Sunteți pe pagina 1din 30

1

5 REMARKS:

1 0 B P0 Revision

AS PRE-FAT FOR TNB APPROVAL PRELIMINARY REVIEW Description LILI JULIANA LILI JULIANA TENG SAY CHUAN R.SUNDARAVADIVELU DATE: DATE: DATE: DATE:

21.12.09 02.06.09

RS RS B

DRAWN BY: DESIGNED BY: CHECKED BY: REVIEWED BY: OWNER/CLIENT:

17.04.09 RS Approved Date 17.04.09 17.04.09 17.04.09 17.04.09

C CONTRACTOR:

TENAGA NASIONAL BERHAD


EPE SWITCHGEAR (M) SDN. BHD.
LOT 6, JALAN PERMATA 2, ARAB MALAYSIAN INDUSTRIAL PARK, 71800 NILAI, NEGERI SEMBILAN, MALAYSIA. TEL: 606-7998500 (General) 7998634 FAX NO: 606-7998640/30

SUPPLIER/MANUFACTURER:

EPE SWITCHGEAR (M) SDN. BHD.


LOT 6, JALAN PERMATA 2, ARAB MALAYSIAN INDUSTRIAL PARK, 71800 NILAI, NEGERI SEMBILAN, MALAYSIA. TEL: 606-7998500 (General) 7998634 FAX NO: 606-7998640/30

JOB NO :. PROJECT TITLE:

U0801001AA

SUPPLY AND ERECT OF 33kV AND 11kV SWITCHGEAR AND ANCILLARY EQUIPMENT

CONTRACT No: TNB 213/2008


E SUBSTATION: E

TYPICAL 33kV/11kV PPU SUBSTATION


DRAWING TITLE:

11kV PROTECTION & CONTROL PANEL SCHEMATIC DIAGRAM 11kV TRANSFORMER FEEDER NO.2 - 11RT1
= KT02
F
For For Revised Updated

+ RW
REV.

/ A1
F THIS SHEET: 01 02

PRELIMINARY REVIEW

TNB APPROVAL

"AS-PRE FAT"
(Before 'FAT')

"AS-BUILT"
(After 'SAT')

DRAWING NO.:

iTEC EPE 96000 11 S 02


5 6 7

NEXT SHEET: 8

TITLE
A 1.0 2.0 3.0 4.0 5.0 B 6.0 7.0 8.0 9.0 C 10.0 11.0 12.0 13.0 D 14.0 15.0 16.0 17.0 E 18.0 19.0 20.0 APPARATUS LIST APPARATUS LIST APPARATUS LIST ANNUNCIATION CONTACT DISTRIBUTION ANNUNCIATION CONTACT DISTRIBUTION SUPERVISORY CONTROL & ALARM CIRCUIT CT CONNECTION COMMON ANNUNCIATOR ALARM CIRCUIT AUXILIARY RELAY CIRCUIT INTERTRIP ALARM SIGNAL CIRCUIT ANNUNCIATOR LIST CLOSING CIRCUIT TRIPPING CIRCUIT DC SUPPLY PROTECTION CIRCUIT INDICATING & CONTROL CIRCUIT COVER SHEET TABLE OF CONTENT TABLE OF CONTENT AC SUPPLY DISTRIBUTION CIRCUIT DC SUPPLY DISTRIBUTION CIRCUIT

DRG. NO.
iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02

SHEET NO. REV.


01 02 03 04 05 06 07 08 & 08A 09 10 11 11A 12 13 14 15 & 15A 16 & 16A 17 18 19 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

DATE
21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09

SUMMARY OF CURRENT REVISION


AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT

REMARKS
NIL NIL NIL NIL NIL B NIL NIL NIL NIL C NIL NIL NIL NIL D NIL NIL NIL NIL E NIL NIL NIL A

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 TABLE OF CONTENTS SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ A2

F 02 03

THIS SHEET:

1 7

NEXT SHEET:

TITLE
A 21.0 22.0 23.0 24.0 25.0 B 26.0 BILL OF MATERIAL APPARATUS LIST APPARATUS LIST TERMINAL FUNCTION DRAWING - AREVA P123 TERMINAL FUNCTION DRAWING - AREVA MVAJ055 TERMINAL FUNCTION DRAWING - AREVA MCAG14

DRG. NO.
iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02 iTEC EPE 96000 11 S 02

SHEET NO. REV.


20 21 22 & 22A 23 24 25 1 1 1 1 1 1

DATE
21.12.09 21.12.09 21.12.09 21.12.09 21.12.09 21.12.09

SUMMARY OF CURRENT REVISION


AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT AS PRE-FAT

REMARKS
NIL NIL NIL NIL NIL B NIL A

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 TABLE OF CONTENTS SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ A3

F 03 04

THIS SHEET:

1 7

NEXT SHEET:

3 HEATER CIRCUIT

4 LIGHTING CIRCUIT

A =KS01+RW FROM ADJACENT BAY 11kV PROTECTION & CONTROL PANEL (BUSWIRE) 240V AC, 50Hz (L) -XH 2 H11 -XH 240V AC, 50Hz (N) 4 H12 3 4 1 -XH 2 H12 3 240V AC, 50Hz (N) H11 =K04+RW -XH 1 240V AC, 50Hz (L) FROM ADJACENT BAY 11kV PROTECTION & CONTROL PANEL (BUSWIRE)

H11

H12

-F52/1 6A SH.17 C

1 2

3 4 C 1

-SH SH.20 2 H15

ON OFF

-SD SH.20

1 2 H19

D -S23 SH.19 H17 X1 -H1 SH.17 X2 E -EH SH.17

1 2

-EC SH.17

L N

2 E

T1 14 12

-F52/1 TYPE T2

REF

11 SH.11/C3

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 AC SUPPLY DISTRIBUTION CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ D1

F 04 05

THIS SHEET:

1 7

NEXT SHEET:

3 DC MCB PROTECTION CIRCUIT DC SUPPLY MONITORING RELAY

4 DC MCB INDICATING & CONTROL CIRCUIT DC SUPPLY MONITORING RELAY

5 DC ANNUNCIATOR CIRCUIT

A 110V DC (+) 110V DC (-) FROM ADJACENT BAY 11kV PROTECTION & CONTROL PANEL (BUSWIRE) B 110V DC (+) 110V DC (-) 13 16 L101 -XJ L102 -XJ 11 12 9 10 L102 11 110V DC (-) L101 9 110V DC (+) -XJ 2 4 J1 -XJ J2 -XJ 110V DC (+) 110V DC (-) 7 10 J3 -XJ J4 -XJ 7 8 5 6 J4 7 110V DC (-) 3 4 J3 5 110V DC (+) FROM ADJACENT BAY 11kV PROTECTION & CONTROL PANEL (BUSWIRE) 1 -XJ 2 J2 3 110V DC (-) J1 -XJ 1 110V DC (+)

-F72/1 10A SH.17

1 2

3 4 -F72/2 10A SH.17

1 2

3 4

2 D -K27DCF1 SH.18 10

2 -K27DCF2 SH.18 D 10 L101 SH.13/D1 L102 SH.13/D1

P2

P1

L1 SH.08/B4

E T1 14 12 -F72/1 TYPE T2 REF T1 4 5 6 7 9 8 -K27DCF1 TYPE T2 REF T1 14 12 -F72/2 TYPE T2 REF T1 4 5 6 7 9 8 -K27DCF2 TYPE T2 REF 1 SH.14/C4 3 SH.15/D4 11 SPARE

SH.08/E4

SH.08/B1

SH.08/E1

L2

11 SH.11/C3

1 SH.14/C4 3 SH.15/D4 11 SPARE

11 SH.11/C4

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 DC SUPPLY DISTRIBUTION CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ D1

F 05 06

THIS SHEET:

1 7

NEXT SHEET:

4 LOCAL CLOSE CB -Q0 REMOTE CLOSE CB -Q0

5 SUPERVISORY CLOSE CB -Q0

7 INTERLOCK CIRCUIT FROM HV & NER

-FMCBM M1 -FMCBCL

B -XK1
T N C

-XK1

-XK -XK

6 7

110VDC SUPPLIY FROM ADJ. BAY

1 -F86E SH.08A/D2 E 3 E

-XK

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 CLOSE CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ M1

F 06 07

THIS SHEET:

1 7

NEXT SHEET:

2 LOCAL TRIP CB

3 REMOTE OPEN CB -Q0

4 SUPERVISORY OPEN CB -Q0

5 INTERTRIP FROM HIGH VOLTAGE 33kV LOCKOUT MASTER TRIP

6 REF TRIP TCS MONITOR CB CLOSE

7 TCS MONITOR CB OPEN

-XP

110VDC SUPPLY FROM ADJ. BAY

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 TRIPPING CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

L1 07 08

THIS SHEET:

1 7

NEXT SHEET:

2 DC SUPPLY OVER CURRENT/EARTH FAULT PROTECTION

4 DC SUPPLY CURRENT TRANSDUCER

5 DC SUPPLY VOLTAGE TRANSDUCER

SH.05/D3 B

P1

P1

SH.08A/A1

SH.05/D4

L1

L1

SH.09/A1 B

-X51OCEF SH.21

13 14

SH.05/D3

P2

P2

SH.08A/E1

SH.05/D4

L2

L2

SH.09/F1

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 DC SUPPLY PROTECTION CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ N1

F 08 08A

THIS SHEET:

1 7

NEXT SHEET:

1 RESTRICTED EARTH FAULT TRIP A

2 OCEF PROTECTION TRIP SBEF STAGE-2 OPERATED

4 MASTER TRIP RESET REMOTE SUPERVISORY

SH.08/B3

P1

B 11 -K64REF SH.11/D2 12 14 DWG.11 S 18 SH.11A

27

25

26 P2

SH.08/E3

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 PROTECTION CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

/ N2 REV.:

F 08A 09

THIS SHEET:

1 7

NEXT SHEET:

2 PROTECTION TRIP COUNTER L1 MANUAL TRIP COUNTER

4 CIRCUIT BREAKER Q0 REMOTE/SUPERVISORY OPEN LAMP TEST

5 CIRCUIT BREAKER Q0 CLOSE / OPEN INDICATION

6 EARTH SWITCH Q8 CLOSE / OPEN INDICATION

7 MASTER TRIP RELAY TRIP INDICATION L1

SH.08/B5

SH.11/A1

B 1 -F510CEF SH.22 3

1A2

B FOR DETAIL REFER DWG. NO.: EPE U0801001AA S 02 SH.10 6 1 -SLT SH.19 2 -F86E SH.23 8

1A1

L7A C

1 -KQO1 SH.15A/D2 5 4

L7

L7 1 -PAC SH.19 2 D =KT02+S -XL 8 X1 8 9 FOR DETAIL REFER DWG. NO.: EPE U0801001AA S 02 SH.10 -S86 SH.18 X2 D

SH.08/E5

L2

L2

SH.11/D1

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 INDICATING & CONTROL CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R1

F 09 10

THIS SHEET:

1 7

NEXT SHEET:

3 ATTENDED ON

4 ANNUNCIATOR BELL ALARM

A =KS01+RW L401 2 L405 4 B L405 L401 =K02+RW

FROM ADJACENT BAY 11kV PROTECTION & CONTROL PANEL (BUSWIRE)

FROM ADJACENT BAY 11kV PROTECTION & CONTROL PANEL (BUSWIRE)

6 D D

E
T1 4 5 6 7 9 8 TYPE

K74ATT T2 1 3 11

E
REF SPARE SH.13/C4 SH.13/C5

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 COMMON ANNUNCIATOR ALARM CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R2

F 10 11

THIS SHEET:

1 7

NEXT SHEET:

1 OCEF PROTECTION RELAY FAIL A

2 TRIP CIRCUIT SUPERVISION FAIL RESTRICTED EARTH FAULT TRIP

3 RCP / SWITCHGEAR MCB TRIP/OFF

5 VT MCB TRIP/FAIL

6 LOCKOUT MASTER TRIP RELAY OPERATED

7 SBEF1 OPERATED

8 INTERTRIP FROM HV 33KV (ALARM) A

=KT02+S FOR DETAIL REFER DWG. NO.: EPE U0801001AA S 02 SH.11 B

=KS01+RW -XL 23

=HT02+RW

-F86E 2 -F64REF/LV SH.24 4 C -XL 11 9 -F86E SH.23 11 C

-F52/1 SH.04/C3

-F72/1 SH.04/C3

-F72/2 SH.04/C4 -XL2 15

-F52/2 SH.16A/C5

A1 -K64REF SH.21 D A2 D

E
T1 4 5 6 7 9 8

K510CEFX1 TYPE T2 1 3 11

REF SH.14/C2 SH.15/D3 SPARE

T1 4 5 6 7 9 8

K510CEFX2 TYPE T2 1 3 11

REF SH.14/C1 SH.15/D2 SPARE

T1 14 12 24 22 34 32 44 42

TYPE

K64REF T2 11 21 31 41

REF SH.08A/B1 SH.13/C6 SH.15/D5 SPARE

T1 4 5 6 7 9 8

TYPE

K74AUX1 T2 1 3 11

REF SH.14/C3 SH.15/D4 SPARE

T1 4 5 6 7 9 8

K74AUX2 TYPE T2 1 3 11

REF SH.14/C3 SH.15/D5 SPARE

T1 13 23 33 43

TYPE

K86E T2 14 24 34 44

REF SH.09/B1 SH.13/C7 SH.15/D2 SH.11A/C4

T1 4 5 6 7 9 8

TYPE

K64SBEF T2 1 3 11

REF SH.14/C6 SH.15/D2 SPARE

T1 4 5 6 7 9 8

TYPE

K86 T2 1 3 11

E
REF SH.14/C5 SH.15/D5 SPARE

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 AUXILIARY RELAY CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R3

F 11 11A

THIS SHEET:

1 7

NEXT SHEET:

3 INTERTRIP TO HV 33kV (TRIP MTR)

4 INTERTRIP TO HV 33kV (ALARM CIRCUIT)

C -F86E SH.23

5 7 -K86E SH.11/D7

43 44

-XP D =HT02+RW

-XP

10

XL

17

-XL

18 D

SH.XX

SH.XX

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 INTERTRIP TO HV MTR & ALARM CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R4

F 11A 12

THIS SHEET:

1 7

NEXT SHEET:

WINDOW ARRANGEMENT

F1 RESTRICTED EARTH FAULT TRIP R F3 OVER CURRENT PROTECTION TRIP R F5


TRIP CIRCUIT FAIL

F2 LOCKOUT & MASTER TRIP OPERATED R F4 EARTH FAULT PROTECTION TRIP R F6 PROTECTION RELAY FAIL A F8

F9
INTERTRIP FROM HV 33KV

F10
SPARE

R F11
TX. NO.1 SBEF 1 STAGE 2 OPERATED

R F12
SPARE
C

R F13
SPARE

R F14
SPARE

A
D

A
D

F7
VT MCB TRIP

MCB TRIP/OFF/ DC SUPPLY FAIL

TEST

MUTE

ACK

RST

A
MBAS9400

A
MINILEC MBAS9400 MINILEC

NOTE 1:
E

TEST MUTE ACK. RST R A

TEST PUSH BUTTON MUTE PUSH BUTTON ACKNOWLEDGE PUSH BUTTON RESET PUSH BUTTON LED COLOUR RED (TRIP FUNCTION) LED COLOUR AMBER (NON-TRIP FUNCTION)

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 ANNUNCIATOR LIST SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R5

F 12 13

THIS SHEET:

1 7

NEXT SHEET:

5 ATTENDED/UNATTENDED SUPPLY BUS

L111

L111

SH.14/B1 B

L103 3 -K74ATT SH.10/D4 7 6

L107 11 -K74ATT SH.10/D4 8 9 21 -K64REF SH.11/D2 22 24 23 -K86E SH.11/D7 24 -F51OCEF SH.22 14 16 -F51OCEF SH.22 18 C 20

L105

L109

L113

L115

L119

L117

-H30 C D SH.05/D6 +VE M A1 U/M A2 A/F F1 F2 F3 F4 D C RST. ACK. MUTE TEST MINILEC MBAS-9400 (2D) SH.05/D6 -VE LV RESTRICTED LOCKOUT EARTH FAULT MASTER TRIP OPERATED RELAY OPERATED I1 C1 I2 C2 OVER CURRENT EARTH FAULT PROTECTION PROTECTION TRIP TRIP (R) (R) (R) (R)

REFER TO SH.10/C4 E E

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 ANNUNCIATION CONTACT DISTRIBUTION SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R6

F 13 14

THIS SHEET:

1 7

NEXT SHEET:

SH.13/B8 B

L111

L111

1 -K510CEFX2 SH.11/D2 5 4 C

1 -K510CEFX1 SH.11/D1 5 4

1 -K74AUX2 SH.11/D5 5 4

1 -K74AUX1 SH.11/D3 5 4

1 -K27DCF1 SH.05/D3 5 4

1 -K27DCF2 SH.05/D5 5 4

1 -K86 SH.11/D8 5 4

1 -K64SBEF SH.11/D7 5 4 C

F5 D (A)

F6

F7

F8

F9

F10

F11

F12

F13

F14 D

(A)

(A)

(A)

(R)

(R)

(R)

(R)

(A)

(A)

TRIP CIRCUIT FAIL

PROTECTION RELAY FAIL

VT MCB TRIP

MCB TRIP/OFF/ DC SUPPLY FAIL

INTERTRIP FROM HV 33KV

SPARE

TX. NO.1 SBEF1 STG-2 OPERATED

SPARE

SPARE

SPARE

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 ANNUNCIATION CONTACT DISTRIBUTION SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R7

F 14 15

THIS SHEET:

1 7

NEXT SHEET:

1
SUPERVISORY LOCKOUT CONTROL MASTER INDICATION TRIP OPERATED

4
MCB TRIP/OFF/ DC SUPPLY FAIL REF TRIP

5
INTERTRIP FROM HV 33KV VT MCB TRIP

SBEF1 TRIP OVERCURRENT EARTH FAULT PROTECTION STAGE-2 CIRCUIT PROTECTION PROTECTION RELAY OPERATED FAIL TRIP TRIP FAIL

-XY

10

14

Y49

-S43 SH.19

S R

-K86E SH.11/D7

-F51OCEF SH.22

11

15

33

15 13

12

16

34

=KT02+S E E

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 SUPERVISORY ALARM CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R8

F 15 15A

THIS SHEET:

1 7

NEXT SHEET:

1 CB -Q0 SUPERVISORY OPEN A +RTU

2 CB -Q0 SUPERVISORY CLOSE

3 MASTER TRIP RELAY SUPERVISORY RESET

4 ANALOG INPUT TO RTU (CURRENT)

5 ANALOG INPUT TO RTU (VOLTAGE)

MCB

C 5 Y11 Y15

D B -K86R SH.18 A

E -KQ0 T2 REF 6 SH.07/C4 -KQO1 T2 -KQC T2 REF 6 SH.06/C5 -K86R T2 REF 6 SH.08A/C4

T1 4

TYPE

T1 4 5 6 7 9 8
DATE

TYPE

REF

1 SH.09/C4 3 11 SPARE SPARE

T1 4

TYPE

T1 4

TYPE

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

DRAWN CHECKED APPROVED

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 SUPERVISORY CONTROL CIRCUIT SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ R9

F 15A 16

THIS SHEET:

1 7

NEXT SHEET:

R Y B A

1 BUSBAR

VCB 2000A, 20kA 3sec 12kV S1 S1 S1 B S2 S2 S2 CT RATIO: 1800/900/1A CL.X P1 P2 S3 S3 S3 C MECHANICAL INTERLOCK A90 A110 A130 A150 7 8 9 A10 A30 A50 A20 A40 A60 -XA 1 2 3

REMOVE LINK UPON CONNECTION =HT02+RW -XA 1 2 3

B 4 5 33kV SIDE RCP 6 A70 -XA 10 5 6 A171 -X64REF/LV SH.21 25 26 A173 1 -RC1 SH.21 A1 -RD1 SH.21 A2
11kV, 2000A (10sec)

-F64REF/LV SH.24 2 A175 27

C A273 28

11 QT1N1 P1 1800/1A CL.X 1600/5A CL.5P20 11kV NER C70 -XC 10

A271

27 28

A273

S1 S1 S1 CT RATIO: 1600/800/5A CL.5P20 15VA P1 P2 S2 S2

C110 C130 C150 C90 C20 C40 C60 C10 C30 C50

-XC 7 8 9 11 4 5 6

S2 S3 S3 S3 R Y B

-X51OCEF SH.21 -XC 1 2 3 REMOVE LINK UPON CONNECTION =KT02+S 4 21 23 25 27 22 24 26 28 41 43 45 47 42 44 46 48 7 8 9 10

1 2 3

CONTINUED TO NEXT PAGE F


1 0 P0 REV. 21.12.09 02.06.09 17.04.09 DATE LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP DATE DRAWN CHECKED APPROVED 17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 CT CONNECTION SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ S1

F 16 16A

THIS SHEET:

1 7

NEXT SHEET:

1 CONTINUED FROM PREVIOUS SHEET A S1 S1 S1 P1

D110 D130 D150 D90

-XD 7 8 9 11 SPARE 4 5 6 D70 -XD 10

P2 S2 B S2 S2 S3 S3 S3 D20 D40 D60 D10 D30 D50

1 2 3 REMOVE LINK UPON CONNECTION

C
-TU PHASE R A E10 a CL.0.5 N n E71 E70 E11

C -XE 1

D
EARTH SWITCH -Q8

-TU PHASE Y A

D
E30 a CL.0.5 E31

2
E72 E70

E
L190

-HVI

L110 L130 L150

-TU PHASE B A

E50 a CL.0.5

E51

3
E73 E70

6
E90

7
30MVA 33/11kV TRANSFORMER

T1 14 12

-F52/2 TYPE T2

REF

11 SH.11/C6

=KT02+S
LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP DATE DRAWN CHECKED APPROVED 17.04.09 LILI TSC RS CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107 SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 CT CONNECTION SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ S2

F 16A 17

THIS SHEET:

1 7

NEXT SHEET:

DEVICE DESIGNATION
A -EC DEVICE FUNCTION MAKE

DEVICE DETAILS

LOCATION

TERMINAL FUNCTION DETAIL


A

: FLOURESCENT LAMP, 15W : GE

=KT02+RW

-EC

SH.04/D4 1 B 2 SH.04/E3

-EH B

DEVICE FUNCTION MAKE TYPE

: HEATER, 60W : VITAR : ACH -EH

-F52/1 C

DEVICE FUNCTION

: MINIATURE CIRCUIT BREAKER 2 POLE; 6A FOR HEATER & LIGHTING CIRCUIT c/w AUXILIARY CONTACT : MERIN GERIN : C60N -F52/1

3 12

11 14 C SH.11/C3

MAKE TYPE

2 SH.04/C3

4 SH.04/C3

-F72/1, -F72/2

DEVICE FUNCTION

MAKE TYPE

: MINIATURE CIRCUIT BREAKER 2 POLE; 10A FOR DC SUPPLY CIRCUIT c/w AUXILIARY CONTACT : MERIN GERIN : C60N

3 12

11

-F72/1 -F72/2

14 2 4 SH.05/C3 SH.05/C3 SH.11/C3 SH.05/C4 SH.05/C4 SH.11/C4

-H1

DEVICE FUNCTION MAKE TYPE

: HEATER ON INDICATION LIGHT, 240V AC c/w CLEAR COLOUR LENS : IDEC IZUMI : ID-PBIL-A-R-20 -H1

-HQ8

DEVICE FUNCTION MAKE TYPE

: SEMAPHORE FOR EARTH SWITCH, 110V DC : FUJI : SPSR-30S -HQ8

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 APPARATUS LIST SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X1

F 17 18

THIS SHEET:

1 7

NEXT SHEET:

DEVICE DESIGNATION
A -K27DCF1 -K27DCF2 -K64SBEF -K74ATT -K510CEFX1 -K510CEFX2 -K86 -K74AUX1 -K74AUX2 -KQ01

DEVICE DETAILS
: : : : : :

LOCATION

TERMINAL FUNCTION DETAIL


A

DEVICE FUNCTION MAKE TYPE RATED AUX. VOLTAGE (Vs) POWER CONSUMPTION TYPICAL PICK-UP TIME VALUES (MAKE/BREAK CONTACT) TYPICAL DROP-OUT TIME VALUES (MAKE/BREAK CONTACT)

AUXILIARY RELAY c/w FRONT CONNECTED BASE OMRON MK3P c/w BASE PF113A-E 110V DC 2.7 VA 30ms

=KT02+RW

: 20ms

-K27DCF1 -K27DCF2 -K64SBEF -K74ATT -K510CEFX1 -K510CEFX2 -K86 -K74AUX1 -K74AUX2 -KQ01

-F52/2

DEVICE FUNCTION

MAKE TYPE C -KQO -KQC -K86R DEVICE FUNCTION MAKE TYPE RATED AUX. VOLTAGE (Vs) POWER CONSUMPTION RATED CURRENT TYPICAL PICK-UP TIME VALUES (MAKE/BREAK CONTACTS) TYPICAL DROP-OUT TIME (MAKE/BREAK CONTACTS)

: MINIATURE CIRCUIT BREAKER 3 POLE; 6A FOR METERING VT c/w AUXILIARY CONTACT : MERLIN GERIN : C60N

5 12

11 14

2 -F52/2

6 SH.11/C6 C

SH.16A/C5 SH.16A/D5 SH.16A/E5

: INTERPOSING RELAY FOR SUPERVISORY CONTROL c/w FRONT CONNECTED BASE : POTTER & BRUMFIELD : KUEP-3015-110 c/w BASE 27E893 : 110V DC : 1.2W : 10A : 15mS : 10mS

-KQO -KQC -K86R D

-S86

DEVICE FUNCTION MAKE TYPE AUX. VOLTAGE

: MASTER TRIP LOCKOUT RESET c/w 1NO CONTACT WITH RED COLOUR LENS : IDEC IZUMI : ALW29910-W : 110V DC -S86 E

E -K86E CONTACTOR MANUFACTURER TYPE RATED VOLTAGE : SIEMENS : 3RH1140-1BF40 : 110V DC -K86E
A1 13 23 33 43

A2

14

24

34

44

SH.11/D7

SH.09/B1

SH.13/C7

SH.15/D2

SH.11A/C4

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 APPARATUS LIST SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X2

F 18 19

THIS SHEET:

1 7

NEXT SHEET:

DEVICE DESIGNATION
A -PA DEVICE FUNCTION MAKE TYPE SCALE CT RATIO SIZE CLASS

DEVICE DETAILS

LOCATION

TERMINAL FUNCTION DETAIL


A

: : : : : : :

AMMETER CROMPTON -0-1920/960A 1600/800/5A 96 x 96 mm sq 1.5

=KT02+RW

-PAC B -PMC

DEVICE FUNCTION MAKE TYPE RATED AUX. VOLTAGE (Vs)

: : : :

NON RESETABLE 6 DIGIT TRIP COUNTER LINE SEIKI ME6070. 7070 110V DC -PAC -PMC

-SLT C

DEVICE FUNCTION MAKE TYPE AUX. VOLTAGE

: LAMP TEST PUSHBUTTON c/w 2NO CONTACTS WITH BLACK COLOUR HEAD : IDEC IZUMI : YWIB-MIE20B : 110V DC -SLT

-SQ0

DEVICE FUNCTION MAKE TYPE RATED OPERATION CURRENT NO. OF POLES

: : : : :

CB CONTROL DISCREPANCY SWITCH KRAUS & NAIMER CA20B-MY3042 25A 3 POLES -SQ0

-S43

DEVICE FUNCTION MAKE TYPE RATED OPERATION CURRENT NO. OF POLES

: PADLOCKABLE REMOTE/SUPERVISORY SWITCH : : : : KRAUS & NAIMER CA10-A371-600 10A 7 POLES

-S43 E

-S23

DEVICE FUNCTION MAKE TYPE RANGE

: THERMOSTAT : DEMEX : DMO-1140 : -S23

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 APPARATUS LIST SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X3

F 19 20

THIS SHEET:

1 7

NEXT SHEET:

1 DEVICE DESIGNATION A

2 DEVICE DETAILS

3 LOCATION

6 TERMINAL FUNCTION DETAIL

-SA

DEVICE FUNCTION MAKE TYPE RATED OPERATION CURRENT NO. OF POLES

: : : : :

AMMETER SELECTOR SWITCH KRAUS & NAIMER CA10-A058-621 10A 6 POLES

=KT02+RW

-SH B

DEVICE FUNCTION MAKE TYPE RATED OPERATION CURRENT NO. OF POLES

: : : : :

HEATER ON/OFF SWITCH KRAUS & NAIMER CA10-A201-600 20A 2 POLE -SH

-SD

DEVICE FUNCTION MAKE TYPE

: LIMIT SWITCH c/w 1NC CONTACT : OMRON : Z-15GQ-B -SD

C -T100 -T101 -T102 DEVICE FUNCTION MAKE CT RATIO BURDEN CT CLASS : SINGLE PHASE SATURATION CURRENT TRANSFORMER : DTMB : 5/5A : 2VA : CLASS 0.5

-U77A

DEVICE FUNCTION MAKE TYPE AUX. VOLTAGE SCALE OUTPUT CT RATIO

: : : : : : :

SINGLE PHASE CURRENT TRANSDUCER CROMPTON TYCO ELECTRONICS (252-SARW) 110V DC 1600/800/5A 4-20mA 1600/800/5A

-U77V E

DEVICE FUNCTION MAKE TYPE AUX. VOLTAGE SCALE OUTPUT CLASS CT RATIO

: : : : : : : :

SINGLE PHASE VOLTAGE TRANSDUCER CROMPTON TYCO ELECTRONICS (252-SVRW) 110V DC 0-15KV 4-20mA 0.5 11KV/110V

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 APPARATUS LIST SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X4

F 20 21

THIS SHEET:

1 7

NEXT SHEET:

ITEM DESIGNATION
A -X510CEF -X64REF/LV

ITEM DETAILS TEST BLOCK


MANUFACTURER TYPE : AREVA : MMLG07

LOCATION =KT02+RW 1 3 5 7

TERMINAL FUNCTION DETAILS


A 9 11 13 15 17 19 21 23 25 27

10

12

14

16

18

20

22

24

26

28

SH.08A/B2 SH.08A/C2 -X510CEF -X64REF/LV SH.08A/B1 SH.08A/C1 SH.07/C6 B -PV DEVICE FUNCTION MAKE TYPE SCALE VT RATIO SIZE CLASS DEVICE FUNCTION MAKE TYPE RATED OPERATION CURRENT NO. OF POLES : : : : : : : VOLTMETER CROMPTON 0-15kV 11kV/110V 96 x 96 mm sq 1.5

SH.08/B2 SH.08/D2 SH.07/B6

SH.16/E4

SH.16/E4

SH.16/F4 SH.16/C6

SH.16/F4 SH.16/C6 B

-PV

SH.16A/D7 V2 V1

-SV

: VOLTMETER SWITCH : KRAUS & NAIMER : CA10-A007-622 : 10A : 4 POLES -SV

C Y B

SH.16A/C7

-RC1

DEVICE FUNCTION

: STABILISING RESISTOR

D -RC1 -RD1 DEVICE FUNCTION : METROSIL SH.16/C6

-RD1 -K64REF E

SH.16/C7

PRIMA PLUG IN RELAY


MANUFACTURER TYPE RATED VOLTAGE : PRIMA AREVA : PRSIIN048 : 110/125V DC 11 -K64REF 14 12 21 24 22 31 34 32 41 44 42 E

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 APPARATUS LIST SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

/ X5 REV.:

F 21 22

THIS SHEET:

1 7

NEXT SHEET:

DEVICE DETAIL
A
DEVICE FUNCTION DEVICE DESIGNATION MAKE TYPE TECHNICAL DATA INPUT RATINGS AC VOLTAGE, V N AC CURRENT, I N RATED FREQUENCY, f N RATED AUX. VOLTAGE, DC OPERATING VOLTAGE Vx 110 -120V nominal phase-phase 1 A or 5 A 50 Hz 110 V 24/250 Vdc : : : : OVERCURRENT & EARTH FAULT PROTECTION RELAY -F510CEF AREVA P123

TERMINAL FUNCTION DETAIL


A

MICOM P123

110V DC SUPPLY SH.08/C2

33 34 49 50 51 52 53 54 55 56 41 42 43

+ 1A

AUX. VOLTAGE WATCHDOG

35 37 36 4 6
RL1

RELAY FAULTY SH.11/C1

AUXILIARY DC VOLTAGE BINARY INPUTS

IR I
1A

R PHASE CURRENT

LOCKOUT MTR SH.08A/C2 B

TRIP CONTACTS

SWITCHING CAPACITY, MAKE BREAK CARRY K-BUS TRANSMISSION MODE SIGNAL LEVELS MESSAGE FORMAT DATA RATE CONNECTION CABLE TYPE CABLE LENGTH CONNECTOR ISOLATION SERIAL (RS232) SIGNAL LEVELS MESSAGE FORMAT DATA RATE CONNECTION CONNECTOR CABLE TYPE ISOLATION

30 A and carry for 3s 50 W resistive, 25W inductive (L/R = 40ms) 5A Continuous

IS I IT I IN I

2 10 12 TCS FAIL (CONTACT MULTIPLICATION) SH.11/C2

Y PHASE CURRENT

SERIAL COMMUNICATIONS

SYNCHRONOUS RS485 HDLC 64 kbit/s MULTIDROP (32 UNITS) SCREENED TWISTED PAIR 1000M SCREW TERMINALS (M4) SELV RS232 DTE (9 pin D-type female) IEC870-5(FT1.2) UP TO 19200 BAUD SINGLE ENDED 25 WAY D-TYPE SERIAL (SCREENED MULTI-CORE) ELV

1A

B PHASE CURRENT

RL2

8 14 OVERCURRENT TRIP SH.13/C7 EARTHFAULT TRIP SH.13/C8 AUTO TRIP COUNTER SH.09/B2

1A

NEUTRAL

RL3

16 18

ANNUNCIATOR C

5A

IR I IS I

RL4 R PHASE CURRENT

20 1

5A Y PHASE CURRENT

RL5

3 5

DOCUMENTATION ENGLISH : MANUAL P123 (OVERCURRENT PROTECTION RELAY) SELECTION AND ORDERING DATA MICOM P123 MICOM P123 B F 1 1 TG1.1509

CT INPUT SH.16/E4,F4

44 45 46 47 48

5A

IT I IN I

RL6 B PHASE CURRENT

7 OVERCURRENT TRIP SH.15/D3 EARTHFAULT TRIP SH.15/D3

00

5A

9
NEUTRAL RL7

Earth Current Input: 0.01 - 8 Ion Auxiliary Supply Voltage: 48-150 Vcc Communication Protocol: MODBUS HMI Languages: English

D RTU

11 13

TCS MONITOR CB CLOSE SH.07/C7 TCS MONITOR CB OPEN SH.07/C7

22 24 26 28 17 19 21 23 25 27

RL8

15

L1

L2

L3
RS-485 (OPTION)

31 32 30

L4 L5

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 TERMINAL FUNCTION DIAGRAM - AREVA P123 SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X6

F 22 22A

THIS SHEET:

1 7

NEXT SHEET:

P123 OVERCURRENT & EARTH FAULT


A A

A. Marshalling Binary Inputs


ADDRESS CONTACT 22-24 26-28 17-19 21-23 25-27 BINARY INPUT 1 2 3 4 5 TASK NO. 1 1 1 1 1 STATUS INPUT Trip Circuit Supervision Trip Circuit Supervision NOTES Trip Circuit Monitoring Trip Circuit Monitoring Spare Spare Spare APPLICATION

B. Marshalling Signal Relays


Address
Contact

35-36 2-4-6 8-10-12 16-14 20-18 3-1 7-5 9-11 13-15

Signal Relay WD 1 2 3 4 5 6 7 8

Task No. 1 1 1 1 1 1 1 1 1

Marshalling (Function No./ Function Description) Relay Faulty General Trip TCS Fail OC Trip EF Trip General Trip OC Trip EF Trip

Notes To Contact Multiplication To Lockout Master Trip Relay To Contact Multiplication To Alarm To Alarm To Auto Trip Counter Spare To SCADA To SCADA

Application

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 TERMINAL FUNCTION DIAGRAM -AREVA P123 SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X7

F 22A 23

THIS SHEET:

1 7

NEXT SHEET:

DEVICE DETAIL
A
DEVICE FUNCTION DEVICE DESIGNATION MANUFACTURER : : : : LOCKOUT MASTER TRIP RELAY -F86E AREVA MVAJ055

TERMINAL FUNCTION DETAIL


A

TECHNICAL DATA OPERATING TIME OUTPUT RELAY CONTACTS 10ms at rated voltage Make & carry continuously Make & carry for 3 seconds Break: 1250Va.c. or 1250Wd.c. within limits of 660V and 5A 7500Va.c. or 7500Wd.c. within limits of 660V and 30A 1250Va.c. or 100W (resistive) d.c. or 50W (inductive) d.c. within limits of 250V and 5A

-F86E LOCKOUT MASTER TRIP RELAY AREVA MVAJ055 RL1 RESET RL2 27 2 4 5 7 6 8 9 11 TRIP CB SH.07/C6 1 3 CB CLOSING INTERLOCK SH.06/E6

B
DOCUMENTATION ENGLISH : FACT SHEET : TR-A SERIES HIGH SPEED TRIPPING RELAYS

25 MASTER TRIP RESET SH.08A/D2 26

SELECTION AND ORDERING DATA BURDEN CONTACT RESET NUMBER OF CONTACTS HIGH HAND/ELECTRICAL RESET 1 NC 4 NO 110VDC

MASTER TRIP OPERATED SH.08A/D2

28

OPERATE

RL3

INTERTRIP TO HV (TRIPPING) SH.11A/C3

AUX. SUPPLY

RL4

MASTER TRIP RESET SH.09/B8 CONTACT MULTIPLICATION SH.11/C7

RL5

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 TERMINAL FUNCTION DIAGRAM - AREVA MVAJ055 SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X8

F 23 24

THIS SHEET:

1 7

NEXT SHEET:

DEVICE DETAIL
A
DEVICE FUNCTION DEVICE DESIGNATION MAKE TYPE TECHNICAL DATA INPUT RATINGS AC CURRENT, N RATED FREQUENCY, f N 2 PAIRS OF MAKE SELF RESETTING CONTACTS 5 - 20% of n 10 - 40% of n 20 - 80% of n 470 ohm, 220 ohm or 47 ohm (STANDARD) 1 A or 5 A 50 Hz : : : : LV RESTRICTED EARTH FAULT PROTECTION RELAY -F64REF/LV AREVA MCAG14

TERMINAL FUNCTION DETAIL


A

TRIP CONTACTS TAP SETTING ( s)

-F64REF/LV AREVA - MCAG14


RL1 2 R1 C1
B

STABILISING RESISTOR

1 3 1 2 3 4 5 6 8 9 10 2 4
CONTACT MULTIPLICATION SH.11/C2 C TRIP CONTACT (TO CB TRIP COIL) SH.07/C6

SELECTION AND ORDERING DATA RELAY TYPE MCAG14 1A 10-40% of In

C
CT SECONDARY RATING SETTING RANGE AUXILIARY SUPPLY VOLTAGE STABILISING RESISTOR VALVE (IF NON STANDARD) 0-1500 ohm

7
R S W BN P GY Y V BE BK F

T1

27

28

REXT E

SMS E

NEUTRAL CURRENT (In) SH.16/C7

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 TERMINAL FUNCTION DIAGRAM - AREVA MCAG14 SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ X9

F 24 25

THIS SHEET:

1 7

NEXT SHEET:

D -S86 WITH RED COLOUR LENS 110V DC -RD1 1DEC IZUMI ALW 29910-W 1

-RC1 E -K64REF

1 E

AREVA

PRSIIN04B

-K86E

SIEMENS

3RH11401BF40

1 0 P0 REV.

21.12.09 02.06.09 17.04.09 DATE

LILI/NNS/RS LILI/TSC/RS LILI/TSC/RS DRN/CHK/APP

DATE DRAWN CHECKED APPROVED

17.04.09 LILI TSC RS

CLIENT:

CONTRACTOR :
EPE SWITCHGEAR (M) SDN. BHD.

TITLE:

CONTRACT NO.: TNB 213/2008 TENDER NO.: T 0213107

SUPPLIER :
EPE SWITCHGEAR (M) SDN. BHD.

SCHEMATIC DIAGRAM 11KV TRANSFORMER FEEDER NO.2 -11RT1 BILL OF MATERIAL SUBSTATION: 11kV PPU STATION 5 6

= KT02 DRAWING NO.:

+ RW REV.:

/ Z1

F 25 NIL

THIS SHEET:

1 7

NEXT SHEET: