COSTOS INDIRECTOS

PERSONAL PLANTA OFICINA

SUELDO

1 GERENTE
1 SUBGERENTE
1 CONTADOR
1 AUXILIAR CONTABLE
1 RECEPCIONISTA
1 MENSAJERO
PRESTACIONES
SUBTOTAL
GASTOS GENERALES OFICINAS

MESES
1,500,000
2,500,000
1,500,000
400,000
380,000
350,000
4,309,500

VALOR

ALQUILER LOCAL
SERVICIOS (AGUA, LUZ).
TELEFONO
VARIOS
SUBTOTAL

1.5
3
3
3
3
3
3

2,250,000
7,500,000
4,500,000
1,200,000
1,140,000
1,050,000
12,928,500
30,568,500

3
3
3
3

1,500,000
600,000
600,000
3,000,000
5,700,000

MESES
500,000
200,000
200,000
1,000,000

TOTAL OFICINA
OBRAS EN EJECUCION
TOTAL POR OBRA

PERSONAL PLANTA OBRA

36,268,500
5
7,253,700

SUELDO

1 INGENIERO DIRECTOR OBRA


1 RESIDENTE
1 INSPECTOR
1 ALMACENISTA
1 VIGILANTE
PRESTACIONES
SUBTOTAL
GASTOS GENERALES OBRAS
1 CAMPAMENTO 18 M2
1 TELEFONO FAX
1 COMPUTADOR
CONEXIN ELECTRICA
1 BAO PROVISONAL (3 MESES)
VARIOS
SUBTOTAL

MESES
2,000,000
1,000,000
700,000
350,000
350,000
3,315,000

VALOR

3
3
3
3
3
3

6,000,000
3,000,000
2,100,000
1,050,000
1,050,000
9,945,000
23,145,000

1
1
1
1
1
1

800,000
150,000
800,000
150,000
200,000
700,000
2,800,000

UND
800,000
150,000
800,000
150,000
200,000
700,000

TOTAL GASTOS EN OBRA

POLIZAS

25,945,000

VALOR

SEGURO COLECTIVO DE VIDA


POLIZA DE SERIEDAD
GARANTIA UNICA
ESTABILIDAD OBRA
RESPOSABILIDAD CIVIL
SUBTOTAL

UND
600,000
124,120
1,237,720
1,766,680
128,760

1
1
1
1
1

TOTAL GASTOS POLIZAS

DESCUENTOS
ESTAMPILLA PRODESARROLLO
ESTAMPILLA PRO-UNIVALLE
ESTAMPILLA PRO-DEPORTES
CONTRIBUCION ESPECIAL
SUBTOTAL

600,000
124,120
1,237,720
1,766,680
128,760
3,857,280
3,857,280

VALOR

UND
3,912,075
3,912,075
3,912,075
19,560,374

1
1
1
1

3,912,075
3,912,075
3,912,075
19,560,374
31,296,599

TOTAL DESCUENTOS

31,296,599

TOTAL GASTOS ADMINISTRATIVOS

68,352,579

COSTO DIRECTO OBRA


PORCENTAJE ADMINISTRACION
PORCENTAJE IMPREVISTOS
PORCENTAJE UTILIDAD
A.I.U

391,207,476
18%
1%
5%
24%

COSTOS INDIRECTOS POLICARPA


PERSONAL PLANTA OFICINA

SUELDO

1 GERENTE
1 CONTADOR
SUBTOTAL
GASTOS GENERALES OFICINAS
SELECCIN DE PERSONAL
ALQUILER LOCAL
SERVICIOS (AGUA, LUZ).
TELEFONO
VARIOS
SUBTOTAL

MESES
1,500,000
200,000

VALOR

0
3

0
600,000
600,000

1
0
0
0
0

200000
0
0
0
0
200,000

MESES
200000
500,000
200,000
200,000
1,000,000

TOTAL OFICINA
OBRAS EN EJECUCION
TOTAL POR OBRA

PERSONAL PLANTA OBRA

800,000
5
160,000

SUELDO

1 INGENIERO DIRECTOR OBRA


1 RESIDENTE
1 INSPECTOR
1 ALMACENISTA
1 VIGILANTE
PRESTACIONES
SUBTOTAL
GASTOS GENERALES OBRAS
1 CAMPAMENTO 18 M2
1 TELEFONO FAX
1 COMPUTADOR
CONEXIN ELECTRICA
1 BAO PROVISONAL (3 MESES)
VARIOS (Ensayos, papeleria, etc.)
SUBTOTAL
TOTAL GASTOS EN OBRA

MESES
1,500,000
1,000,000
700,000
350,000
350,000
455,000

VALOR

0
0
0
0
2
0

0
0
0
0
700,000
0
700,000

0
0
0
0
0
1.5

0
0
0
0
0
750,000
750,000

UND
800,000
150,000
800,000
150,000
200,000
500,000

1,450,000

COSTOS INDIRECTOS POLICARPA

POLIZAS

VALOR

EPS Y ARP
POLIZA DE SERIEDAD
GARANTIA UNICA
ESTABILIDAD OBRA
RESPOSABILIDAD CIVIL
SUBTOTAL

UND
74,500
35,000
85,795
108,604
35,000

6
1
1
1
1

TOTAL GASTOS POLIZAS

DESCUENTOS
PUBLICACION CONTRATO
ESTAMPILLA PRODESARROLLO
ESTAMPILLA PRO-UNIVALLE
ESTAMPILLA PRO-DEPORTES
CONTRIBUCION OBRA CIVIL ESPECIAL
RETENCION INDUSTRIA SERVICIOS
301(CONSTRUCCIONES 0.33%)
RETEFUENTE OBRA CIVIL
APORTES SENA
APORTES BIENESTAR FAMILIAR
3x1000
VALLA
SUBTOTAL
CVY

447,000
35,000
85,795
108,604
35,000
711,399
711,399

VALOR

UND
166000
289,612
289,612
434,418
1,448,059

1
1
1
1
0

166,000
289,612
289,612
434,418
0

95,572
289,612
217,209
217,209
114,812
150,000

1
1
1
1
1
1

95,572
289,612
217,209
217,209
114,812
150,000
2,264,055

TOTAL DESCUENTOS

2,264,055

TOTAL GASTOS ADMINISTRATIVOS

4,585,454

COSTO DIRECTO OBRA


PORCENTAJE ADMINISTRACION
PORCENTAJE IMPREVISTOS
PORCENTAJE UTILIDAD
A.I.U

17,906,531
25.6%
1.0%
0%
26.6%

COSTO TOTAL

22,669,668

COSTOS INDIRECTOS POLICARPA


UTILIDAD NETA
VALOR CONTRATACION
ANTICIPO

6,291,505
28,961,173
13,781,174