Sunteți pe pagina 1din 10

EULOGIO AMANG RODRIGUEZ

INSTITUTE OF SCIENCE AND TECHNOLOGY


NAGTAHAN, SAMPALOC MANILA

REINFORCE CONCRETE DESIGN


SLAB COMPUTATION

JONAR C. TALIPTIP
BSCE 5

ENGR ALFONSO P. LICUD


PROFESSOR

S-1 and S-4

c = 30 N/mm
y = 460 N/mm
Assume Covering = 15mm
Assume = 10 mm
d = 9300/28 = 332mm
try d=330mm
d =h-cover-/2
=332 15 - 5
H = 310mm
Deadload
Wt. of slab = .31 x 24
Ceiling and floor finishes

=7.44 kn/m
=1.0 kn/m

Liveload

=2.9 kn/m

Ultimate load (Wu) = (1.2(7.44) + 1.6(2.9))(9.3)

=145.43 kn/m/m width

*Bending
Since bay size >30m the span are equal and LL<1.25DL,
Assume the End support is simply supported
M=0.086(145.43)(9.3) = 116.31 kn.m
K= M/ c bd = 116.31x106/30(1000)(330)
=0.036 < 0.156
Z = d(0.5 +
)
Z = 0.96d > 0.95d use 0.95d
As = M/0.87 y z
= 116.31x106/0.87(460)(313.5)
As = 926 mm/m
*Span-effective depth ratio
M/bd = 116.31x106/1000(330)
= 1.06

*Distributed/transverse steel
As min = 0.13bh/100
= 0.13(1000)(310)
=403 mm/m
*Shear
V = 0.6Wu
= 0.6(116.31)
= 69.786 kn
Shear stress v = V/bd
= 69.786 / 1000(310)
= 0.205 N/mm

S-2 and S-5

c = 30 N/mm
y = 460 N/mm
Assume Covering = 15mm
Assume = 10 mm
d = 9000/28 = 321mm
try d=320mm
d =h-cover-/2
=320 15 - 5
H = 300mm
Deadload
Wt. of slab = .31 x 24
Ceiling and floor finishes

=7.2 kn/m
=1.0 kn/m

Liveload

=2.9 kn/m

Ultimate load (Wu) = (1.2(8.2) + 1.6(2.9))(9) =130.32 kn/m/m width

*Bending
Since bay size >30m the span are equal and LL<1.25DL,
Assume the End support is simply supported
M=0.086(130.32)(9) = 100.87 kn.m
K= M/ c bd = 100.32x106/30(1000)(320)
=0.032 < 0.156
Z = d(0.5 +
)
Z = 0.96d > 0.95d use 0.95d
As = M/0.87 y z
= 100.32x106/0.87(460)(304)
As = 829.10 mm/m

*Span-effective depth ratio

M/bd = 100.32x106/1000(320)
= 0.985
*Distributed/transverse steel
As min = 0.13bh/100
= 0.13(1000)(300)
=390 mm/m

*Shear
V = 0.6Wu
= 0.6(100.32)
= 60.52 kn
Shear stress v = V/bd
= 60.52 / 1000(320)
= 0.189 N/mm

S-3

c = 30 N/mm
y = 460 N/mm
Assume = 10 mm
H = 300mm
Assume Covering = 15mm
Deadload
Wt. of slab = .3 x 24
Ceiling and floor finishes

=7.2 kn/m
=1.0 kn/m

Liveload

=2.0 kn/m

Ultimate load (Wu) = (1.2(8.2) + 1.6(2.0)

=13.04 kn/m/m width

Positive moment at mid-span


Ms = 0.032(Wu)(Ls)
Ms = 0.032(13.04)(7) = 20.446 kn.m
ML = 0.024(Wu)(Ls)
ML = 0.024(13.04)(7) = 15.335 kn.m
Negative moment at support
Along ab and cd, MSX = 0.042 (13.04)(7) = 26.836 kn.m
Along ad and bd, MSY = 0.032 (13.04)(7) = 20.446 kn.m
dx = h cover -/2
= 300 12 5
= 280mm
dy = h cover -/2
= 300 -15 -10- 5
= 270mm
Short Span
At mid-span, Ms = 0.032(13.04)(7) = 20.446 kn.m
K= M/ c bd = 20.446x106/30(1000)(280)
=0.00081 < 0.156
Z = d(0.5 +
)
Z = 0.99d > 0.95d use 0.95d
As = M/0.87 y z

= 100.32x106/0.87(460)(278.18)
As = 127.79 mm/m width

At support, , MSX = 0.042 (13.04)(7) = 26.836 kn.m


K= M/ c bd = 26.836x106/30(1000)(280)
=0.00081 < 0.156
Z = d(0.5 +
)
Z = 0.99d > 0.95d use 0.95d
As = M/0.87 y z
= 26.836x106/0.87(460)(268.61)
As = 249.642 mm/m width

Long Span
At mid-span, ML = 0.024(13.04)(7) = 15.335 kn.m
K= M/ c bd = 15.335x106/30(1000)(270)
=0.00070 < 0.156
Z = d(0.5 +
)
Z = 0.99d > 0.95d use 0.95d
As = M/0.87 y z
= 15.335x1060/0.87(460)(256.5)
As = 149.38 mm/m width

At support, MSY = 0.032 (13.04)(7) = 20.446 kn.m


K= M/ c bd = 20.446x106/30(1000)(270)
=0.0093 < 0.156
Z = d(0.5 +
)
Z = 0.99d > 0.95d use 0.95d
As = M/0.87 y z
= 20.446x106/0.87(460)(256.5)
As = 199.179 mm/m width

S-5a and S-5b

c = 30 N/mm
y = 460 N/mm
Assume = 10 mm
H = 300mm
Assume Covering = 15mm
Deadload
Wt. of slab = .15 x 24
Ceiling and floor finishes

=3.6 kn/m
=1.0 kn/m

Liveload

=1.9 kn/m

Ultimate load (Wu) = 1.2(4.6) + 1.6(1.9)

=8.56 kn/m/m width

Positive moment at mid-span


Ms = 0.032(Wu)(Ls)
Ms = 0.032(8.56)(3) = 2.46 kn.m
ML = 0.024(Wu)(Ls)
ML = 0.024(8.56)(73) = 1.84 kn.m
Negative moment at support
Along ab and cd, MSX = 0.042 (8.56)(3) = 3.23 kn.m
Along ad and bd, MSY = 0.032 (8.56)(3) = 2.46 kn.m
dx = h cover -/2
= 300 12 5
= 280mm
dy = h cover -/2
= 300 -15 -10- 5
= 270mm
Short Span
At mid-span, Ms = 0.032(8.56)(3) = 2.46 kn.m
K= M/ c bd = 2.46x106/30(1000)(280)
=0.001 < 0.156
Z = d(0.5 +
)
Z = 0.54(280) = 153.68
As = M/0.87 y z
= 2.46x106/0.87(460)(153.68)

As = 39.99 mm/m width

At support, , MSX = 0.042 (8.56)(3) = 3.23 kn.m


K= M/ c bd = 3.23x106/30(1000)(280)
=0.001 < 0.156
Z = d(0.5 +
)
Z = 0.54(280) =153.59
As = M/0.87 y z
= 3.23x106/0.87(460)(153.59)
As = 52.54 mm/m width
Long Span
At mid-span, ML = 0.024(8.56)(73) = 1.84 kn.m
K= M/ c bd = 1.84x106/30(1000)(270)
=0.00084 < 0.156
Z = d(0.5 +
)
Z = 0.54(270) = 148.24
As = M/0.87 y z
= 1.84x1060/0.87(460)(148.24)
As = 31.01 mm/m width

At support, MSY = 0.032 (8.56)(3) = 2.46 kn.m


K= M/ c bd = 2.46x106/30(1000)(270)
=0.0011 < 0.156
Z = d(0.5 +
)
Z = 0.99d > 0.95d use 0.95d
As = M/0.87 y z
= 2.46x106/0.87(460)(256.5)
As = 22.79 mm/m width

S-6 and S-6a

c = 30 N/mm
y = 460 N/mm
Assume Covering = 15mm
Assume = 10 mm
d = 9000/28 = 321mm
try d=320mm
d =h-cover-/2
=320 15 - 5
H = 300mm
Deadload
Wt. of slab = .15 x 24
Ceiling and floor finishes

=3.6 kn/m
=1.0 kn/m

Liveload

=1.9 kn/m

Ultimate load (Wu) = (1.2(4.6) + 1.6(1.9)) (9) =77.04 kn/m/m width

*Bending
M=0.086(77.04)(9) = 59.628kn.m
K= M/ c bd = 59.628x106/30(1000)(320)
=0.019 < 0.156
Z = d(0.5 +
)
Z = 0.52(320) = 166.4
As = M/0.87 y z
= 59.628x106/0.87(460)(166.4)
As = 895.40 mm/m

*Span-effective depth ratio


M/bd = 59.628x106//1000(320)
= 0.58
*Distributed/transverse steel
As min = 0.13bh/100
= 0.13(1000)(300)
=390 mm/m

*Shear
V = 0.6Wu
= 0.6(59.628)
= 35.77 kn
Shear stress v = V/bd
= 35.77x10/1000(320)
= 0.111 N/mm