Mooring operations include: 1 throwing heaving lines 2 running out mooring lines 3 reporting distance off 4 securing mooring

lines 5 letting go mooring lines 6 recovering mooring lines 7 making fast fore and aft to a fixed jetty 8 9 making fast to a conventional buoy mooring 10 preparing mooring area for operations 12 adjusting moorings during a port stay 13 securing mooring area on departure 14 rigging gangways, accommodation ladders and pilot ladders 15 stowing mooring lines after use Mooring equipment includes: 1 man-made fibre and wire-rope moorings 2 heaving lines and stoppers - (rope and chain) 4 winches 5 electric, hydraulic and hand driven capstans/drum ends 6 dead men and fairleads Equipment malfunctions or problems may include: 1 failure of moorings or equipment 2 damage to moorings 3 insufficiency of moorings 4 poor leads 5 inability to maintain ship in position Routine and emergency anchor operations may include: dropping, paying out and holding an anchor reporting amount and lie of cable letting go and weighing anchor securing to a single anchor securing to twin anchors recovering anchor clearing anchor and cable recovering a foul hawse hanging off an anchor Anchor equipment may include: 1 cable 2 securing arrangements 3 anchor balls 4 cable locker Operational hazards during mooring or anchor handling operations may include: 1 failure of moorings, anchor or equipment 2 damage to moorings 3 insufficiency of moorings 4 faulty or damaged machinery and equipment 5 moving and rotating machinery 6 using equipment beyond safe working limits 7 cables and ropes 8 poor leads 9 inability to maintain ship in position 10 moving heavy loads using unsafe lifting procedures 11 slippery deck 12 poor housekeeping procedures 13 non-compliance with safe working procedures

Berthing and mooring: throw heaving lines run out mooring lines report distance off secure mooring lines let go mooring lines recover mooring lines make fast fore and aft to a fixed jetty make fast to a conventional buoy mooring prepare mooring area for operations adjust moor lines during a port stay secure mooring area on departure stow mooring lines after use Anchoring: clear away anchor for letting go let go anchor pay out cable report amount and lie of cable secure cable weigh anchor secure anchor for sea

S-ar putea să vă placă și