Documente Academic
Documente Profesional
Documente Cultură
A designer chooses the layout if a written RFP does not specify an outline.
The software that is used to create the proposal dictates the proposal layouts.
Proposal layouts are required to use a format that is designed by the network engineer.
2
What two items are typically included in the executive summary of a
proposal? (Choose two.)
3
Which proposal section describes the intended routing protocol, security
mechanisms, and addressing for the planned network?
logical design
physical design
executive summary
implementation plan
network requirements
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
4
Which occurrence would indicate a failure of the design phase?
5
A network installation team is assigned to replace all core switches in an
existing data center. No other upgrades are planned. Which kind of installation is this?
a new installation
a fork-lift installation
a phased installation
6
What service is provided Cisco standard warranty?
access to the Cisco Technical Assistance Center (TAC) 24 hours a day, 7 days a week
7
An upgraded version of the Cisco IOS has been purchased. However,
the CD arrived damaged. How will this loss be covered?
a hardware warranty
a software warranty
8
A company informs the account manager that the installation of a new
edge router at the customer remote branch location cannot be done at the scheduled
time
because of a large order that the branch office needs to complete. As a result, the end
date of the
project must be adjusted to accommodate the additional time. What is the action
should the
account manager take?
Instruct the technician to complete the install of the router at on the date in the
contract.
Adjust the timeline documentation to show the company how the delay will affect the
project completion date.
9
NetworkingCompany completes the installation of a network upgrade for
a retail customer. All of the onsite tests complete successfully and the customer IT
staff approves
the results of the tests. The manager of the retail store contacts NetworkingCompany
to inform
the company that the store will not pay for the upgrade until a recently purchased
software
package is installed and tested on the network. Which two items that are contained in
the
proposal can the account manager refer to when discussing this issue with the store
manager?(Choose two.)
the bill-of-material
10
The operation of a new branch location network is delayed because a
VPN cannot be configured and established between the branch location and the main
office. It is
determined that the router at the main office does not have enough memory and does
not have
the correct Cisco IOS version image to support the VPN features. To prevent this
delay, this
problem should have been identified and corrected during which part of the design
project?
11
The NetworkingCompany team is tasked to prepare an implementation
schedule for a customer. It is determined that the new firewalls and wireless
controllers that are
specified in the design cannot be delivered and installed within the agreed upon time
frame. The
NetworkingCompany informs the customer of the problem. What two options can the
NetworkingCompany team take to ensure the success of the project? (Choose two.)
plan to add additional staff and resources to shorten the installation time after the new
equipment is delivered
eliminate redundancy in the design to reduce the amount of equipment that is needed
renegotiate a new time frame with the customer to accommodate the delay
delay the installation of the security devices and controllers until a later time
redesign the network to use only readily available equipment and software
12
AAA Financial Services Company is performing implementation planning
for a core switch upgrade. The company has 200 financial software programmers that
work
billable hours during the week. They have critical, scheduled money transfer
transmissions that
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
occur at hourly intervals every night. There are two, two-hour long IT maintenance
windows
scheduled for software upgrades, one on Saturday and one on Sunday. The bank
advertises
online banking as available 24 hours on business days and 21 hours on the weekends.
However,
a network upgrade that is necessary to replace some switches is expected to take four
hours.
Because of rack constraints, this time includes three hours to remove the old switches
before the
new switches can be installed and one hour to test the logical configuration. How
should the
implementation scheduling be handled
Defer the software upgrades. Use the Saturday window to perform the hardware
installation. Use the Sunday window to perform the logical testing.
Coordinate and publish a separate four-hour downtime during Friday to perform the
complete switch installation and testing process. Use the Saturday and Sunday
windows to
correct any outage problems after the Friday window.
13
Included in a Bill of Materials (BOM) for a SOHO wired implementation is
a Cisco 2811 router, Catalyst 2560 switch, four PCs, three laptops, and a networked
printer.
Wireless LAN capability will be implemented on this network. Which two equipment
types must be
added to the BOM to implement this request? (Choose two.)
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
DNS server
LAN switch
wireless NICs
DHCP server
14
A customer has just taken delivery of a Cisco 2811 router and Catalyst
3560 switch. Included with the purchase is the SMARTnet Service. Which two
resources are
included with SMARTnet Service? (Choose two.)
15
A Cisco 1841 router has been purchased without an agreement for
SMARTnet Service. What two items are guaranteed under the standard warranty?
(Choose two.)
access to TAC
16
Upon completion of a proposal, a network design team must sell their
ideas to two key stakeholders. Who are these two stakeholders? (Choose two.)
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
customers
licensing boards
cabling contractors
internal management
17
What are two important guidelines when creating a slide presentation for
a meeting with a customer? (Choose two.)
Use all capital letters on words and phrases when possible for added emphasis.
18
In order to finalize a project proposal, an account manager of a
networking company creates the terms and conditions section. What are two clauses
that should
be included in this section? (Choose two.)
cost summary
installation steps
19
Which two items will a systems engineer include in an implementation plan? (Choose
two.)
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
20
Which statement describes a phased installation into an existing network?
A phased installation generally takes less time and expense than a green-field
installation.