PRESUPUESTO ANALITICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.
2.6.2.2.2.3

2.6.2.2.2.3
2.6.2.2.2.3
2.6.2.2.2.3
2.6.2.2.2.3
2.6.2.2.2.3

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

MANO DE OBRA
TOPOGRAFO

hh

34.92

10.00

CAPATAZ

349.20

hh

10,689.85

9.63

102,943.26

OPERARIO

hh

123,438.16

8.53

1,052,927.50

OFICIAL

hh

67,409.81

7.55

508,944.07

PEON

hh

120,837.92

6.82

824,114.61

2,489,278.64

TOTAL

2.6.2.2.2.4

MATERIALES

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

ACEITE PARA MOTOR GRADO 30

gln

49.1500

48.00

2,359.20

ALAMBRE NEGRO RECOCIDO # 16

kg

112.2700

5.50

617.49

ALAMBRE NEGRO RECOCIDO # 8

kg

144.5000

5.50

794.75

CLAVOS PARA MADERA C/C 2 1/2"

kg

10.8000

6.00

64.80

CLAVOS PARA MADERA C/C 2"

kg

6.5200

6.00

39.12

CLAVOS PARA MADERA C/C 3"

kg

1,294.2900

4.50

5,824.31

CLAVOS PARA MADERA C/C 3/4"

kg

5.0100

6.00

30.06

CLAVOS PARA MADERA C/C 4"

kg

272.2000

4.50

1,224.90

CLAVO NEGRO PARA CEMENTO C/C 1 1/2 "

kg

112.2100

6.50

729.37

CLAVOS Fo No C/C 3"

kg

26.5800

6.00

159.48

CLAVOS Fo No C/C 3/4"

kg

97.8500

5.50

538.18

ALAMBRE NEGRO N16

kg

19,714.7900

5.00

98,573.95

ALAMBRE NEGRO N8

kg

897.1500

5.00

4,485.75

PERNO HEXAGONAL P/BRIDA DE 6" INC.TUERCA

und

61.3200

2.00

122.64

PERNO HEXAGONAL P/BRIDA DE 8" INC.TUERCA

und

7.1300

2.50

17.83

PERNO HEXAGONAL P/BRIDA DE 10"INC.TUERCA

und

28.5200

3.00

85.56

CLAVOS PARA CALAMINA

kg

7.2000

6.00

43.20

SOPORTE T/ABRAZADERA P/TUB 4"

und

321.0000

15.00

4,815.00

SOPORTE T/ABRAZADERA P/TUB 2"

und

487.0000

18.00

8,766.00

SOPORTE T/ABRAZADERA P/TUB 6"

und

10.0000

20.00

200.00

SOPORTE T/ABRAZADERA P/TUB 3"

und

93.0000

31.25

2,906.25

SOPORTE T/ABRAZADERA P/TUB 2 1/2"

und

67.0000

28.00

1,876.00

PERNOS 1/4" X 2 1/2"

und

2,426.5500

0.60

1,455.93

CLAVOS DE FIERRO (PROMEDIO)

kg

63.7400

4.50

286.83

VOLANDAS DE PRESION 3/4"

pza

1,182.6900

2.00

2,365.38

TORNILLOS DE 2"

und

2,119.4600

0.50

1,059.73

VENTANA METALICA APERSIANADA INCL. SUMINISTRO Y COLOCADO

und

1.0000

35.00

35.00

VENTANA MET. APERSIANADA INCL. SUMINISTRO Y COLOCADO

und

14.0000

50.00

700.00

TUBO DE ACERO 1 1/2" X 5.5 MTS.

pza

814.4300

38.23

31,135.66

ACERO DE REFUERZO FY=4200 GRADO 60

kg

619,476.3300

3.10

1,920,376.62

ACERO DE CONSTRUCCION LISO 1/4"

kg

2,012.6200

3.40

6,842.91

FIERRO CORRUGADO D=3/8"

kg

21.0000

3.20

67.20

FIERRO CORRUGADO PROMEDIO

kg

49.5700

2.80

138.80

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

ACERO CORRUGADO 0 3/8"

kg

1.5000

3.20

4.80

FIERRO CORRUGADO GRADO 60

kg

393.0100

3.00

1,179.03

ARENA FINA

m3

412.0500

40.00

16,482.00

ARENA GRUESA

m3

969.3500

35.00

33,927.25

TIERRA NEGRA DE CHACRA O TIERRA VEGETAL

m3

12.0000

40.00

480.00

MALLA ELECTROSOLDADA 2.40x6.00M COCADA 10X10CM D=4.20MM

m2

10,873.7900

14.00

152,233.06

PLANCHA DE ACERO GALVANIZADO 1 1/6" (INCL. SUMINISTRO Y COLOCACION)

GLB

1.0000

12,500.00

ABRAZADERA DE FIERRO GALVANIZADO C/2 OREJAS 4"

KW

29.0000

25.00

725.00

ABRAZADERA DE FIERRO GALVANIZADO C/2 OREJAS 6"

KW

22.0000

15.00

330.00

ABRAZADERA DE FIERRO GALVANIZADO C/2 OREJAS 8"

und

44.0000

77.10

3,392.40

PIEDRA CHANCADA DE 1/2"

m3

2.3900

45.00

107.55

PIEDRA CHANCADA DE 3/4"

m3

0.1400

50.00

7.00

PIEDRA GRANDE DE 8"

m3

187.9200

40.00

7,516.80

GRAVA PARA FILTRO DE 10 A 100 mm

m3

0.4100

120.00

49.20

PIEDRA KALA GRISS

m2

707.9000

158.00

111,848.20

GRAVA SELECCIONADA PARA FILTRO DE 12 mm

m3

38.2800

60.00

2,296.80

GRAVA SELECCIONADA PARA FILTRO DE 1"

m3

363.4100

60.00

21,804.60

ARENA GRUESA

m3

141.4900

35.00

4,952.15

MATERIAL DE RELLENO

m3

13.7700

30.00

413.10

TUBERIA PVC-SAP C-7.5 DE 3" X 5 m

62.5800

8.00

500.64

TUBERIA PVC SAP C-10 S/P DE 2 1/2" X 5 m

104.5800

8.00

836.64

REDUCCION PVC SAP C-10 R 3/4" A 1/2"

KW

3.0000

5.00

15.00

REDUCCION PVC SAP S/P DE 2"

und

1.0000

25.00

25.00

REDUCCION PVC SAP S/P DE 2"

und

1.0000

20.00

20.00

REDUCCION PVC SAP S/P DE 1 1/2"

und

1.0000

15.00

15.00

MATERIAL AFIRMADO

m3

1,544.5100

35.00

54,057.85

CONDUCTOR DE COBRE DESNUDO 25 mm2, TEMPLE BLANDO

150.0000

7.00

1,050.00

TAPON PVC-SAL 4"

KW

32.0000

5.80

185.60

TAPON PVC-SAL 4"

und

4.0000

5.80

23.20

CONECTOR DE COBRE TIPO ANDERSON, PARA VARILLA 3/4"

pza

6.0000

10.00

60.00

CABLE 4 mm2 NH80

28,388.3600

2.60

73,809.74

CABLE 6 mm2 NH80

2,600.0000

2.60

6,760.00

CABLE 10 mm2 NH80

4,300.0000

5.20

22,360.00

CABLE 16 mm2 NH80

2,600.0000

7.50

19,500.00

CABLE 25 mm2 NH80

1,300.0000

12.50

16,250.00

CABLE 35 mm2 NH80

200.0000

18.00

3,600.00

CABLE 50 mm2 NH80

2,600.0000

22.00

57,200.00

CABLE 70 mm2 NH80

700.0000

32.00

22,400.00

CABLE 2.5 mm2 NH80

7,300.0000

2.20

16,060.00

DUCTO DE VACIO 1/2"

und

1.0000

20.00

20.00

INODORO TIPO RAPID JET FLUX COLOR BLANCO

und

107.0000

450.00

48,150.00

TRAMPA "P" DE BRONCE DE 6"

und

1.0000

10.00

10.00

LAVATORIO OVALIN SONNET COLOR BLANCO

pza

93.0000

110.00

10,230.00

12,500.00

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

POLIESTIRENO EXPANDIDO PARA TECHO 100X34X20CM DENSIDAD 9 - 12 KG/M3

m3

1,476.0700

150.75

URINARIO FLUXOMETRO DE DESCARGA REDUCIDA TIPO CADET COLOR BLANCO.

pza

31.0000

300.00

JABONERA DE VOLTEO P/JABON LIQUIDO

und

107.0000

50.00

5,350.00

PAPELERA C/EJE 15x15 BLANCA

und

107.0000

37.50

4,012.50

LLAVE CORPORATION DE 1/2"

und

4.0000

30.00

120.00

REGISTRO DE BRONCE DE 4"

und

2.0000

15.00

30.00

JUNTA WATER STOP DE NEOPRENE 10 PULG.

143.3300

25.00

3,583.25

LUMINARIA DE EMERGENCIA CON DOS FAROS DE 20 W

und

209.0000

120.00

25,080.00

LUMINARIA TIPO REJILLA ALUMINIZADA DE 4x28W PARA EMPOTRAR EN CIELO RASO


DECORATIVO DE 0.61x0.61 M

und

1,680.0000

150.00

SPOT LIGHT P/TECHO C/PROTECTOR, LAMP. AHORR. 18W

pza

1,452.0000

35.00

SPOT LIGHT CIRCULAR C/VIDRIO SERIGRAFIADO 2x26W

und

10.0000

50.00

500.00

SPOT LIGHT CIRCULAR C/VIDRIO SERIGRAFIADO 2x18W

und

273.0000

50.00

13,650.00

REFLECTOR LUXIOD EX (INTEGRADO), C/LAMP. HALOG. METAL. 150W

und

44.0000

120.00

5,280.00

TABLERO MONOFASICO DE 8 POLOS

und

11.0000

200.00

2,200.00

TABLERO MONOFASICO DE 12 POLOS

und

18.0000

320.00

5,760.00

TABLERO TRIFASICO DE 8 POLOS

und

1.0000

300.00

300.00

TABLERO TRIFASICO DE 12 POLOS

und

1.0000

350.00

350.00

TABLERO TRIFASICO DE 70 POLOS

und

1.0000

500.00

500.00

TABLERO TRIFASICO DE 10 POLOS

und

1.0000

300.00

300.00

TABLERO MONOFASICO DE 10 POLOS

und

4.0000

220.00

880.00

TABLERO MONOFASICO DE 6 POLOS

und

15.0000

200.00

3,000.00

TABLERO TRIFASICO DE 60 POLOS

und

4.0000

500.00

2,000.00

TABLERO TRIFASICO DE 27 POLOS

und

14.0000

400.00

5,600.00

TABLERO TRIFASICO DE 20 POLOS

und

1.0000

400.00

400.00

TABLERO TRIFASICO DE 16 POLOS

und

28.0000

350.00

9,800.00

TABLERO MONOFASICO DE 20 POLOS

und

1.0000

200.00

200.00

TOMACORRIENTE DOBLE PLANO BAKELITA C/TIERRA

und

566.0000

8.00

4,528.00

INTERRUPTOR TERMOMAGNETICO DE 2x30Ax240V

und

2.0000

26.00

52.00

INTERRUPTOR TERMOMAGNETICO 3X30AX220V

und

1.0000

30.00

30.00

INTERRUPTOR TERMOMAGNETICO DE 3x80Ax220V

und

2.0000

95.00

190.00

INTERRUPTOR TERMOMAGNETICO DE 2x10Ax220V

und

119.0000

35.00

4,165.00

INTERRUPTOR TERMOMAGNETICO DE 2x15Ax220V

und

128.0000

35.00

4,480.00

INTERRUPTOR TERMOMAGNETICO DE 2x30Ax220V

und

56.0000

35.00

1,960.00

INTERRUPTOR TERMOMAGNETICO DE 2x25Ax220V

und

73.0000

35.00

2,555.00

INTERRUPTOR TERMOMAGNETIC DE 3x25Ax220V

und

32.0000

50.00

1,600.00

INTERRUPTOR TERMOMAGNETIC DE 3x30Ax220V

und

110.0000

60.00

6,600.00

INTERRUPTOR TERMOMAGNETIC DE 3x35Ax220V

und

26.0000

65.00

1,690.00

INTERRUPTOR TERMOMAGNETIC DE 3x50Ax220V

und

2.0000

75.00

150.00

INTERRUPTOR TERMOMAGNETIC DE 3x70Ax220V

und

26.0000

85.00

2,210.00

INTERRUPTOR TERMOMAGNETIC DE 3x120Ax220V

und

3.0000

120.00

360.00

INTERRUPTOR TERMOMAGNETIC DE 3x150Ax220V

und

26.0000

150.00

3,900.00

INTERRUPTOR TERMOMAGNETIC DE 3x250Ax220V

und

3.0000

180.00

540.00

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

222,517.55
9,300.00

252,000.00
50,820.00

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

INTERRUPTOR TERMOMAGNETIC DE 3x1000Ax220V

und

2.0000

700.00

1,400.00

INTERRUPTOR TERMOMAGNETICO DE 3x1800x220V

und

2.0000

2,100.00

4,200.00

INTERRUPTOR TERMOMAGNETIC DE 3x2200Ax220V

und

1.0000

2,500.00

2,500.00

INTERRUPTOR TERMOMAGNETICO 2x20Ax220V

und

120.0000

35.00

4,200.00

CAJA RECTANG GALV PESADA 4"x2 1/8"x2 1/8"

und

2,714.0000

6.00

16,284.00

CAJA DE PASO GALV. 12"x12"x6" C/TAPA Y CHAPA

und

556.0000

15.00

8,340.00

CAJA OCTOGONAL GALV. PESADO 4"x4"x2 1/2"

und

7,032.0000

5.00

35,160.00

TAPA CIEGA CIRCULAR

pza

549.0000

2.00

1,098.00

INTERRUPTOR SIMPLE

pza

261.0000

6.00

1,566.00

INTERRUPTOR DOBLE

pza

79.0000

7.00

553.00

TOMACORRIENTE DOBLE PLANO BAKELITA C/TIERRA EMPOTRADO UNIVERSAL

pza

960.0000

18.00

INTERRUPTOR CONMUTADOR 3 VIAS SIMPLE

pza

57.0000

18.00

1,026.00

INTERRUPTOR CONMUTADOR 3 VIAS DOBLE

pza

128.0000

22.00

2,816.00

CONTACTOR ELECTROMAGNETICO 2 x 30 A x 240 V, 60 HZ.

und

2.0000

35.00

70.00

LADRILLO KING KONG MECANIZADO 10X14X24

und

155,710.1700

1.20

186,852.20

LADRILLO P/TECHO DE 15x30x30 CM 8 HCOS.

und

773.2300

2.50

1,933.08

CONCRETO PREMEZCLADO F'c=280 kg/cm2 CON CEMENTO PORTLAND TIPO I

m3

4,985.2500

420.00

CONCRETO PREMEZCLADO F'c=350 kg/cm2 CON CEMENTO PORTLAND TIPO I

m3

133.3600

520.00

SERVICIO DE BOMBA PARA CONCRETO PREMEZCLADO

m3

5,081.9000

38.00

SERVICIO DE ALQUILER DE GRUA TORRE ALCANCE DE 75M DE ALTURA, CARGA


CRITICA DE 1.50 TON CON BRAZO EXTENDIDO A 35M

mes

12.0000

28,500.00

CEMENTO PORTLAND TIPO I (42.5KG)

BOL

476.1900

21.80

ADOQUIN DE CONCRETO DE 10 X 20 CM

m2

50.9000

60.00

3,054.00

ADITIVO IMPERMEABILIZANTE PARA CONCRETO ARMADO

gln

840.2400

35.00

29,408.40

ADITIVO IMPERMEABILIZANTE BITUMINOSO

gln

83.7000

50.00

4,185.00

CERAMICO 30x30

m2

92.3300

24.00

2,215.92

CERAMICO BLANCO DE 40x40

m2

1,268.9400

26.00

32,992.44

PORCELANATO DE 60X60 CM

m2

5,630.2600

53.00

298,403.78

PORCELANATO COLOR BEIGE DE 60X10 CM

pza

5,399.9800

12.00

64,799.76

PORCELANATO COLOR BLANCO DE 60X10 CM

pza

224.1800

12.00

2,690.16

PICAPORTE DE ALUMINIO DE 3"

pza

16.7400

6.00

100.44

BISAGRAS DE FIERRO DE 1 1/2"

pza

34.6800

2.00

69.36

BISAGRAS DE FIERRO DE 1 1/2"

und

104.0500

2.20

228.91

BISAGRA ALUMINIZADA CAPUCHINA 4"x4"

pza

1,095.0000

4.10

4,489.50

PICAPORTE DE ALUMINIO DE 3"

und

50.2300

7.65

384.26

PICAPORTE DE ALUMINIO DE 6"

und

142.0000

15.30

2,172.60

CERRADURA DE PERILLA DE BAO

pza

47.0000

34.00

1,598.00

CERRADURA DOS GOLPES C/SEGURO Y LLAVE EXT.

pza

249.0000

52.00

12,948.00

TORNILLO DE ENC.

pza

1,182.6900

1.00

1,182.69

TORNILLO WAFER PUNTA BROCA 8x13

mll

15.4400

50.00

772.00

CLAVOS (FIJACION POLVORA) 1"

cto

61.7800

7.50

463.35

TORNILLO AUTOROSCANT GYPLAC/SPB P. FINA 6 X 32 MM

mll

114.2800

18.96

2,166.75

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

17,280.00

2,093,805.00
69,347.20
193,112.20
342,000.00
10,380.94

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

MECHA NARANJA

105.0000

0.90

94.50

MECHA O GUIA

97.9200

1.20

117.50

FULMINANTE O DETONANTE

und

32.6400

1.00

32.64

FULMINANTE

und

105.0000

0.90

94.50

DINAMITA EN CARTUCHO

und

32.6400

2.00

65.28

DINAMITA

kg

26.2500

9.00

236.25

VIGUETA PRETENSADA PREFABRICADA FC= 350 - 400 KG/CM2

25,945.3500

21.00

544,852.35

CERA PARA PISO

gln

116.7100

26.00

3,034.46

YESO EN BOLSAS DE 25 KG

BOL

65.5300

6.00

393.18

CARBON VEGETAL

kg

300.0000

5.00

1,500.00

CINTA TEFLON

pza

0.3000

1.00

0.30

CANASTILLA DE 3"

und

1.0000

25.00

25.00

ACOPLE RIGIDO RANURADO 2 1/2"

pza

208.0000

10.00

2,080.00

ACOPLE RIGIDO RANURADO 3"

pza

1.0000

12.50

12.50

ACOPLE RIGIDO RANURADO 4"

pza

39.0000

15.00

585.00

ACOPLE RIGIDO RANURADO 2"

pza

1.0000

1.00

1.00

CINTA TEFLON

und

3.9600

1.00

3.96

SOLDADURA CELLOCORD 1/8"

kg

33.4900

9.50

318.16

SOLDADURA OVERCORD 1/8"

kg

377.9400

9.50

3,590.43

SOLDADURA CELLOCORD PUNTO AZUL 1/8"

kg

54.4300

13.50

734.81

PLACA DE YESO CARTON ESTANDAR RH DE 1/2" 1.22X2.44 M

pza

2,162.1300

40.00

86,485.20

BALDOSA ACUSTICA 61 x 61 CM, E = 5/8" INCL. PERFILERIA DE FIJACION, ACCESORIOS m2


E INSTALACION

10,301.8900

48.00

494,490.72

BARRENO 5' X 1/8"

und

0.7100

780.00

553.80

VARILLA DE COBRE D=3/4" x L=2.40m

und

6.0000

250.00

1,500.00

IMPERMEABILIZANTE

gln

16.7000

20.00

334.00

PORCELANA

kg

299.9400

5.20

1,559.69

PASTA PARA JUNTA HANILTON'S

kg

185.3300

16.14

2,991.23

ADITIVO DESMOLDEADOR DE ENCOFRADOS

gln

790.8200

35.00

27,678.70

PINTURA BARNIZ

gln

34.4100

45.00

1,548.45

CRISTAL TEMPLADO TRANSPARENTE SIST. MODUGLASS DE 6mm (INC. ACCESORIOS E p2


INSTALACION SEGUN DETALLE DE PLANO)

15,541.2300

27.00

CRISTAL TEMPLADO TRANSPARENTE SIST. MODUGLASS DE 10mm (INC. ACCESORIOS p2


E INSTALACION SEGUN PLANO DE DETALLE)

2,053.7400

42.00
58.00

13,994.24

419,613.21
86,257.08

FORMICA NOGAL 4' x 8'

pln

241.2800

RELE TEMPORIZADOR, 16(4) A, 240 V, 60 HZ.

und

2.0000

50.00

100.00

CENTRAL DE CONTROL REMOTO

und

1.0000

250.00

250.00

MODULO DE CONTROL ARRANQUE Y PARADA

und

1.0000

300.00

300.00

LAVADERO ACERO INOXIDABLE 20" x 39" C/ACCESORIOS

und

2.0000

150.00

300.00

PEGAMENTO PARA PVC AGUA FORDUIT

gln

72.0600

26.00

1,873.56

PEGAMENTO PLASTICO P/PVC

gln

18.4100

32.00

589.12

PEGAMENTO PARA PVC 1/4 GLN

und

0.0100

8.00

0.08

PEGAMENTO PARA PVC

8.6700

6.00

52.02

CINTA AISLANTE ELECTRICA 3M-1700

rll

315.9000

5.00

1,579.50

CINTA PARA JUNTA ROLLO X 150 m.

rll

30.8900

5.00

154.45

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Proyecto

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

FRAGUA

kg

154.2700

5.40

833.06

OCRE

kg

162.1100

10.00

1,621.10

OCRE ROJO

kg

25.4500

10.00

254.50

NIVEL

DIA

0.5000

5.00

2.50

TEODOLITO

DIA

0.5000

10.00

5.00

MANOMETRO 0 A 300 LB/PUL2 I/ACCESORIOS

und

3.0000

35.00

105.00

MACROMEDIDOR DE AGUA POTABLE C/ROSCA Q 3"

und

1.0000

1,500.00

1,500.00

GABINETE CONTRAINCENDIO INCL/ACCESORIOS

und

15.0000

250.00

3,750.00

THOR GEL (DOSIS DE 5 KG)

DOS

6.0000

15.00

90.00

ADITIVO IMPERMEABILIZANTE

gln

384.0000

40.00

15,360.00

CONEXION PARA MANGUERA

und

1.0000

20.00

20.00

CORDEL

4.4700

0.50

2.24

LIJA

und

115.7300

1.60

185.17

TAPONES DE MORTERO YESO-CEMENTO

und

74.6300

20.00

1,492.60

CINTA TEFLON

und

151.8800

1.00

151.88

TRIPLAY LUPUNA 1.20X2.40m x 19 mm

pln

226.7600

130.00

29,478.80

TAPA DE CONCRETO ARMADO 0.45 X 0.60 M

und

3.0000

60.00

180.00

FLETE TRANSPORTE LOCAL

kg

3,511.0800

1.50

5,266.62

LANA DE VIDRIO

BLK

231.6600

85.00

19,691.10

HORMIGON

m3

626.4600

25.00

15,661.50

HORMIGON (PUESTO EN OBRA)

m3

0.6300

30.00

18.90

COLA SINTETICA FULLER

gln

238.7500

23.80

5,682.25

LIJAR # 50 ABRALIT

0.8500

10.00

8.50

ENERGIA ELECTRICA

mes

24.0000

400.00

9,600.00

HOJA DE SIERRA

pza

69.2200

4.00

276.88

LIJA DE FIERRO # 80

pza

108.7700

1.60

174.03

LIJA PARA MADERA

und

837.5400

1.60

1,340.06

EMPAQUETADURA DE JEBE ENLONADO DE 6"

und

4.3400

5.00

21.70

EMPAQUETADURA DE JEBE ENLONADO DE 8"

und

0.5100

8.00

4.08

EMPAQUETADURA DE JEBE ENLONADO DE 10"

und

2.0200

10.00

20.20

AGUA

m3

53.2700

1.00

53.27

AGUA PARA LA OBRA INC. CONEXION

mes

24.0000

350.00

8,400.00

TIZA

BOL

1.2500

5.00

6.25

GUANO DE OVINO

m3

12.0000

10.00

120.00

INSTALACION DE ASCENSOR INCLUYE M.O. Y ACCESORIOS

est

4.0000

7,750.00

31,000.00

ARENADO,LABOR PINTADO TUBO FIERRO 2"

171.2000

2.50

428.00

CANALETA PLUVIAL GALV. INCL/TRANSPORTE Y COLOCACION

8.9300

25.00

223.25

TAPA METALICA EN BOTADERO DE BASURA

und

15.0000

40.00

600.00

CERAMICO ALTO TRANSITO T-4 40 x 40 cm

m2

660.0300

28.00

18,480.84

PARQUETON VETEADO

m2

6,127.2000

60.00

367,632.00

MADERA NACIONAL P/ENCOFRADO-CARP

p2

2,379.1100

5.00

11,895.55

MADERA TORNILLO

p2

20,647.4100

5.00

103,237.05

RODON DE MADERA 3/4" x 3/4"

2,356.3200

2.90

6,833.33

CONTRAZOCALO DE MADERA 4" x 3/4"

2,311.4300

8.00

18,491.44

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

MADERA AGUANO

p2

13,030.6000

5.00

65,153.00

MADERA CEDRO CEPILLADO

p2

771.9400

5.30

4,091.28

REGLA DE MADERA

p2

14.2900

5.00

71.45

ANDAMIO DE MADERA

p2

138.4200

5.00

692.10

LISTONES DE MADERA 1/2"X2"X7'

pza

2,573.6000

5.65

14,540.84

LISTONES DE MADERA 1 1/4"X4"X7'

pza

1,286.8000

9.35

12,031.58

LISTONES DE MADERA 1 3/4"X6"X7'

pza

643.4000

13.85

8,911.09

MADERA TORNILLO CEPILLADA

p2

1.2500

5.00

6.25

MELAMINE DE 18 MM

pza

138.7400

136.98

19,004.61

MELAMINA DE 9 MM

pza

2.7200

110.00

299.20

TRIPLAY DE 4'x8'x 12 mm

pln

2.3900

230.00

549.70

TABLERO AGLOMERADO FINO DE MADERA 4MM

pln

482.5500

52.50

25,333.88

PASAMANOS DE CEDRO CIRCULAR D=3"

941.9100

28.00

26,373.48

MUEBLES DE MELAMINA BAJO Y ALTO P/KITCHENETTE (INCL. SUMINISTRO Y


COLOCADO)

GLB

1.0000

1,750.00

MADERA TORNILLO INC.CORTE P/ENCOFRADO

p2

1,828.8600

4.50

8,229.87

LAVATORIO TIPO MALIBU CON PEDESTAL COLOR BLANCO

und

14.0000

120.00

1,680.00

ASCENSOR DE PUERTAS AUTOMATICA Y APERTURA CENTRAL C/ ACCESORIOS

und

4.0000

139,514.00

SECADOR AUTOMATICO DE MANOS C/PANEL DE HIERRO 220V/50HZ, 2200 W.

und

32.0000

250.00

TEE DE FIERRO GALVANIZADO DE 4"

KW

1.0000

30.00

30.00

UNION SIMPLE DE FIERRO GALVANIZADODE 3"

KW

3.0000

35.00

105.00

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3"

KW

4.0000

40.00

160.00

TARUGOS DE MADERA

pza

6,434.0000

1.50

9,651.00

TAPA C/MARCO FF DE BUZON D=0.60m

und

6.0000

220.00

1,320.00

TAPA C/MARCO FF DE BUZON D=0.90m

und

1.0000

320.00

320.00

FIERRO ANGULAR 3/4" x 3/4" x 1/8" x 6m

pza

18.8800

35.00

660.80

TEE REDUCCION RANURADO 4"x4"x2 1/2"

pza

16.0000

60.00

960.00

PLATINA DE FIERRO 1/8" x 3/4" x 6m

pza

5.5600

15.00

83.40

PLATINA DE FIERRO 3/16" x 2" x 6m

pza

155.8000

32.00

4,985.60

PLATINA DE FIERRO 3/16" x 3" x 6m

pza

106.2300

40.00

4,249.20

TUBO CUADRADO 1"X1" E=2MM

796.5400

5.41

4,309.28

PLATINA DE FIERRO 1/4" X 1 1/2" X 6 M.

pza

69.0800

25.00

1,727.00

PLATINA 1" X 1/8"

124.3800

2.30

286.07

PLATINA DE FIERRO 1/ 8" X 3"X 6 M.

pza

4.6600

26.00

121.16

RIEL 65 X 25 mm. E= 0.45mm. L=3.00 m.

und

1,081.0700

8.50

9,189.10

PARANTE METALICO 64 X38 mm.(2 1/2"X 1 5/8") E= 0.45 mm. L= 3.00 m

pza

3,110.3800

10.45

32,503.47

ESQUINERO METALICO 30 X 30 X 0.40 MM X2.40 M.

pza

247.1000

6.95

1,717.35

ANGULAR 1 1/4"*1 1/4"*3/16"x6M

15.5500

6.00

93.30

ANGULAR 1" * 1 * 1/8"

342.8600

3.83

1,313.15

ANGULAR 1 1/4"*1 1/4"*1/8"x6M

pza

46.6400

24.20

1,128.69

ESTRUCTURA METALICA CURVA EN FACHADA PRINCIPAL REVESTIDA CON


REYNOBOND(INC ACCESORIOS E INSTALACION)

GLB

1.0000

90,000.00

TUBERIA SCH-40 O 2"

186.2000

25.00

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

1,750.00

558,056.00
8,000.00

90,000.00
4,655.00

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

BIPODE DE SUJECION

und

2,316.5700

6.50

15,057.71

CANOPLA DE ALUMINIO DE 2"

pza

689.9600

5.00

3,449.80

CANTONERA DE ALUMINIO C/ ANCLAJE 2" 11/2" 6mts

var

230.4100

43.00

9,907.63

VALVULA ANGULAR C/REDUCCION HEMBRA-MACHO 2"

pza

15.0000

18.00

270.00

THINER

gln

32.5200

16.00

520.32

BREA

kg

166.8900

3.29

549.07

VALVULA REDUCTORA DE PRESION ROSCADA 2 1/2", ACERO INOXIDABLE

pza

2.0000

75.00

150.00

PINTURA LATEX

gln

128.3200

42.50

5,453.60

PINTURA ESMALTE SINTETICO

gln

9.7800

30.00

293.40

PINTURA LATEX VENCELATEX

gln

442.0700

42.50

18,787.98

PINTURA LATEX SUPERMATE

gln

38.1200

42.50

1,620.10

PINTURA ANTICORROSIVA

gln

32.9400

35.00

1,152.90

PINTURA ANTICORROSIVA EPOX-USO NAVAL

gln

12.9800

50.00

649.00

LACA ACRILICA

gln

7.0800

45.00

318.60

BARNIZ DD PARA PISOS CPP

gln

175.0600

140.00

24,508.40

PINTURA ACRILICA 1/4 GLN

und

7.0800

35.00

247.80

PINTURA ESMALTE

gln

16.7100

45.00

751.95

PINTURA SELLADOR

gln

32.8400

25.00

821.00

PINTURA IMPRIMANTE

gln

704.1600

22.50

15,843.60

BRIDA DE ACERO P/ SOLDAR-ANCLAJES DE 4"

und

1.0000

80.00

80.00

BRIDA ACERO P/SOLDAR-ROMPE AGUA DE 4"

und

1.0000

80.00

80.00

BRIDA ACERO P/SOLDAR-ROMPE AGUA DE 6"

und

3.0000

120.00

360.00

BRIDA ACERO P/SOLDAR-ROMPE AGUA DE 8"

und

1.0000

160.00

160.00

BRIDA ACERO P/SOLDAR-ROMPE AGUA DE 10"

und

1.0000

200.00

200.00

CALAMINA GALVANIZADA ( 3mm)

pln

306.0000

28.00

8,568.00

BRIDA ACERO P/SOLDAR-ROMPE AGUA DE 3"

und

2.0000

70.00

140.00

BRIDA ACERO P/SOLDAR-ROMPE AGUA DE 2 1/2"

und

2.0000

60.00

120.00

PUERTA METALICA C/REJILLA

und

1.0000

220.00

220.00

PUERTA METALICA ANTIFUEGO P-5 1.20 X 2.10 (INC/ACCESORIOS E INSTALACION)

und

18.0000

4,200.00

PUERTA METALICA ANTIFUEGO P-7 2.00 X 2.10 (INC/ ACCESORIOS Y MONTAJE)

und

1.0000

6,750.00

EQUIPO DE BOMBEO CENTRIFUGO MULTIETAPA HP=20 HDT=115MCA

und

1.0000

25,000.00

25,000.00

EQUIPO DE BOMBEO CENTRIFUGO MULTIETAPA HP=12.5 HDT=90MCA

und

2.0000

28,000.00

56,000.00

TEKNOPOR DE 1" x 4' x 8'

pln

842.6300

12.00

10,111.56

LUMINARIA DECORATIVA 20 W

und

40.0000

80.00

3,200.00

4.0000

35.00

2.6.2.2.2.4

ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 1 pza
1/2"
ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS,
2"

pza

12.0000

32.00

2.6.2.2.2.4

ABRAZADERA METALICA ACERO INOX. CON TIRAFONDO Y DOS OREJAS TORNILLOS, 2 pza
1/2"

59.0000

28.00

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

75,600.00
6,750.00

140.00
384.00
1,652.00

TUBO FIERRO GALVANIZADO 1" x 6.40m

und

452.6200

65.00

29,420.30

TUBO FIERRO GALVANIZADO 1 1/2" x 6.40m

und

5.2500

80.00

420.00

TUBO FIERRO GALVANIZADO 2" x 6.40m

und

264.0300

115.00

30,363.45

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

TUBO DE FG 3" x 5 m.

pza

18.9000

180.00

3,402.00

TUBO DE FG 4" x 5 m.

pza

17.8500

220.00

3,927.00

CODO DE Fo. GALV. ISO-I DE 2 1/2" x 900

und

4.0000

35.00

140.00

CODO DE Fo. GALV. ISO-I DE 4" x 900

und

5.0000

50.00

250.00

CODO DE Fo. GALVANIZADO DE 1/2" x 90

und

4.0000

15.00

60.00

CODO DE Fo. GALVANIZADO DE 3" x 450

und

2.0000

40.00

80.00

TEE DE Fo. GALV. ISO-I DE 2 1/2"

und

1.0000

40.00

40.00

TEE DE Fo. GALV. DE 3"

und

2.0000

60.00

120.00

UNION SIMPLE DE Fo. GALV. DE 3"

und

1.0000

50.00

50.00

UNION UNIVERSAL DE Fo. GALV. DE 1"

und

2.0000

30.00

60.00

UNION UNIVERSAL DE Fo. GALV. DE 1 1/4"

und

4.0000

35.00

140.00

UNION UNIVERSAL DE Fo. GALV. DE 1 1/2"

und

92.0000

40.00

3,680.00

UNION UNIVERSAL DE Fo. GALV. DE 2 1/2"

und

8.0000

50.00

400.00

REDUCCION DE PVC SAP C-10 DE 4" x 2"

und

62.0000

5.80

359.60

REDUCCION DE PVC SAP C-10 DE 6" x 4"

und

16.0000

8.00

128.00

REDUCCION CONCENTRICA ACERO INOXD MACHO-MACHO 2 1/2"-1 1/2"

und

15.0000

36.00

540.00

REDUCCION CONCENTRICA ACERO INOXD MACHO-MACHO 4"-3"

und

1.0000

45.00

45.00

REDUCCION DE Fo. GALV. DE 2 1/2" x 1/2"

und

1.0000

40.00

40.00

NIPLE DE Fo Go DE 1/2" x 1 1/2"

und

4.0000

15.00

60.00

NIPLE ADAPTADOR HD RANURA C/ROSCA MACHO 2 1/2"

und

15.0000

10.00

150.00

TUB.SCHELUDE 40 DE 4"(100MM)

84.3900

40.00

3,375.60

KIT DE DESCARGA INDIRECTA D=1" PARA INODORO

und

93.0000

20.00

1,860.00

KIT DE DESCARGA INDIRECTA D=3/4" PARA URINARIO

und

31.0000

18.00

558.00

UNION SIMPLE DE PVC C-10 C/R = 2 1/2"

und

4.0000

18.00

72.00

UNION SIMPLE DE PVC C-10 C/R = 2"

und

6.0000

15.00

90.00

UNION SIMPLE DE PVC C-10 C/R = 1 1/2"

und

2.0000

12.00

24.00

NIPLE DE F GALV. DE 1/2" X 2"

pza

4.0000

15.00

60.00

NIPLE DE F GALV. DE 1" X 4"

pza

2.0000

35.00

70.00

NIPLE DE F GALV. DE 3" X 6"

pza

2.0000

50.00

100.00

NIPLE ROSCADO DE FG 2 1/2" x 6"

pza

16.0000

36.00

576.00

NIPLE ROSCADO DE FG 1 1/2" x 4"

pza

92.0000

30.00

2,760.00

NIPLE ROSCADO DE FG 1 1/4" x 4"

pza

4.0000

25.00

100.00

NIPLE DE F GALV. DE 4" X 6"

pza

2.0000

80.00

160.00

TIRAFON 3"

und

775.0100

1.00

775.01

TEE DE FGALV.CON REDUCCION DE 3" A 2"

pza

1.0000

40.00

40.00

ESCALERA TIPO MARINERA H=1.60M

pza

1.0000

250.00

250.00

ESCALERA TIPO MARINERA H=2.0M

pza

1.0000

350.00

350.00

ESCALERA TIPO MARINERA H=1.95M

pza

1.0000

300.00

300.00

ESCALERA TIPO MARINERA H=7.0M

pza

1.0000

1,250.00

1,250.00

IMPERMEABLE CON CAPUCHA TIPO CAPOTIN COLOR AMARILLO

und

120.0000

50.00

6,000.00

CORTAVIENTO PARA CASCO

und

120.0000

8.00

960.00

CHALECO REFLECTIVO

und

100.0000

45.00

4,500.00

ZAPATOS DE SEGURIDAD PUNTA DE ACERO

PAR

80.0000

75.00

6,000.00

ARNES DE SEGURIDAD CON DOBLE LINEA DE VIDA INC.

pza

50.0000

350.00

17,500.00

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

OVEROL DE DRILL COLOR AZUL

und

150.0000

60.00

9,000.00

SEALIZACION

KW

20.0000

15.00

300.00

SUMIDERO DE BRONCE 2"

und

49.0000

3.00

147.00

CAJA DE REGISTRO CONCRETO PREFABRICADO 18" x 24"

KW

3.0000

60.00

180.00

LUMINARIA C/DIFUSOR TRANSPARENTE 2x36 W

und

84.0000

150.00

12,600.00

TUB. FIERRO FUNDIDO BB CENT. 10" 250MM

4.0400

50.00

202.00

TUB. FIERRO FUNDIDO BB CENT. 6"

8.6900

30.00

260.70

TUB. FIERRO FUNDIDO BB CENT. 8"

1.0100

40.00

40.40

CODO Fo.Fo. C/BRIDA C-125 ANSI 8"x900

pza

1.0000

40.00

40.00

CODO FO.FO. B.B. DE 10"

und

2.0000

60.00

120.00

CODO Fo.Fo. C/BRIDA C-125 ANSI 8"x450

pza

2.0000

50.00

100.00

TEE FO.FO. BRIDADA 6" X 6"

pza

1.0000

40.00

40.00

TRANSICION Fo.Fo. C/BRIDA C-125 ANSI 3"

pza

1.0000

25.00

25.00

TRANSICION Fo.Fo. BB 4"

pza

1.0000

35.00

35.00

YEE FO.FO. BRIDADA DE 8" X 6"

pza

2.0000

120.00

240.00

UNION FLEXIBLE TIPO DRESSER DE 8"

und

4.0000

120.00

480.00

UNION FLEXIBLE TIPO DRESSER DE 10"

und

2.0000

160.00

320.00

ABRAZADERA C/TUERCA TIPO "U" 6"

pza

6.3500

9.00

57.15

ABRAZADERA C/TUERCA TIPO "U" 4"

pza

277.1500

9.00

2,494.35

ABRAZADERA C/TUERCA TIPO "U" 2"

pza

369.4500

7.00

2,586.15

TEE DE F F 8"

pza

1.0000

80.00

80.00

TUB. PVC SAP PRESION C-10 R 1/2" x 5m

und

15.0300

10.50

157.82

TUB. PVC SAP PRESION C-10 R 3/4" x 5m

und

16.9500

13.90

235.61

TUB. PVC SAP PRESION C-10 R 1" x 5m

und

18.1100

20.50

371.26

TUB. PVC SAP PRESION C-10 R. 1 1/4"x5m

und

69.0100

37.00

2,553.37

TUB. PVC SAP PRESION C-10 R 1 1/2" x 5m

und

61.1700

45.00

2,752.65

TUB. PVC SAP PRESION C-10 R. 2" x 5m

und

7.5600

14.00

105.84

TUB. PVC SAP PRESION P/AGUA C-10 R 1/2"

214.8300

2.20

472.63

TUB. PVC SAP PRESION C-10 R. DE 1 1/4"

186.0000

7.50

1,395.00

TUB. PVC SAP PRESION C-10 R. DE 1"

62.0000

5.00

310.00

TUB. PVC SAP PRESION C-10 R. DE 2 1/2"

und

5.6700

20.00

113.40

TUERCA DE SUJECION CABEZA DE COCHE

pza

474.4900

1.00

474.49

REDUCCION SP PVC SAP P/AGUA 3/4" A 1/2"

und

63.0000

3.50

220.50

REDUCCION SP PVC SAP P/AGUA 1" A 3/4"

und

31.0000

5.00

155.00

REDUCCION SP PVC SAP P/AGUA 1" A 1/2"

und

2.0000

4.00

8.00

REDUCCION SP PVC SAP P/AGUA 1 1/4" A 1"

und

95.0000

6.00

570.00

REDUCCION SP PVC SAP P/AGUA 1 1/2" A 1"

und

15.0000

5.00

75.00

REDUCCION SP PVC SAP P/AGUA 2" A 1 1/2"

und

14.0000

8.00

112.00

REDUCCION SP PVC SAP P/AGUA 1 1/2" A 1/2"

und

1.0000

6.00

6.00

REDUCCION SP PVC SAP P/AGUA 1 1/2" A 3/4"

und

19.0000

6.00

114.00

REDUCCION SP PVC SAP P/AGUA 1 1/4" A 1/2"

und

2.0000

8.00

16.00

REDUCCION SP PVC SAP P/AGUA 1 1/4" A 3/4"

und

15.0000

8.00

120.00

REDUCCION SP PVC SAP P/AGUA 2 1/2" A 1 1/2"

und

5.0000

15.00

75.00

TAPON HEMBRA SP PVC SAP P/AGUA DE 1"

und

31.0000

0.80

24.80

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

TAPON HEMBRA SP PVC SAP P/AGUA DE 1 1/4"

und

93.0000

3.00

279.00

CODO DE 90C/R PVC SAP P/AGUA DE 1/2"

und

13.8400

2.50

34.60

TEE SP PVC SAP P/AGUA DE 1/2"

und

30.0000

2.50

75.00

TEE SP PVC SAP P/AGUA DE 3/4"

und

34.0000

4.00

136.00

TEE SP PVC SAP P/AGUA DE 1"

und

47.0000

5.00

235.00

TEE SP PVC SAP P/AGUA DE 1 1/4"

und

172.0000

8.00

1,376.00

TEE SP PVC SAP P/AGUA DE 1 1/2"

und

52.0000

10.00

520.00

TEE SP PVC SAP P/AGUA DE 2"

und

14.0000

15.00

210.00

TEE SP PVC SAP P/AGUA DE 2 1/2"

und

7.0000

20.00

140.00

CODOS PVC SAP SIMPLE PRESION 3" X 45

pza

3.0000

25.00

75.00

CODOS PVC SAP SIMPLE PRESION 3" X 22.5

pza

4.0000

30.00

120.00

CODOS PVC SAP SIMPLE PRESION 3" X 90

pza

1.0000

25.00

25.00

TUB. PVC SAL P/DESAGUE DE 2" x 3 m

und

190.5600

7.90

1,505.42

TUB. PVC SAL P/DESAGUE DE 3" x 3 m

und

30.3800

13.00

394.94

TUB. PVC SAL P/DESAGUE DE 4" x 3 m

und

145.4900

16.40

2,386.04

TUB. PVC SAL P/DESAGUE DE 6" x 5 m

und

22.1200

90.00

1,990.80

TUB. PVC SAL P/DESAGUE DE 8" x 5 m

und

0.3500

23.00

8.05

TUB. PVC SAL P/DESAGUE DE 6" x 3 m

und

75.2100

28.00

2,105.88

TUBERIA PVC UF ISO 4422 C-7.5 110 MM

146.5900

20.00

2,931.80

TUBERIA PVC UF ISO 4422 C-7.5 250 MM

42.6800

35.00

1,493.80

CODO DE 90 PVC SAL DE 2"

und

656.0000

1.80

1,180.80

CODO DE 90 PVC SAL DE 3"

und

14.0000

4.00

56.00

CODO DE 900 PVC SAL DE 6"

und

4.0000

8.00

32.00

CODO DE 45 PVC SAL DE 2"

und

109.0000

3.00

327.00

CODO DE 45 PVC SAL DE 4"

und

157.0000

5.50

863.50

CODO DE 90 PVC SAL DE 8"

und

1.0000

12.00

12.00

TEE SANITARIA DOB C/REDUC PVC SAL 4"A2"

und

2.0000

8.00

16.00

TRAMPA "P" PVC SAL DE 2"

und

98.0000

5.00

490.00

TRAMPA "P" PVC SAL DE 4"

und

8.0000

7.50

60.00

TRAMPA "P" PVC SAL DE 6"

und

1.0000

12.00

12.00

TAPON HEMBRA PVC SAP ROSCADO 1/2"

pza

95.0000

2.00

190.00

TAPON HEMBRA PVC SAP ROSCADO 3/4"

pza

31.0000

2.50

77.50

TAPON HEMBRA PVC SAP ROSCADO 1"

pza

93.0000

3.00

279.00

TAPON HEMBRA PVC SAP ROSCADO 4"

pza

1.0000

12.00

12.00

REDUCCION PVC SAL P/DESAGUE DE 6" A 4"

und

3.0000

35.00

105.00

SOMBRERO DE VENTILACION PVC SAL DE 8"

und

0.0000

15.00

0.00

CODO RANURADO HD 2 1/2" x 45

pza

64.0000

10.00

640.00

CODO RANURADO HD 2 1/2" x 90

pza

32.0000

10.00

320.00

CODO RANURADO HD 4" x 45

pza

2.0000

25.00

50.00

CODO RANURADO HD 4" x 90

pza

1.0000

25.00

25.00

YEE PVC SAL DOBLE DE 4"

und

45.0000

11.00

495.00

YEE PVC SAL 4"

und

115.0000

8.80

1,012.00

YEE PVC SAL 2"

und

22.0000

2.80

61.60

YEE PVC SAL C/REDUCCION 4" a 2"

und

93.0000

5.80

539.40

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

CONEXION A LA RED GENERAL DE DESAGUE

GLB

1.0000

1,500.00

1,500.00

CODO PVC SAP 6" X 90

pza

2.1000

30.00

63.00

CODO PVC SAP 1/2" X 90

und

97.0000

1.00

97.00

CODO PVC SAP C-10 1/2" X 90

pza

142.0000

1.00

142.00

CODO PVC SAP C-10 3/4" X 90

pza

70.0000

2.00

140.00

CODO CON VENTILACION PVC 4"X2"X90

pza

97.6500

5.70

556.61

CODO PVC SAP C-10 1" X 90

pza

103.0000

1.50

154.50

CODO PVC SAP C-10 1 1/2" X 90

pza

209.0000

2.50

522.50

CODO PVC SAP C-10 1 1/4" X 90

pza

273.0000

3.50

955.50

CODO PVC SAP C-10, 2 1/2"

pza

2.1000

6.00

12.60

UNION PVC SAP (AGUA) 1"

pza

93.0000

2.00

186.00

UNION PVC SAP (AGUA) 3/4"

pza

31.0000

2.50

77.50

TUBERIA CRIBADA PVC SAL D=4"

0.3500

24.50

8.58

TUBO PVC SAL 4" X 3M

pza

0.7000

15.00

10.50

CODOS PVC SAL 4" X 90

pza

2.1000

5.00

10.50

CODOS PVC SAL 4" X 45

pza

13.6500

5.00

68.25

TEE PVC SAL 2" X 2"

pza

158.0000

2.00

316.00

TEE PVC SAL 3" X 2"

pza

0.0000

3.50

0.00

TEE SANITARIA DE 4X4" PVC SAL

und

126.0000

5.50

693.00

TEE SANITARIA DE 2 x 2" PVC SAL

und

126.0000

2.80

352.80

TEE SANITARIA DE 3 x 3" PVC SAL

und

28.0000

5.00

140.00

TEE SANITARIA DE 6X6" PVC SAL

und

17.0000

12.00

204.00

TEE PVC SAL 8" X 4"

und

0.0000

8.00

0.00

YEE PVC SAL DE 4" X 4"

pza

7.3500

8.00

58.80

REDUCCION PVC SAL 3" A 2"

pza

42.0000

2.50

105.00

REDUCCION PVC SAL 4" A 3"

pza

0.0000

12.00

0.00

REDUCCION PVC 2 1/2" A 2"

pza

2.0000

8.00

16.00

REDUCCION PVC SAL 1 1/2" A 1 1/4"

pza

33.0000

5.00

165.00

SOMBRERO DE VENTILACION PVC SAL 6"

pza

3.0000

15.00

45.00

TUBO PVC SAP (LUZ) (E/C) 3/4" X 3 M.

pza

7,173.8600

5.00

35,869.30

UNION PRESION ROSCA PVC SAP 1 1/2"

pza

94.0000

5.00

470.00

UNION PRESION ROSCA PVC SAP 1 1/4"

pza

4.0000

7.00

28.00

UNION PRESION ROSCA PVC SAP 1"

pza

2.0000

4.00

8.00

UNION PRESION ROSCA PVC SAP 2 1/2"

pza

4.0000

13.00

52.00

TUBO PVC SEL (E/C) 1" x 3.00 M

pza

24.0000

16.50

396.00

CURVAS PVC SEL D=1"

pza

24.0000

1.50

36.00

CURVAS PVC SEL (ELECTRICO) 3/4"

pza

4,117.3800

0.25

1,029.35

VALVULA MARIPOSA DE 10"

pza

1.0000

350.00

350.00

VALVULA COMPUERTA DE BRONCE DE 1"

und

1.0000

25.00

25.00

VALVULA COMPUERTA DE BRONCE DE 1 1/4"

und

2.0000

35.00

70.00

VALVULA COMPUERTA DE BRONCE DE 1 1/2"

und

46.0000

40.00

1,840.00

VALVULA COMPUERTA DE BRONCE DE 2 1/2"

und

1.0000

60.00

60.00

VALVULA COMPUERTA DE BRONCE DE 3"

und

4.0000

120.00

480.00

VALVULA COMPUERTA DE BRONCE DE 4"

und

2.0000

180.00

360.00

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

VALVULA COMPUERTA DE BRONCE DE 2 1/2"

und

5.0000

80.00

400.00

VALVULA CONTROL RETENCION 10"

und

1.0000

350.00

350.00

VALVULA CONTROL RETENCION 8"

und

3.0000

240.00

720.00

VALVULA FLOTADORA 3" C/BOLA DE COBRE

und

1.0000

50.00

50.00

VALVULA DE ALIVIO B.B. C/PILOTO 6"

und

1.0000

60.00

60.00

REGISTRO ROSCADO DE BRONCE DE 4"

pza

33.0000

8.00

264.00

SUMIDERO DE BRONCE DE 6"

pza

1.0000

20.00

20.00

VALVULA DE AIRE DOBLE EFECTO 2" C/R

und

4.0000

80.00

320.00

VALVULA MARIPOSA B.B. DE 8"

und

2.0000

220.00

440.00

ESPEJO DE CRISTAL E=4 mm

p2

1,014.9300

4.80

4,871.66

CRISTAL TEMPLADO COLOR GRISS 6 MM. (INC. ACCESORIOS E INSTALACION SEGUN p2


PLANO DE DETALLE)

2,509.5200

30.00

2.6.2.2.2.4

18,528.6500

22.00

2.6.2.2.2.4

PLACA REYNOBOND SILVER METALIC E=6MM, SIST. MURO CORTINA (INC. ACC. E INST. p2
PLANO DETALLE)
CRISTAL TEMPLADO COLOR GRISS 6 MM. SISTEMA MURO CORTINA (INC.
ACCESORIOS E INSTALACION SEGUN PLANO DE DETALLE)

p2

41,492.6300

33.00

AGREGADO GRUESO (MATERIAL ZARANDEADO)

m3

10.3800

40.00

415.20

CEMENTO PORTLAND TIPO IP (42.5KG)

BOL

83,680.6300

22.30

1,866,078.05

2.6.2.2.2.4
2.6.2.2.2.4
2.6.2.2.2.4

75,285.60
407,630.30
1,369,256.79

14,490,680.59
COMBUSTIBLE

2.6.2.2.2.4
2.6.2.2.2.4

PETROLEO

gln

644.0500

13.00

8,372.65

GASOLINA 84 OCTANOS

gln

1,386.9200

13.50

18,723.42

27,096.07
2.6.2.2.2.5

SERVICIOS

2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5

OFICINA PARA RESIDENCIA DE OBRA

GLB

1.0000

1,500.00

1,500.00

ENCOFRADO PREFABRICADO PARA COLUMNA INC ACCESORIOS

m2

3,238.7900

35.00

113,357.65

ENCOFRADO PREFABRICADO PARA PLACA INC ACCESORIOS

m2

5,193.9100

20.00

103,878.20

ENCOFRADO PREFABRICADO PARA SOPORTE DE LOSA PREFABRICADA INC.


ACCESORIOS

m2

10,563.1100

20.00

ENCOFRADO PREFABRICADO PARA SOPORTE DE VIGAS INC. ACCESORIOS

m2

8,726.3900

45.00

ENCOFRADO PREFABRICADO PARA PLACA DE ASCENSOR INC ACCESORIOS

m2

3,065.1000

40.00

COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP

HE

1,514.9200

10.00

15,149.20

VIBRADOR DE CONCRETO 4 HP 1"

HE

2,076.3800

6.25

12,977.38

ANDAMIO METALICO (0.80 m - 3.00 m)

he

14,422.9300

5.00

72,114.65

PIEDRA ESMERIL

pza

11.8700

30.00

356.10

CASCO AMARILLO

und

200.0000

12.00

2,400.00

CIZALLA P/FIERRO CONST. HASTA 3/4"

HE

10,296.7200

5.00

51,483.60

GUANTES DE JEBE

PAR

500.0000

12.00

6,000.00

GUANTES DE CUERO

PAR

400.0000

12.00

4,800.00

PROTECTOR DE OIDOS

pza

100.0000

8.00

800.00

2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5

211,262.20
392,687.55
122,604.00

PRESUPUESTO ANALITICO
MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto

MEJORAMIENTO DE LOS SERVICIOS ACADEMICOS EN LA FORMACION BASICA,


INFORMATICA Y VIRTUAL DE LAS ESCUELAS PROFESIONALES DE LA UNIVERSIDAD
NACIONAL DEL ALTIPLANO

Fecha

10/01/2013

Lugar

PUNO - PUNO - PUNO

Part. Esp.

2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5
2.6.2.2.2.5

Recurso

Unidad Cantidad

Precio
S/.

Parcial
S/.

BOTAS DE JEBE NUEVAS

PAR

100.0000

30.00

3,000.00

LENTES DE PROTECCION

pza

200.0000

10.00

2,000.00

MEZCLADORA CONCRETO TROMPO 8HP-9P3

hm

1,879.3500

10.00

18,793.50

MEZCLADORA DE CONCRETO DE 9 -11P3

hm

66.0700

10.00

660.70

WINCHE ELECTRICO 3.6 HP DE DOS BALDES

hm

1.0700

10.00

10.70

CAMION CISTERNA 4x2 (AGUA) 122 HP 1,500

hm

2.5200

350.00

882.00

CAMION VOLQUETE 4x2 140-210 HP 6 M3

hm

18.6600

120.00

2,239.20

MOTOBOMBA 10 HP 4"

hm

0.0300

250.00

7.50

MEDIDAS DE MITIGACION DE IMPACTO AMBIENTAL

GLB

1.0000

37,500.00

37,500.00

CAMION CISTERNA 4X2 (AGUA) 1,500 GAL.

hm

4.0000

80.00

320.00

SOLDADORA

hm

265.8000

5.00

1,329.00

MOTOSOLDADORA DE 250 AMPERIOS

hm

306.6700

10.00

3,066.70

ESMERIL

hm

101.0300

5.00

505.15

CEPILLADORA PISOS DE PARQUET

hm

466.8300

5.00

2,334.15

BALDE DE PRUEBA (TUBERIA)

hm

37.3100

150.00

5,596.50

COMPRES.AIRE 425P3 A.C.SERIE ARP 168579

und

12.4800

5.00

62.40

COMPRESORA NEUMATICA 196 HP 600-690 PCM

hm

3.2300

150.00

484.50

COMPRESORA NEUMATICA 87 HP 250-330 PCM

hm

0.2200

80.00

17.60

COMPACTADOR VIBR. TIPO PLANCHA 4 HP

hm

100.4100

10.00

1,004.10

CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3

hm

6.1100

160.00

977.60

CARGADOR S/LLANTAS 125-155 HP 3 YD3.

hm

0.1000

180.00

18.00

RETROEXCAVADOR S/ORUGA 80-110HP 0.5-1.3Y

hm

3.6800

240.00

883.20

TRACTOR DE ORUGAS DE 140-160 HP

hm

0.1000

240.00

24.00

TRACTOR DE ORUGAS DE 190-240 HP

hm

10.3600

260.00

2,693.60

MARTILLO NEUMATICO DE 21 Kg.

hm

12.9300

50.00

646.50

MARTILLO NEUMATICO 29 KG C/BARRENO-ACCS

hm

0.4400

50.00

22.00

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

12.8500

10.00

128.50

VIBRADOR DE 3/4" - 2" CONCRETO

hm

35.3600

10.00

353.60

MEZCLADORA CONCRETO TAMBOR 18HP 11P3

hm

57.1800

10.00

571.80

MEZCLADORA CONCRETO TROMPO 8 HP 9 P3

hm

0.0700

10.00

0.70

TEODOLITO

hm

34.9200

8.00

279.36

NIVEL TOPOGRAFICO

hm

34.9200

5.00

174.60

MIRA TOPOGRAFICA DE 4M

hm

34.9200

2.00

69.84

1,198,027.53
2.6.2.2.2.6

OTROS

2.6.2.2.2.6

HERRAMIENTAS MANUALES

%MO

97,680.90

TOTAL

18,302,763.72