DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

REMARKS

Description

Eshan Gold
Kota Stone
Black Granite

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

0.00

0.00

SQM

790.00

0.00

0.00

0.00

Tower Hoist (1 No)

2990.00

0.00

0.00

0.00

Bar Cutting (1 No)

551.00

0.00

0.00

0.00

'B' BLOCK
Staircase Steps Fittings
SS Railing Stair case

RMT

Dado Fitting

SQM

Flooring Kota Stone

SQM

729.00

Internal Plastering

SQM

127.00

Dado Plastering

SQM

75.00

4.60

Units

Qty.

Kg
Sqft

500.00
8404.00

Sqft

720.00

Remark

Mechanical Record (Vehicle)

Lintel RCC Casting

II

Fuel

Hrs/Km

Remark

1
11
92KM
65KM
Machinery
Fulday Sand Sieveing (1No)
Halfday Bar Bending (1 No)

Fulday
Fulday

Idle Machinery

0.00

0.00

0.00

Submersible Pump 1No

idle

0.00

0.00

0.00

Petrol Vibrator (2 No)

idle

345.00

4.60

345.00

Hand Vibrator (1 No)

idle
idle

Dewatering Pump (1No) idle


Plate Vibrator (1 No)
idle
Tractor MH 12E 9403
idle
Compact Machine(1No) idle

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Block Casting (1 No)

Hard Core

CUM

1549.00

0.00

0.00

0.00

MiniMobilePlant(1No)

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

Mason

Male

Female

External Plastering

SQM

193.00

0.00

0.00

0.00

A & B Blocks

10

10

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

D Blocks

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Mess helper

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Store

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

Batching Plant

Lintel Shuttering

SQM

334.00

idle
Labor Record

Description

0.00

0.00

0.00

Sand Sieveing

60.84

0.00

0.00

0.00

Labour Camp

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Total

Non Skid Ceramic Tile Flooring

SQM

695.00

312.75

0.45

312.75

External Plastering

G Total
Mason

Lintel Reinforcement

KG

0.45

193.00

0.00
0.00

0.00

0.00

0.00

0.00

T Shivana

SQM

193.00

0.00

0.00

0.00

Manoj

SS Railing Stair case

RMT

2990.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

Tiling work

FOYER

Lintel Reinforcement

KG

19

19

Male

53
Female

Total

17

11

28

15
19
19
A,B Block ,Foyer & Ramp

53

(Masonry/Plastering)

Total

2
15

Contractor

SQM

External Plastering

III

Lalji Prasad

15

Mason

Male

25

Total
6

60.84

0.00

0.00

0.00

Radheshyam

Painters

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

V S Decorator

Painters

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Shantaram

Polishing

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Dharampal

Polishing

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Krishnapal

Carpenter/Helper

Oil Bond Distemper

SQM

45.00

1440.00
0.00

32.00

1440.00

0.00

0.00

Internal Plastering

SQM

127.00

32.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

Tiling work

60.84

0.00

0.00

0.00

V S Decorator

Painters

CUM

5428.00

0.00
0.00

0.00

0.00

Sri sai enterprises

Fabicator

0.00

0.00

Dharampal

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Benjman

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

0.00

0.00

RAMP PORTION

IV

Lintel Reinforcement

KG

Lintel RCC Casting


V

'C' BLOCK

'D' BLOCK

VI

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.0

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.0

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.0

0.00

0.00
0.00

Window Sill Kota

RMT

400.00

0.0

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

1818.6

14.32

1818.64

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

6.18

2156.8

6.18

2156.82

Dado Fitting

SQM

551.00

14.11

7775.7

14.11

7775.71

External Plastering

SQM

193.00

0.0

0.00

0.00

Dado Plastering

SQM

75.00

34.28

2571.0

34.28

2571.00

Dry Distemper

SQM

23.00

0.0

0.00

0.00

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

14.32

Internal Electrification
28.00

12801.9

28.00

12801.88

Fan Point

No's

525.96

10.00

5259.6

10.00

5259.60

Exhaust Fan Point

No's

941.91

8.00

7535.3

8.00

7535.28

Power Point 15A

No's

525.96

12.00

6311.5

12.00

6311.52

Power Point 20A

No's

941.91

3.00

2825.7

3.00

2825.73

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

10880.0

160.00

10880.00

0.00

0.00

0.00

Fire Detection & Alarm System


25mm MS Conduit

RMT

68.00

160.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

DRAIN

XIII

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

0.00

0.00

Back Filling

CUM

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.78

3340.34

0.78

3340.34

62.79

79.33

4981.19

79.33

4981.19

2843.19

0.00

0.00

0.00

135.63

0.00
70355.46

0.00
0.00

0.00
0.00
70355.46

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

50.00

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Plastering Work
Satyam Doors

Mason

Male

Total
4

Polishing
1
Mason
2

Male

Female

Helper

Total

Carpenter

PVC Door Fitting

Total

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Jagdish Pandit

Total
D Block

0.00

457.21

VIII

Lalji Prasad

Helper

0.00

No's

Fire Fighting System

D - BLOCK
Carpenter
Kamalmanna

0.00

Light Point

VII

Tuesday Date:01-Oct-2013

Site :-MH KRIKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

REMARKS

Description

Crush Sand

Units

Qty.

Brass

3.44

Remark

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

Mechanical Record (Vehicle)

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
Tractor 9403

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

TATA 207D

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

Tata Sumo

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

II

'B' BLOCK
Staircase Steps Fittings

SQM

790.00

0.00

2990.00

Fuel

Hrs/Km

Remark

11
45KM
44KM
20
Machinery

0.00

0.00

Tower Hoist (1 No)

0.00

0.00

Bar Cutting (1 No)


MiniMobilePlant(1No)

Fulday Sand Sieveing (1No)


Halfday Bar Bending (1 No)

Fulday
Fulday

Fulday
Idle Machinery

SS Railing Stair case

RMT

0.00

0.00

0.00

Dado Fitting

SQM

551.00

7.38

4066.38

7.38

4066.38

Flooring Kota Stone

SQM

729.00

7.03

5124.87

7.03

5124.87

Submersible Pump 1No

idle

Internal Plastering

SQM

127.00

8.70

1104.90

8.70

1104.90

Petrol Vibrator (2 No)

idle

Dado Plastering

Dewatering Pump (1No) idle


Plate Vibrator (1 No)
idle

SQM

75.00

345.00

Hand Vibrator (1 No)

idle

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Block Casting (1 No)

idle

PVC Frame

RMT

275.00

25.50

7012.50

25.50

7012.50

PVC Shutter

SQM

1949.00

7.80

15202.20

7.80

15202.20

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

Mason

Male

Female

External Plastering

SQM

193.00

0.00

0.00

0.00

A & B Blocks

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

D Blocks

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Mess helper

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Store

Cement Base Paint

SQM

44.00

5582.50

126.88

5582.50

Lintel Shuttering

SQM

334.00

0.00

126.88

4.60

JCB TEREX (1033)


Description

Potluru Enterprises

0.00

0.00

0.00

Sand Sieveing

60.84

0.00

0.00

0.00

Labour Camp

CUM

5428.00

0.00

0.00

0.00

Total

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.45

312.75

External Plastering

G Total
Mason

KG

193.00

0.00
0.00

0.00

0.00

0.00

0.00

T Shivana

SQM

193.00

0.00

0.00

0.00

Manoj

SS Railing Stair case

RMT

2990.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

Tiling work

FOYER

Lintel Reinforcement

KG

(Masonry/Plastering)

Total

13

20

17

Male

50
Female

Total

18

Contractor

SQM

External Plastering

III

Tractor MH 12E 9403


idle
Compact Machine(1No) idle

idle
Labor Record

Lintel RCC Casting

Lintel Reinforcement

13

26
24

13
20
17
A,B Block ,Foyer & Ramp

Lalji Prasad

Mason

Male

50
Total
6

60.84

0.00

0.00

0.00

Radheshyam

Painters

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Shantaram

Polishing

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dharampal

Polishing

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Krishnapal

Carpenter/Helper

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

RAMP PORTION

IV

Flooring PCC

D - BLOCK
Carpenter
Kamalmanna

Total
D Block

SQM

399.00

0.00

0.00

0.00

CUM

2142.00

0.00

0.00

0.00

Tiling work

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

V S Decorator

Painters

60.84

0.00

0.00

0.00

Sri sai enterprises

Fabicator

KG

Lintel RCC Casting

Lalji Prasad

Helper

Block Masonry 200 MM Thick


Lintel Reinforcement

CUM

5428.00

0.00
0.00

0.00

0.00

Dharampal

0.00

0.00

Benjman

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

0.00

0.00

0.0

0.00

0.00

'C' BLOCK

'D' BLOCK

VI

Door Panel Fixing

SQM

1451.00

Non Skid Ceramic Tile Flooring

SQM

695.00

9.30

6463.5

9.30

6463.50

Flooring Kota Stone

SQM

729.00

9.77

7118.7

9.77

7118.69

Block Masonry 200 MM Thick

CUM

2142.00

1.22

2613.2

1.22

2613.24

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

1782.1

28.35

3600.70

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

Block Masonry 100 MM Thick

SQM

349.00

Dado Fitting

SQM

551.00

External Plastering

SQM

193.00

0.0

0.00

0.00

Dado Plastering

SQM

75.00

2571.0

68.56

5142.00

Dry Distemper

SQM

23.00

0.0

0.00

0.00

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

14.03

5.42

34.28

Internal Electrification

0.00

0.00

11.60

4048.40

0.0

14.11

7775.71

30.00

13716.3

58.00

26518.18

Fan Point

No's

525.96

12.00

6311.5

22.00

11571.12

Exhaust Fan Point

No's

941.91

10.00

9419.1

18.00

16954.38

Power Point 15A

No's

525.96

10.00

5259.6

22.00

11571.12

Power Point 20A

No's

941.91

5.00

4709.6

8.00

7535.28

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

8840.0

290.00

19720.00

0.00

0.00

0.00

Fire Detection & Alarm System


25mm MS Conduit

RMT

68.00

130.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

DRAIN

XIII

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

CUM

0.00

Block Masonry 200 MM Thick

3979.89

0.00

0.00

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.34

1441.35

1.12

4781.69

62.79

35.51

2229.67

114.84

7210.87

2843.19

0.00

0.00

0.00

135.63

0.00
112460.51

0.00
0.00

0.00
0.00
182815.97

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Total
4

Polishing
3
Mason
2

Male

Female

Helper

Total

Carpenter

PVC Door Fitting

Total

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Satyam Doors

0.00

457.21

VIII

Plastering Work

Male

0.00

0.0
1891.6

No's

Fire Fighting System

Jagdish Pandit

Mason

0.00

Light Point

VII

Wednesday Date:02-Oct-2013

Site :-MH KRIKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

REMARKS

Description

PVC Door with frame


Diesel
Black Granite

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

0.00

0.00

SQM

790.00

0.00

0.00

0.00

Tower Hoist (1 No)


Bar Cutting (1 No)

'B' BLOCK
Staircase Steps Fittings

2990.00

Units

Qty.

No's
Ltr

35.00
100.00

No's

32.00

Remark

Mechanical Record (Vehicle)

Lintel RCC Casting

II

Fuel

Hrs/Km

Remark

2
11

75KM
80KM
Machinery
Fulday Sand Sieveing (1No)
Halfday Bar Bending (1 No)

Fulday
Fulday

SS Railing Stair case

RMT

0.00

0.00

0.00

Dado Fitting

SQM

551.00

4.92

2710.92

12.30

6777.30

Flooring Kota Stone

SQM

729.00

6.90

5030.10

13.93

10154.97

Internal Plastering

SQM

127.00

0.00

8.70

1104.90

Submersible Pump 1No

idle

Dewatering Pump (1No) idle

Dado Plastering

SQM

75.00

0.00

4.60

345.00

Petrol Vibrator (2 No)

idle

Plate Vibrator (1 No)

idle
idle

Tractor MH 12E 9403


idle
Compact Machine(1No) idle

MiniMobilePlant(1No)

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Hand Vibrator (1 No)

PVC Frame

RMT

275.00

25.50

7012.50

51.00

14025.00

Block Casting (1 No)

PVC Shutter

SQM

1949.00

7.80

15202.20

15.60

30404.40

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

Fulday
Idle Machinery
idle

idle
Labor Record
Description

193.00

0.00

0.00

0.00

Mason

Male

Female

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

A & B Blocks

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

D Blocks

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Mess helper

Cement Base Paint

SQM

44.00

5582.50

253.75

11165.00

Lintel Shuttering

SQM

334.00

External Plastering

SQM

126.88

Store

0.00

0.00

0.00

Potluru Enterprises

60.84

0.00

0.00

0.00

Sand Sieveing

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Labour Camp

Non Skid Ceramic Tile Flooring

SQM

695.00

410.05

1.04

722.80

Total

External Plastering

SQM

193.00

0.00
0.00

0.00

0.00

G Total
Mason

Lintel Reinforcement

KG

0.59

FOYER

III

0.00

0.00

0.00

0.00

T Shivana

0.00

0.00

0.00

Manoj

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

60.84

0.00

0.00

SQM

SS Railing Stair case

RMT

Dado Plastering

KG

(Masonry/Plastering)

Total

2
2

13

20

17

Male

50
Female

Total

18

Contractor

0.00

193.00
2990.00

External Plastering

Lintel Reinforcement

13

26
24

13
20
17
A,B Block ,Foyer & Ramp

Lalji Prasad

Mason

Male

50
Total

0.00

Tiling work

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Radheshyam

Painters

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dharampal

Polishing

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Krishnapal

Carpenter/Helper

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

RAMP PORTION

IV

Flooring PCC

Carpenter
Kamalmanna

SQM

399.00

0.00

0.00

0.00

CUM

2142.00

0.00

0.00

0.00

Tiling work

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

V S Decorator

60.84

0.00

0.00

0.00

Benjman

KG

Lintel RCC Casting

CUM

5428.00

0.00
0.00

0.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

0.00

0.00

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

9.30

6463.5

18.60

12927.00

Flooring Kota Stone

SQM

729.00

18.92

13792.7

28.69

20911.37

Block Masonry 200 MM Thick

CUM

2142.00

1.32

2827.4

2.54

5440.68

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

1782.1

42.38

5382.77

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.0

11.60

4048.40

Dado Fitting

SQM

551.00

0.0

14.11

7775.71

External Plastering

SQM

193.00

0.0

0.00

0.00

Dado Plastering

SQM

75.00

2571.0

102.84

7713.00

Dry Distemper

SQM

23.00

0.0

0.00

0.00

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

'C' BLOCK

'D' BLOCK

VI

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

14.03

34.28

Internal Electrification
32.00

14630.7

90.00

41148.90

Fan Point

No's

525.96

10.00

5259.6

32.00

16830.72

Exhaust Fan Point

No's

941.91

8.00

7535.3

26.00

24489.66

Power Point 15A

No's

525.96

9.00

4733.6

31.00

16304.76

Power Point 20A

No's

941.91

3.00

2825.7

11.00

10361.01

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

10200.0

440.00

29920.00

0.00

0.00

0.00

Fire Detection & Alarm System


25mm MS Conduit

RMT

68.00

150.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

DRAIN

XIII

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.45

1924.65

1.57

6706.34

62.79

47.34

2972.48

162.18

10183.34

2843.19

0.00

0.00

0.00

135.63

0.00
113467.05

0.00
0.00

0.00
0.00
296283.03

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Mason

Male

Total
6

Painters

5
4

Male

Mason
2

Carpenter

Female

Total

Helper

Total

PVC Door Fitting

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Satyam Doors

0.00

457.21

VIII

Jagdish Pandit
Plastering Work

Total
D Block

0.00

No's

Fire Fighting System

Lalji Prasad

Helper

0.00

Light Point

VII

D - BLOCK

Block Masonry 200 MM Thick


Lintel Reinforcement

Thursday Date:03-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

Units

Qty.

Remark

REMARKS

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

Mechanical Record (Vehicle)

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

0.00

0.00

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

Tower Hoist (1 No)

Granite Fittings

SQM

3213.48

5.59

17950.50

5.59

17950.50

Bar Cutting (1 No)

Dado Fitting

SQM

551.00

3.20

1763.20

15.50

8540.50

Flooring Kota Stone

SQM

729.00

28.00

20412.00

41.93

30566.97

Internal Plastering

SQM

127.00

0.00

8.70

1104.90

Submersible Pump 1No

idle

Dewatering Pump (1No) idle

Dado Plastering

SQM

75.00

0.00

4.60

345.00

Petrol Vibrator (2 No)

idle

Plate Vibrator (1 No)

idle
idle

Tractor MH 12E 9403


idle
Compact Machine(1No) idle

II

'B' BLOCK

Hrs/Km

Fuel

20

11

Remark

69KM
74KM
20
Machinery

MiniMobilePlant(1No)

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Hand Vibrator (1 No)

PVC Frame

RMT

275.00

18.00

4950.00

69.00

18975.00

Block Casting (1 No)

PVC Shutter

SQM

1949.00

4.69

9138.86

20.29

39543.26

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

Fulday Sand Sieveing (1No)


Halfday Bar Bending (1 No)

Fulday
Fulday

Fulday
Idle Machinery
idle

idle
Labor Record
Description

193.00

0.00

0.00

0.00

Mason

Male

Female

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

A & B Blocks

11

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

D Blocks

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Mess helper

Cement Base Paint

SQM

44.00

0.00

253.75

11165.00

Batchin Plant

Slab Shuttering

SQM

External Plastering

SQM

Slab Reinforcement

KG

Slab RCC Casting

CUM

Non Skid Ceramic Tile Flooring

SQM

External Plastering

SQM

304.00

52.89

16078.56

52.89

16078.56

Potluru Enterprises

60.84

1416.60

86185.94

1416.60

86185.94

Sand Sieveing

4763.00

7.97

37961.11

7.97

37961.11

Labour Camp

695.00

0.00

1.04

722.80

Total

193.00

0.00
0.00

0.00

0.00

G Total
Mason

FOYER

III

0.00

0.00

0.00

0.00

T Shivana

0.00

0.00

0.00

Manoj

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

60.84

0.00

0.00

SQM

SS Railing Stair case

RMT

Dado Plastering

KG

1
2

Contractor

0.00

193.00
2990.00

External Plastering

Lintel Reinforcement

17

19

Male

51
Female

Total

15

11

28

15
17
19
A,B Block ,Foyer & Ramp

51

(Masonry/Plastering)

Total

15

Lalji Prasad

15

Mason

Male

23

Total

0.00

Tiling work

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Radheshyam

Painters

Internal Plastering

SQM

127.00

0.00

0.00

0.00

V S Decorator

Painters

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Dharampal

Polishing

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Krishnapal

Carpenter/Helper

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Oil Bond Distemper


RAMP PORTION

IV

Kamalmanna

SQM

127.00

0.00

0.00

0.00

SQM

45.00

0.00

0.00

0.00

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

Tiling work

60.84

0.00

0.00

0.00

V S Decorator

CUM

5428.00

0.00
0.00

0.00

0.00

Benjman

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

0.00

0.00

Lintel RCC Casting


V

'C' BLOCK

'D' BLOCK

VI

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

4.65

3231.8

23.25

16158.75

Flooring Kota Stone

SQM

729.00

8.71

6349.6

37.40

27260.96

Block Masonry 200 MM Thick

CUM

2142.00

0.0

2.54

5440.68

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

0.0

42.38

5382.77

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

5.27

1837.5

16.87

5885.89

Dado Fitting

SQM

551.00

11.46

6314.5

25.57

14090.17

External Plastering

SQM

193.00

5.88

1133.9

5.88

1133.88

Dado Plastering

SQM

75.00

0.0

102.84

7713.00

Dry Distemper

SQM

23.00

0.0

0.00

0.00

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

Internal Electrification
32.00

14630.7

122.00

55779.62

Fan Point

No's

525.96

10.00

5259.6

42.00

22090.32

Exhaust Fan Point

No's

941.91

8.00

7535.3

34.00

32024.94

Power Point 15A

No's

525.96

9.00

4733.6

40.00

21038.40

Power Point 20A

No's

941.91

3.00

2825.7

14.00

13186.74

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

10200.0

590.00

40120.00

0.00

0.00

0.00

Fire Detection & Alarm System


25mm MS Conduit

RMT

68.00

150.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

DRAIN

XIII

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.64

2728.73

2.21

9435.06

62.79

67.07

4211.01

229.25

14394.36

2843.19

0.00

0.00

0.00

135.63

0.00
265432.04

0.00
0.00

0.00
0.00
561715.07

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Mason

Male

Total
6

Painters

4
4

Mason
2

Male

Female

Total

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Total
D Block

0.00

457.21

VIII

Jagdish Pandit
Plastering Work

Helper

0.00

No's

Fire Fighting System

Lalji Prasad

0.00

Light Point

VII

D - BLOCK

Oil Bond Distemper

KG

Carpenter

Internal Plastering

Lintel Reinforcement

Description

Friday Date:04-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

Units

Qty.

Remark

REMARKS

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

Mechanical Record (Vehicle)

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

0.00

0.00

84KM
20
Machinery

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

Tower Hoist (1 No)

Fulday Bar Bending (1 No)

Granite Fittings

SQM

3213.48

Bar Cutting (1 No)

Dado Fitting

SQM

551.00

Flooring Kota Stone

SQM

Internal Plastering

SQM

Dado Plastering

II

'B' BLOCK

Hrs/Km

Fuel

20

11

5.59

17950.50

27.53

15169.03

729.00

0.00

41.93

30566.97

Submersible Pump 1No

idle

127.00

0.00

8.70

1104.90

Petrol Vibrator (2 No)

idle

SQM

75.00

345.00

Hand Vibrator (1 No)

idle

SQM

399.00

0.00

0.00

0.00

Block Casting (1 No)

idle

PVC Frame

RMT

275.00

25.50

7012.50

94.50

25987.50

MiniMobilePlant(1No)

PVC Shutter

SQM

1949.00

7.80

15202.20

28.09

54745.46

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

External Plastering

SQM

0.00

4.60

Fulday

Halfday
Idle Machinery

0.00
6628.53

12.03

Remark

93KM

Flooring PCC

Dewatering Pump (1No) idle


Plate Vibrator (1 No)
idle
Tractor MH 12E 9403
idle
Compact Machine(1No) idle

idle Sand Sieveing (1No)


Labor Record

Description

idle

Mason

Male

Female

193.00

0.00

0.00

0.00

A & B Blocks

10

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

D Blocks

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Mess helper

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Batchin Plant

Cement Base Paint

SQM

44.00

0.00

253.75

11165.00

Potluru Enterprises

Slab Shuttering

SQM

304.00

0.00

52.89

16078.56

Steel Yard

60.84

0.00

1416.60

86185.94

Labour Camp

Slab RCC Casting

CUM

4763.00

0.00

7.97

37961.11

Total

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

1.04

722.80

External Plastering

G Total
Mason

Slab Reinforcement

KG

193.00

0.00
0.00

0.00

0.00

0.00

0.00

T Shivana

SQM

193.00

0.00

0.00

0.00

Manoj

SS Railing Stair case

RMT

2990.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

Tiling work

FOYER

Lintel Reinforcement

KG

19

20

Male

54
Female

Total

17

11

28

15
19
20
A,B Block ,Foyer & Ramp

54

(Masonry/Plastering)

Total

6
15

Contractor

SQM

External Plastering

III

Lalji Prasad

15

Mason

Male

26

Total
6

60.84

0.00

0.00

0.00

Radheshyam

Painters

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

V S Decorator

Painters

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dharampal

Polishing

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Krishnapal

Carpenter/Helper

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

RAMP PORTION

IV

Flooring PCC

D - BLOCK
Carpenter
Kamalmanna

SQM

399.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Tiling work

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

V S Decorator

60.84

0.00

0.00

0.00

Benjman

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

5428.00

0.00
0.00

0.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.0

23.25

16158.75

Flooring Kota Stone

SQM

729.00

24.52

17875.1

61.92

45136.04

Block Masonry 200 MM Thick

CUM

2142.00

1.06

2274.8

3.60

7715.48

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

0.0

42.38

5382.77

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.0

16.87

5885.89

Dado Fitting

SQM

551.00

0.0

25.57

14090.17

External Plastering

SQM

193.00

0.0

5.88

1133.88

Dado Plastering

SQM

75.00

0.0

102.84

7713.00

Dry Distemper

SQM

23.00

0.0

0.00

0.00

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

'C' BLOCK

'D' BLOCK

VI

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

Internal Electrification

122.00

55779.62

Fan Point

No's

525.96

0.0

42.00

22090.32

Exhaust Fan Point

No's

941.91

0.0

34.00

32024.94

Power Point 15A

No's

525.96

0.0

40.00

21038.40

Power Point 20A

No's

941.91

0.0

14.00

13186.74

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

0.0

590.00

40120.00

0.00

0.00

0.00

25mm MS Conduit

RMT

68.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

DRAIN

XIII

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.60

2566.20

2.81

12001.26

62.79

63.12

3963.30

292.37

18357.66

2843.19

0.00

0.00

0.00

135.63

0.00
55522.62

0.00
0.00

0.00
0.00
617237.69

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Male

Total
6

Painters

5
6

Male

Mason

Female

Plastering Work

Total
0

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Mason

0.00

0.0

Fire Detection & Alarm System

0.00

457.21

VIII

Jagdish Pandit

Total
D Block

0.00

No's

Fire Fighting System

Lalji Prasad

Helper

0.00

Light Point

VII

Description

Saturday Date:05-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

Units

Qty.

Remark

REMARKS

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

Mechanical Record (Vehicle)

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

0.00

0.00

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

Tower Hoist (1 No)

idle

Granite Fittings

SQM

3213.48

0.00

5.59

17950.50

Bar Cutting (1 No)

idle

Dado Fitting

SQM

551.00

0.00

27.53

15169.03

MiniMobilePlant(1No)

Flooring Kota Stone

SQM

729.00

0.00

41.93

30566.97

Internal Plastering

SQM

127.00

0.00

8.70

1104.90

Submersible Pump 1No

idle

Dewatering Pump (1No) idle

Dado Plastering

SQM

75.00

0.00

4.60

345.00

Petrol Vibrator (2 No)

idle

Compact Machine(1No) idle

idle

Tractor MH 12E 9403

idle

II

'B' BLOCK

Flooring PCC

SQM

399.00

PVC Frame

RMT

275.00
1949.00

24.80
7.52

Fuel

Hrs/Km

Remark

8
111KM
47KM
Machinery

0.00

0.00

0.00

Hand Vibrator (1 No)

6820.00

119.30

32807.50

Block Casting (1 No)

Sand Sieveing (1No)


Bar Bending (1 No)

idle
idle

idle
Idle Machinery

idle

idle
Labor Record

PVC Shutter

SQM

14656.48

35.61

69401.94

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

External Plastering

SQM

193.00

0.00

0.00

0.00

Mason

Male

Female

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

A & B Blocks

15

15

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

D Blocks

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Mess helper

Cement Base Paint

SQM

44.00

0.00

253.75

11165.00

Batchin Plant

Slab Shuttering

SQM

304.00

14

18

23

Male

55
Female

Total

16

12

11

27

14
18
23
A,B Block ,Foyer & Ramp

55

Description

0.00

52.89

16078.56

Potluru Enterprises

60.84

0.00

1416.60

86185.94

Sand Sieveing

Slab RCC Casting

CUM

4763.00

0.00

7.97

37961.11

Labour Camp

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

1.04

722.80

Total

External Plastering

SQM

193.00

0.00
0.00

0.00

0.00

G Total
Mason

Slab Reinforcement

KG

FOYER

III

0.00

0.00

0.00

0.00

T Shivana

0.00

0.00

0.00

Manoj

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

60.84

0.00

0.00

SQM

SS Railing Stair case

RMT

Dado Plastering

KG

Contractor

0.00

193.00
2990.00

External Plastering

Lintel Reinforcement

(Masonry/Plastering)

Total
Lalji Prasad

14

Mason

Tiling work

CUM

5428.00

0.00

0.00

0.00

Radheshyam

Painters

Internal Plastering

SQM

127.00

0.00

0.00

0.00

V S Decorator

Painters

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Dharampal

Polishing

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Krishnapal

Carpenter/Helper

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Oil Bond Distemper


RAMP PORTION

Kamalmanna

SQM

127.00

0.00

0.00

0.00

SQM

45.00

0.00

0.00

0.00

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

V S Decorator

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

Benjman

60.84

0.00

0.00

0.00

CUM

5428.00

0.00
0.00

0.00

0.00

Plastering Work

0.00

0.00

Dharampal

CUM

2142.00

0.00

0.00

0.00

0.00

0.00

Lintel RCC Casting


V

'C' BLOCK
Block Masonry 200 MM Thick
Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.0

23.25

16158.75

Flooring Kota Stone

SQM

729.00

0.0

61.92

45136.04

Block Masonry 200 MM Thick

CUM

2142.00

0.0

3.60

7715.48

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

0.0

42.38

5382.77

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.0

16.87

5885.89

Dado Fitting

SQM

551.00

0.0

25.57

14090.17

External Plastering

SQM

193.00

4149.5

27.38

5283.38

Dado Plastering

SQM

75.00

0.0

102.84

7713.00

Dry Distemper

SQM

23.00

0.0

0.00

0.00

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

'D' BLOCK

VI

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

21.50

Internal Electrification

0.0

122.00

55779.62

Fan Point

No's

525.96

0.0

42.00

22090.32

Exhaust Fan Point

No's

941.91

0.0

34.00

32024.94

Power Point 15A

No's

525.96

0.0

40.00

21038.40

Power Point 20A

No's

941.91

0.0

14.00

13186.74

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

0.0

590.00

40120.00

0.00

0.00

0.00

Fire Detection & Alarm System


25mm MS Conduit

RMT

68.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

DRAIN

XIII

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.53

2245.43

3.33

14246.69

62.79

55.23

3467.89

347.60

21825.55

2843.19

0.00

0.00

0.00

135.63

0.00
31339.30

0.00
0.00

0.00
0.00
648576.98

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Painters

4
4

Mason
2

Male

Female

Polishing

Total
6

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Total
D Block

0.00

457.21

VIII

Helper

0.00

No's

Fire Fighting System

Jagdish Pandit

0.00

Light Point

VII

D - BLOCK

Oil Bond Distemper

KG

Total
0

Carpenter

Internal Plastering

Lintel Reinforcement

28

Male

0.00

Lintel RCC Casting

IV

Description

Sunday Date:06-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

REMARKS

Description

Units

Qty.

Ltr

200.00

Diesel

Remark

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

Mechanical Record (Vehicle)

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

II

'B' BLOCK

0.00
16.40

Hrs/Km

Fuel

20

11

5
20

88KM

Remark

163KM
20
Machinery

0.00
Tower Hoist (1 No)

Fulday Sand Sieveing (1No)

Sub Base PCC

SQM

290.00

4756.00

16.40

4756.00

Granite Fittings

SQM

3213.48

0.00

5.59

17950.50

Dado Fitting

SQM

551.00

0.00

27.53

15169.03

Flooring Kota Stone

SQM

729.00

11.29

8230.41

53.22

38797.38

Submersible Pump 1No

idle

Internal Plastering

SQM

127.00

6.20

787.40

14.90

1892.30

Petrol Vibrator (2 No)

idle

Dado Plastering

4.80

360.00

MiniMobilePlant(1No)

Fulday

Halfday
Idle Machinery
Dewatering Pump (1No) idle
Plate Vibrator (1 No)
idle

SQM

75.00

705.00

Hand Vibrator (1 No)

idle

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Block Casting (1 No)

idle

PVC Frame

RMT

275.00

0.00

119.30

32807.50

PVC Shutter

SQM

1949.00

0.00

35.61

69401.94

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

Mason

Male

Female

External Plastering

SQM

193.00

0.00

0.00

0.00

A & B Blocks

19

12

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

D Blocks

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Mess helper

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Batchin Plant

Cement Base Paint

SQM

44.00

1650.00

291.25

12815.00

Potluru Enterprises

Slab Shuttering

SQM

12

22

20

Male

54
Female

Total

20

11

Slab Reinforcement

KG

Slab RCC Casting

CUM

Non Skid Ceramic Tile Flooring

SQM

External Plastering

37.50

9.40

Bar Cutting (1 No)

304.00

0.00

52.89

16078.56

Sand Sieveing

60.84

0.00

1416.60

86185.94

Labour Camp

4763.00

0.00

7.97

37961.11

Total

695.00

0.00

1.04

722.80

G Total
Mason

193.00

0.00
0.00

0.00

0.00

0.00

0.00

T Shivana

SQM

193.00

0.00

0.00

0.00

Manoj

SS Railing Stair case

RMT

2990.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

Tiling work

Lintel Reinforcement

KG

Contractor

SQM
FOYER

Tractor MH 12E 9403


idle
Compact Machine(1No) idle

Bar Bending (1 No)


idle
Labor Record

Description

External Plastering

III

(Masonry/Plastering)

Total

12

31
23

12
22
20
A,B Block ,Foyer & Ramp

Lalji Prasad

Mason

Male

54
Total
4

60.84

0.00

0.00

0.00

Radheshyam

Painters

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

V S Decorator

Painters

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dharampal

Polishing

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Krishnapal

Carpenter/Helper

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

RAMP PORTION

IV

Flooring PCC

D - BLOCK
Carpenter
Kamalmanna

SQM

399.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Tiling work

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

V S Decorator

60.84

0.00

0.00

0.00

Benjman

Lintel Reinforcement

KG

Lintel RCC Casting

Lalji Prasad

CUM

5428.00

0.00
0.00

0.00

0.00

0.00

0.00

Plastering Work

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Dharampal

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.0

23.25

16158.75

Flooring Kota Stone

SQM

729.00

37.00

26973.0

98.92

72109.04

Block Masonry 200 MM Thick

CUM

2142.00

5.32

11395.4

8.92

19110.92

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

0.0

42.38

5382.77

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

Sub Base PCC

SQM

290.00

Dado Fitting

SQM

551.00

External Plastering

SQM

193.00

Dado Plastering

SQM

75.00

Dry Distemper

SQM

23.00

Lintel Shuttering

SQM

'C' BLOCK

'D' BLOCK

VI

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

0.00

0.00

0.00

21.95

6364.63

0.0

25.57

14090.17

9321.9

75.68

14605.28

0.0

102.84

7713.00

0.0

0.00

0.00

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

No's

457.21

30.00

13716.3

152.00

69495.92

Fan Point

No's

525.96

8.00

4207.7

50.00

26298.00

Exhaust Fan Point

No's

941.91

9.00

8477.2

43.00

40502.13

Power Point 15A

No's

525.96

10.00

5259.6

50.00

26298.00

Power Point 20A

No's

941.91

4.00

3767.6

18.00

16954.38

0.00

0.00

0.00
0.00

Fire Fighting System


100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

10880.0

750.00

51000.00

0.00

0.00

0.00

Fire Detection & Alarm System

VIII

25mm MS Conduit

RMT

68.00

160.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

DRAIN

XIII

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.60

2566.20

3.93

16812.89

62.79

63.12

3963.30

410.72

25788.86

2843.19

0.00

0.00

0.00

135.63

0.00
117785.84

0.00
0.00

0.00
0.00
765367.79

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Mason

Male

Total
6

Painters

4
4

Mason
3

Male

Female

Polishing

Total
8

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

0.00

Light Point

VII

Total
D Block

0.00

0.0

48.30

Jagdish Pandit

Helper

0.00

1473.8

5.08

Internal Electrification

Monday Date:07-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

REMARKS

Description

POP II

(18Kg)

Units

Qty.

Bag

20.00

Remark

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Window Sill Kota

RMT

400.00

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Granite Fittings

SQM

3213.48

8888.49

2.77

8888.49

60.84

0.00

0.00

0.00

Lintel Reinforcement

KG

2.77

0.00

Mechanical Record (Vehicle)

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

Tractor 9787

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

TATA 207D

0.00

Tata Sumo

II

'B' BLOCK

0.00

Sub Base PCC

SQM

290.00

Granite Fittings

SQM

3213.48

Dado Fitting

SQM

Flooring Kota Stone


Internal Plastering
Dado Plastering

Remark

5
11

59KM
Machinery

0.00

16.40

4756.00

9.75

31331.43

Tower Hoist (1 No)

551.00

0.00

27.53

15169.03

MiniMobilePlant(1No)

SQM

729.00

0.00

53.22

38797.38

SQM

127.00

0.00

14.90

1892.30

4.16

Fuel

Hrs/Km

134KM

13380.93

Fulday Bar Cutting (1 No)


Halfday Bar Bending (1 No)
Idle Machinery

Fulday
Fulday

Submersible Pump 1No

idle

Dewatering Pump (1No) BD


Plate Vibrator (1 No)

SQM

75.00

705.00

Petrol Vibrator (2 No)

idle

Flooring PCC

SQM

399.00

0.00

0.00

0.00

Hand Vibrator (1 No)

idle

PVC Frame

RMT

275.00

25.00

6875.00

144.30

39682.50

Block Casting (1 No)

PVC Shutter

SQM

1949.00

7.40

14422.60

43.01

83824.54

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

Mason

Male

Female

External Plastering

SQM

193.00

0.00

0.00

0.00

A & B Blocks

19

13

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

D Blocks

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Mess helper

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Labour Camp

Cement Base Paint

SQM

44.00

1342.00

321.75

14157.00

Slab Shuttering

SQM

Slab Reinforcement

KG

Slab RCC Casting

CUM

Non Skid Ceramic Tile Flooring

SQM

External Plastering

SQM

0.00

30.50

External Plastering

SQM

9.40

304.00

0.00

52.89

16078.56

60.84

0.00

1416.60

86185.94

4763.00

0.00

7.97

37961.11

695.00

0.00

1.04

722.80

193.00

0.00
0.00

0.00

0.00

0.00

0.00

FOYER

III

Total

193.00

0.00

0.00

0.00

2990.00

0.00

0.00

0.00

Tiling work

75.00

0.00

0.00

0.00

Radheshyam

Flooring Kota Stone

SQM

729.00

14580.00

20.00

14580.00

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Male

57
Female

Total

22

12

34

12

Mason

Male

V S Decorator
Krishnapal

5428.00

0.00

0.00

0.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Tiling work

Painters

Carpenter/Helper

Kamalmanna

Lalji Prasad

Helper

Total
D Block

Mason

Male

127.00

0.00

0.00

0.00

V S Decorator

Painters

SQM

45.00

0.00

0.00

0.00

Dharampal

Polishing

Benjman

SQM

399.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

Plastering Work

60.84

0.00

0.00

0.00

Dharampal

CUM

5428.00

0.00
0.00

0.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.0

23.25

16158.75

Flooring Kota Stone

SQM

729.00

27.84

20295.4

126.76

92404.40

Block Masonry 200 MM Thick

CUM

2142.00

0.86

1842.1

9.78

20953.04

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

800.1

48.68

6182.87

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Sub Base PCC

SQM

290.00

0.0

21.95

6364.63

Dado Fitting

SQM

551.00

0.0

25.57

14090.17

External Plastering

SQM

193.00

60.60

11695.8

136.28

26301.08

Dado Plastering

SQM

75.00

0.0

102.84

7713.00

Block Masonry 100 MM Thick

SQM

349.00

4.32

1507.7

4.32

1507.68

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

Lintel RCC Casting


V

'C' BLOCK

'D' BLOCK

VI

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

6.30

Internal Electrification

12801.9

180.00

82297.80

Fan Point

No's

525.96

10.00

5259.6

60.00

31557.60

Exhaust Fan Point

No's

941.91

8.00

7535.3

51.00

48037.41

Power Point 15A

No's

525.96

12.00

6311.5

62.00

32609.52

Power Point 20A

No's

941.91

5.00

4709.6

23.00

21663.93

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

8840.0

880.00

59840.00

0.00

0.00

0.00

25mm MS Conduit

RMT

68.00

130.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

DRAIN

XIII

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.60

2566.20

4.53

19379.09

62.79

63.12

3963.30

473.84

29752.16

2843.19

0.00

0.00

0.00

135.63

0.00
147617.41

0.00
0.00

0.00
0.00
912985.20

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Female

Total

Polishing
Plumber Work

Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Male

0.00

28.00

Fire Detection & Alarm System

5
Mason
3

0.00

457.21

VIII

0.00

No's

Fire Fighting System

Jagdish Pandit

Total

0.00

Light Point

VII

Carpenter

SQM

KG

Oil Bond Distemper

Lintel Reinforcement

Total

Painters

Internal Plastering
Flooring PCC

23
57

D - BLOCK

CUM

RAMP PORTION

21

12
24
21
A,B Block ,Foyer & Ramp

Lalji Prasad

Lintel RCC Casting

Oil Bond Distemper

G Total
Mason

(Masonry/Plastering)

RMT

IV

24

Contractor

SQM

20

12

T Shivana

Dado Plastering

KG

2
Total

Manoj

idle

Sand Sieveing (1No)


idle
idle Compact Machine(1No) idle
Labor Record

Description

SS Railing Stair case

Lintel Reinforcement

Tuesday Date:08-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

REMARKS

Description

Units

Qty.

Hydrolic Oil
Engine Oil
Gear Oil

Ltr
Ltr

50.00
50.00

Ltr

5.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Transmission Oil

Ltr

20.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Collent

Ltr

3.00

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Granite R Black

Sqft

86.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

Crush Sand

Brass

3.04

Lintel Shuttering

SQM

334.00

0.00

2.77

923.84

60.84

0.00

0.00

0.00

'A' BLOCK

Lintel Reinforcement

KG
CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

0.00

0.00

Sub Base PCC

SQM

290.00

0.16

45.24

16.56

4801.24

Granite Fittings

SQM

3213.48

0.00

9.75

31331.43

Dado Fitting

SQM

551.00

12.17

6705.67

39.70

21874.70

'B' BLOCK

Remark

Mechanical Record (Vehicle)

Lintel RCC Casting

II

Hrs/Km

Fuel

20

11

5
20

54KM

Remark

74KM
Machinery

Tower Hoist (1 No)

Fulday Bar Cutting (1 No)


Halfday Bar Bending (1 No)

MiniMobilePlant(1No)

Fulday
Fulday

Idle Machinery

Flooring Kota Stone

SQM

729.00

0.00

53.22

38797.38

Submersible Pump 1No

idle

Internal Plastering

SQM

127.00

0.00

14.90

1892.30

Petrol Vibrator (2 No)

idle

Dado Plastering

SQM

75.00

0.00

9.40

705.00

Hand Vibrator (1 No)


Block Casting (1 No)

Dewatering Pump (1No) BD


Plate Vibrator (1 No)
idle

idle Sand Sieveing (1No)


idle
idle Compact Machine(1No) idle
Labor Record

Flooring PCC

SQM

399.00

0.00

0.00

0.00

PVC Frame

RMT

275.00

20.20

5555.00

164.50

45237.50

PVC Shutter

SQM

1949.00

5.96

11616.04

48.97

95440.58

Mason

Male

Female

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

A & B Blocks

16

11

External Plastering

SQM

193.00

0.00

0.00

0.00

D Blocks

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Mess helper

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Block Shifting

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Labour Camp

Cement Base Paint

SQM

44.00

1694.00

360.25

15851.00

12

24

22

Slab Shuttering

SQM

Male

58
Female

Total

22

13

35

Slab Reinforcement

KG

Slab RCC Casting

CUM

Non Skid Ceramic Tile Flooring

SQM

External Plastering

SQM

38.50

304.00

0.00

52.89

16078.56

60.84

0.00

1416.60

86185.94

4763.00

0.00

7.97

37961.11

695.00

0.00

1.04

722.80

193.00

0.00
0.00

0.00

0.00

0.00

0.00

FOYER

III

External Plastering

SQM

Description

Manoj

(Masonry/Plastering)

Total

193.00

0.00

0.00

0.00

RMT

2990.00

0.00

0.00

0.00

Tiling work

SQM

75.00

0.00

0.00

0.00

Radheshyam

Flooring Kota Stone

SQM

729.00

8230.41

31.29

22810.41

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

11.29

Krishnapal

0.00

0.00

0.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

SQM

45.00

0.00
0.00

32.00

1440.00

0.00

0.00

Tiling work

Kamalmanna

Lalji Prasad

SQM

127.00

0.00

0.00

0.00

V S Decorator

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Benjman

SQM

399.00

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Plastering Work

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

Dharampal

60.84

0.00

0.00

0.00

CUM

5428.00

0.00
0.00

0.00

0.00

0.00

0.00

CUM

2142.00

0.00

0.00

0.00

0.00

0.00

Lintel Reinforcement

KG

Lintel RCC Casting


V

'C' BLOCK
Block Masonry 200 MM Thick
Oil Bond Distemper

SQM

45.00

0.00

Door Panel Fixing

SQM

1451.00

0.0

0.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.0

23.25

16158.75

Flooring Kota Stone

SQM

729.00

9.24

6736.0

136.00

99140.36

Block Masonry 200 MM Thick

CUM

2142.00

6.64

14220.7

16.42

35173.78

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

4724.4

85.88

10907.27

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Sub Base PCC

SQM

290.00

0.0

21.95

6364.63

Dado Fitting

SQM

551.00

0.0

25.57

14090.17

External Plastering

SQM

193.00

5998.4

167.36

32299.52

Dado Plastering

SQM

75.00

0.0

102.84

7713.00

Block Masonry 100 MM Thick

SQM

349.00

0.0

4.32

1507.68

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

'D' BLOCK

VI

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

37.20

31.08

Internal Electrification

14630.7

212.00

96928.52

Fan Point

No's

525.96

12.00

6311.5

72.00

37869.12

Exhaust Fan Point

No's

941.91

9.00

8477.2

60.00

56514.60

Power Point 15A

No's

525.96

10.00

5259.6

72.00

37869.12

Power Point 20A

No's

941.91

3.00

2825.7

26.00

24489.66

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

10200.0

1030.00

70040.00

0.00

0.00

0.00

25mm MS Conduit

RMT

68.00

Electrical

IX

150.00

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

Block Masonry 200 MM Thick

CUM

3979.89

0.00

0.00

0.00

DRAIN

XIII

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.00

4.53

19379.09

62.79

0.00

473.84

29752.16

2843.19

0.00

0.00

0.00

135.63

0.00
113230.66

0.00
0.00

0.00
0.00
1018251.22

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

5
4

Jagdish Pandit

Helper

Total
D Block

Mason

Male

Total
4

Painters

3
3

Mason
3

Male

Female

Polishing

Total
9

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Painters
Carpenter/Helper

0.00

32.00

Fire Detection & Alarm System

0.00

457.21

VIII

Total
7

0.00

No's

Fire Fighting System

3
Painters

0.00

Light Point

VII

Male

Carpenter

Internal Plastering
Flooring PCC

23
58

D - BLOCK

5428.00

RAMP PORTION

Mason

V S Decorator

CUM

Oil Bond Distemper

12

12
24
22
A,B Block ,Foyer & Ramp

Lalji Prasad

Lintel RCC Casting

IV

G Total
Mason

Contractor
T Shivana

Dado Plastering

KG

2
Total

SS Railing Stair case

Lintel Reinforcement

Wednesday Date:09-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Cloudy/Rainy

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

'A' BLOCK
Internal Plastering

SQM

127.00

Dado Plastering

SQM

75.00

Window Sill Kota

RMT

400.00

Non Skid Ceramic Tile Flooring

SQM

695.00

PVC Frame

RMT

PVC Shutter

REMARKS

Description

20mm Metal
Crumple Sheet
Sand Sive 3'x5'

Units

Qty.

Brass
Sqft

2.96
320.00

No

1.00

0.00

0.00

0.00

5.20

390.00

5.20

390.00

0.00

0.00

0.00

275.00

20.16

5544.00

22.93

6304.65

SQM

1949.00

5.91

11518.59

5.91

11518.59

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

0.00

0.00

0.00

TATA 207D

62KM

Flooring Kota Stone

SQM

729.00

0.00

0.00

0.00

Tata Sumo

59KM
Machinery

II

0.00

'B' BLOCK

0.00

0.00

Mechanical Record (Vehicle)

290.00

0.00

16.56

4801.24

SQM

3213.48

0.00

9.75

31331.43

Dado Fitting

SQM

551.00

4297.80

47.50

26172.50

Fuel

Hrs/Km

Remark

3
11

0.00

SQM

Granite Fittings

7.80

Remark

0.00

Sub Base PCC

Tower Hoist (1 No)


MiniMobilePlant(1No)

20

Fulday Bar Cutting (1 No)


Halfday Bar Bending (1 No)
Idle Machinery

Flooring Kota Stone

SQM

729.00

0.00

53.22

38797.38

Submersible Pump 1No

idle

Internal Plastering

SQM

127.00

0.00

14.90

1892.30

Petrol Vibrator (2 No)

idle

Dado Plastering

SQM

75.00

0.00

9.40

705.00

Hand Vibrator (1 No)


Block Casting (1 No)

Fulday
Fulday

Dewatering Pump (1No) BD


Plate Vibrator (1 No)
idle

idle Sand Sieveing (1No)


idle
idle Compact Machine(1No) idle
Labor Record

Flooring PCC

SQM

399.00

0.00

0.00

0.00

PVC Frame

RMT

275.00

0.00

164.50

45237.50

PVC Shutter

SQM

1949.00

0.00

48.97

95440.58

Mason

Male

Female

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

A & B Blocks

10

External Plastering

SQM

193.00

0.00

0.00

0.00

D Blocks

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

Mess helper

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Block Shifting

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Sand Sieveing

Cement Base Paint

SQM

44.00

0.00

360.25

15851.00

Sand Shifting

Slab Shuttering

SQM

304.00

0.00

52.89

16078.56

Shuttering Material Shifting

60.84

0.00

1416.60

86185.94

Labour Camp
13

22

23

Male

58
Female

Total

20

12

11

26

13
22
23
A,B Block ,Foyer & Ramp

58

Slab Reinforcement

KG

Description

CUM

4763.00

0.00

7.97

37961.11

Total

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

1.04

722.80

External Plastering

G Total
Mason

Contractor

SQM

193.00

0.00
0.00

0.00

0.00

0.00

0.00

T Shivana

External Plastering

SQM

193.00

0.00

0.00

0.00

Manoj

SS Railing Stair case

RMT

2990.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

0.00

31.29

22810.41

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

Tiling work

FOYER

Lintel Reinforcement

KG

(Masonry/Plastering)

Total

2
2

Slab RCC Casting

III

Lalji Prasad

13

Mason

Male

32

Total
6

60.84

0.00

0.00

0.00

Radheshyam

Painters

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

V S Decorator

Painters

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Krishnapal

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

Sub Base PCC

SQM

290.00

0.00

0.00

0.00

SQM

45.00

1587.15
0.00

67.27

3027.15

0.00

0.00

1137.52

59.00

1137.52

Oil Bond Distemper

35.27

RAMP PORTION

IV

Plaster Skirting

RMT

Oil Bond Distemper

19.28

59.00

Kamalmanna

45.00

0.00

0.00

0.00

SQM

399.00

0.00

0.00

0.00

Tiling work

CUM

2142.00

0.00

0.00

0.00

V S Decorator

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

Benjman

Lintel Reinforcement

KG

Lintel RCC Casting

Oil Bond Distemper

60.84

0.00

0.00

0.00

5428.00

0.00
0.00

0.00

0.00

Plastering Work

0.00

0.00

Dharampal

CUM

2142.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SQM

45.00

0.00

Door Panel Fixing

SQM

1451.00

0.0

Non Skid Ceramic Tile Flooring

SQM

0.0

23.25

16158.75

Flooring Kota Stone

SQM

729.00

38323.5

188.57

137463.89

Block Masonry 200 MM Thick

CUM

2142.00

0.0

16.42

35173.78

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

0.0

85.88

10907.27

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Sub Base PCC

SQM

290.00

0.0

21.95

6364.63

Dado Fitting

SQM

551.00

3570.5

32.05

17660.65

External Plastering

SQM

193.00

0.0

167.36

32299.52

Dado Plastering

SQM

75.00

0.0

102.84

7713.00

Block Masonry 100 MM Thick

SQM

349.00

0.0

4.32

1507.68

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

'D' BLOCK

VI

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

695.00
52.57

6.48

Internal Electrification
28.00

12801.9

240.00

109730.40

Fan Point

No's

525.96

10.00

5259.6

82.00

43128.72

Exhaust Fan Point

No's

941.91

8.00

7535.3

68.00

64049.88

Power Point 15A

No's

525.96

9.00

4733.6

81.00

42602.76

Power Point 20A

No's

941.91

5.00

4709.6

31.00

29199.21

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

9180.0

1165.00

79220.00

0.00

0.00

0.00

Fire Detection & Alarm System


25mm MS Conduit

RMT

68.00

135.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

DRAIN

XIII

PCC (1:4:8)

CUM

2758.42

0.00

0.00

0.00

Drain top coping (1:3:6)

CUM

4204.80

0.00

0.00

0.00

CUM

3979.89

17193.12

Block Masonry 200 MM Thick

17193.12

4.32

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.00

4.53

19379.09

62.79

0.00

473.84

29752.16

2843.19

0.00

0.00

0.00

135.63

0.00
127782.14

0.00
0.00

0.00
0.00
1145870.17

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

4.32

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Mason

Male

Total
7

Painters

3
3

Male

Mason

Female

Total
0

Polishing

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Total
D Block

0.00

457.21

VIII

Helper

0.00

No's

Fire Fighting System

Jagdish Pandit

0.00

Light Point

VII

Lalji Prasad

CUM
'C' BLOCK

Block Masonry 200 MM Thick

D - BLOCK

Block Masonry 200 MM Thick

SQM

Carpenter/Helper
Carpenter

Flooring PCC

Thursday Date:10-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PROJECTS PVT. LTD.

Sunny

Weather Report

DAILY PROGRESS REPORT FOR THE MONTH OF OCTOBER-2013


COMPLETION DATE:-31.01.2014

Sr
No

DESCRIPTION OF WORK

RATE

TODAY'S PROGRESS
QTY
AMOUNT

OCTOBER MONTH CUMLATIVE

QTY

AMOUNT

REMARKS

Description

Crush Sand

Units

Qty.

Brass

6.92

Remark

'A' BLOCK
Internal Plastering

SQM

127.00

0.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

5.20

390.00

Window Sill Kota

RMT

400.00

0.00

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

0.00

0.00

PVC Frame

RMT

275.00

0.00

22.93

6304.65

PVC Shutter

SQM

1949.00

0.00

5.91

11518.59

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Dado Fitting

SQM

551.00

0.00

0.00

0.00

Machinary Name
JCB TEREX (1033)

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

Tractor 9403

Staircase Steps Fittings

SQM

790.00

Flooring Kota Stone

SQM

729.00

II

5.04

0.00

0.00

0.00

0.00

0.00

TATA 207D

5.04

3674.16

Tata Sumo

'B' BLOCK

0.00
290.00

0.00

16.56

4801.24

SQM

3213.48

0.00

9.75

31331.43

Dado Fitting

SQM

551.00

3746.80

54.30

29919.30

Hrs/Km

Fuel

20

11

71KM

Tower Hoist (1 No)


Sand Sieveing (1No)

Fulday Bar Cutting (1 No)


Fulday Bar Bending (1 No)
Idle Machinery

Flooring Kota Stone

SQM

729.00

1749.60

55.62

40546.98

Submersible Pump 1No

idle

Internal Plastering

SQM

127.00

0.00

14.90

1892.30

Petrol Vibrator (2 No)

idle

Dado Plastering

SQM

75.00

0.00

9.40

705.00

Hand Vibrator (1 No)

idle

Block Casting (1 No)

idle

2.40

Remark

108KM
Machinery

0.00

SQM

Granite Fittings

6.80

Mechanical Record (Vehicle)

3674.16

Sub Base PCC

Fulday
Fulday

Dewatering Pump (1No) BD


Plate Vibrator (1 No)
idle
MiniMobilePlant(1No)
idle
Compact Machine(1No) idle

Flooring PCC

SQM

399.00

0.00

0.00

0.00

PVC Frame

RMT

275.00

24.80

6820.00

189.30

52057.50

PVC Shutter

SQM

1949.00

7.40

14422.60

56.37

109863.18

Alluminium Fix Glazzing

SQM

2280

0.00

0.00

0.00

Mason

Male

Female

External Plastering

SQM

193.00

0.00

0.00

0.00

A & B Blocks

14

10

Window Sill Kota

RMT

400.00

0.00

0.00

0.00

D Blocks

10

Door Panel Fixing

SQM

1451.00

0.00

0.00

0.00

Mess helper

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Sand Sieveing

Cement Base Paint

SQM

44.00

0.00

360.25

15851.00

Drain Work

Slab Shuttering

SQM

304.00

Labor Record
Description

0.00

52.89

16078.56

60.84

0.00

1416.60

86185.94

CUM

4763.00

0.00

7.97

37961.11

Non Skid Ceramic Tile Flooring

SQM

695.00

0.00

1.04

722.80

External Plastering

SQM

193.00

0.00
0.00

0.00

0.00

Manoj

0.00

0.00

Bhola Ram

193.00

0.00

0.00

0.00
0.00

Slab Reinforcement

KG

Slab RCC Casting

FOYER

III

External Plastering

SQM

Total
G Total
Mason

Contractor

14

23

21

Male

58
Female

Total
33

T Shivana
(Masonry/Plastering)

Total

20

13

14

RMT

2990.00

0.00

0.00

Dado Plastering

SQM

75.00

0.00

0.00

0.00

Flooring Kota Stone

SQM

729.00

7887.78

42.11

30698.19

Block Masonry 100 MM Thick

SQM

349.00

0.00

0.00

0.00

Radheshyam

Painters

60.84

0.00

0.00

0.00

V S Decorator

Painters

Krishnapal

KG

10.82

Lintel RCC Casting

CUM

5428.00

0.00

0.00

0.00

Internal Plastering

SQM

127.00

0.00

0.00

0.00

Slab Shuttering

SQM

304.00

0.00

0.00

0.00

SQM

290.00

0.00

0.00

0.00

SQM

45.00

0.00
0.00

67.27

3027.15

0.00

0.00

Sub Base PCC


Oil Bond Distemper
RAMP PORTION

IV

30.40

Lalji Prasad
Tiling work

Kamalmanna

RMT

19.28

586.11

89.40

1723.63

SQM

45.00

0.00

0.00

0.00

Tiling work

Lalji Prasad

Flooring PCC

SQM

399.00

0.00

0.00

0.00

V S Decorator

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Benjman

Lintel Shuttering

SQM

334.00

0.00

0.00

0.00

60.84

0.00

0.00

0.00

Plastering Work

CUM

5428.00

0.00
0.00

0.00

0.00

Dharampal

0.00

0.00

Block Masonry 200 MM Thick

CUM

2142.00

0.00

0.00

0.00

Oil Bond Distemper

SQM

45.00

0.00

0.00

0.00

0.00

0.00

KG

'C' BLOCK

'D' BLOCK

VI

Door Panel Fixing

SQM

1451.00

0.0

Non Skid Ceramic Tile Flooring

SQM

695.00

0.0

23.25

16158.75

Flooring Kota Stone

SQM

729.00

0.0

188.57

137463.89

Block Masonry 200 MM Thick

CUM

2142.00

2242.7

17.47

37416.46

Window Sill Kota

RMT

400.00

0.0

0.00

0.00

Ceilling Plaster

SQM

101.00

0.0

0.00

Alluminium Windows

SQM

6083.00

0.0

0.00

0.00

Internal Plastering

SQM

127.00

0.0

85.88

10907.27

PVC Frame

RMT

275.00

0.0

0.00

PVC Shutter

SQM

1949.00

0.0

0.00

0.00

Sub Base PCC

SQM

290.00

0.0

21.95

6364.63

Dado Fitting

SQM

551.00

25.38

13984.4

57.43

31645.03

External Plastering

SQM

193.00

58.55

11300.2

225.91

43599.67

Dado Plastering

SQM

75.00

0.0

102.84

7713.00

Block Masonry 100 MM Thick

SQM

349.00

0.0

4.32

1507.68

Lintel Shuttering

SQM

334.00

0.0

0.00

0.00

60.84

0.0

0.00

0.00

5428.00

0.0

0.00

0.0

0.00

0.00

Lintel Reinforcement

KG

Lintel RCC Casting

CUM

1.05

Internal Electrification

0.00

13716.3

270.00

123446.70

Fan Point

No's

525.96

12.00

6311.5

94.00

49440.24

Exhaust Fan Point

No's

941.91

9.00

8477.2

77.00

72527.07

Power Point 15A

No's

525.96

10.00

5259.6

91.00

47862.36

Power Point 20A

No's

941.91

6.00

5651.5

37.00

34850.67

0.00

0.00

0.00
0.00

100mm MS Pipe

RMT

1483.60

0.0

0.00

150mm MS Pipe

RMT

2015.42

0.0

0.00

0.0

0.00

0.00

10200.0

1315.00

89420.00

0.00

0.00

0.00

25mm MS Conduit

RMT

68.00

150.00

Electrical

IX

SQM

78.02

0.0

0.00

0.00

PCC BLOCK (300x200x200)

NOS

24.00

0.00

0.00

0.00

PCC BLOCK (300x200x100)

NOS

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SEWAGE
Angle Iran Frame

Kg

98.89

External plaster

SQM

PCC&Hounchingfor300mm RCC pipe

RMT

699.71

0.00

0.00

0.00

CI Pipe 100MM

RMT

1270.00

0.00

0.00

0.00

CI Pipe 75mm

RMT

1065

0.00

0.00

0.00

PVC Rain water pipe 110mm

RMT

185.00

0.00

0.00

0.00

PCC & Hounching for 100mm SGSW pipeRMT

215.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SANITARY

XII

DRAIN

XIII

PCC (1:4:8)

CUM

2758.42

Drain top coping (1:3:6)

CUM

4204.80

1051.20

0.25

1051.20

Block Masonry 200 MM Thick

CUM

3979.89

0.00

4.32

17193.12

0.25

Back Filling

CUM

50.00

0.00

0.00

Plastering

SQM

139.54

0.00

0.00

0.00

Chamber cover RCC slab casting

CUM

4277.00

0.00

4.53

19379.09

62.79

0.00

473.84

29752.16

2843.19

0.00

0.00

0.00

135.63

0.00
117081.53

0.00
0.00

0.00
0.00
1262951.70

Chamber cover Steel

Kg

Cable Trench Masonry

CUM

Excavation &Earth Work

XIV

Excavation

CUM

Total Value of work done

Jagdish Pandit

Helper

Total
D Block

Mason

Male

Total
2

Painters

4
4

Mason
5

Male

Female

Polishing

Total
12

Plumber Work
Nayak

Plumbing Work

0.00

Plastering (Cable Trench)

XI

Carpenter/Helper

0.00

30.00

Fire Detection & Alarm System

0.00

457.21

VIII

Total
5

0.00

No's

Fire Fighting System

0.00

Light Point

VII

Male

58

D - BLOCK

Oil Bond Distemper

Lintel RCC Casting

Mason

Carpenter

Plaster Skirting

Lintel Reinforcement

25

14
23
21
A,B Block ,Foyer & Ramp

SS Railing Stair case

Lintel Reinforcement

Friday Date:11-Oct-2013

Site :-MH KIRKEE - PUNE


UNIT

Stores Record

0.00

Completed Buildings Including Services


A/C PLANT & SUBSTATION
MEDICAL DENTAL CARE
MORTUARY
ANIMAL HOUSE
AUDITORIUM
OVER HEAD TANK
SANTRY POST
BOUNDARY WALL
ROAD WORK
WALKIN COOLER
EXTERNAL WATER SUPPLY (SEC 'B')

GALACON INFRASTRUCTURE & PR

DAILY PROGRESS REPORT FOR THE MONT


COMPLETION DATE:-16.06.2014
SrNo
I

DESCRIPTION OF WORK

UNIT

RATE

CUM
SQM
CUM
MT
CUM
No's
No's
No's
No's
No's
No's

3020
384
6000
53910
5087

CUM
SQM
CUM
Cum
Cum
CUm

3020
384
5614
6000
5087
53910

'E' BLOCK

External Brick Work


Internal Brick Work
SLAB PROjections
LMR Column Reinforcement
LMR Slab Casting
Light Point
Fan Point
Exhaust Fan Point
Power Point 15A
AC Point 20A
Gyser Point 16A
II

Site :-SUN WAY OPUS-HYDERABAD

'H' BLOCK

External Brick Work


Internal Brick Work
Column Casting
Sloped Slab Casting
LMR Bottom Slab Casting
Sloped Slab Reinforcement

III

I' BLOCK
Stair Case Casting
Column Casting
Slab Reinforcement
Slab BEam Casting
IV
F' BLOCK
Column Casting
Footing Casting
Stair CaseCasting
Plinth Beam PCC
Slab Casting
Column Reinforcement
V
G' BLOCK
Slab Reinforcement
Stair Case CASting
Column Casting
Plinth Beam pcc
SLAB Casting
VI
J' BLOCK
Column Reinforcement
COLUMN Casting
STAIR Case Casting
LABOR RECORD
CONTRACTOR
SLNO
1 LAXMAN RAO
2 RAJASHEKAR
3 DILIP KUMAR

CUm
CUM
MT
CUM

6143.14
5614
53910
6000

CUM
CUM
CUM
SQM
CUM
MT

5614
5614
6143.14
2486.21
6000
53910

MT
Cum
CUM
SQM
CUM

53910
6143.14
5614
2486.21
6000

MT
CUM
CUM

53910
5614
6143.14

CARPENTER

FITTER

4
5
6
7
8
9
10
11
12
13

NOTE

VEERENDER KUMAR
SANJIT MANDAL
RANJITH MANDAL
V.RAJESWAR
ABINAV BISWAS
RAMI REDDY
PAUL
k.PRABHAKAR
PRUDVI RAJ
KISHORE
TOTAL

4
4
2
9
4
6

25

11.57 MT Robo Sand Unloading in Site


5000 Bricks unloading in site
Sunway 2Cum Concrete

ON INFRASTRUCTURE & PROJECTS PVT. LTD.


PROGRESS REPORT FOR THE MONTH OF FEBRUARY-2014
Date:05.02.2014

Site :-SUN WAY OPUS-HYDERABAD


FEBRUARY MONTH
CUMLATIVE

TODAY'S PROGRESS
QTY
0.33
0.75

2
0.5
1.5

AMOUNT

QTY

AMOUNT

996.6 0.63
288 26
0 1.75
0
0

1902.6
9984
10500
0
0

0
768
2807
0
0
80865

6.5
18
0.5
1.5

19630
6912
2807
0
0
80865

0
0
0
0
2.5

1.3

14035
0
0
0
0
70083

0
0
0
0
12000

0.7
2.5

ELECTRICIANS

37737
14035
0

1
0.5
6.5
2
60
3.5
8.3

62
1.5
5.5
4

0
5614
0
3000
36491
0
12286.3
0
360000
188685
447453
0
0
0
372000
80865
30877
24572.6

MASON

MC

FC

11

18

18

18

PVT. LTD.

UARY-2014

Stores R

Date:05.02.2014
REMARKS

Description
Ply Wood
Runners 2*3''
Runners 3*4''
Suttering Boards 2'*4'
Suttering Boards 2'*3'

E1 GF Brick Work in Progress


E1 1st Floor Brick Work in Progress

H31st Floor Brick Work in progress

Cement
Robo Sand
Bricks
Steel
Acro Spans
props

SL.NO
1
2
3
4
5

i1-I2 2nd Floor Slab Shuttering

F7-F8 GF Slab Shuttering

6
7
8
9
10
11
12
13
14
15

F3-F4 GF Slab Shuttering Started


Stilt Floor Slab Shuttering G5-G6,G3-G4

SL.NO
1
2

J7-J8 Stilit Floor Slab Shuttering

HELPER
4
5

TOTAL
4
31
10

4
4
4
9
9
6

45

8
8
6
18
13
12
2
10
0
122

Stores Record
Description

Units

Qty.

od

NO's

35

rs 2*3''
rs 3*4''
ng Boards 2'*4'
ng Boards 2'*3'

CFT
CFT
NO's
NO's

0
1500
2955
2738

Bags
Tonnes
NO's
Tonnes
NO's
NO's

2476
315
20000
39
1639
2513

nt

Remark

MACHINERY
MACHINE
Breaker
Viberator
Dewatering Pump
Curing Pump
Backhoe

NO'S

1
3
2
4
1

REMARKS

Monkeylift
Mini Batching Plant
CSM
Concrete Pump
DG Set
HE MAN
Tuffrider
Barbending Machine
Bar Cutting Machine
Wood Cutting Machine
RMC CONSUMPTION (SLAB)
DESCRIPTION Units
M20
CUM
M25
CUM

2
1
1
1
1
1
1
1
1
7
Qty.
2980.5
145.5

Amount
17883000
873000