Sunteți pe pagina 1din 2

NOTES 1 2 3 4 5 Modern curb. Modern steps. Pit in floor: dimensions and location approximate. Recess with broken figure.

Steps assumed in this position; currently unexcavated. 0 5 10 20 40 cubits 0 5 10 20 m

Tr u

eN

rid PG TM No rth

or

th

Pillar 1

Pillar 2

N 99,621.308 E 94,063.747 Elev 169.750

Axis 324 45' 27"

I Pillar 3 Pillar 4

Pillar 3

Jf Pillar 1
5

Pillar 7 Fa Pillar 4 Pillar 2

Pillar 5

Pillar 3

Pillar 1

Ja

Je

157.622

Faa Pillar 8 Pillar 6 Pillar 4 Pillar 2

Jb

Jdd

Pillar 2 Jd

Pillar 1 Pillar 2 Pillar 1 Jc

169.750

Pillar 2 Jddd

Pillar 1

166.373

159.749

157.656

154.862

154.655

Plan, sections 1:125

KV 7 - Rameses II

Theban Mapping Project

154.655 154.117 154.117

154.655 154.117

154.903

Sheet 18/72 - KV 7 (1/2)

Dyn. XIX

Theban Mapping Project

Sheet 19/72 - KV 7 (2/2)

KV 7 - Rameses II
Axonometric

Dyn. XIX

10 m

10 m

5m

5m

5m

10 m

S-ar putea să vă placă și