Ejercicio 1
Datos:
-
= 0.9
Fc = 210 Kg/cm2
b= 100 cm
Vista en Planta:
Viga principal
Interior
Pasadizo
Solucin
LOSA INTERIOR (b = 1m)
1.
Espesor
t1=12cm
t2= 15cm
t3= 15cm
* Por condiciones de seguridad se usara el mayor peralte obtenido por el mtodo para no verificar
deflexin. (t = 18cm).
2.
Metrado de cargas
(m)
Momento para cada tramo.
(Wu*Ln2)/24
(Wu*Ln2)/10
(Wu*Ln2)/14
(Wu*Ln2)/11
(Wu*Ln2)/11
(Wu*Ln2)/16
(Wu*Ln2)/10
(Wu*Ln2)/24
(Wu*Ln2)/11
(tn/m)
Resultado de w.
Resultado de Pcalculado
Resultado de Pdiseo
Pmin=0.00242
(m2).
Resultado de Sccalculado
Sr = 3*t
Momento
128500
220000
345000
314000
240000
326000
360000
304000
140000
3/8
18.37
18.37
11.89
13.12
17.34
12.62
11.37
13.57
18.37
Sr=54
Sccalculado
1/2
32.86
32.86
21.27
23.47
31.02
22.57
20.34
24.28
32.86
5/8
51.24
51.24
33.17
36.60
48.36
35.19
31.72
37.85
51.24
(cm).
Resultado de Scdiseo
(cm).
53/8@.20
51/2@.20
51/2@.20
53/8@.20
41/2@.25
41/2@.25
41/2@.25
53/8@.20
(1.15Wu*Ln)/2
(Wu*Ln)/2
(Wu*Ln)/2
(1.15Wu*Ln)/2
(Wu*Ln)/2
(Wu*Ln)/2
53/8@.20
Tn
5. Verificacin por corte
c = *0.53*fc
c = 0.9*0.53*210
c = 6.912 kg/cm3
Ln
4.3
4.55
4.55
4.6375
4.6375
4.475
Vact
3.59
3.79
3.79
3.87
3.87
3.73
Vperm
11.0592
11.0592
11.0592
11.0592
11.0592
11.0592
verificacin
ok
ok
ok
ok
ok
ok
t1=12cm
t2= 15cm
t3= 15cm
2.
Metrado de cargas
(m)
Momento para cada tramo.
(Wu*Ln2)/24
(Wu*Ln2)/10
(Wu*Ln2)/14
(Wu*Ln2)/11
(Wu*Ln2)/11
(Wu*Ln2)/16
(Wu*Ln2)/10
(Wu*Ln2)/24
(Wu*Ln2)/11
(tn/m)
Resultado de w.
Resultado de Pcalculado
Resultado de Pdiseo
Pmin=0.00242
(m2).
Resultado de Sccalculado
Sr = 3*t
Momento
144000
250000
388000
353000
270000
370000
337000
340000
157000
3/8
18.37
16.62
10.51
11.61
15.35
11.05
12.19
12.08
18.37
Sr=54
Sccalculado
1/2
32.86
29.74
18.80
20.77
27.46
19.77
21.80
21.60
32.86
5/8
51.24
46.36
29.31
32.38
42.81
30.82
33.99
33.68
51.24
Resultado de Scdiseo
(cm).
53/8@.20
51/2@.20
51/2@.20
31/2@.30
41/2@.25
31/2@.30
41/2@.25
41/2@.25
(1.15Wu*Ln)/2
(Wu*Ln)/2
(Wu*Ln)/2
(1.15Wu*Ln)/2
(Wu*Ln)/2
(Wu*Ln)/2
53/8@.20
Tn
c = *0.53*fc
c = 0.9*0.53*210
c = 6.912 kg/cm3
Ln
4.3
4.55
4.55
4.6375
4.6375
4.475
Vact
4.04
4.91
4.27
4.35
5.01
4.20
Vperm
11.0592
11.0592
11.0592
11.0592
11.0592
11.0592
verificacin
ok
ok
ok
ok
ok
ok
VIGA PRINCIPAL
Vista en Planta:
1.
Peralte
2.
Seccin 1 = (30x75)
Seccin 2 = (30x50)
Columnas = (30x50), L=2.5m
Metrado de cargas
Seccin 1
Carga muerta (D)
-
D =3.32 tn/m
Seccin 2
Carga muerta (D)
-
D = 3.14 tn/m
Carga viva (s/c)
S/c = 0.6*(2.25+2.15) = 2.64 tn/m
Wu2 = 1,5*(D) + 1.8*(s/c) = 9.462 tn/m
Vista Frontal:
3.
CROSS
Resultado de momentos
Diagrama de momentos
4.
= 0.9
Pb = 0.72 * Fc * 6000 / (Fy (Fy + 6000))
Pb = 0.021176471
Segn el Reglamento Nacional de Edificaciones
P mx = 0.75 x Pb = 0.01588
P mn = 0.7 x (fc)/fy = 0.00242
w = 0.138344
Pdis = (w x fc)/fy
Pdis = 0.0069172
As = Pdis x b x d
As = 14.53 cm2
Barras de Acero
Dimetro (pulgadas)
7/8
1 1/4
>>> (cm)
2.2352
2.54
3.175
3.923942718
5.067074791
Nmero de Barras
7.847885436
11.77182815
15.69577087
10.13414958
15.20122437
20.26829916
15.83460872
23.75191308
7.917304361
w = 0.109963
Pdis = (w x fc)/fy
Pdis = 0.00549815
As = Pdis x b x d
As = 11.55 cm2
Barras de Acero
Dimetro (pulgadas)
7/8
1 1/4
>>> (cm)
2.2352
2.54
3.175
3.923942718
5.067074791
Nmero de Barras
7.847885436
11.77182815
15.69577087
10.13414958
15.20122437
20.26829916
15.83460872
23.75191308
7.917304361
w = 0.207437
Pdis = (w x fc)/fy
Pdis = 0.01037185
As = Pdis x b x d
As = 21.78 cm2
Barras de Acero
Dimetro (pulgadas)
7/8
1 1/4
>>> (cm)
2.2352
2.54
3.175
3.923942718
5.067074791
Nmero de Barras
7.847885436
11.77182815
15.69577087
10.13414958
15.20122437
20.26829916
15.83460872
23.75191308
7.917304361