LISTA cuprinzand cantitatile de lucrari BENEFICIAR: COMUNA MESESENI DE JOS 0064 INVESTITIE: MODERNIZAREA COMUNEI MESESENII DE JOS 001

OBIECT: PODET DALAT STR. BRISCANESTI KM 0+836.40 0003 CATEGORIA DE LUCRARI: APARARI DE MAL 3887 Nr crt Capitolul de lucrari UM Cantitate

Formular C5

SECTIUNEA TEHNICA 2

Pret unitar Valoare a) material material [3x4a] b) manopera manopera [3x4b] c) utilaj utilaj [3x4c] d) transport transport [3x4d] Total a+b+c+d Total [3x4] SECTIUNEA FINANCIARA 4 5

1 TSC 100 MC SAPATURA CU EXCAVATOR PE PNEURI CAT M 315 D

22.67

0.00 0.00 300.00 0.00 300.00 0.00 0.00 400.00 0.00 400.00

0.00 0.00 6 801.00 0.00 6 801.00 0.00 0.00 14 844.00 0.00 14 844.00

2 TSC 100 MC NIVELARE CU BULDOZER PE SENILE CAT M 315 D

37.11

Cheltuieli directe Alte cheltuieli directe - CAS 20.8% - Somaj 0.5% - Sanatate 5.2% - Fond risc 0.196% - Alte cheltuieli 1.85% TOTAL CHELT.DIR. - Chelt indirecte 10% - Profit 5% TOTAL GENERAL (fara TVA) TVA TOTAL GENERAL

Material 0

Manopera 0 0 0 0 0 0 0

Utilaj 21 645

Transport 0

Total 21 645 0 0 0 0 0 21 645 2 165 1 190 25 000 6000 31 000

21 645

24%

Ofertant,

Pag: 1 din 2

LISTA cuprinzand cantitatile de lucrari BENEFICIAR: COMUNA MESESENI DE JOS 0064 INVESTITIE: MODERNIZAREA COMUNEI MESESENII DE JOS 001 OBIECT: PODET DALAT STR. BRISCANESTI KM 0+836.40 0003 CATEGORIA DE LUCRARI: APARARI DE MAL 3887 Nr crt Capitolul de lucrari UM Cantitate

Formular C5

SECTIUNEA TEHNICA 2

Pret unitar Valoare a) material material [3x4a] b) manopera manopera [3x4b] c) utilaj utilaj [3x4c] d) transport transport [3x4d] Total a+b+c+d Total [3x4] SECTIUNEA FINANCIARA 4 5

1 TSC 100 MC SAPATURA CU EXCAVATOR PE PNEURI CAT M 315 D

98.8023

0.00 0.00 300.00 0.00 300.00 0.00 0.00 400.00 0.00 400.00

0.00 0.00 29 640.69 0.00 29 640.69 0.00 0.00 63 000.00 0.00 63 000.00

2 TSC 100 MC NIVELARE CU BULDOZER PE SENILE CAT M 315 D

157.50

Cheltuieli directe Alte cheltuieli directe - CAS 20.8% - Somaj 0.5% - Sanatate 5.2% - Fond risc 0.196% - Alte cheltuieli 1.85% TOTAL CHELT.DIR. - Chelt indirecte 10% - Profit 5% TOTAL GENERAL (fara TVA) TVA TOTAL GENERAL

Material 0

Manopera 0 0 0 0 0 0 0

Utilaj 92 641

Transport 0

Total 92 641 0 0 0 0 0 92 641 9 264 5 094 106 999 25679.76 132 679

92 641

24%

Ofertant,

Pag: 2 din 2