Sunteți pe pagina 1din 3

. . . .

| > f

CIVITAS PROFESSIONAL DEVELOPMENT

DATE

LEVEL

TOPIC

OUTCOME: At the end of each session the staff will be able to:

7-Sep-12

SCHOOL

CSTDATA SCHOOL-TEACHER

(1) state our current performance level on the CST (2) state the gap between where we are and the Dist's goal (3) Develop their department's performance goal. (NOTE - The goal will be finalized at the end of next weeks department.) meeting.
INTERVENTION:

(1) determine which students require intervention and in which areas


based on our established timelines.

(2) Determine the length of the intervention cycle 14-Sep-12


SCHOOL INTERVENTION NEEDS CST TEACHER - STUDENT

(3) Prioritize the cycle / subjects that the student will be in.
CST

(1) present to each student in his or her advisory their position on the CST in all appropriate academic area. (2) Present a plan to each student to advance on future high stakes test.
Blood Born Patthegens : Mandatory Training for all Staff VOCABULARY: (1) State the importants of formally teaching vocabulary Blood Born Pathegens
DEPT

21-Sep-12

VOCABULARY

FOCUS - Department PLANNING

in each academic area (2) Develop schoolwide, dept and class specific strategies to meet the language, reading, and knowledge level of our student population. (3) Develop the classroom word wall for the current standards. DEPARTMENT: Address any department needs related to PD covered to date. Advise department chair of any needs and concerns related to the training and or impementation.
EL MODULE: The first of 3 to 4 mandiated trainings on EL students. GRADE LVL: Focus on things presented to date and or grade Ivl project.

28-Sep-12

DEPT

EL MODULE 1 - GRADE LVL PLANNING

Rev: 10/8/2012

lof 3

PROFESSIONAL DEVELOPMENT

.r.UkJL*

-r-

CIVITAS PROFESSIONAL DEVELOPMENT

DATE

LEVEL

TOPIC

OUTCOME: At the end of each session the staff will be able to:
STANDARDS BASED CLASSROOM OBSERVATION PROTOCOL FOR

EDUCATORS: Staff will receive an overview of how this instrument will


5-Oct-12
SCHOOL SCOPE OVERVIEW

be used to guide teaching practices.

SCOPE: Staff will observe a video lesson and evaluate instruction using
SCOPE. Staff will debrief and calibrate their observations. Desired
12-Oct-12 SCHOOL SCOPE - OBSERVATIONS

outcome: Staff is confidant that they know what each section of the protocol is looking for. EL MODULE 2: Continue the manditory training
EL MODULE 2: Continue the manditory training INTERVENTION: (1) determine which students require intervention and in which areas
based on our established timelines.

19-0ct-12

GRADE

EL MODULE 2 INTERVENTION NEEDS

COOPERATIVE GROUPS: Staff will develop their classroom routines with


26-Oct-12 DEPT

CLASSROOM ROUTINE - COOPERATIVE GROUPS

a focus on the benefit of using cooerative groups within the room. EL MODULE: The third of 3 to 4 mandiated trainings on EL students.

2-Nov-12

SCHOOL

EL MODULE 3-

9-Nov-12

SCHOOL

SCOPE

SCOPE: Staff will critique observations and seek to establish best practices as a school, department and individual teacher.
INTERVENTION:

16-Nov-12

GRADE

INTERVENTION NEEDS

(1) determine which students require intervention and in which areas


based on our established timelines.

23-Nov-12

DEPT

HOLIDAY

30-Nov-12

INCLUSION MODEL: GRADE LVL

INCLUSION: Staff will (1) state the theory behind the inclusion model (2) ID the students with specail needs to include EL, Special ED and gifted. (4) ID strategies to meet the needs of all groups to include the general population. (5) Identify lesson strategies to

Rev: 10/8/2012

2 of 3

PROFESSIONAL DEVELOPMENT

CIVITAS PROFESSIONAL DEVELOPMENT

DATE

LEVEL

TOPIC

OUTCOME: At the end of each session the staff will be able to:

SCHOOL: ADMIN - DEPT-TEACHER - STUDENT PROGRESS


7-Dec-12
14-Dec-12 SCHOOL REVIEW

PROGRESS REVIEW: Staff will self evaluate our progress in all

educational and operational areas.

SCHOOL

WINTER HOLIDAY PARTY

28-Dec-12
4-Jan-13

DEPT

HOLIDAY
HOLIDAY

SCHOOL
SCHOOL

ll-Jan-13

READING LEVELS AND READING IN CONTENT AREAS


REPORT OF SELF ASSESSMENT COOPERATIVE GROUPSCLASSROOM ROUTINES
INTERVENTION NEEDS

25-Jan-13

DEPT

l-Feb-13
8-Feb-13

SCHOOL SCHOOL

22-Feb-13
l-Mar-13

DEPT SCHOOL

CST BOOTCAMP CSTBOOTCAMP

8-Mar-13

SCHOOL

4
22-Mar-13
29-Mar-13 DEPT

5-Apr-13 12-Apr-13

SCHOOL SCHOOL

CST BRIEF AND PLAN


TECHNOLOGY

JMftgrt
26-Apr-13 3-May-13 10-May-13

XSRAW
DEPT

SCHOOL SCHOOL

IliMiifl.
24-May-13
DEPT

Rev: 10/8/2012
^atfh^tiU

3 of 3

PROFESSIONAL DEVELOPMENT

S-ar putea să vă placă și