Documente Academic
Documente Profesional
Documente Cultură
MASERU,KINGDOM OF LESOTHO
COMPANY PROFILE
2000
222,500
$ 94 M
$ 84.6 M
Industries Catered
PRODUCT DETAILS
PROCESS SEQUENCE
FABRIC STORE ACCESSORY CUTTING PRINTING
SEWING
SEWING
PATTERN
DRY PROCESS
LOADING
SHIPPING
CHEMICAL
4
WASHING
DISPATCH
DATA COLLECTION
TheoreticalTakt Time
Customer PS No Demand/month LEVIS
Days 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0
Time study
Fabric Store 4
Access Dry Washin Dispatc Pattern Cutting Sewing ory Process g h 1 1 1 2.5 2 2 2
Operation
Takt Time =
PROCESS PARAMETERS
Machines OEE(24 hr) Max output / hr / Mc MTBF (minutes) For each Needed Floor Space (sqm) individual Connected load in KW
operations
Time (seconds) process time changeover time / pc loading time takt time / pc
Inspection time(sec/bin)
Inspection frequency(garment) Quality Check/hour Setup adjustments (min/garment) No. of operators No. of machines Mudas-Identification Line balancing Thread Consumption
FABRIC STORE
3
4
Issuing
Supervisor
02
01
5 6
7 8
Inspection 10% from current arrival After wash of shrinkage- measure length and width After wash of shade changes will categories into A , B & C etc.
Request from cutting department for fabric and will provide as much required.
FABRIC STORE
Point/100 sq.yard = (Total point * 36 * 100) / (sample yards * cuttable roll width). If it exceeds 15 the fabric will get rejected.
SL No. 1 2 Length (Yard) 138 104.9 Width( Yard) Setup Time (Min) 58.5 58.5 5.58 7.2 Inspection (min) 25.34 25.04 Point Calculation 3 2.56
FABRIC STORE
General Ideas
Supply chain Management- Ship Routes PS NUMBER WASH NAME
P-11002
P-11003 P-11006 P-11007 P-11008
Medium
Dark Relaxed Medium Journey Anthem
1.India-> Durban -> Lesotho 2.India -> Cape town -> Lesotho 3.Pakistan -> Durban -> Lesotho
P-11009
P-11011
Time Average
Rustic
Summit
QUALITY ISSUES Barre Holes Biased Jerk In Bow Knots Broken End Misdraw Course Ends Mispick Crack Marks Mote Compactor Marks Needle Lines Creases Off Pattern Double Ends Press Off Dye Streaks Read Marks Ends Out Rope Marks Filling Bands Runs Fine Ends Seam Marks Finger Mark Slub Float Smash Fly Soil
Total time to reach a fabric to cutting is 3-4days Minimum. In Emergency 2 days. Time for washing in shade blanket is 1 day. Before that 1day for cutting. For shrinking washing time is minimum 2hrs and after washing 1hr.
11
FABRIC STORE
Continuous..
Containers
including Container
number, P/O, quantity, ETA, ETD, YDS, Shipping line. When arrived, the uploading will do only after customs
Issuing the fabric to cutting as per cutting plan. They will give
request for fabric to issue. Mostly will cut 7% more than order quantity
12
FABRIC STORE
PATTERN ROOM
13
Process details
Buyer will give design to the management as per their requirement. Through Merchandiser it will transfers to pattern department. Pattern maker will calculate the total fabric needed for a garment in yards. It always an average of 1.40yards + 2 % allowance. Management will decide the overall cost of making a garment and will inform to buyer. If the buyer is not ready to accept the rate, there will also a discussion for cost reduction and may reach as per buyers standard. For sample piece of garment firstly as per shrinkage report, pattern will make with GEBER Software.
14
PATTERN
Continuous..
Sample will send to buyer for verification. After that there might be small changes from buyer will occur. They also will send back to Merchandiser and finally to pattern department.
Pattern department will start pre-production and will make a pattern of three or four size garments with two or three pieces and will undergo all process including quality check in final.
Quality department will note and inform if there any changes and problems in the final product, Always the utilization of fabric should be more than 90%. And at least like to reach 93%. In pre-production buyer will always give a tolerance on +5 to -5 as example. So the size issue, because of external issues like shrinkage will always between this.
15
PATTERN
Continuous
PATTERN
Continuous
Production sheet contents like PS NO, SAP-PO NO, PRODUCT CODE, ORDER QUANTITY From the Order Quantity cut plan will make taking Insim and Size as major calculation point of view. With exact number of quantity of each size like 32, 34, 36, 38 etc. Marker count and table count will decide. From the fabric shrinkage report and marker allotment total quantity of fabric will calculate.
Design is making with Geber software and will allot in exact yards with 90% efficiency. Always make Order quantity with 0-7% extra, with comparison of stock level in previous production. Printer needs at least 20-30 minutes to make a printout.
PATTERN
CUTTING
18
Production Plan
From Marker the quality department will check whether all the pieces of a garment are present or not. The fabric roll will keep in table with more than 74 layers as per the thickness of garment. May be the capacity will reach about 100. There are 12 line of cutting table. 6 tables with 19 and 6 tables with 21.
After cutting there will be a quality checking for whether there any more excess cut is made or any other wrong cut is made. They will mark in error piece bundles for rework. After that numbering will do in all pieces of bundles. And they will make bundles of garments together. There also a quality checks after numbering.
After all the line feeders in sewing department will take the bundles to respective area.
19
SL. No 1
2 3 4
2 2 1
20
CUTTING
PLANNING
21
General ideas
22
PLANNING
Continuous
Mainly deals with fabric quantity, accessory needed, date of order and arrival Production Planning
Production is well planned as per the day of shipping as final designation with proper date and allocating works in proper Line. Quantity Control Number of garments in each operation is well controlled to get proper output with less WIP in each level of production. Order Reconciliation
It will shows clear idea of all sewing quantity , washing quantity, Input to dispatch, sewing reject, washing reject, cutting reject , shipping quantity, Leftover etc. All management staffs will get a clear view report after Order reconciliation.
23
PLANNING
Departmental capacity
Example
Sewing department:
Lead time
Total time availability Machine hour
= 21.32 minutes
= 9 * 60 = 110 * 9 * 60 = 59400 minutes
= 85%
= (59400 * 0.85) / (21.32) = 2368 nos. = 263 nos.
Production in 5 lines
24
PLANNING
Total
25
PLANNING
ACCESSORY STORE
26
Accessories
Main label
Pocket label
Care Label Leather patch Zipper Fusing
Threads
Buttons
Plastic stables
Rivets
Waist tag
27
ACCESSORY
Suppliers
Will get Production sheet Sl.No 1 2 3 Item Zipper Thread Leather Patch (RT) Country Swaziland Hongkong Mauritius from merchandiser.
28
ACCESSORY
Continuous..
From PO will get what type of label needed and prepare with printing machine. Model will sent by Levis. 3000 pieces/hr
29
ACCESSORY
SPARE PARTS
30
General Ideas
Spare parts are categories into different variety and kept inside spare part store. As per the Mechanic and Head Mechanic request spare parts will get issued. Some consequent replacing parts have Minimum Inventory Level.
Company have monthly budget for purchasing spare parts. Asitha is the in charge and having more than five regular suppliers. Some parts are supply from Hongkong.
Issues are Not getting the spare parts from suppliers. So there is issue when a part is to be replaced as soon.
31
SPARE PARTS
Thread take up Thread guide Thread guide Thread guide Thread guide Thread guide Thread guide[right] Needle guide Flat knife Needle guard
32
SPARE PARTS
PR-SEWING
33
Shop floor..
Reports to/from PR
Current Situation
PR-SEWING
Operation Bulletin
35
PR-SEWING
PG-SEWING
36
Shop floor..
Line Target= (present line manpower * 60 *9) / (Line Total SMV * 85%)
Line balancing is observed as per the availability of manpower and work.
37
PG-SEWING
Bonus calculation
SL No.
1 2 3 4
Efficiency (%)
80-90 91-100 101-110 111 and above
Workers (R)
10 15 18 21
SL No. 1 2 3 4
Supervisor (R) 25 35 45 55
38
PG-SEWING
Continuous..
In pre-production, all management will group together for the new garment. It includes the rate for all kinds of utilization include threads, manpower, electricity, space, machine etc. and will go for sample production. Product safety is very important in quality check. There should not be any harmful material or sharp edge parts are in the garment. Quality persons have to do thorough check up regarding this issue. Operation Bulletin is attached.
39
PG-SEWING
INDUSTRIAL ENGINEER
40
General Ideas..
Standard Minute Value: The taken for completing an operation. It also called as cycle time. Machine Capacity: The maximum number of products that a machine can perform during an hourly based production Thread Consumption: Done thread consumption practical study with the help of a Jeans (Denizen) Production Efficiency in each operation /section
Total Number of workers in IE Department Bonus calculator-1, IE clerk-1, Score ladies-6. Total of 8 workers. General Production Issue Mainly thread wastage. Loop wastage. Time delay between operations. Waiting for successive operation. Line is not balanced
41
INDUSTRIAL ENGINEER
thread consumption.pdf
42
INDUSTRIAL ENGINEER
DRY PROCESS
43
Operation
SORTING MARKING FRONT
MARKING BACK
TURNING 1st
TURNING 2nd
BLOWING
TRIMMING
HAND SAND
CHEVERON
WASHING
GRINDERS
P.P.SPRAY
44
DRY PROCESS
Availability
Currently having 106 machines in working. Having 6 grinding machines. Having 15 P.P.Spray machines. Two blowing machine Two Turning machine
P.P.Spray
Whisker pattern
45
Whisker area
Manpower
SL.NO. OPERATION MANPOWER TARGET 150 300 METHOD Checking size/Inseam and grouping Vary from size Vary from size
1
2 3 4
Sorting
Marking Front Marking Back Turning 1st
3
6 3 2
5 6
7 8 9 10 11 12 13
Trimming Blowing
Turning 2nd Whisker Chevron Grinding Crinkle Hand sand P.P.Spray Supervisor PPC Score Lady Score Lady whisker Supervisor Whisker QC Table Trolley Boy
3 2
2 10 7 4 58 11 1 3 2 1 6 1
120 20 50
50 45
Marking in near knee Using grinders Using resin with Owen in 140 degree Celsius for 15 minutes. Using sand paper with hand sand machine in horizontal Using KMnO4 (300gm/10litre water) for making lighter the color.
46
TOTAL
125
DRY PROCESS
Safety Equipments
Mask
Finger guards
Ear plug
Gloves for PP spray
Overall gown
Two filter respirator
Inventories
Role Rubber 300 pieces tug 3kg of resin 4 roll of sandpaper for each day
47
DRY PROCESS
Quality checking
48
DRY PROCESS
Time study
SL.NO. OPERATION TIME STUDY (sec/piece)
20.1 9.8 6.3 35.9 12 12.55 70 33.8 65 28.2 45 153 560 DRY PROCESS
1 2 3 4 5 6 7 8 9 10 10 11 12 13
49
Sorting Marking Front Marking Back Turning Trimming Blowing Whisker Marking Whisker Chevron Marking Chevron Grinding- Bottom Grinding- pocket Hand sand (31 * 32) P.P.Spray
50
DRY PROCESS
WASHING
51
Shop Floor..
Machine availability
Sl.No Machine Number Workers
Target 23000 pieces /24 hr
2 3 Total
52
WASHING
Current State
Sl.No Operation count Maximum Capacity per machine 33 pieces at a time
35kg
Washing
capacity
23000-25000
pieces/24 hour
53
WASHING
General Ideas..
The washing Head will get the Washing plan for each day. Mostly it varies from each day to day. The washing plan is as per PPC chart
54
WASHING
Operation Procedure
Alpha-Amylase (not reacts with fiber, react with starch). Temperature- 60 degree. Oscillation with lubricant Reducing friction. Tungle of garment will reduce. Anti-black strain- 0.25%, 0.1%, 0.5% (if good).
Anti cleaning- 1% 1.Enzyme is effective at 35-40 degree Celsius. Ideal effect at 50 degree Celsius.
2.Concentration 1kg for 100Kg garment i.e. 0.1%.
55
WASHING
CHEMICAL STORE
56
Chemical Names..
Sl.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 57 33 CHEMICAL NAME Maxiclean Caustic soda Cellex (50) Indilite (50) Aqua Persulphate Denclean Denlube Oxalic acid Acetic acid Thiosulphate X-brite Salt Pretex P.permaganet Exclore Garmensoft Indisoft Soda-ash Bleach (25) Bleach (45) Bleach (50) Nanotin Peires cat Orange Brown 8rl Black Violet Brown Brr Brown Gxl Brown Bl Indigo Stone
1. Chemical utilization will update each day as per the consumption in washing department. 2. Chemicals are mainly from India and south Africa. 3. New arrivals are checked properly and handled with safety precautions.
DISPATCH
58
Operation
Cut Loop
Trimming
Final QC
Blowing
Rivets
Buttons
Size Label
Waist Tag
Pairing
Measurement
Pressing
Check Shade
Folding
Scan Pack
Loading
TARGET/SHIFT 10K-21K
59
DISPATCH
Current Scenario
60
DISPATCH
Continuous
Solid pack
Scan Pack
Check size, check quantity, Scan UVM barcode and enter the P-style and count the garment.
Loading plan From import/Export department Loading Memo will get. It contains container info, Security check etc. Arrange as per the memo and seal the container with shipping seal. And will get confirmation from shipping department.
Final Audit
Check the size, waist length, rivet position and button strength.
Accessory lag.
Rivet problems
Workers are lazy Waiting for previous Operator Unnecessary Motion Improper Feeding DISPATCH
Machine problems
Human error
61
QUALITY
62
General Ideas
Quality Analysis [QA] - Preventive maintenance, Root cause Analysis, Corrective Action plan Quality Control [QC] - 100% check on daily basis. Rolling QC: Randomly checking in bundles in Sewing line Station QC: 100% checking End line QC: Assembled final check
63
QUALITY
Acceptable quality Level: In general cases the buyer will determine which sampling plan and what AQL to adopt. The AQL 1.5 is applied when severe inspection conditions are required on high-class expensive items. The AQL 2.5 is applied when textiles of normal/good quality are involved. There are three types of sampling plans: i.e. single, double and multiple sampling plans. Each sampling plan can be performed at three levels, i.e. normal, tightened and reduced, depending on inspection requirements and quality of the products. In the garments industry generally single and double normal sampling plans are applied.
64
QUALITY
Point/100 sq.yard = (Total point * 36 * 100) / (sample yards * cuttable roll width). If it exceeds 15 the fabric will get rejected.
65
QUALITY
General points..
Internal PP Meeting Arrange with Merchandiser, all department head, and factory Manager to review PP sample. Conclude to one decision for buyers requirement with technical support.
Levis Standard
QUALITY
General points..
Final Audit Internal audit will take care by QA. Carton Marking Pocket accuracy Shade checking Measurement
Check all safety levels in garments. Especially metallic safety. Check needle presence. And rivet and button strength. Having Metal detector and pull test machine.
67
QUALITY
REJECT STORE
68
General points..
All garments that all categories as not as per buyers requirement will taken to reject store. In reject store separation of garment will take place. It will divide into A, B, C, and D categories.
69
REJECT STORE
General points..
Category Specification Good Garments of leftover Good Garments of overrun Good Garments from PP Sample with non conformity, washing , construction or measurement Good Garments without of shade band Good garments with wrong pocket placements Shading within the garment Fabric flaws Small stains within 1" diameter area and not more than 3 points
Small hole noticeable at hemming or waistband, big stains Damage but still wearable (fix) Big Holes and Bursting but still wearable (fix) REJECT STORE
71
Apron Safety Shoes Winter Jacket Emergency Alarm Safety Mask Ear Muffs Safety Gown
12 Months
1 Month 12 months
Having Safety Marking with different colours in shop floor. Fire and safety training in each 3 months. Safety Inspection in regular time. Drinking water is allotted in regular places by the government
72
Snaps
73
PERSONAL WAGES
74
General Ideas..
Probation 3 months.
Benefits: Bonus + Sick leave-12 days/ year with salary. If more than 12days half the salary will get cut. Clinic 3 days. Personal leave end of year 12 days paid. Maternity leave-2 weeks.
75
PERSONAL WAGES
Continuous..
Notice Period: 1 week for 6month experience. 2 weeks for above 6 months, 1 month for 1 year and above. Termination for poor performance: 1 month notice period.
In public holiday if the worker is present for a work means double the payment.
Rand
3.99 4.3 4.76
PERSONAL WAGES
WAGES
77
General Procedures..
Temporary contract for 3 months. Casual labour will get permanent if she/he working more than three months in the company. Passport is necessary to sign the contract.
After three month contract the same person can come to company as a casual labour after a period of one month.
Contract Daily Wage (R) 4.55 Contract 1 year Colour of paper white
Weekly
Biweekly
4.31
4.31
2 year
3 year
Blue
Yellow
Monthly
3.99
ID cards will provide in the evening of date Joined with photo in lamination.
78
WAGES
55.86
79
WAGES
Discharge
Operation
Casual Bonus
Payment Day
Friday Thursday
Query
Casual OT
Wednesday
Tuesday
Discharge
Monday
80
WAGES
IMPORT
81
General Process
Collect documents from suppliers: Invoice, Packing List, Bill of lading/telex, Country of Origin, Beneficiary etc. Send to clearing Agent to process any duties and entry (Bill of Entry)
Follow up with clearing agent or shipping Line about the arrival of containers. Update the incoming document you have received,
Follow up any outstanding documents from suppliers Follow up payment if any (factory or shipping Line)
When entry stamped, payment for duties (if any) is done push for the released of container to avoid penalty. When Container at factory, ask for inspection before offloading container, offload fast to avoid penalty.
82
IMPORT
Continuous..
* *make follow up call from shipping line or clearing agent about the status of the vessel, documents and the container to avoid late charges for submitting documents or any charges.
83
IMPORT
IMPORT
Charges..
BAF BAS CCL CTO DDF DHC EMF ERS EXP FFC IHI IMP ODF OHC PAE PIO POS PSE PSS SER TCE CHARGE TYPE Bunker Adjustment Factor Basic Ocean Freight Container Cleaning Container terminal Order Documentation Fee-Designation Handling Charge- Designation Equipment Management Fee Emergency Risk Surcharge Export Service charge Freight Forwarder Commission Inland Haulage Import Import Service charge Documentation fee-Origin Handling charge-Origin Port additional- Export Pick-up/Drop off Equipment Positioning Surcharge Port Security Charge-Export Peak Season Surcharge Carrier Security Charge Temporary Customs Export
85
IMPORT
Continuous..
Contract No: 530298 INLAND/LOCAL CHARGES (RAND) ROAD INDIA DOCUMENTAION Durban 20 40 Port Elizabeth 20 40 250 250 20 40
275 510
575 1020
275 510
575 1020
INLAND HAULAGE CONTAINER CLEANING CTO FEE HANDLING CHARGE IMPORT SERVICE CHARGE PICK UP/DROP OFF
90 9
180 9
90 9
TOTAL CHARGES
884 1784
884
1784
86
IMPORT
Charges..
COST PER COUNTRY (US $) TRAVEL (Rand)
INDIA
20 40
PAKISTAN
20 40
HONG KONG
20 40
YANITAN
20 40
DALIAN
20 40
SHANGHAI
20 40
QINGDAO
20 40
ROAD
20 40
RAIL
20 40
SAFMARINE
884 1784
909 1809 1074 2139 1074 2139 1124 2239 1074 2139 1124 2239 16987 22101 9561 18424
MAERSK
MOL
859 1709
1596 3286 1334 2662 1521 3036 1471 2936 1421 2853 1471 2936 1471 2936 14123 15766 11048 19688
87
IMPORT
EXPORT
88
General Process
Booking Information like PO, Order List etc. Arrange Booking by SAEL Forwarder. Will get Confirmation from Shipping Department. Check VISA, Certificate of Origin and Commercial Document. Always contact Merchandiser for all updates. Currently using FOB for export activities
89
EXPORT
MAINTENANCE
90
Boiler
Operating Procedure
Basic Ideas
Currently have two boilers
Design Temperature Shop Test Pressure Site Test Pressure Max.Permissible Operating Pressure Operating Pressure Operating Temperature Capacity (Flooded)
250 C 1551 kPa 1293 kPa 1034 kPa 960 kPa 183 C 34 m3
Fig: Boiler
Sl.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PARAMETERS Steam Pressure Water Flow Feed pump CO2 Gas Exit Temp Coal Bed Depth Stoker Speed Steam Flow Fuel Trim ID Fan control Blow down secs Gauge glasses blow down Mobrey blow down Soot blowes Fuel ash LR Chem dosing tank
91
MAINTENACE
WATER TREATMENT
92
Process Diagram
PAC WASTE WATER 150 cub.m/ h NaOH POLYMER AUTO MIXING MACHINE
EQUALIZATION BASIN
NEUTRALIZATION BASIN 1
DAF SYSTEM
SEDIMENTATION BASIN
NEUTRALIZATION BASIN 2
COAGULATION BASIN
THICKENIN G
MUD
A.C.FILTER 3 CYLINDERS
EFFLUENT BASIN
RECYCLED WATER
WATER TREATMENT
Operation Procedure
Grit Basin: will collect all water from Presitex and CGM.
In Bio Treatment Process Bacteria will act to purify the water with enough quantity of Oxygen. Currently having a five chamber of 2500 cubic meter water storing.
94
WATER TREATMENT
Continuous..
In one final compartment there will be purification process. Here also there is a mixing of polymer negative is doing for indigo dye filtering. Through pumps water is then passed to Sedimentation tank. Here continuous 3 hour sedimentation will do. Impurities will sediment in down and will remove. After sedimentation filtering of water will take place in three cylinders with coconut and coal. And the purified water is sent back to each department for usage.
95
WATER TREATMENT
Snaps..
96
WATER TREATMENT
MERCHANDISING
97
98
MERCHANDISING