Title :

PROJECT OWNER PMC LOCATION PMC JOB NO. CLIENT JOB NO.

DOCUMENT & DRAWING CONTROL REGISTER - ELECTRICAL


: : : : : :

LPG Bottling Plant


MAESTRO OIL & GAS SOLUTION IOT DESIGN AND ENGINEERING LIMITED

Dar Es Salam, Tanzania


11C1A34

REV

DESCRIPTION

PREPARED BY

REVIEWED BY

APPROVED BY

DATE

PROJECT DOCUMENT REVISION

PMC

CLIENT

IOT DESIGN & ENGINEERING LIMITED, KOLKATA


TITLE : DOCUMENT & DRAWING CONTROL REGISTER

MAESTRO OIL & GAS SOLUTION

DRAWING/DOCUMENT NO.

SHEET 1 OF 3

REV A

DATE

\\vboxsrv\conversion_tmp\scratch_3\170606967.xls.ms_office

REVISION

SR NO.

DOC. NUMBER

DOCUMENT TITLE

SCH / ACT

Category

ISSUED FOR COMMENTS

70% SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT

80%

90%

100%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

11C1A34-01-06-A0-6000 11C1A34-01-06-A0-6001 11C1A34-01-06-A2-6002 11C1A34-01-06-A3-6003 11C1A34-01-06-A4-6004 11C1A34-01-06-A3-6005 11C1A34-01-06-A3-6006 11C1A34-01-06-A3-6007 11C1A34-01-06-A3-6008 11C1A34-01-06-A3-6009 11C1A34-01-06-A3-6010 11C1A34-01-06-A3-6011 11C1A34-01-06-A3-6012 11C1A34-01-06-A3-6013 11C1A34-01-06-A0-6014 11C1A34-01-06-A3-6015 11C1A34-01-06-A0-6016 11C1A34-01-06-A0-6017 11C1A34-01-06-A1-6018 11C1A34-01-06-A3-6019 11C1A34-01-06-A3-6020 11C1A34-01-06-A3-6021 11C1A34-01-06-A3-6022 11C1A34-01-06-A3-6023 11C1A34-01-06-A3-6024 11C1A34-01-06-A0-6025 11C1A34-01-06-CSC-001 11C1A34-01-06-CSC-002

Electrical Load List Key Single Line Diagram Electrical Equipment Layout-Substation Building Location of new sub-station building Overall cable layout Single line diagram HV switchgear Single line diagram - PMCC Single line diagram - PDB Single line diagram - UPS System Single line diagram - LDB Single line diagram - DCDB Cable layout-Sub-station building Cable layout-New LPG Pump Compressor House Cable layout-Air Compressor House Overall Earthing Layout Earthing layout sub-station building Lightning protection layout Lightning protection layout - TL Gantry 8 bay Single line diagram lighting system Single line diagram DC lighting system Lighting layout sub-station building Sub-station building periphery lighting Lighting layout-New LPG pump compressor house Lighting layout-Air compressor house Lighting layout-TL Gantry 8 bay Hazardous Area Classification for electrical Installation Power cable schedule Control cable schedule

I A A A I A A I I I I I I I I I I I I I I I I I I I I I

CONSULTANT

CLIENT

IOT DESIGN & ENGINEERING LTD.

LPG Bottling Plant at MAESTRO OIL & Dar Es Salam, GAS SOLUTION Tanzania

PREPARED BY BB

DOC. No.Clint Job No.Consultant Job No.-11C1A34 REV NO. A

DRAWING CONTROL REGISTER

SHEET NO 1 OF 1

WTD PROGRESS

% WEIGHTAGE

% PROGRESS

ISSUED FOR APPROVAL (Incorpn. Of comments)

ISSUED FOR ISSUED FOR CONSTRUCTIO CONSTRUCTION N (Without (With HOLD) -IFC1 HOLD) -IFC2

% WEIGHTAGE

SR NO.

DOC. NUMBER

DOCUMENT TITLE

SCH / ACT

REVISION

Category

ISSUED FOR COMMENTS

70% SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT

80%

90%

100%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16 16 16 16 18 19 20

11C1A34-01-06-DB-001 11C1A34-01-06-MR-002 11C1A34-01-06-MR-003 11C1A34-01-06-MR-004 11C1A34-01-06-MR-005 11C1A34-01-06-MR-006 11C1A34-01-06-MR-007 11C1A34-01-06-MR-008 11C1A34-01-06-MR-009 11C1A34-01-06-MR-010 11C1A34-01-06-MR-011 11C1A34-01-06-MR-012 11C1A34-01-06-MR-013 11C1A34-01-06-MR-014 11C1A34-01-06-MR-015 11C1A34-01-06-TS-001 11C1A34-01-06-CA-001 11C1A34-01-06-CA-002 11C1A34-01-06-CA-002 11C1A34-01-06-CA-002

Design Basis MR for 630 kVA Transformer MR for 100 kVA lighting Transformer MR for HV Switchgear MR for PMCC MR for PDB MR for flame proof lighting distribution board MR for lighting distribution board MR for Battery Charger & DC distribution board MR for UPS & AC distribution board MR for HV & MV Cable MR for LV Battery MR for flame proof lighting fixture MR for lighting fixture MR for flame proof Local PB station & power socket Technical specification & scope of work for erection HV & LV cable sizing calculation ( Internal) Earthing Calculation (Internal) Lightning Protection Calculation (Internal) Lighting Calculation (Internal)

R R R R R R R R R R R R R R R R R R R R

CONSULTANT

CLIENT

IOT DESIGN & ENGINEERING LTD.

LPG Bottling Plant at MAESTRO OIL & Dar Es Salam, GAS SOLUTION Tanzania

PREPARED BY BB

% PROGRESS DOC. No.Clint Job No.Consultant Job No.-11C1A34

ISSUED FOR APPROVAL (Incorpn. Of comments)

ISSUED FOR ISSUED FOR CONSTRUCTIO CONSTRUCTIO N (With HOLD) N (Without IFC1 HOLD) -IFC2

DOCUMENT CONTROL REGISTER

SHEET NO

IOT DESIGN & ENGINEERING LTD.

LPG Bottling Plant at MAESTRO OIL & Dar Es Salam, GAS SOLUTION Tanzania

DOCUMENT CONTROL REGISTER


1 OF 1 REV NO.

DOC. No.Clint Job No.Consultant Job No.-11C1A34

WTD PROGRESS