Project : Four laning of Hubli darwad Bypass Carrige way type: Two lane divided carrigeway Pavement type

proposed: Asphalt over Cement stabilised surface asper IRC 37 - 2012. CBR of Existing road :7-8% Traffic Sl no 1 2 3 4 Category LCV Bus Truck MAV Total No's in both directions 2226 1175 4671 18 8090 CVPD

i) ii iii iv v vi vii viii

Data Two lane divided carrige way Initial traffic Percentage of Single, tandem and tridem axles are 64%, 34% and 0.1% Traffic groeth rate Design life VDF CBR of soil below the 500mm subgrade CBR of the 500mm of the subgrade from barrow pits.

Design Calculations 1 Lane Distribution factor 2 Initial traffic 3 VDF 4 msa