Documente Academic
Documente Profesional
Documente Cultură
Pgina :
Presupuesto
Obra
0301021
Frmula03
Item
MEJORAMIENTO DE LOS SERVICIOS EN EL CENTRO DE SALUD AGALLPAMPA - DISTRITO DE AGALLPAMPA -OTUZCO - LA LIBERTAD
INSTALACIONES ELECTRICAS
Descripcin
Unidad
Metrado
Precio
Parcial
Total
pto
129.00
44.48
5,737.92
pto
105.00
43.60
4,578.00
pto
9.00
46.31
416.79
pto
76.00
46.24
3,514.24
und
3.00
891.20
2,673.60
pto
17.00
44.04
748.68
pto
1.00
44.04
44.04
pto
20.00
45.86
917.20
pto
15.00
47.55
713.25
pto
6.00
145.91
875.46
pto
12.00
97.13
1,165.56
pto
16.00
42.87
685.92
5,150.11
und
6.00
3,042.23
18,253.38
18,253.38
16,920.55
5,850.00
1.84
10,764.00
1,170.00
2.70
3,159.00
35.00
3.68
128.80
67.00
5.19
347.73
55.00
7.74
425.70
46.00
10.48
482.08
58.00
18.42
1,068.36
04.08.00 CABLE ELECTRICO NYY 3X1X95 + 1X70 MM2 (N). INC EXCAVACION/RELLENO
16.00
157.32
2,517.12
18,892.79
und
120.00
143.64
17,236.80
und
22.00
131.72
2,897.84
und
52.00
127.52
6,631.04
26,765.68
1,950.00
3.45
6,727.50
450.00
4.09
1,840.50
95.00
4.87
462.65
45.00
5.32
239.40
58.00
6.42
372.36
35.00
6.89
241.15
9,883.56
UN
1.00
57,175.63
57,175.63
57,175.63
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
SUBTOTAL
IGV (18%)
TOTAL
153,041.70
15,304.17
7,652.08
175,997.95
31,679.63
207,677.58