The purpose of industrial training is to acclimatize the students with the organization &
the industry in which this organization exists. Summer training is a part of management
Management trainees are trained in such a way that after they come out, they can manage
includes how an export order is processed & what all documents are required to complete
This training was a valuable experience in terms of understanding & learning & I believe
PRASHANT RAMPURIA
PGDM (IB)
2K81/IB/29
2008-10
1|Page
Acknowledgement
SPL Industries Ltd. was just like an opportunity to shake hand with the practical world of
business.
I am indebted to all those individuals who helped me in gaining knowledge & insight into
various aspects of export procedure & documentation. The source of learning have been
one too many & a complete list of individual references would become encyclopedic.
Industries Ltd, without whose help this summer internship in SPL Industries would not
be possible.
I am grateful to Mr. Jagmohan Chhibber, Export manager, SPLIL, for sharing his
experience & knowledge & without whose help the project would not have got any
shape.
My deepest appreciation also extends to Dr. Tulika Chandra, Project guide, Faculty
I would like to thank Dr. D. K. Banerjee, Director AIM, for his constant support &
encouragement.
Finally, I would express my gratitude towards Mr. Shailendra Tyagi, Sr. Manager,
PRASHANT RAMPURIA
PGDM (IB)
2K81/IB/29
2|Page
3|Page
4|Page
Table of Contents
Chapter 1
Introduction ........................................................................................................................7
Background of the problem task undertaken ....................................................................7
Project Objectives ............................................................................................................7
Rationale of the study .......................................................................................................8
Scope of the study ............................................................................................................8
Introduction of the company ............................................................................................9
Chapter 2
Methodology .....................................................................................................................12
Chapter 3
Bibliography .....................................................................................................................47
Annexure...........................................................................................................................48
List of Illustrations
Figure 1: The “T” angle of the Apparel Supply Chain ..................................................16
Figure 2: Fabric Process Flow Chart .............................................................................21
Figure 3: Garment Process Flow Chart .........................................................................22
Figure 4: The PPC link with other departments ............................................................27
5|Page
EXECUTIVE SUMMARY
This project is aimed at understanding export procedure & documentation. It begins with
the introduction of the company i.e. company profile. This part includes introduction of
the company, its plant location, capacity, the client base & some export figures giving
Chapter 2 discusses the Methodology used for the data collection. Exploratory research is
used for data collection as is best suited for this fulfilling the project objective.
Next chapter provides the detail on the objective: Apparel business process. It is
explained through the “T” angle apparel supply chain. The three sides of the supply chain
i.e. The Buyer, the Supplier & the Manufacturer, are discussed.
order to process an export order. The role of each department is discussed in context of
export procedure & documentation & what contribution they make towards it.
Next objective gives a brief idea on the merchandisers & what role they play. They are
the one who interacts with the clients & update the company with client’s requirement.
In the final objective a brief summary of all the export documents used at the SPLIL for
legalizing an export order is given. Further the documents regarding pre & post shipment
6|Page
CHAPTER-1
Introduction
manufacturer & exporter of Knitted fabric and Knitted garments. Project on Export
So, selecting a project on export procedure & documentation is an obvious & important
decision.
7|Page
1.3) Rationale of the Study
Export in simple words means selling goods abroad or Export refers to outflow of
goods and services and inflow of foreign exchange. Each country has its own rules and
regulations regarding the foreign trade. For the fulfillment of all the rules and regulations
goods, process of manufacturing, type of industry and the country to which goods is
to be exported. In order to complete an order for Knitted garment, many activities like
payment process, quality control, packing and shipment of goods etc. are undertaken.
Different departments work in synchronicity & various documents are prepared in the
process. Hence, a single mistake or lack of proper planning can lead to the rejection
Today’s world is the global village in which each country is trading with other countries
in the form of export or import. This field has a great scope because today each company
So, it is very important to study the export procedure and documents involved in it.
The aim of this project report is to unfold stepwise all complexities involved in the export
business right from receiving an export order to final realization of export proceeds. It
8|Page
gives a detail idea of how different departments in an Apparel export house work in
This project would be helpful to fulfill many loopholes of manufacturing, processing and
Established in 1994
SPLIL designs, manufactures and sells a wide range of outer wear – T shirts,
sweat shirts, polo shirts, etc. for top end customers in the international market
SPLIL has five factories in Faridabad covering 500,000 square feet spread over
The Company’s total turnover for the year ended March 31, 2009 was US $
9|Page
“The vision of the Company is to become a leading manufacturer and exporter of
1. Fabric Dyeing and processing plant - Plot No.21, Sector-6, Faridabad-121 006
(India).
4. Garment manufacturing plant - Plot No. 15/1, Mile Stone, Mathura Road,
Faridabad-121006 (India)
All Locations are within 30 KM from New Delhi, and located within 10-12 km from
each other.
10 | P a g e
1.5.4) SPLIL Capacities
SECTION CAPACITY
SPLIL’s high profile customers are not only happy but also satisfied which has earned
Customers Countries
11 | P a g e
Chapter-2
Methodology
Our primary objective of doing this project is to get the first hand knowledge of
functioning of an export house. Since we are not comparing two different entities on the
basis of their financial results, rather we are learning the export procedure. Hence
Further there are few reasons which made me to use Exploratory Qualitative research:
People may be unable & unwilling to answer certain questions or unable to give
truthful answers.
People may be unable to provide accurate answer to question that tap their sub
consciousness.
In Secondary data, both internal & external research was done. For internal
research Ready to use documents available with the organization were used. For
12 | P a g e
Limitations of the Methodology
1. Concern about the validity: the issue arises from the fact that qualitative
research does not rely on tests for reliability & credibility that are external to data
communicated in the form of case studies. The case study is written after an
observation.
13 | P a g e
CHAPTER-3
The textile and apparel supply chain accounts for a good share in terms of number of
companies and people employed. The apparel industry is divided into four main
segments. At the top of the supply chain, there are fibre (raw material) producers using
either natural or synthetic materials. Raw fibre is spun, woven or knitted into fabric by
second segment. The third segment of the supply chain is the apparel manufacturer
which converts fabric into garment with many processes involved. The final segment
is the retailers who are responsible for making apparels available to consumers.
The “T” angle of the apparel supply chain shows how buyer, suppliers and garment
manufacturer are linked to each other. There are two sides of the “T” i.e. left and right.
The left side is called the buyer to the manufacturer and the right side is called the
suppliers to manufacturer. The two horizontal sides are linked to each other through
the vertical side i.e. the buyer and suppliers are linked through apparel manufacturer.
14 | P a g e
The “T” angle illustrates how information flows from the buyer to the apparel
manufacturer. The information normally, sketches of the garment given by the buyer,
are studied by the manufacturer and accordingly list of raw materials required is made.
The different swatch (standard for type of yarn, colour of the yarn and piece of
accessories) are sent to different suppliers for development. The supplier develops and
the orders are placed with the suppliers with approved samples. When the raw
materials are received as per the specifications given to the supplier, in-house
results in the final garment product which is finally dispatched to the Buyer. The
Buyer then retails the same through stores to the ultimate consumers.
15 | P a g e
Figure 1: The “T” angle of the Apparel Supply Chain
The buyer side is normally involved with designing of the garment, production of
16 | P a g e
Apparel Design
first step in designing is the analysis of the consumer which the Company is targeting.
The apparel design is influenced by various parameters like other designer collection
presented in the fashion cities of the world, fashion reviews from earlier seasons,
fashion magazine also plays an important input for the design efforts and most
important is the feedback gained from the sales of the similar products that were
developed earlier.
Prototype garments are made for design approval which consumes considerable
amount of time.
The next step after the design in apparel supply chain is the production of the samples.
Once the designs are developed, decisions regarding the fabric like cotton or polyester
and quantity etc are made. Based on fabric and quantity decided, decisions related to
country and manufacturers are made. Once decision is made, developed designs are
sent to different manufacturers and are asked to develop proto samples (the stage
brings design from paper to cloth for design appearance). Normally, during proto stage
manufacturer figure stands between 5 and 8. Once proto are developed, number of
(alternate sizes of the garment are developed example S: Small, L: Large, XXL: Extra
Extra Large). Once size-set is approved, sale samples (samples developed for
17 | P a g e
advertising and see the market response towards the article) are made. Finally, with
everything in place two identical pieces are developed one for the buyer and other for
production). This sample is stamped by the buyers and the manufacturer can proceed
Apparel Retail
Specialty stores offer a limited range of apparel products and accessories specialising
in a specific market segment. Apparel sales also take place through wholesalers or
mass merchandisers such as Wal-Mart, Kmart and Target. These retailers offer a
variety of hard and soft goods in addition to apparel. Departmental stores like Macy’s,
Nordstrom offer a large number of national brands in both hard and soft goods
categories. Off-price stores, such as Marshall’s and T.J.Maxx buy excess stock of
designer- label and branded apparel from retailers and are able to offer lower prices
but with incomplete assortments. The apparel sale is also shared by mail order
The suppliers in the apparel manufacturing are quite diversified. It involves suppliers
of different raw materials such as fibre and yarn producers, fabric manufacturers and
other raw-materials.
Fibres are categorised into two groups: natural and man-made. Natural fibre includes
plant fibres such as cotton, linen, jute etc and animal fibre such as wool. Synthetic
18 | P a g e
fibres include nylon, polyester, acrylic etc. Synthetic fibre production usually requires
significant capital and knowledge. Natural and synthetic fibres of short lengths are
fibres can also be blended together to produce yarn such as grindle etc.
Fabric production
This segment of supply chain transforms the yarn into fabric by different processes
looped together lengthwise and width wise at right angles. Grey Yarn may be woven
by a simple procedure to produce grey fabric and which are then dyed for a specific
colour. Instead, dyed yarns may also be woven but not dyed. In knitting, yarn is
interloped by latched and spring needles i.e. two different loops are mingled together
Once the approvals regarding the raw-material are made by the buyer, the
Apparel Production
The process proceeds once the fabric is produced; it is either dyed or washed. The
dyed (coloured) yarn fabric is washed and grey fabric is dyed into a specific colour.
After dyeing or washing, fabric is finished by removing water in the tumbler and later
pressed in stenter which also maintains width of the fabric. Now the fabric is ready
for garmentising i.e. it is ready to be cut and stitched into the garment. Garmentising
starts with the design of the garment to be made (usually on the paper called specs).
Patterns (usually made up of thicker and stronger paper) are made from the design
19 | P a g e
which is then used to cut the fabric (cutting usually happens in the form of layers). An
efficient layout of the patterns on the layers of fabric is crucial for reducing the
wasted material.
CAD systems are used for pattern layout and are integrated together with cutting
systems. In apparel manufacturing, all the stages are labour intensive as they are not
suitable for any kind of automation. In the stitching section, garment is usually
assembled using the progressive bundle system (PBS). In PBS, the work is delivered
to individual work stations from the cutting department in bundles. Sewing machine
operators then process or sew them in batches i.e. first few are operation are joining
the different parts together and then further amendments related to design are carried
out. The supervisors direct and balance the line activities and check the quality. This
involves large work in progress (WIP) inventories and minimal flexibility. For faster
apparel production, use of unit production system which reduces the buffer sizes
between the operations or modular assembly systems and allows a small group of
Garments produced are labelled, packaged and usually shipped to a warehouse. The
garments are then shipped to the retailers’ warehouse. In an effort to reduce time from
placement of the product order to the consumer’s purchase of the apparel, several
practices are gaining popularity. There is increased automation and use of electronic
20 | P a g e
2.2) To understand the working of various departments of SPL Industries Ltd
Testing of Yarns
Count, knit ability,
100% fabric
wash ability, spirality,
strength, shade (if yarn Quality check
dyed)
Recipe
formulation
Knit Set (automatic
Approval color kitchen)
21 | P a g e
Figure 3: Garment Process Flow Chart
100% Garment
Final Checking
Audit
22 | P a g e
The above two diagrams show detailed picture of SPLIL’s Apparel Manufacturing and
Supply Chain. The manufacturer supply chain starts when yarn is in-house and ends
when garment is produced and is ready for dispatch. The entire process is divided into
two segments i.e. the process and the production. The process involves yarn inspection,
knitting, dyeing or washing and finishing. In the process, the yarn is converted to fabric
then it is either dyed or washed and finally finished. The production involves fabric
Company mainly deals in two segments of the apparel supply chain i.e. one
manufacturing of fabric and other manufacturing of garment. These two segments are
two different processes but are very much linked in the supply chain. The Company
Description of each department will follow in respect to how they occur in supply
chain:
Yarn Department
Yarn (thread) is one of the most important raw-materials for the garment
manufacturing. Company purchases yarn from other spinning mills across the country
and also sometimes from other countries such as China and Italy. Yarn department is
responsible for placing order of yarn to the mills. Their responsibility is to make sure
yarn is ordered from right supplier, delivered in right time with desired quality and
maintain stock listing of yarn. Yarn department is also responsible for checking the
quality i.e. strength, colour and quantity of the yarn delivered. The decision regarding
23 | P a g e
the yarn quantity, quality and strength is decided by PPC i.e. production, planning
and control department. PPC places the order one month in advance.
Knitting Department
Knitting department is responsible for producing knitted fabric i.e. fabric from yarn.
For fabric production, two types of machines are normally used i.e. circular knitting
machine and flat knitting machine. Knitting department receives orders from PPC
stating article or style number and quantity of fabric required. The knitting
department makes the production planning for all knitting machines based on request
from PPC and also calculates and orders required yarn from the yarn department.
The department is responsible for two different stages in garment manufacturing. For
grey (not coloured) fabric, department is responsible for colouration of fabric and for
dyed (coloured) fabric, department is responsible for washing. The process of dyeing
is time consuming and as different colour checks are required. The department
receives order from the PPC stating article and quantity required. The department
makes the production plan for the dyeing and the washing machine based on order
from the PPC and also sends request to knitting department for the dispatch of the
Finishing Department
The department is responsible for finishing of the fabric with a proper procedure so
that it is ready for garment production. Whether the fabric is dyed or washed, it
follows the same process in the finishing department. Once the fabric is washed or
24 | P a g e
dyed, it needs to be tumbled in tumbler (sort of big washing machine) responsible for
removing water and maintain the fabric width and shrinkage. After which fabric is
dried in a Stenter (dryer) and packed in layer and is ready for garment production.
The finishing departments receive orders from PPC again stating the article or style
Cutting Department
The department is responsible for cutting of the fabric into different parts of the
garment. This department is mainly responsible for cutting and avoiding wastage. To
ensure minimum wastage, proper set of tools such as CAD and others are used in the
process. The PPC by using CAD and other tools issues article average with a draft or
diagram of how different patterns should be placed on to the layer. The cutting
department based on their experience and expertise either accepts the proposed
average or sometimes gives a better average by few percent. The department makes
production plan for all cutting stations based on article or style requested. This also
works on weekly basis. Once fabric is cut different parts of the same garment are
bundled together.
Stitching Department
The department is responsible for stitching different parts of garment together. The
process takes place in the assembly line system. The assembly line system is the set
of many different stitching machines each for a specific purpose. These machines are
attached. Assembly line method is used for large production. PPC decides on the
25 | P a g e
article or style to be produced with quantity. The stitching department makes
necessary production planning i.e. time line in accordance with each article. The
stitching process is the most time consuming and labour intensive process in the
This is final stage before the garment is ready to be shipped. As the garment is
already finished, it requires a series of quality checks. The garment goes through the
quality checks like colour test, washing test, stitching test etc. After which it is steam
pressed, labelled, packed into garment bags and finally, put into the cartons. Once all
cartons are packed and labelled, external quality check takes place and goods are
shipped. The PPC department gives the details of the PO to be finished, packed and
dispatched.
The department is responsible for making plans for the entire organization i.e. all the
departments. PPC being in the centre of all departments also controls their
basis and daily for any amendments. The PPC keeps check on different departments
by requesting planning and production reports for each day. PPC only receives orders
from the Management. With order quantity and dispatch date, it does the planning for
26 | P a g e
Figure 4: The PPC link with other departments
TOP
MANAGEMENT
Yarn Knitting
Department Department
Finishing,
Packing & Dyeing &
Dispatch Washing
Department
Production
Planning &
Control
Stitching
Department Merchandising
Department
27 | P a g e
2.3) To understand the role of Merchandisers in SPL industries ltd.
The department acts as a liaison between the buyer and manufacturing division. On
one hand, the department is responsible for notifying changes in the product to the
PPC and also to make sure that article is produced as per planning by the PPC and
within dispatch time limits. On the other hand, it has to continually update buyer with
planning and production status. The department takes care of all correspondence with
buyer and is responsible for communicating it to PPC. The department also takes care
of necessary sampling such as proto, size set and final which is necessary prior to
2.3.2) Marketing
Design
Designing is an integral part of the marketing process. The Company’s ability to keep
abreast of the dynamic fashion trends enables it to showcase its capabilities and
manufacturer, tracking the changing fashion trends across different geographies for
various end customers is critical for success. The Company has a well equipped
design studio. SPLIL employs a team of designers who design and develop the
products as per the requirements of the customers. They regularly visit International
fairs like PITTI FILATI, EXPOFIL and PREMIERE VISION. These fairs
determine the latest trends in yarn / fabric and colours for the following season. The
design team regularly interacts with the customers which helps it to keep pace with
28 | P a g e
their expectations. Besides, the Company has opened a Product Development and
Spring
Summer
Fall/Autumn
Holiday/Winter
2.3.3) Merchandising
The Company’s marketing team endeavours to enhance its share of the business with
existing customers as well as expand the customer base. The Company receives orders
Walk-in customers.
The Company’s experienced marketing team has been able to devise different
strategies to suit the needs of both existing & new buyers. For the existing buyers, the
Company’s prime focus is to expand the product base and enhance volumes. By
leveraging the long standing relationships with the buyers, the Company strives to be a
preferred partner to the buyers. For the new buyers, based on the understanding of
their product range and brand identity / customer identity, the Company presents to
them the entire product range. This gives them a good idea of areas of the Company’s
29 | P a g e
Sometimes the buyers come to SPLIL with their thoughts on designs, where they offer
the existing design. SPLIL’s designers along with the sampling department provide
the client with prototypes, which undergo various alterations till the client, finalizes
the design. Once the buyer finalizes a particular style it is translated into samples as
quickly as possible because the entire season’s business depends on timely delivery of
manufacturing scale and efficiency and global sourcing ability enables SPLIL to
compete with international vendors effectively. This is proven by the growth of the
Company in non-quota categories, where competition has already been open without
any quota related barriers. Quality and ability to deliver the required products on time
and competitive pricing enables to enhance share with customers. The merchandising
teams are to service the requirements of different customers. On receipt of the enquiry,
the merchandiser coordinates with PPC to get an estimate of the raw material
consumption, likely suppliers and costs, accessories as well as the conversion efforts.
Based on this, the costing sheet is prepared. Modifications are also suggested on
apparel design or engineering, or fabric to try and bring the cost to the buyer within
their required range. The price setting process thus becomes a collaborative effort with
Company’s customers instead of just a negotiation process, with both the Company
prospective buyer places his requirement with the company, company can work out an
30 | P a g e
optimal price-quality combination for him through permutation and combination of
must get acquainted with the entire procedure. Failure to comply with documentary
department issues an invoice. Two invoices are prepared i.e. commercial invoice
& custom invoice. Commercial invoice is prepared for the buyer & Custom
Custom Invoice
Packing list
IEC certificate
31 | P a g e
Custom annexure
After custom clearance a set of documents with custom clearance receipt are sent
along with the consignment to the forwarder. Forwarder books the shipment & as
per the size of the cartons calculates CBM & decides which container to be used.
Following documents are sent to buying house for their reference, as per buyer’s
requirement:
Invoice
Packing List
Buying house then intimates the buyer about the shipment & gives the details
regarding it. Buying house will send a set of these documents to the buyer.
Buyer collects the consignment from the destination port by showing the following
documents:
o Invoice
o Packing List
On shipment of goods, exporter will send the documents to the importer’s bank.
32 | P a g e
2.4.2) Post-Shipment Procedure
Letter of Credit
If the payment terms are a confirmed L/C then the payment will be made by the
Invoice
Packing list
B/L
At Sight
After shipment, exporter sends the documents to the buyer’s bank for payment. As
the buyer’s bank receive the documents it will confirm with the buyer for release
33 | P a g e
The domestic branch will credit the exporter’s account, as against the respective
If the payment is through wire transfer, the payment will be made as per the terms
agreed by the exporter (Advance payment, as per the clause – 50% advance &
domestic trade transaction in more than one way. One of the most significant variations
between the two arises on account of the much more intensive documentation work. The
documents mentioned in the pre & post shipment procedure are discussed below:
acceptance. When the buyer is ready to purchase the goods, he will request for an
buyer raising his claim for the value of goods described therein, it
indicates description of goods, quantity, value agreed per unit & total
value to be paid. Normally, the invoice is prepared first, & several other
(See Annexure 4)
trade papers are in order & the goods being shipped do not violate any law
or trade restrictions.
34 | P a g e
c. Customs invoice: It is an invoice made on specified format for the
2. Packing list: It shows the details of goods contained in each parcel / shipment.
Considerably more detailed and informative than a standard domestic packing list, it
itemizes the material in each individual package and indicates the type of package,
such as a box, crate, drum or carton. Both commercial stationers and freight
goods and confirming that they have been inspected. It is required by some
purchasers and countries in order to attest to the specifications of the goods shipped.
This is usually performed by a third party and often obtained from independent
without which clearance to import is refused. The certificate of origin states that the
goods exported are originally manufactured in the country whose name is mentioned
The goods produced in a particular country are subject to’ preferential tariff
The goods produced in a particular country are banned for import in the
foreign market.
35 | P a g e
useful for taking advantage of preferential duty concession, if available. It is
exports or imports will be effected without the IEC code. It is mandatory for every
7. Wearing Apparel Sheet: It is like a check list which gives the detail regarding the
8. Bill of Lading: The bill of lading is a document issued by the shipping company or
its agent acknowledging the receipt of goods on board the vessel, and undertaking
to deliver the goods in the like order and condition as received, to the consignee or
his order, provided the freight and other charges as specified in the bill have been
duly paid. It is also a document of title to the goods and as such, is freely
9. Airway Bill: An airway bill, also called an air consignment note, is a receipt issued
by an airline for the carriage of goods. As each shipping company has its own bill
of lading, so each airline has its own airway bill. Airway Bill or Air Consignment
Note is not treated as a document of title and is not issued in negotiable form.
10. Mate's Receipt: Mate's receipt is a receipt issued by the Commanding Officer of
the ship when the cargo is loaded on the ship. The mate's receipt is a prima facie
evidence that goods are loaded in the vessel. The mate's receipt is first handed over to
the Port Trust Authorities. After making payment of all port dues, the exporter or his
36 | P a g e
agent collects the mate's receipt from the Port Trust Authorities. The mate's receipt is
freely transferable. It must be handed over to the shipping company in order to get the
bill of lading. Bill of lading is prepared on the basis of the mate's receipt. (See
Annexure 11)
11. Shipping Bill: Shipping bill is the main customs document, required by the
customs authorities for granting permission for the shipment of goods. The cargo is
moved inside the dock area only after the shipping bill is duly stamped, i.e. certified
by the customs. Shipping bill is normally prepared in five copies: (See Annexure 12)
Customs copy.
Drawback copy.
Exporter's copy.
12. Letter of Credit: This method of payment has become the most popular form in
recent times; it is more secured as company to other methods of payment (other than
A letter of credit can be defined as “an undertaking by importer’s bank stating that
payment will be made to the exporter if the required documents are presented to the bank
37 | P a g e
Contents of a Letter Of Credit
A letter of credit is an important instrument in realizing the payment against exports. So,
needless to mention that the letter of credit when established by the importer must contain
all necessary details which should take care of the interest of Importer as well as
Exporter. Let us see shat a letter of credit should contain in the interest of the exporter.
Mode of transport
Details of goods to be exported like description of the product, quantity, unit rate,
Type of packing
Reimbursement clause
38 | P a g e
Steps in an Import Transaction with Letter of Credit
The importer includes a purchase contract for the buying of certain goods.
↓
The importer requests this bank to open a LC in favor of his supplier.
↓
The importer’s bank opens the LC as per the application.
↓
The opening bank will forward the original LC to the advising bank.
↓
The advising bank, after satisfying itself about the authenticity of the credit, forwards the
same to the exporter.
↓
The exporter scrutinizes the LC to ensure that it confirms to the terms of contract.
↓
In case any terms are not as agreed, the importer will be asked to make the required
amendments to the LC.
↓
In case the LC is as required, the exporter proceeds to make arrangements for the goods.
↓
The exporter will effect the shipment of goods.
↓
After the shipment is effected, the exporter will prepare export documents, including
Bills of Exchange.
↓
The exporter’s bank (negotiation bank) verifies all the documents with the LC.
↓
If the documents are in the conformity with the terms of LC and all other conditions are
satisfied, the bank will negotiates the bill.
↓
The exporter receives the payment in his bank account.
↓
The LC Opening bank (Importer’s Bank) receives the bill and documents from the
exporter’s bank.
↓
The importer’s bank checks the documents and informs the importer. The importer then
accepts/pays the bill (This would depend on the terms, Delivery against Acceptance or
Delivery against Payment). On acceptance/ payment, the importer gets the shipping
documents covering the goods purchased by him.
↓
The LC issuing bank reimburses the negotiating bank, the amount, if the documents are
found in order.
39 | P a g e
2.4.4) Terms of Shipments – Incoterms
definition of international trade terms, such as FOB, CFR & CIF, developed by the
International Chamber of Commerce (ICC) in Paris, France. It defines the trade contract
responsibilities and liabilities between buyer and seller. It is invaluable and a cost-saving
tool. The exporter and the importer need not undergo a lengthy negotiation about the
conditions of each transaction. Once they have agreed on a commercial terms like FOB,
they can sell and buy at FOB without discussing who will be responsible for the freight,
The purpose of Incoterms is to provide a set of international rules for the interpretation of
the most commonly used trade terms in foreign trade. Thus, the uncertainties of different
considerable degree. The scope of Incoterms is limited to matters relating to the rights
and obligations of the parties to the contract of sale with respect to the delivery of goods.
Incoterms deal with the number of identified obligations imposed on the parties and the
Ex Works: Ex means from. Works means factory, mill or warehouse, which are the
seller’s premises. EXW applies to goods available only at the seller’s premises. Buyer is
responsible for loading the goods on truck or container at the seller’s premises and for the
40 | P a g e
subsequent costs and risks. In practice, it is not uncommon that the seller loads the goods
on truck or container at the seller’s premises without charging loading fee. The term
EXW is commonly used between the manufacturer (seller) and export-trader (buyer), and
the export-trader resells on other trade terms to the foreign buyers. Some manufacturers
may use the term Ex Factory, which means the same as Ex Works.
Free Carrier: The delivery of goods on truck, rail car or container at the specified point
(depot) of departure, which is usually the sellers premises, or a named railroad station or
a named cargo terminal or into the custody of the carrier, at seller’s expense. The point
(depot) at origin may or may not be a customs clearance centre. Buyer is responsible for
the main carriage/freight, cargo insurance and other costs and risks.
In the air shipment, technically speaking, goods placed in the custody of an air carrier are
considered as delivery on board the plane. In practice, many importers and exporters still
Free Alongside Ship: Goods are placed in the dock shed or at the side of the ship, on the
dock or lighter, within reach of its loading equipment so that they can be loaded aboard
the ship, at seller’s expense. Buyer is responsible for the loading fee, main
carriage/freight, cargo insurance, and other costs and risks In the export quotation,
indicate the port of origin(loading)after the acronym FAS, for example FAS New York
41 | P a g e
and FAS Bremen. The FAS term is popular in the break-bulk shipments and with the
Free on Board: The delivery of goods on the board the vessel at the named port of origin
(Loading) at seller’s expense. Buyer is responsible for the main carriage/freight, cargo
insurance and other costs and risks. In the export quotation, indicate the port of origin
(loading) after the acronym FOB, for example FOB Vancouver and FOB Shanghai.
Under the rules of the INCOTERMS 1990, the term FOB is used for ocean freight only.
However, in practice, many importers and exporters still use the term FOB in the air
freight. In North America, the term FOB has other applications. Many buyers and sellers
in Canada and the USA dealing on the open account and consignment basis are
accustomed to using the shipping terms FOB Origin and FOB destination.
FOB Origin means the buyer is responsible for the freight and other costs and risks. FOB
Destination means the seller is responsible for the freight and other costs and risks until
the goods are delivered to the buyer’s premises which may include the import custom
clearance and payment of import customs duties and taxes at the buyer’s country,
depending on the agreement between the buyer and seller. In international trade, avoid
using the shipping terms FOB Origin and FOB Destination, which are not part of the
42 | P a g e
CFR (At the named port of destination)
Cost and Freight: The delivery of goods to the named port of destination (discharge) at
the seller’s expenses. Buyer is responsible for the cargo insurance and other costs and
risks. The term CFR was formerly written as C&F. Many importers and exporters
Cost, Insurance and Freight: The cargo insurance and delivery of goods to the named
port of destination (discharge) at the seller’s expense. Buyer is responsible for the import
In the export quotation, indicate the port of destination (discharge) after the acronym CIF,
for example CIF Pusan and CIF Singapore. Under the rules of the INCOTERMS 1990,
the term CIFI is used for ocean freight only. However, in practice, many importers and
Carriage Paid To: The delivery of goods to the named port of destination (discharge) at
the seller’s expenses. Buyer assumes the cargo insurance, import custom clearance,
payment of custom duties and taxes, and other costs and risks. In the export quotation,
indicate the port of destination (discharge) after the acronym CPT, for example CPT Los
43 | P a g e
CIP (At the named place of destination)
Carriage and Insurance Paid To: The delivery of goods and the cargo insurance to the
named place of destination (discharge) at seller’s expense. Buyer assumes the importer
customs clearance, payment of customs duties and taxes, and other costs and risks.
Delivered at Frontier: The delivery of goods at the specified point at the frontier on
seller’s expense. Buyer is responsible for the import custom clearance, payment of
Delivered Ex Ship: The delivery of goods on board the vessel at the named port of
destination (discharge) at sellers expense. Buyer assumes the unloading free, import
customs clearance, payment of customs duties and taxes, cargo insurance, and other costs
and risks.
Delivered Ex Quay: The delivery of goods to the Quay (the port) at the destination on
the buyers expense. Seller is responsible for the importer customs clearance, payment of
customs duties and taxes, at the buyers end. Buyer assumes the cargo insurance and other
44 | P a g e
DDU (At the named point of destination)
Delivered Duty Unpaid: The delivery of goods and the cargo insurance to the final point
of destination, which are often the project site or buyers premises at sellers expense.
Buyer assumes the import customs clearance, payment of customs duties and taxes. The
seller may opt not to insure the goods at his/her own risks.
Delivered Duty Paid: The seller is responsible for most of the expenses which include
the cargo insurance, import custom clearance, and payment of custom duties, and taxes at
the buyers end, and the delivery of goods to the final point of destination, which is often
the project site or buyers premise. The seller may opt not to insure the goods at his/her
own risk.
“E”-term, “F”-term, “C”-term & “D”-term: Incoterms 2000, like its immediate
predecessor, groups the term in four categories denoted by the first letter in the three-
letter abbreviation.
Under the “E”-TERM (EXW), the seller only makes the goods available to the
buyer at the seller’s own premises. It is the only one of that category.
Under the “F”-TERM (FCA, FAS, &FOB), the seller is called upon to deliver
Under the “C”-TERM (CFR, CIF, CPT, & CIP), the seller has to contract for
carriage, but without assuming the risk of loss or damage to the goods or
45 | P a g e
Under the “D”-TERM (DAF, DEQ, DES, DDU & DDP), the seller has to bear
all costs and risks needed to bring the goods to the place of destination.
All terms list the seller’s and buyer’s obligations. The respective obligations of both
parties have been grouped under up to 10 headings where each heading on the seller’s
side “mirrors” the equivalent position of the buyer. Examples are Delivery, Transfer of
risks, and Division of costs. This layout helps the user to compare the party’s respective
46 | P a g e
Bibliography
Reference Site
Reference book
Puri, V. K., Exporters’ Guidelines, A Basic Book on How to Export as per Govt.
Paul, Justin & Aserkar, Rajiv, Export Import Management, 2nd Edition, Oxford
47 | P a g e
Annexure
Interview Questions
What role the different departments play for the completion of the export order?
What are the different documents prepared & used for the export?
48 | P a g e
Annexure 1
49 | P a g e
Annexure 2
50 | P a g e
Annexure 3
51 | P a g e
Annexure 4
52 | P a g e
Annexure 5
53 | P a g e
Annexure 6
54 | P a g e
Annexure 7
55 | P a g e
Annexure 8
56 | P a g e
Annexure 9
57 | P a g e
Annexure 10
58 | P a g e
Annexure 11
59 | P a g e
Annexure 12
60 | P a g e
Annexure 13
61 | P a g e