

Conf. Eje1, Tramo OP

0.030

0.550

2.06

1.00

0.98

0.06

Conf. Eje3, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo KL

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo MN

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo OP

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje1, Tramo JK

0.030

0.550

2.66

1.00

1.31

0.08

Conf. Eje1, Tramo KL

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo MN

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje1, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje1, Tramo OP

0.030

0.550

1.91

1.00

0.90

0.06

Conf. Eje3, Tramo JK

0.030

0.550

3.06

1.00

1.53

0.09

Conf. Eje3, Tramo KL

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo LM

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo MN

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo NO

0.030

0.550

2.91

1.00

1.45

0.09

Conf. Eje3, Tramo OP

0.030

0.550

3.06

1.00

1.53

0.09

TOTAL

62.91 m

3.82 m

01.01.05.04.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

596.95

01.01.05.04.04

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS

kg

6,414.52

01.01.05.05
01.01.05.05.01

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

67.71

m3
Factor para Techo
inclinado 00%

1 PLANTA
BLOQUE I y Escalera

1 PLANTA
BLOQUE II y Escalera

2 PLANTA
BLOQUE I y Escalera

2 PLANTA
BLOQUE II y Escalera

Descripcin Losa Aligerada

Area CAD(m)

1.000

espesor (m)

SECRETARIA

15.438

15.44

0.200

AULA 202

15.438

15.44

0.200

SALA DE PROFESORES

15.438

15.44

0.200

Voladizo

29.16

29.16

0.200

TOPICO

10.76

10.76

0.200

BIBLIOTECA

5.28

5.28

0.200

AULA 203

53.710

53.71

0.200

AULA 204

53.62

53.62

0.200

AULA 205

53.71

53.71

0.200

Voladizo Aula

35.16

35.16

0.200

TOTAL

287.71 m

Descripcin Losa Aligerada techo

Area (m)

Factor para Techo


inclinado 20%

1.020

espesor (m)

AULA 201

53.71

54.77

0.170

AULA 202

53.62

54.68

0.170

AULA 203

53.71

54.77

0.170

Voladizo Aula FRONTAL

41.97

42.80

0.170

Voladizo Aula posterior

26.37

26.89

0.170

Voladizo Aulalateral

8.8725

9.05

0.170

Escalera

21.62

22.05

0.170

Voladizo Escalera posterior

5.5

5.61

0.170

Voladizo Escalera front

9.18

0.170

Voladizo Escalera lateral

8.76

8.93

0.170

AULA 201

53.71

54.77

0.170

AULA 202

53.62

54.68

0.170

AULA 203

53.71

54.77

0.170

Voladizo Aula FRONTAL

41.97

42.80

0.170

Voladizo Aula posterior

26.37

26.89

0.170

Voladizo Aulalateral

8.8725

9.05

0.170

TOTAL

531.71 m

Dimensiones

N Lad / m

Area (m)

Cantidad Lad.

Volumen Total

Vol. Lad.

Vol. Ladrillos

0.30x0.30x0.15

8.333

287.713

2398.000

57.543

0.014

32.373

90.391

0.011

LADRILLO HUECO
1 Planta

0.30x0.30x0.12

01.01.05.05.02

1 Planta

531.710

4431.000

819.423

6,829.000

ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS


Descripcin (Bordes o Frisos)

Largo

Peralte

Area (m)

Borde aligerado AULAS

92.360

0.200

18.472

120.920

0.170

20.556

3.800

0.200

0.760

30.400

0.170

2 Planta
1 Planta

8.333
TOTAL

Borde alig. ESCALERA

2 Planta

Area Total de Aligerado FONDO

Vol.
Concreto
25.170

47.855

42.536

TOTAL

67.71 m

m2

864.38

5.168
819.423

TOTAL

864.38 m

01.01.05.05.03

ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS

kg

5,538.48

01.01.05.05.04

LADRILLO HUECO DE ARCILLA 15x30x30 PARA TECHO ALIGERADO h = 0.20

2,398.00

01.01.05.05.05

LADRILLO HUECO DE ARCILLA 12x30x30 PARA TECHO ALIGERADO h = 0.17

4,431.00

01.01.05.06
01.01.05.06.01

ESCALERAS
CONCRETO EN ESCALERAS f'c=210 kg/cm2
Descripcin

Escalera 1

01.01.05.06.02

Cimiento Escalera
Area Lateral Tramo Inicial
Area Descanso 1
Area Lateral Tramo Intermedio
Area Descanso 2
Area Lateral Tramo Final

L (m)

Volumen (m)

1.800

0.630

0.744

1.800

1.340

0.310

1.800

0.558

0.690

1.800

1.242

0.310

1.800

0.558

0.550

1.800

0.990

TOTAL

5.32 m

ENCOFRADO Y DESENCOFRADO EN ESCALERAS


Descripcin

Escalera 1

Area
0.350

m3

5.32

m2

23.83

Cantidad

B (m)

L (m)

Area Parc.

Area Total

1.00

1.80

1.58

2.84

2.84

0.69

1.38

Fondo de Tramo Inicial


Area Lateral Tramo Inicial
Contrapasos Tramo Inicial
fondo descanso 1
fondo tramo intermedio
Area Lateral Tramo Intermedio
Contrapasos Tramo Iintermedio
fondo descanso 2
Fondo de Tramo Final
Area Lateral Tramo Final
Contrapasos Tramo Final

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.58

2.84

2.84

0.55

1.10

2.00
5.00

1.80

0.19

0.34

1.71

1.00

1.80

1.80

3.24

3.24

1.00

1.80

1.87

3.37

3.37

0.00

0.00

2.00
7.00

1.80

0.19

0.34

2.39

TOTAL

23.83 m

01.01.05.06.03

ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS

kg

297.85

01.01.05.06.04

CURADO DE OBRAS DE CONCRETO CON ADITIVO (ANTISOL)

m2

2,184.47

110.48

6.00

01.01.06
01.01.06.01

ESTRUCTURAS METALICAS Y TECHADOS


CANALETA DE PLANCHA GALVANIZADA D=6"
Descripcin

Longitud (m)

Lado Posterior BLOQUE I

25.120

Lado Frontal BLOQUE I

25.120

Lado Posterior Escalera

5.000

Lado Frontal Escalera

5.000

Lado Posterior BLOQUE II

25.120

Lado Frontal BLOQUE II

25.120

TOTAL

110.48 m

01.01.06.02

CONO DE PLANCHA GALVANIZADA e = 0.30mm

01.01.06.03

COBERTURA DE TEJA ANDINA (1.14 x 0.72 x 5mm)

m2

594.32

55.24

Factor para
Techo inclinado
20%

01.01.06.04

Descripcin

b (m)

L (m)

Area (m)

1.020

Cobertura en BLOQUE I

10.55

25.12

265.02

270.26

Cobertura en Escalera

10.55

5.00

52.75

53.79

Cobertura en BLOQUE II

10.55

25.12

265.02

270.26

TOTAL

594.32 m

CUMBRERA PARA TEJA ANDINA

01.01.06.05

correas para fijar teja

01.02
01.02.01
01.02.01.01

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

VIGUETAS DE MADERA DE 1" x 2", PARA TECHO


Descripcin

L (m)

Cantidad

Lviga (m)

Cobertura en BLOQUE I

25.12

21.00

527.52

Cobertura en Escalera

5.00

21.00

105.00

Cobertura en BLOQUE II

25.12

21.00

527.52

TOTAL

1160.04 m

1,160.04

m2

0.00

ARQUITECTURA
ALBAILERIA
MUROS DE LADRILLO DE ARCILLA DE CABEZA, Mezcla 1:4 x 1.5 cm

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Muro Eje A, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje A, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje A, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje C, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje E, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje G, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje N, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

2.51

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

2.51

0.00

1.00

0.00

Muro Eje J, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje J, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje L, Tramo 1-3

0.25

3.00

0.00

1.00

0.00

Muro Eje N, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro EjeNE, Tramo 2-3

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 1-2

0.25

3.00

0.00

1.00

0.00

Muro Eje P, Tramo 2-3

0.25

3.00

0.00

1.00

Area Vano(m)

Area (m)

0.00
TOTAL

01.02.01.02

PRIMER NIVEL

PRIMER NIVEL

TERCER NIVEL

MUROS DE LADRILLO DE ARCILLA DE SOGA CON MEZCLA 1:4 X 1.5 cm

0.00 m
734.43

m2

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje L-L, Entre Eje 22-2 y Eje 26-26

0.15

3.00

5.85

1.00

Eje L-L, Entre Eje 22-2 y Eje 26-26

0.15

1.20

25.30

1.00

30.36

Eje M-M, Entre Eje 22-22 y Eje 26-26

0.15

3.00

35.30

1.00

105.90

Eje 22-22, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 24-24, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 25-25, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 26-26, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje L-L, Entre Eje 22-2 y Eje 26-26

0.15

3.00

5.85

1.00

17.55

Eje L-L, Entre Eje 22-2 y Eje 26-26

0.15

1.20

25.30

1.00

30.36

Eje M-M, Entre Eje 22-22 y Eje 26-26

0.15

3.00

35.30

1.00

105.90

Eje 22-22, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 23-23, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 24-24, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 25-25, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 26-26, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje L-L, Entre Eje 22-2 y Eje 26-26

0.15

3.00

5.85

1.00

17.55

Eje L-L, Entre Eje 22-2 y Eje 26-26

0.15

1.20

25.30

1.00

30.36

Eje M-M, Entre Eje 22-22 y Eje 26-26

0.15

3.00

35.30

1.00

105.90

Eje 22-22, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 23-23, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 24-24, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 25-25, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Eje 26-26, Entre Eje L-L y Eje M-M

0.15

3.00

6.50

1.00

19.50

Area Vano(m)

Area (m)

17.55

TOTAL
01.02.01.03

SEGUNDO NIVEL

TERCER NIVEL

PARAPETO DE LADRILLO DE ARCILLA DE SOGA, Mezcla 1:4 x 1.5 cm

1 PLANTA
Aulas 101, 102 y
Escaleras

92.28

m2

Descripcin

e (m)

H Hprom (m)

L (m)

N veces

Eje 1`-1`, Entre Eje A`-A` y Eje D`-D`

0.15

1.20

28.50

1.00

34.20

Eje D`-D`, Entre Eje 1`-1` y Eje 8`-8`

0.15

1.20

9.95

1.00

11.94

Eje 1`-1`, Entre Eje A`-A` y Eje D`-D`

0.15

1.20

28.50

1.00

34.20

Eje D`-D`, Entre Eje 1`-1` y Eje 8`-8`

0.15

1.20

9.95

1.00

76.90
01.02.01.04

734.43 m

Area Vano(m)

Area (m)

11.94
TOTAL

JUNTA CON TEKNOPORT e = 1"

92.28 m
m2

Descripcin

Longitud (m)

Ancho (m)

Cantidad

Area (m)

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

Tramo E-F-1

0.15

Tramo F-G-1

0.15

Tramo A-B-3

0.15

0.00

1 PLANTA
Aulas 101, 102 y
Escaleras

2 PLANTA
Aulas 201, 202 y
Escaleras

JUNTA SISMICA

1 PLANTA
BLOQUE II

2 PLANTA
BLOQUE II

01.02.02
01.02.02.01

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

Tramo A-B-1

0.15

Tramo B-C-1

0.15

Tramo C-D-1

0.15

Tramo D-E-1

0.15

Tramo E-F-1

0.15

Tramo F-G-1

0.15

Tramo A-B-3

0.15

Tramo B-C-3

0.15

Tramo C-D-3

0.15

Tramo D-E-3

0.15

Tramo E-F-3

0.15

Tramo F-G-3

0.15

1 PLANTA

0.15

1 PLANTA

0.2

Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

Tramo N-O-3

0.15

Tramo O-P-3

0.15

Tramo J-K-1

0.15

Tramo K-L-1

0.15

Tramo L-M-1

0.15

Tramo M-N-1

0.15

Tramo N-O-1

0.15

Tramo O-P-1

0.15

Tramo J-K-3

0.15

Tramo K-L-3

0.15

Tramo L-M-3

0.15

Tramo M-N-3

0.15

Tramo N-O-3

0.15

Tramo O-P-3

0.15

TOTAL

0.00 m

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA

Descripcin

Longitud (m)

Ancho (m)

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

734.43

PARAPETO DE LADRILLO DE ARCILLA DE SOGA

01.02.02.02

Longitud (m)

m2

826.71

92.28
0.150

11.54

TOTAL

838.25 m

TARRAJEO EN EXTERIORES

Descripcin

838.25

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

PARAPETO DE LADRILLO DE ARCILLA DE SOGA (Parte Superior)


76.900

m2

Ancho (m)

Area (m)

MUROS DE LADRILLO DE ARCILLA DE CABEZA

0.00

MUROS DE LADRILLO DE ARCILLA DE SOGA

734.43

PARAPETO DE LADRILLO DE ARCILLA DE SOGA

92.28
TOTAL

826.71 m

01.02.02.03

TARRAJEO DE SUPERFICIE Y ARISTAS DE COLUMNAS


Descripcin Columnas
area de encofrado de columnas
area de encofrado de columnas conf. Y parapeto
TOTAL

01.02.02.04

area de encofrado de vigas


area de encofrado de vigas confinamiento
TOTAL
01.02.02.05

Escalera

01.02.02.06

m2

596.95

m2

11.02

305.40

521.31
43.70
565.01 m

Area (m)
534.04
62.91
596.95 m

TARRAJEO DE SUPERFICIE Y ARISTAS DE ESCALERA

Descripcin

565.01

Area (m)

TARRAJEO DE SUPERFICIE Y ARISTAS DE VIGAS


Descripcin vigas

m2

Cantidad

Area Lateral Tramo Inicial

2.00

Contrapasos Tramo Inicial

9.00

Area Lateral Tramo Final

2.00

Contrapasos Tramo Final

9.00

B (m)

L (m)

1.85

Area Cad

Area

1.08

2.17

0.20

1.85

3.33
1.09

2.19

TOTAL

11.02 m

0.20

3.33

VESTIDURA DE DERRAMES EN VANOS (PUERTAS, VENTANAS)

Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Ancho
Derrame

Derrame (m)

1 Planta

Puerta -2

1.00

2.30

4.00

0.15

22.40

Puertas 2 Planta

Puerta 2

1.00

2.30

4.00

0.15

22.40

Puertas 3 Planta

Puerta 2

1.00

2.30

4.00

0.15

22.40

V-9

3.45

1.20

1.80

3.00

0.15

31.50

V - 10

2.95

1.20

1.80

3.00

0.15

28.50

V - 11

3.30

1.20

1.80

1.00

0.15

10.20

V - 22

2.80

1.20

1.80

1.00

0.15

9.20

V-9

3.45

1.20

1.80

3.00

0.15

31.50

V - 10

2.95

1.20

1.80

3.00

0.15

28.50

V - 11

3.30

1.20

1.80

1.00

0.15

10.20

V - 22

2.80

1.20

1.80

1.00

0.15

9.20

V-9

3.45

1.20

1.80

3.00

0.15

31.50

V - 10

2.95

1.20

1.80

3.00

0.15

28.50

V - 11

3.30

1.20

1.80

1.00

0.15

10.20

V - 22

2.80

1.20

1.80

1.00

0.15

9.20

TOTAL

305.40 m

1 Planta

2 Planta

3 Planta

01.02.02.07

VESTIDURA DE SUPERFICIE FONDO DE ESCALERA CON MORTERO 1:4 X 1.5 cm

m2

Descripcin

Cantidad

B (m)

L Cad (m)

Area

Fondo de Tramo Inicial

1.00

1.85

4.05

7.48

Fondo de Tramo Final

1.00

1.85

4.45

8.23

TOTAL

15.72 m

15.72

01.02.02.08

BLOQUE I

BLOQUE II

BRUAS

m
Descripcin

Seccin

C - A1

Cantidad
2.00

h1 (m)
2.61

h2 (m)
2.70

Brua (m)
10.62

C - B1

Rectangular

2.00

2.61

2.70

10.62

C - C1

2.00

2.61

2.70

10.62

C - D1

Rectangular

2.00

2.61

2.70

10.62

C - E1

2.00

2.61

2.70

C - F1

Rectangular

2.00

2.61

2.70

10.62

C - G1

2.00

2.61

2.70

10.62

C - A2

Rectangular

2.00

2.61

3.70

12.62

C - E2

Rectangular

2.00

2.61

3.70

12.62

C - G2

Rectangular

2.00

2.61

3.70

12.62

C - A3

2.00

2.61

2.70

10.62

C - B3

Rectangular

2.00

2.61

2.70

10.62

C - C3

2.00

2.61

2.70

10.62

C - D3

Rectangular

2.00

2.61

2.70

10.62

C - E3

2.00

2.61

2.70

10.62

C - F3

Rectangular

2.00

2.61

2.70

10.62

C - G3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

C - J1

2.00

2.61

2.70

10.62

C - K1

Rectangular

2.00

2.61

2.70

10.62

C - L1

2.00

2.61

2.70

10.62

C - M1

Rectangular

2.00

2.61

2.70

10.62

C - N1

2.00

2.61

2.70

C - O1

Rectangular

2.00

2.61

2.70

10.62

C - P1

2.00

2.61

2.70

10.62

C - J2

Rectangular

2.00

2.61

3.70

12.62

C - N2

Rectangular

2.00

2.61

3.70

12.62

C - P2

Rectangular

2.00

2.61

3.70

12.62

C - J3

2.00

2.61

2.70

10.62

C - K3

Rectangular

2.00

2.61

2.70

10.62

C - L3

2.00

2.61

2.70

10.62

C - M3

Rectangular

2.00

2.61

2.70

10.62

C - N3

2.00

2.61

2.70

10.62

C - O3

Rectangular

2.00

2.61

2.70

10.62

C - P3

2.00

2.61

2.70

10.62

COL.CONF.

Rectangular

12.00

1.96

1.96

47.04

VIGAS.CONF.

Rectangular

6.00

15.76

15.76

189.12

TOTAL

824.16 m

824.16

01.02.03
01.02.03.01

CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

Descripcin

Area

1 Planta

Area Planta Aligerado BLOQUE I Y


ESCALERA

287.7125

2 Planta

Area Planta Aligerado BLOQUE I Y


ESCALERA

531.7104578

TOTAL

819.42 m

01.02.04
01.02.04.01

1 Planta
2 Planta

3 Planta

01.02.04.02

01.02.05.01

01.02.05.02

01.02.05.03

01.02.05.04

01.02.06
01.02.06.01

1 Planta

819.42

m2

1,053.60

33.20

m2

87.62

m2

770.82

m2

770.82

m2

0.00

205.94

PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO

Descripcin

Area (m)

Entre Eje L-L Eje M-M Y Eje 22-22 , Eje 26-26

304.38

PERIMETRO
ZOCALO(m)
128.92

Entre Eje L-L Eje M-M Y Eje 22-22 , Eje 26-26

304.38

95.22

Voladizo

57.00

38.32

Escalera

13.23

14.70

Entre Eje L-L Eje M-M Y Eje 22-22 , Eje 26-26

304.38

95.22

Voladizo

57.00

38.32

Escalera

13.23

14.70

TOTAL

1053.60 m

425.40 m

JUNTAS ASFALTICAS e = 1/2"


Descripcin

01.02.05

m2

Longitud (m)

Cantidad

junta (m)

Junta de 0.90m

1.00

14.00

14.00

Junta de 1.60m

1.60

12.00

19.20

TOTAL

33.20 m

ESTRADO PARA DOCENTE


ENCOFRADO Y DESENCOFRADO PARA ESTRADO DE DOCENTE
Descripcin

Cantidad

Perimetro (m)

h (m)

Area Total(m)

ESTRADO

11.00

17.70

0.45

87.62

ESTRADO SUM

0.00

0.00

TOTAL

87.62 m

FALSO PISO MEZCLA 1:8 CEMENTO:HORMIGON E= 12 CM


Descripcin

Cantidad

Area CAD (m)

h (m)

Volumen(m)

1 Planta

1.00

228.44

0.05

11.42

2 Planta

1.00

271.19

0.05

13.56

3 Planta

1.00

271.19

0.05

TOTAL

770.82 m

13.56
38.54 m

PISO DE CEMENTO PULIDO COLOREADO CON OCRE ROJO e = 2" BRUADO


Descripcin

Area CAD (m)

Cantidad

Area Total

1 Planta

228.44

1.00

228.44

2 Planta

271.19

1.00

271.19

3 Planta

271.19

1.00

271.19

TOTAL

770.82 m

RELLENO CON BLOQUES DE TECKNOPORT 0.12 x 0.30 x 1.20 m


Descripcin

Area CAD (m)

Cantidad

Estrado 2 Planta

0.00

6.00

Area Total
0.00

TOTAL

0.00 m

CONTRAZOCALOS
CONTRAZOCALO CEMENTO SIN COLOREAR H = 30 cm

Descripcin

Area (m)

Eje L-L, Entre Eje 22-2 y Eje 26-26

1.17

PERIMETRO
ZOCALO(m)
5.85

Eje L-L, Entre Eje 22-2 y Eje 26-26

5.06

2.00

1 Planta

2 Planta

Eje M-M, Entre Eje 22-22 y Eje 26-26

7.06

14.65

Eje 22-22, Entre Eje L-L y Eje M-M

1.30

5.58

Eje 24-24, Entre Eje L-L y Eje M-M

1.30

6.25

Eje 25-25, Entre Eje L-L y Eje M-M

1.30

9.25

Eje 26-26, Entre Eje L-L y Eje M-M

1.30

11.30

Eje L-L, Entre Eje 22-2 y Eje 26-26

1.17

6.00

Eje L-L, Entre Eje 22-2 y Eje 26-26

5.06

19.05

Eje M-M, Entre Eje 22-22 y Eje 26-26

7.06

4.35

Eje 22-22, Entre Eje L-L y Eje M-M

1.30

18.05

Eje 23-23, Entre Eje L-L y Eje M-M

1.30

7.08

Eje 24-24, Entre Eje L-L y Eje M-M

1.30

7.00

2 Planta

3 Planta

01.02.07

Eje 25-25, Entre Eje L-L y Eje M-M

1.30

7.00

Eje 26-26, Entre Eje L-L y Eje M-M

1.30

7.00

Eje L-L, Entre Eje 22-2 y Eje 26-26

1.17

6.00

Eje L-L, Entre Eje 22-2 y Eje 26-26

5.06

19.05

Eje M-M, Entre Eje 22-22 y Eje 26-26

7.06

4.35

Eje 22-22, Entre Eje L-L y Eje M-M

1.30

18.05

Eje 23-23, Entre Eje L-L y Eje M-M

1.30

7.08

Eje 24-24, Entre Eje L-L y Eje M-M

1.30

7.00

Eje 25-25, Entre Eje L-L y Eje M-M

1.30

7.00

Eje 26-26, Entre Eje L-L y Eje M-M

1.30

7.00

TOTAL

58.07 m

205.94 m

CARPINTERIA DE MADERA

01.02.07.01

PUERTA VENTANA DE TABLERO CON OJO DE BUEY 1.00 x 2.76 m, Hvent. = 0.56m (Incluye Cerradura)

pza

12.00

01.02.07.02

PUERTA DE TABLERO 0.90 x 2.20 m, (Incluye Cerradura)

pza

2.00

m2

136.62

7.94

13.72

01.02.08

CARPINTERIA METALICA

01.02.08.01

1 Planta

2 Planta

3 Planta

01.02.08.02

VENTANA DE FIERRO
Descripcin

Ancho

Alfeizar (m)

Altura (m)

Cantidad

Area Total(m)

V-9

3.45

1.20

1.80

3.00

18.63

V - 10

2.95

1.20

1.80

3.00

15.93

V - 11

3.30

1.20

1.80

1.00

5.94

V - 22

2.80

1.20

1.80

1.00

5.04

V-9

3.45

1.20

1.80

3.00

18.63

V - 10

2.95

1.20

1.80

3.00

15.93

V - 11

3.30

1.20

1.80

1.00

5.94

V - 22

2.80

1.20

1.80

1.00

5.04

V-9

3.45

1.20

1.80

3.00

18.63

V - 10

2.95

1.20

1.80

3.00

15.93

V - 11

3.30

1.20

1.80

1.00

5.94

V - 22

2.80

1.20

1.80

1.00

5.04

TOTAL

136.62 m

BARANDA DE TUBO CUADRADO EN ESCALERA


Descripcin

Longitud

Tramo Inclinado Inicial Izquierdo

2.94

Tramo Inclinado Inicial Derecho

2.87

Descanso Interseccin Tramo Inicial con Tramo Final

0.10

Tramo Inclinado Final Izquierdo

3.10

Tramo Inclinado Final Derecho

2.91

Tramo de llegada Final Izquierdo

1.80

TOTAL
01.02.08.03

Pasamano

Pasamano

13.72 m

PASAMANOS CON CUBIERTA DE ALUMINIO

01.02.08.04

TUBO DE FIERRO 1 1/2" EN PARAPETO PARA AULAS


Unicacin

Long. (m)

Cantidad

Longitud (m)

2 PLANTA

Eje L''- L''

35.18

1.00

35.18

2 PLANTA

Eje L''- L''

35.18

01.02.08.05

Unicacin

Long.
Parapeto (m)

Cantidad

Tramo A-B Lateral

1.45

Tramo A-B

3.06

Tramo B-C

01.02.09.01

01.02.10
01.02.10.01

Long. (m)

f 1/4"

Peso (kg)

0.00

0.70

0.00

0.00

0.70

0.00

2.91

0.00

0.70

0.00

Tramo C-D

2.91

0.00

0.70

0.00

Tramo D-E

2.91

0.00

0.70

0.00

Tramo E-F

2.91

0.00

0.70

0.00

Tramo F-G

3.06

0.00

0.70

0.00

Tramo H-I

2.90

0.00

0.70

0.00

Tramo O-P Lateral

1.45

0.00

0.70

0.00

Tramo O-P

3.06

0.00

0.70

0.00

Tramo N-O

2.91

0.00

0.70

0.00

Tramo M-N

2.91

0.00

0.70

0.00

Tramo L-M

2.91

0.00

0.70

0.00

Tramo K-L

2.91

0.00

0.70

0.00

Tramo J-K

3.06

0.00

0.70

0.00

TOTAL

0.00 kg

2 PLANTA
SEGUNDA PLANTA

01.02.09

35.18
70.36 m

ACERO fy=4200 kg/cm GRADO 60 PARA ARRIOSTRE DE PARAPETO

2 PLANTA
PRIMERA PLANTA

01.02.08.06

1.00
TOTAL

CANTONERAS DE ALUMINIO EN ESCALERAS


Descripcin

Cantidad

L cantonera (m)

L (m)

Tramo derecho

2.00

9.69

19.38

Tramo izquierdo

2.00

7.20

14.60

TOTAL

33.98 m

70.36

kg

0.00

33.98

p2

1,470.57

m2

1,416.38

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES NACIONALES
Descripcin

Area (m)

Area Ventanas

136.62

Area (pie)
1,470.57

TOTAL

1,470.57

PINTURA
PINTURA LATEX BLANCA EN CIELORRASO Y VIGAS
Descripcin

Area CAD (m)

Area 1 Planta de Aligerado

287.71 m

Area Techo Aligerado

531.71 m

Vigas Portantes, de Amarre, en Voladizo y de confinamiento


TOTAL

596.95
1416.38 m

01.02.10.02

PINTURA LATEX EN MUROS INTERIORES

m2

1,507.74

01.02.10.03

PINTURA LATEX EN MUROS EXTERIORES

m2

1,391.72

01.02.10.04

PINTURA ANTICORROSIVA Y ESMALTE EN VENTANAS

m2

45.54

47.26

01.02.11
01.02.11.01

TUBERAS PARA EVACUACIN DE AGUAS DE LLUVIA


TUBERIA DE PVC SAL 4" (Montante Aguas de Lluvia)
Descripcin

Longitud

Tuberia Frontal Escalera

1.70

Tuberia Posterior Escalera

15.52

Tuberia Frontal Aulas

15.02

Tuberia Posteior Aulas

15.02

TOTAL

47.26 m

01.02.11.02

CODO DE PVC SAL DE 4" x 90

pza

7.00

01.02.11.03

CODO DE PVC SAL DE 4" x 45

pza

22.00

01.02.11.04

TUBERIA DE PVC SAL DE 4" (Evacuacin aguas de Lluvia)

14.50

m3

0.45

m3

0.51

m2

1.92

0.70

01.02.12
01.02.12.01

01.02.12.02

CAJAS DE TRANSICIN DE AGUAS DE LLUVIA


EXCAVACION DE ZANJA PARA CAJA DE TRANSICIN
Ubicacin Caja de Transicin de Aguas
de Lluvia

Area (m)

h (m)

Volumen (m)

Lado derecho BLOQUE II

0.64

0.70

0.45

CONCRETO f'c=175 kg/cm2 PARA CAJA DE TRANSICION

Ubicacin Caja de Transicin de Aguas Area CAD Secc.


Transversal (m)
de Lluvia
Lado derecho BLOQUE II
01.02.12.03

01.02.12.04

01.03
01.03.01

Longitud (m)

Volumen (m)

2.80

0.51

0.18

ENCOFRADO Y DESENCOFRADO PARA CAJA DE TRANSICIN


Ubicacin Caja de Transicin de Aguas
de Lluvia

Area (m)

Lado Izquierdo Aula 102, Interior

1.92

REJILLA PARA CAJA DE TRANSICIN DE AGUAS DE LLUVIA


Descripcin

L (m)

Lado Izquierdo Aula 102, Interior

0.7

INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y FUERZA

01.03.01.01

SALIDA PARA CENTRO DE LUZ

pto

96.00

01.03.01.02

SALIDA PARA BRAQUETE

pto

10.00

01.03.01.03

SALIDA TOMACORRIENTE

pto

57.00

01.03.02

CANALIZACIONES Y/O TUBERAS

01.03.02.01

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 20mm (3/4")

712.22

01.03.02.02

TUBERIAS PARA INSTALACIONES ELECTRICAS SAP 13mm (5/8")

294.05

01.03.02.03

TUBERIA FIERRO GALVANIZADO PARA POZO A TIERRA

9.88

01.03.03

CONDUCTORES Y/O CABLES

01.03.03.01

CABLE ELECTRICO TW AWG-MCM # 10 -5.3 mm2

40.20

01.03.03.02

CABLE ELECTRICO TW AWG-MCM # 12 -4.0 mm2

922.79

01.03.03.03

CABLE ELECTRICO TW AWG-MCM # 14 -2.5 mm2

1,939.88

01.03.03.04

CABLE ELECTRICO TW AWG-MCM # 16 -1.5 mm2

9.52

01.03.04

TABLEROS Y LLAVES DE INTERRUPCION

01.03.04.01

TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 6 CIRCUITOS

4.00

01.03.04.02

LLAVE INTERRUPTOR THERMOMAGNETICO DE 2 X 15 A

15.00

01.03.04.03

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 20 A

3.00

01.03.04.04

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 40 A

4.00

01.03.04.05

LLAVE INTERRUPTOR THERMOMAGNETICA DE 2 X 60 A

2.00

01.03.05

ARTEFACTOS

01.03.05.01

ARTEFACTO ADOSADO CON FLUORESCENTE 2 x 40w

62.00

01.03.05.02

LAMPARA INCANDESCENTE DE 1OO W

pza

29.00

01.03.05.03

FLUORESCENTE CIRCULAR 40 W

pza

4.00

01.03.05.04

BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 1OO W

10.00

TIMBRE PARA FORMACIN

1.00

1.00

11.00

01.03.05.05
01.03.06
01.03.06.01
02.07
02.07.01
02.07.01.01
02.07.02

POZO CONEXION A TIERRA


POZO CONEXION A TIERRA
VARIOS
PIZARRA
PIZARRA ACRILICA CON MARCO DE ALUMINIO 4 x 1.40m
MOBILIARIO

02.07.02.01

'BUTACAS AUDITORIO

60.00

02.07.02.04

CARPETAS UNIPERSONALES

350.00

02.07.02.05

PUPITRES

10.00

02.07.02.06

SILLAS PARA PUPITRES

10.00

glb

1.00

glb

1.00

02.07.03
02.07.03.01
02.07.04
02.07.04.01

EQUIPOS DE PROTECCION PERSONAL


EQUIPOS DE PROTECCION PERSONAL
FLETE
FLETE

02.01.03

02.01.03.02

02.01.04
02.01.05

1.1

02.01.06

02.01.07
02.01.08

02.01.10

02.01.10.01

02.01.10.02

02.01.10.02

02.01.10.02

02.01.11

02.01.11.01

02.01.11.02

02.01.11.02

02.01.11.02

02.01.11.02

02.01.11.03

02.01.11.03

02.01.11.03
02.02
02.02.01

02.02.02

02.02.03

02.02.04

02.03

02.04.08.

02.04.08.04

02.04.08.05

02.04.08.02

02.05

02.06

SUSTENTO DE METRADOS

COBTRUCCION I.E 2080 "ANDRES BELLO"


ANDRES BELLO
CARABAYLLO LIMA
ESPECIALIDAD INSTALACIONES SANITARIAS
PROYECTO
I.E.
UBICACIN

FECHA: MAY-2013

PROYECTISTA ING.
METRADO

ING.

ITEM
01
01.01
01.01.01

DESCRIPCION

UND

TOTAL

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO CON FLUXOMETRO TANQUE BAJO

pza

01.01.02

INODORO TANQUE BAJO DE LOSA

pza

01.01.03

URINARIO EN PARED DE 1ERA NACIONAL COLOR BLANCO

01.01.04

LAVADERO DE ACERO INOXIDABLE (1 POZA)

pza

01.01.05

LAVADERO DE ACERO INOXIDABLE (2 POZAS)

pza

2.00

01.01.06

LAVATORIO DE LOZA BLANCA

pza

11.00

01.01.07

LAVATORIO OVALIN

pza

01.01.08

DUCHA CON MEZCLADORA Y GRIFERIA

pza

01.01.09

LAVATORIO EN PARED DE 1ERA NACIONAL COLOR BLANCO

8.80

01.01.10

URINARIO EN PARED DE 1ERA NACIONAL COLOR BLANCO

8.80

01.01.11

JABONERA LOSA BLANCA

TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA COLOR BLANCO

4.00

01.01.12
01.02
01.02.01

35.00
8.80

SISTEMA DE AGUA FRIA


SALIDAS DE AGUA FRIA

01.02.01.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

pto

41.00

01.02.01.02

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4"

pto

20.00

01.02.01.03

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1"

pto

01.02.01.02

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1 1/4"

pto

01.02.01.05

SALIDA DE AGUA CALIENTE - CPVC.- 1/2" - VESTUARIOS.

pto

01.02.02

MOVIMIENTO DE TIERRAS

01.02.02.01

EXCAVACION MANUAL PARA REDES SANITARIAS (AGUA)

60.00

01.02.02.02

CAMA DE ARENA GRUESA (RED DE DE AGUA)

60.00

01.02.02.03

RELLENO COMPACT. C/EQUIPO, MAT PROPIO

60.00

01.02.03

REDES DE DISTRIBUCION

01.02.03.01

RED DE ALIMENTADOR TUBERIA DE 3/4" PVC - C10

32.00

01.02.03.02

RED DE ALIMENTADOR TUBERIA DE 1" PVC - C10

47.00

01.02.03.03

RED DE ALIMENTADOR TUBERIA DE 1 /2" PVC - C10

40.00

01.02.03.04

RED DE ALIMENTADOR TUBERIA DE 1 1/2" PVC - C10

01.02.03.05

RED DE ALIMENTADOR TUBERIA DE 2" PVC - C10

01.02.03.06

RED DE ALIMENTADOR TUBERIA DE 2 1/2" PVC - C10

01.02.03.07

RED DE ALIMENTADOR TUBERIA DE 3" PVC - C10

01.02.03.08

RED DE ALIMENTADOR TUBERIA DE 4" PVC - C10

01.02.03.09

RED DE ALIMENTADOR TUBERIA DE 6" PVC - C10

01.02.03

19.00
43.00

MONTANTES DE AGUA DE PVC

01.02.04.01

MONTANTE DE TUB. PVC - 1 " DE AGUA EN FALSA COLUMNA

01.02.03.01

MONTANTE DE TUB. PVC - 2" DE AGUA EN FALSA COLUMNA

4.00

01.02.03.02
01.02.04

MONTANTE DE TUB. PVC - 2 1/2" DE AGUA EN FALSA COLUMNA

VALVULAS

01.02.06.01

VALVULA DE COMPUERTA 1/2"

13.00

01.02.04.01

VALVULA DE COMPUERTA 3/4"

4.00

01.02.06.03

VALVULA DE COMPUERTA 1"

5.00

01.02.06.04

VALVULA DE COMPUERTA 1 1/4"

01.02.06.05

VALVULA DE COMPUERTA 1 1/2"

01.02.04.02

VALVULA DE COMPUERTA 3"

01.02.06.07

VALVULA DE COMPUERTA 2 1/2"

01.02.04.03

CAJA DE VALVULAS EN NICHO RECUBIERTO DE MAYOLICA

01.03
01.03.01

u
pza

SISTEMA DE DESAGUE
SALIDAS DE DESAGUE Y VENTILACION

01.03.01.01

SALIDA DE VENTILACION EN PVC - SAL 2"

pto

7.00

01.03.01.02

SALIDA DE DESAGUE EN PVC - SAL 4"

pto

63.00

01.03.01.03

SALIDA DE DESAGUE EN PVC - SAL 2"

pto

22.00

6.00

01.03.01.04
01.03.02

CAJA DE REGISTRO DE 30X30


TUBERIAS DE LA RED DE DESAGUE

01.03.02.01

RED DE DISTRIBUCION TUBERIA DE PVC SAL 2"

30.00

01.03.02.02

RED DE DISTRIBUCION TUBERIA DE PVC SAL 4"

117.00

01.03.02.03

RED DE DISTRIBUCION TUBERIA DE PVC SAL 8"

01.03.02.01

TUBERIA PVC - SAL 2" P/VENTILACION EN FALSA COLUMNA

108.00

01.03.02.02

MONTANTE CON TUBERIA PVC DE 4" EN FALSA COLUMNA

8.00

01.03.03

MOVIMIENTO DE TIERRAS

01.03.03.01

EXCAVACION MANUAL PARA REDES SANITARIAS (DESAGUE)

53.00

01.03.03.02

CAMA DE ARENA GRUESA (RED DE DESAGUE)

53.00

01.03.03.03

RELLENO COMPAC. C/EQUIPO MAT. PROPIO

53.00
10.00

01.03.03

ADITAMIENTOS VARIOS

01.03.04.01

SUMIDERO DE BRONCE 2"

01.03.03.01

SUMIDERO DE BRONCE 3"

01.03.03.02

REGISTROS DE BRONCE DE 2"

01.03.03.03

REGISTROS DE BRONCE DE 4"

01.03.03.04

REGISTROS DE BRONCE DE 2" TIPO DADO

01.03.03.05

REGISTROS DE BRONCE DE 4" TIPO DADO

01.03.03.06

SOMBRERO DE VENTILACION 2"

01.04

6.00

RED DE DRENAJE PLUVIAL

01.04.01

CANAL RECTANGULAR PLANCHA GALVANIZADA

01.04.02

CANALETA PLUVIAL DE CONCRETO FC=175KG/CM2 CORTE Y-Y (CON REJILLA)

54.40

01.04.03

PASE DE DRENAJE PLUVIAL C/TUBERIA DE PVC SAL 6"

15.00

01.04.04

PASE DE DRENAJE PLUVIAL C/TUBERIA DE PVC SAL 8"

02.02
02.02.01
02.02.01.01

PLATAFORMA DEPORTIVA - PATIO DE USOS MULTIPLES


OBRAS PRELIMINARES
TRAZO DE NIVELES Y REPLANTEO
Descripcin

patio de usos
mult.

02.02.02
02.02.02.01

230.00

TOTAL

890.00 m

CORTE SUPERFICIAL MANUAL HASTA 1m DE PROFUNDIDAD

CORTE SUP. PLATAFORMA y veredaPara 1 Capa de Afirmado

860.00

CORTE SUP. PLATAFORMA y vereda Para 2 Capa de Afirmado

870.00
0.12

0.12

CUA TRAPEZOIDAL FORMADA Para SARDINEL

184.32

Volumen proveniente de demolicion

133.50

Total

860.00

0.10

86.00

870.00

0.10

87.00

TOTAL

184.32 m

98.40

m3

391.02

m2

1,730.00

m2

216.80

m3

0.89

11.32

5.00
391.02 m

Descripcin

Area i (m)

Area f (m)

1 Capa e = 0.10

860.00

860.00

2 Capa e = 0.10

870.00

Area
Promedio (m)
860.00

870.00

870.00

TOTAL

1730.00 m

OBRAS DE CONCRETO SIMPLE


ENCOFRADO Y DESENCOFRADO EN LOSA DEPORTIVA Y PATIO DE USOS MULTIPLES

patio
Interiores (JUNTAS)

02.02.03.02

Volumen (m)

CONFORMACION Y COMPACTACION DE BASE GRANULAR, Capas de e = 0.10m

Exteriores

CUNETAS

h (m)

Volumen (m)

Volumen Excavado
Vol. De relleno (-)

VEREDA EN
PATIO DE
USOS
MULTIPLES
(CONTORNO
DE
PLATAFORM

L Permetro
Promedio (m)

ELIMINACION DE MATERIAL EXCEDENTE (A MANO USANDO CARRETILLA, DISTANCIA PROMEDIO DE 30M)


Descripcin

02.02.03.01

184.32

MOVIMIENTO DE TIERRAS

Area CAD
Final (m)

02.02.03

m3

660.00

contorno plataforma (vereda)

Area CAD
inicial (m)

02.02.02.03

890.00

Area CAD (m)


plataforma

Descripcin

02.02.02.02

m2

Exteriores

Interiores (JUNTAS)
CUNETA

Descripcin

L (m)

h (m)

Cantidad

Area (m)

Lado Izquierdo

22.00

0.40

1.00

8.80

Lado Derecho

22.00

0.40

1.00

8.80

Lado Frontal

60.00

0.40

1.00

24.00

Lado Posterior

60.00

0.40

1.00

24.00

Vertical 1

21.00

0.10

8.00

16.80

Horizontal 1

25.00

0.10

8.00

20.00

Lado Izquierdo

35.00

0.40

1.00

14.00

Lado Derecho

8.00

0.40

1.00

3.20

Lado Frontal

31.00

0.40

1.00

12.40

Lado Posterior

41.00

0.40

1.00

16.40

Vertical 1

172.00

0.10

1.00

17.20

Horizontal 1

200.00

0.10

1.00

20.00

Vertical 1

20.00

0.30

2.00

12.00

Horizontal 1

32.00

0.30

2.00

19.20

TOTAL

216.80 m

CONCRETO f'c=140 kg/cm PARA ANCLAJES Y/O DADOS


Descripcin

A (m)

B (m)

h (m)

Cantidad

Volumen (m)

Dado de Concreto Izquierdo en Arcos

0.50

0.50

0.80

2.00

0.40

Dado de Concreto Derecho en Arcos

0.50

0.50

0.80

2.00

0.40

Dado en Parantes para Net de Voley

0.30

0.30

0.50

2.00

0.09

TOTAL

0.89 m

02.02.03.03

CONCRETO f'c=175 kg/cm EN SARDINELES DE PLATAFORMA Y PATIO DE USOS MULTIPLES

L Permetro
Promedio (m)

Descripcin (Ver grafico de metrados en plano de plataforma)

100.00

0.12

CUA TRAPEZOIDAL FORMADA VEREDA CONTORNO

215.00

0.12

25.80

TOTAL

37.30 m

Area CAD (m)

h (m)

Volumen (m)

620.00

0.10

62.00

VEREDA CONTORNO

144.00

0.10

14.40

CUNETA

0.10

103.20

10.32

TOTAL

86.72 m

PLATAFORMA

02.02.03.05

plataforma
vereda (contorno)
CUNETA

m3

86.72

662.00

11.50

CONCRETO f'c=175 kg/cm EN LOSA DE PLATAFORMA Y PATIO DE USOS MULTIPLES


Descripcin

37.30

Area CAD (m)


Volumen (m)
Seccin Sardinel

CUA TRAPEZOIDAL FORMADA SARDINEL PLATAFORMA

02.02.03.04

m3

JUNTAS ASFALTICAS EN PLATAFORMA, e = 1"


Descripcin

L (m)

Cantidad

Juntas (m)

Juntas Verticales

30.00

5.00

150.00

Juntas Horizontales

20.00

7.00

140.00

Juntas Verticales

172.00

1.00

172.00

Juntas Horizontales

200.00

1.00

200.00

Juntas Verticales

1.20

14.00

16.80

Juntas Horizontales

1.20

10.00

12.00

TOTAL

662.00 m

02.02.03.06

CURADO DE OBRAS DE CONCRETO CON ADITIVO (ANTISOL)

m2

890.00

02.02.03.07

REJILLA PARA CUNETAS

100.00

plataforma

02.02.04

Descripcin

L (m)

Cantidad

Juntas (m)

FRONTAL Y POSTERIOR

30.00

2.00

60.00

LADO DERECHO E IZQUIERDO

20.00

2.00

40.00

TOTAL

100.00 m

EQUIPAMIENTO PLATAFORMA DEPORTIVA

02.02.04.01

ARCO DE FULBITO Y TABLERO DE BASKET

2.00

02.02.04.02

POSTES DE FIERRO Y NET PARA BOLEY

2.00

02.02.04.03

REFLECTORES

8.00

02.02.04.04

PINTURA EN DELIMITACION DE AREAS DE JUEGO

m2

12.37

Descripcin

L (m)

e (m)

Cantidad

Pintura (m)

Delimitacins Transversales 1

18.00

0.05

1.00

0.90

Delimitacins Transversales 2

9.00

0.05

1.00

0.45

Delimitacins Transversales 3

18.00

0.05

1.00

0.90

Delimitacins Transversales 4

9.00

0.05

1.00

0.45

Delimitacins Transversales 5

18.00

0.05

1.00

0.90

Delimitacins Longitudinales 1

18.00

0.05

1.00

0.90

Delimitacins Longitudinales 2

18.00

0.05

1.00

0.90

Delimitacin Transversal Fulbito

18.00

0.05

2.00

0.90

Delimitacin Longitudinal Fulbito

28.00

0.05

2.00

1.40

Delimitacin Transversal

15.00

0.05

2.00

0.75

Delimitacin Longitudinal

26.00

0.05

2.00

1.30

Semicircunferencia

22.88

0.05

2.00

1.14

Circunferencia menor

9.74

0.05

2.00

0.49

Transversal Circunferencia Menor

3.10

0.05

2.00

0.16

Linea inclinada

5.74

0.05

4.00

0.29

Circunferencia Central de Losa Deportiva

11.00

0.05

1.00

0.55

TOTAL

12.37 m

02.06
02.06.01

PATIO DE HONOR
LIMPIEZA DE JUNTAS E= 1" EN PATIO DE HONOR

PATIO DE HONOR

02.06.02

02.07.01
02.07.01.01

N juntas

espesor (m)

Lprom. (m)

Area CAD (m)

8.00

0.025

21.25

4.32

transversales

8.00

0.025

25.00

5.00

TOTAL

9.32 m

JUNTAS ASFALTICAS e = 1"

PATIO DE
HONOR
02.07

Descripcin
longitudinales

Descripcin

L (m)

Cantidad

N veces

Juntas (m)

Juntas Verticales

21.25

8.00

1.00

170.00

Juntas Horizontales

25.00

8.00

1.00

200.00

TOTAL

370.00 m

m2

9.32

370.00

1.00

VARIOS
Estrado Movil
ESTRADO MOVIL DE ACERO Y MADERA 1.95 x 10.10 m

HOJA DE SUSTENTO DE METRADOS


PROYECTO
I.E.
UBICACIN
ESPECIALIDAD
PROYECTISTA
METRADO

COBTRUCCION I.E 2080 "ANDRES BELLO"


ANDRES BELLO
CARABAYLLO LIMA
CONSTRUCCION CERCO PERIMETRICO
ING.
ING.

ITEM

DESCRIPCION

02.00.00

CONSTRUCCION DEL CERCO PERIMETRICO

02.01.00

TRABAJOS PRELIMINARES

02.01.04

LIMPIEZA DE TERRENO

02.01.05

TRAZO, NIVELACION Y REPLANTEO

02.02.00

MOVIMIENTO DE TIERRAS

02.02.03

EXCAVACION PARA CIMENTACIONES

FECHA: MAY-2013

UND

CANT

MEDIDAS
AREA

PARCIAL

LARGO

ANCHO

ALTO

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

m2

TOTAL

1.00

m2

1.00

m2

0.42
0.42

CIMIENTO CORRIDO
02.02.04

RELLENO CON MATERIAL PROPIO MANUAL

1.00

1.00

0.60

0.70

0.42

m2

CIMIENTO CORRIDO

0.05
1.00

0.45

0.10

0.05

02.03.00

OBRAS DE CONCRETO SIMPLE

02.03.01

CIMIENTO CORRIDO f'c=100kg/cm2 +30%PG

m3

1.00

1.00

0.60

0.7

0.42

0.42

02.03.02

CONCRETO f'c=140kg/cm2 +25%PG EN SOBRECIMIENTO

m3

1.00

1.00

0.15

0.3

0.05

0.05

02.03.03

ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO

m2

2.00

1.00

0.3

0.60

0.60

02.04.00

OBRAS DE CONCRETO ARMADO

02.04.01

COLUMNAS
CONCRETO f'c=175kg/cm2 EN COLUMNAS

m3

1.00

3.15

0.15

0.25

0.12

0.12

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

1.00

3.15

0.80

2.52

2.52

VIGAS

m2

CONCRETO f'c=175kg/cm2 EN COLUMNAS

m3

1.00

1.00

0.15

0.20

0.03

0.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

1.00

1.00

0.40

0.40

0.40

m2

1.00

1.00

2.85

2.85

2.85

02.04.03

02.05.00

MUROS Y TABIQUES EN ALBAILERIA


MUROS DE LADRILLO PANDERETA 24X12X10

02.05.00

REVOQUES Y ENLUCIDOS

02.05.01

TARRAJEO EN MUROS

m2

1.00

1.00

3.05

3.05

3.05

02.05.01

TARRAJEO EN COLUMNAS

m2

1.00

3.05

0.50

1.53

1.53

02.05.01

TARRAJEO EN VIGAS

m2

1.00

1.00

0.55

0.55

0.55

02.05.01

VESTIDURA DE ARISTAS DE VIGA

m2

2.00

1.00

2.00

2.00

02.05.00

PINTURA

02.05.01

PINTURA EN MUROS

m2

2.00

1.00

3.05

6.10

6.10

02.05.01

PINTURA EN COLUMNAS

m2

1.00

3.05

0.60

1.83

1.83

02.05.01

PINTURA EN VIGAS

m2

1.00

1.00

0.40

0.40

0.40

02.13.00

VARIOS
LIMPIEZA FINAL EN OBRA

m2
1.00

1.00

1.00

1.00

02.13.05

1.00