Documente Academic
Documente Profesional
Documente Cultură
JONAR C. TALIPTIP
BSCE 5
c = 30 N/mm
y = 460 N/mm
Assume Covering = 15mm
Assume = 10 mm
d = 9300/28 = 332mm
try d=330mm
d =h-cover-/2
=332 15 - 5
H = 310mm
Deadload
Wt. of slab = .31 x 24
Ceiling and floor finishes
=7.44 kn/m
=1.0 kn/m
Liveload
=2.9 kn/m
*Bending
Since bay size >30m the span are equal and LL<1.25DL,
Assume the End support is simply supported
M=0.086(145.43)(9.3) = 116.31 kn.m
K= M/ c bd = 116.31x106/30(1000)(330)
=0.036 < 0.156
Z = d(0.5 +
)
Z = 0.96d > 0.95d use 0.95d
As = M/0.87 y z
= 116.31x106/0.87(460)(313.5)
As = 926 mm/m
*Span-effective depth ratio
M/bd = 116.31x106/1000(330)
= 1.06
*Distributed/transverse steel
As min = 0.13bh/100
= 0.13(1000)(310)
=403 mm/m
*Shear
V = 0.6Wu
= 0.6(116.31)
= 69.786 kn
Shear stress v = V/bd
= 69.786 / 1000(310)
= 0.205 N/mm
c = 30 N/mm
y = 460 N/mm
Assume Covering = 15mm
Assume = 10 mm
d = 9000/28 = 321mm
try d=320mm
d =h-cover-/2
=320 15 - 5
H = 300mm
Deadload
Wt. of slab = .31 x 24
Ceiling and floor finishes
=7.2 kn/m
=1.0 kn/m
Liveload
=2.9 kn/m
*Bending
Since bay size >30m the span are equal and LL<1.25DL,
Assume the End support is simply supported
M=0.086(130.32)(9) = 100.87 kn.m
K= M/ c bd = 100.32x106/30(1000)(320)
=0.032 < 0.156
Z = d(0.5 +
)
Z = 0.96d > 0.95d use 0.95d
As = M/0.87 y z
= 100.32x106/0.87(460)(304)
As = 829.10 mm/m
M/bd = 100.32x106/1000(320)
= 0.985
*Distributed/transverse steel
As min = 0.13bh/100
= 0.13(1000)(300)
=390 mm/m
*Shear
V = 0.6Wu
= 0.6(100.32)
= 60.52 kn
Shear stress v = V/bd
= 60.52 / 1000(320)
= 0.189 N/mm
S-3
c = 30 N/mm
y = 460 N/mm
Assume = 10 mm
H = 300mm
Assume Covering = 15mm
Deadload
Wt. of slab = .3 x 24
Ceiling and floor finishes
=7.2 kn/m
=1.0 kn/m
Liveload
=2.0 kn/m
= 100.32x106/0.87(460)(278.18)
As = 127.79 mm/m width
Long Span
At mid-span, ML = 0.024(13.04)(7) = 15.335 kn.m
K= M/ c bd = 15.335x106/30(1000)(270)
=0.00070 < 0.156
Z = d(0.5 +
)
Z = 0.99d > 0.95d use 0.95d
As = M/0.87 y z
= 15.335x1060/0.87(460)(256.5)
As = 149.38 mm/m width
c = 30 N/mm
y = 460 N/mm
Assume = 10 mm
H = 300mm
Assume Covering = 15mm
Deadload
Wt. of slab = .15 x 24
Ceiling and floor finishes
=3.6 kn/m
=1.0 kn/m
Liveload
=1.9 kn/m
c = 30 N/mm
y = 460 N/mm
Assume Covering = 15mm
Assume = 10 mm
d = 9000/28 = 321mm
try d=320mm
d =h-cover-/2
=320 15 - 5
H = 300mm
Deadload
Wt. of slab = .15 x 24
Ceiling and floor finishes
=3.6 kn/m
=1.0 kn/m
Liveload
=1.9 kn/m
*Bending
M=0.086(77.04)(9) = 59.628kn.m
K= M/ c bd = 59.628x106/30(1000)(320)
=0.019 < 0.156
Z = d(0.5 +
)
Z = 0.52(320) = 166.4
As = M/0.87 y z
= 59.628x106/0.87(460)(166.4)
As = 895.40 mm/m
*Shear
V = 0.6Wu
= 0.6(59.628)
= 35.77 kn
Shear stress v = V/bd
= 35.77x10/1000(320)
= 0.111 N/mm