Documente Academic
Documente Profesional
Documente Cultură
proposed: Asphalt over Cement stabilised surface asper IRC 37 - 2012. CBR of Existing road :7-8% Traffic Sl no 1 2 3 4 Category LCV Bus Truck MAV Total No's in both directions 2226 1175 4671 18 8090 CVPD
Data Two lane divided carrige way Initial traffic Percentage of Single, tandem and tridem axles are 64%, 34% and 0.1% Traffic groeth rate Design life VDF CBR of soil below the 500mm subgrade CBR of the 500mm of the subgrade from barrow pits.