Name of Company: Halliburton Integrated Services Well Name & Number: West Cameron 17 Well #12

Microsoft Excel 97

Drilling Application
PRIMARY CEMENTING JOB
CEMENT PLAN
LENGTH YIELD % EXCESS

Date: July 8, 2013


THIS CSG. PREV CSG.

GEOMETRY

Depth Set, Ft? = Casing OD, in? = Nominal ID, in? = Average Hole or Bit Size, in? = Mud Pump Output, bbl/stk? =

10,260 7.625 6.765 9.875

4,607 10.75 9.95 0.1000 10,172


SACKS

Lead - Open Hole? = Tail - Open Hole? = Between Strings? = On Top of Liner? =

4,600 1,500 0 0

1.51 1.43 0 0

0 0 Notes @ Cell A29

Depth TOL Set or Depth Sub Sea Hanger? = Run String I.D. for Liner or Sub Sea Job? =
2nd STAGE CEMENTING

Anticipated Depth Float or Landing Collar Set? =


RESULTS - LEAD CEMENT 1st STAGE

Shoe Joint Open Hole Between Strings and Top of Liner Total Cement
RESULTS - TAIL CEMENT 1st STAGE

0 654 0 654
SACKS

Depth Stage or DV Tool Set, ft? =


CEMENT PLAN
LENGTH YIELD % EXCESS

Lead (OH)? = Tail (OH)? = Between-Csg? =


2nd STAGE RESULTS SACKS

Shoe Joint Open Hole Total Cement


CAPACITIES

15 225 241 0.2229 0.2148 0.2496 0.5400 THE END

Total Lead Cement Total Tail Cement Total Between Strings


DISPLACEMENT BBLS

0 0 0
STKS

Cased Hole Annulus, ft/ft Open Hole Annulus, ft/ft Shoe Joint, ft/ft Previous Casing, ft/ft

Land Plug 1st Stage Land Plug 2nd Stage Land Plug for Liner / Subsea Job

452 0 0

4,522 0 0

This application will calculate the Cement and Displacement volumes for a ... 1. Long string job, namely any casing job that extends back to the wellhead sub sea or surface. 2. Liner job regardless of BOP stack location. 3. Stage or DV Tool job using Lead and /or Tail cements. 4. 'Between Strings' can be a column length of cement between the casing being run and previous casing set or the length of liner overlap with cement or the actual length of liner overlap. Some Regulatory Agencies mandate the tail cement extend a minimum of 20% above the setting depth of the DV Tool, i.e., (5,000 x .20) =1,000' of tail cement to extend above the DV Tool. 5. A cell with a red triangle in the upper right hand corner signifies a comment, mover cursor over cell for viewing.

HOLE SIZE CALCULATION