CRONOGRAMA VALORIZADO DE OBRA

PROYECTO: CONSTRUCCION DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y DESAGUE EN LA ASOC. VIV. LA PRADERA

PARTIDA

DESCRIPCIN

01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

und/DIA

MES1
560.4800
EQ.

Descripcin Recurso

560.48

Precio S/.

Parcial S/.

CAPATAZ

14.40

11.52

OPERARIO

12.88

103.04

PEON

11.05

88.40
202.96

CLAVOS PARA MADERA C/C 3"

4.50

4.50

CEMENTO PORTLAND TIPO I (42.5KG)

21.50

9.68

HORMIGON

25.00

5.00

AGUA

10.00

2.25

6.00

210.00

TRIPLAY 4' X 8' X 6 MM.

35.00

70.00

PINTURA ESMALTE SINTETICO

50.00

MADERA TORNILLO

50.00
351.43

HERRAMIENTAS MANUALES

202.96

6.09
6.09

01.01.02

SEALIZACION - DESVIO EN VIA

GLB/DIA

5,220.7600
EQ.

Descripcin Recurso
PEON

5,220.76

Precio S/.

Parcial S/.

11.05

397.80
397.80

CINTA DE SEGURIDAD

55.00

495.00

SEALES DE 60 X 150 CM

260.00

2,340.00

SEALES DE INFORMACION

220.00

1,980.00
4,815.00

HERRAMIENTAS MANUALES

397.80

7.96
7.96

01.02.01

LIMPIEZA DE TERRENO MANUAL

m2/DIA

6,443.4300
EQ.

Descripcin Recurso

6,443.43

Precio S/.

Parcial S/.

OPERARIO

12.88

640.62

PEON

11.05

5,495.98
6,136.60

HERRAMIENTAS MANUALES

6,136.60

306.83
306.83

01.02.02

TRAZO Y REPLANTEO ZANJAS P/TUBERIA

m/DIA
Descripcin Recurso

3,379.5700
EQ.

3,379.57

Precio S/.

Parcial S/.

TOPOGRAFO

14.40

383.18

OPERARIO

12.88

342.73

PEON

11.05

585.32
1,311.23

YESO

5.00

PINTURA ESMALTE SINTETICO

50.00

621.72
621.72
1,243.44

NIVEL
MIRA TOPOGRAFICA
TEODOLITO

10.00

266.10

6.00

159.66

15.00

399.14
824.90

01.02.03

MOVILIZACION Y DESMOVILIZACION DE PERSONAL OBRERO

GLB/DIA

5,284.3200
EQ.

Descripcin Recurso
CAPATAZ

5,284.32

Precio S/.

Parcial S/.

14.40

4.32
4.32

CAMION BARANDA 3 TON.

110.00

5,280.00
5,280.00

01.03.01

EXCAVAC. DE ZANJA, TERRENO NORMAL TUB. 8-12" HASTA 1.50 M

m/DIA

25,332.7100
EQ.

Descripcin Recurso

25,332.71

Precio S/.

Parcial S/.

OFICIAL

12.05

958.94

PEON

11.05

1,758.71
2,717.65

HERRAMIENTAS MANUALES
RETROEXCAVADORA S/O 75-110 HP,.50-1.3Y3

2,717.65

81.53

170.00

22,533.53
22,615.06

01.03.02

REFINE Y NIVELACION DE ZANJA NORMAL DE 8-12" PARA ALCNT.

m/DIA

11,340.6253
EQ.

Descripcin Recurso

14,792.12

Precio S/.

Parcial S/.

CAPATAZ

14.40

956.15

PEON

11.05

7,328.89

733.0483
5,618.8157

8,285.04
ARENA GRUESA

25.00

6,092.83

4,671.1697

6,092.83
HERRAMIENTAS MANUALES

8,285.04

414.25
414.25

01.03.03

CAMA DE APOYO P/TUBO DE ALCANT. 8-12"

m/DIA
Descripcin Recurso

317.5917
11,340.6253
9,307.9960

EQ.

23,269.99

Precio S/.

Parcial S/.

CAPATAZ

14.40

533.74

PEON

11.05

12,317.97
12,851.71

213.4960
4,927.1880

ARENILLA

30.00

10,032.73

4,013.0920

10,032.73
HERRAMIENTAS MANUALES

12,851.71

385.55
385.55

01.03.04

RELLENO SOBRE CAMA MATERIAL PRESTAMO SOBRE CAMA

m/DIA

154.2200
9,307.9960
15,044.0604

EQ.

Descripcin Recurso

42,311.42

Precio S/.

Parcial S/.

CAPATAZ

14.40

476.29

PEON

11.05

3,663.07

169.3476
1,302.4249

4,139.36
ARENILLA

30.00

26,858.20

AGUA

10.00

6,217.18

9,549.5822
2,210.5529

33,075.38
HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 7 HP

4,139.36

124.18

15.00

4,972.50
5,096.68

01.03.05

44.1529
1,768.0000
15,044.0604

RELLENO CON MATERIAL PROPIO C/COMPACTADOR

m/DIA

EQ.

Descripcin Recurso

22,637.52

Precio S/.

Parcial S/.

CAPATAZ

14.40

286.49

PEON

11.05

17,587.14
17,873.63

AGUA

10.00

1,243.44
1,243.44

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 7 HP

17,873.63

536.21

15.00

2,984.24
3,520.45

01.03.06

ELIMINACION MATERIAL EXCEDENTE S/ACARREO

m3/DIA

EQ.

Descripcin Recurso

43,235.07

Precio S/.

Parcial S/.

CAPATAZ

14.40

642.53

PEON

11.05

19,697.25
20,339.78

CAMION VOLQUETE 4X2 140-210 HP 6 M3.

100.00

HERRAMIENTAS MANUALES

20,339.78

22,285.10
610.19
22,895.29

01.03.07

EXCAVACION MANUAL BUZON T.C.

m3/DIA
Descripcin Recurso

3,853.5948
EQ.

8,758.17

Precio S/.

Parcial S/.

CAPATAZ

14.40

980.44

PEON

11.05

7,522.64
8,503.08

431.3936
3,309.9616

HERRAMIENTAS MANUALES

8,503.08

255.09
255.09

01.04.01

SUMINISTRO E INSTALACION DE TUBERIA P.V.C. 8" (ALCANTARILLADO) + PRUEBA HIDRAULICA

m/DIA

EQ.

Descripcin Recurso

112.2396
3,853.5948
69,764.0265

155,031.17

Precio S/.

Parcial S/.

CAPATAZ

14.40

3,978.59

OPERARIO

12.88

8,542.64

OFICIAL

12.05

3,329.31

PEON

11.05

18,320.86

1,790.3655
3,844.1880
1,498.1895
8,244.3870

34,171.40
LUBRICANTE PARA TUBERIA DE UNION FLEXIBLE
ANILLO DE JEBE 8"
AGUA
ANILLO DE JEBE DE 160 MM

47.20

293.45

6.44

2,722.63

10.00

3,755.17

6.44

2,722.63

TUBO PVC - DESAGUE 200 MM (SAL 8")X6M

246.10

107,103.29

TAPON HEMBRA PVC SAL P/DESAGUE DE 8"

16.87

104.88

132.0525
1,225.1835
1,689.8265
1,225.1835
48,196.4805
47.1960

116,702.05
BALDE PRUEBA- TAPON -ABRAZ. Y ACCESORIOS

17.70

2,935.97

MOTOBOMBA 3.5 HP 2"

11.80

196.61

34,171.40

1,025.14

HERRAMIENTAS MANUALES

4,157.72
01.05.01

BUZON ESTANDAR DE CONCRETO HASTA 2.00 m

und/DIA

1,321.1865
88.4745
461.3130
69,764.0265
15,140.1928

EQ.

Descripcin Recurso

59,184.39

Precio S/.

Parcial S/.

CAPATAZ

14.40

430.09

OPERARIO

12.88

11,540.48

OFICIAL

12.05

2,519.26

PEON

11.05

10,230.84

110.0230
2,952.2158
644.4619
2,617.1916

24,720.67
ALAMBRE NEGRO RECOCIDO # 16

4.50

30.74

ACERO DE REFUERZO FY=4200 GRADO 60

4.20

2,234.40

ARENA FINA

39.66

57.74

PIEDRA CHANCADA DE 1/2"

39.67

2,096.00

ARENA GRUESA

25.00

1,005.90

CEMENTO PORTLAND TIPO I (42.5KG)

21.50

11,016.60

203.55

5,699.40

TAPA DE CONCRETO ARMADO PARA BUZON


AGUA

10.00

299.60

MARCO F.FDO. DIAMETRO 0.60 M.

98.30

2,752.40

7.8637
571.5907
14.7707
536.1860
257.3233
2,818.2000
1,457.9860
76.6419
704.1023

25,192.78
HERRAMIENTAS MANUALES

24,720.67

494.41

MOLDE METALICO PARA BUZON

17.70

6,773.22

VIBRADOR DE CONCRETO 4 HP 2.40"

15.00

559.99

MEZCLADORA CONCRETO TAMBOR 18HP 11P3

19.33

1,443.32
9,270.94

01.05.02

BUZON ESTANDAR DE CONCRETO HASTA 5.00 m

und/DIA
Descripcin Recurso
CAPATAZ

EQ.

24,377.88

Precio S/.

Parcial S/.

14.40

138.24

126.4770
1,732.6842
143.2533
369.2214
15,140.1928

OPERARIO

12.88

3,709.44

OFICIAL

12.05

1,156.80

PEON

11.05

3,394.56
8,399.04

ALAMBRE NEGRO RECOCIDO # 16

4.50

9.88

ACERO DE REFUERZO FY=4200 GRADO 60

4.20

718.20

ARENA FINA

39.66

22.13

PIEDRA CHANCADA DE 1/2"

39.67

847.95

ARENA GRUESA

25.00

412.43

CEMENTO PORTLAND TIPO I (42.5KG)

21.50

4,489.20

203.55

1,831.95

TAPA DE CONCRETO ARMADO PARA BUZON


MARCO F.FDO. DIAMETRO 0.60 M.

98.30

884.70
9,216.44

HERRAMIENTAS MANUALES

8,399.04

167.98

MOLDE METALICO PARA BUZON

17.70

5,950.49

VIBRADOR DE CONCRETO 4 HP 2.40"

15.00

180.00

MEZCLADORA CONCRETO TAMBOR 18HP 11P3

19.33

463.93
6,762.40

01.05.03

EMPALME A BUZON Y/O RED EXISTENTE EN DIAMETRO 8 - 12 "

und/DIA

EQ.

Descripcin Recurso

403.34

Precio S/.

Parcial S/.

CAPATAZ

14.40

11.52

OPERARIO

12.88

51.52

OFICIAL

12.05

96.40

PEON

11.05

176.80
336.24

ARENA FINA

39.66

ARENA GRUESA

25.00

2.50

CEMENTO PORTLAND TIPO I (42.5KG)

21.50

43.00

YESO

5.00

0.79

4.00
50.29

HERRAMIENTAS MANUALES

336.24

16.81
16.81

01.06.01

TRAZO Y REPLANTEO ZANJAS P/TUBERIA

m/DIA

EQ.

Descripcin Recurso

2,331.98

Precio S/.

Parcial S/.

TOPOGRAFO

14.40

264.40

OPERARIO

12.88

236.49

PEON

11.05

403.89
904.78

YESO
PINTURA ESMALTE SINTETICO

5.00

429.00

50.00

429.00
858.00

NIVEL
MIRA TOPOGRAFICA
TEODOLITO

10.00

183.61

6.00

110.17

15.00

275.42
569.20

01.06.02
m/DIA

EXCAVAC. ZANJA T.S.R. A PULSO TUB. 6" MENOR= 1 M


EQ.

50,459.48

Descripcin Recurso

Precio S/.

Parcial S/.

CAPATAZ

14.40

5,648.80

PEON

11.05

43,340.99
48,989.79

HERRAMIENTAS MANUALES

48,989.79

1,469.69
1,469.69

01.06.03

REFINE Y NIVELACION EN TERRENO NORMAL PARA TUBERIA PVC DE 2" A 6" EN ALCANTARILLADO

m/DIA

EQ.

Descripcin Recurso

2,617.15

Precio S/.

Parcial S/.

TOPOGRAFO

14.40

580.69

CAPATAZ

14.40

116.14

OFICIAL

12.05

291.56

PEON

11.05

893.10
1,881.49

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 4 HP
NIVEL

1,881.49

94.07

15.00

241.96

9.91

399.63
735.66

01.06.04

CAMA DE APOYO P/TUBO DE ALCANT. 6"

m/DIA

EQ.

Descripcin Recurso

7,203.27

Precio S/.

Parcial S/.

CAPATAZ

14.40

328.65

PEON

11.05

2,527.61
2,856.26

ARENA GRUESA

25.00

4,204.20
4,204.20

HERRAMIENTAS MANUALES

2,856.26

142.81
142.81

01.06.05

RELLENO SOBRE CAMA MATERIAL PRESTAMO SOBRE CAMA

m/DIA

EQ.

Descripcin Recurso

29,195.89

Precio S/.

Parcial S/.

CAPATAZ

14.40

328.65

PEON

11.05

2,527.61
2,856.26

ARENILLA

30.00

AGUA

10.00

18,532.80
4,290.00
22,822.80

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 7 HP

2,856.26

85.69

15.00

3,431.14
3,516.83

01.06.06
m/DIA

RELLENO CON MATERIAL PROPIO C/COMPACTADOR


EQ.

15,620.43

Descripcin Recurso

Precio S/.

Parcial S/.

CAPATAZ

14.40

197.68

PEON

11.05

12,135.55
12,333.23

AGUA

10.00

858.00
858.00

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 7 HP

12,333.23

370.00

15.00

2,059.20
2,429.20

01.06.07

PRUEBA HIDRAULICA+DESINFECCION TUB.4"(100MM) A ZANJA TAPADA

m/DIA

EQ.

Descripcin Recurso

3,774.05

Precio S/.

Parcial S/.

CAPATAZ

14.40

88.96

OPERARIO

12.88

786.83

PEON

11.05

675.04
1,550.83

HIPOCLORITO DE CALCIO AL 70%

67.23

230.73
230.73

BALDE PRUEBA- TAPON -ABRAZ. Y ACCESORIOS

17.70

CAMION CISTERNA 4x2 (AGUA) 122 HP 1,500

147.50

1,081.29
911.20
1,992.49

01.06.08

ELIMINACION MATERIAL EXCEDENTE S/ACARREO

m3/DIA

EQ.

Descripcin Recurso

19,237.75

Precio S/.

Parcial S/.

CAPATAZ

14.40

285.90

PEON

11.05

8,764.43
9,050.33

CAMION VOLQUETE 4X2 140-210 HP 6 M3.

100.00

HERRAMIENTAS MANUALES

9,050.33

9,915.91
271.51
10,187.42

01.06.09

CONEXIONES DOMICILIARIAS-DESAGUE

und/DIA
Descripcin Recurso

EQ.

75,535.68

Precio S/.

Parcial S/.

CAPATAZ

14.40

760.32

OPERARIO

12.88

13,601.28

OFICIAL

12.05

6,362.40

PEON

11.05

5,834.40
26,558.40

ARENA GRUESA

25.00

660.00

CACHIMBA 45 DE 200 MM X 160 MM CON ACCESORIOS

45.00

11,880.00

CEMENTO PORTLAND TIPO I (42.5KG)

21.50

1,702.80

CAJA CONCRETO SIMPLE DESAGUE DE 0.30X0.60 M

21.24

5,607.36

TAPA CONCRETO ARMADO DESAG 0.30X0.60 M

14.75

3,894.00

TUBERIA PVC SAL 6"

15.93

25,233.12
48,977.28

01.07.01

MITIGACION DE IMPACTO AMBIENTAL

GLB/DIA

945.0000
EQ.

4,500.00

Descripcin Recurso

Precio S/.

Parcial S/.

MITIGACION DE IMPACTO AMBIENTAL

1,500.00

4,500.00

945.0000

4,500.00
02.01.01

TRAZO Y REPLANTEO ZANJAS P/TUBERIA

m/DIA

EQ.

Descripcin Recurso

3,379.57

Precio S/.

Parcial S/.

TOPOGRAFO

14.40

383.18

OPERARIO

12.88

342.73

PEON

11.05

585.32
1,311.23

YESO

5.00

PINTURA ESMALTE SINTETICO

50.00

621.72
621.72
1,243.44

NIVEL
MIRA TOPOGRAFICA
TEODOLITO

10.00

266.10

6.00

159.66

15.00

399.14
824.90

02.01.02

ROTURA PAVIMENTO ASFALTO e=2" (Manual)

m2/DIA

EQ.

Descripcin Recurso

119.29

Precio S/.

Parcial S/.

CAPATAZ

14.40

1.18

OPERARIO

12.88

21.16

PEON

11.05

18.16
40.50

HERRAMIENTAS MANUALES

40.50

0.81

CORTADOR DE PAVIMENTO

95.00

77.98
78.79

02.01.03

OFICINA Y CASETA DE GUARDIANIA

m2/DIA

2,776.7100
EQ.

Descripcin Recurso
OFICINA Y CASETA DE GUARDIANIA

2,776.71

Precio S/.

Parcial S/.

69.21

2,776.71

2,776.7100

2,776.71
02.01.04

ALMACEN DE OBRA

m2/DIA

4,461.9700
EQ.

4,461.97

Descripcin Recurso

Precio S/.

Parcial S/.

ALMACEN DE OBRA

69.21

4,461.97

4,461.9700

4,461.97
02.01.05
mes/DIA

IMPLEMENTOS DE SEGURIDAD

2,726.9000
EQ.

2,726.90

Descripcin Recurso
IMPLEMENTOS DE SEGURIDAD

Precio S/.

Parcial S/.

545.38

2,726.90

2,726.9000

2,726.90
02.01.06

ENERGIA ELECTRICA PARA LA OBRA

mes/DIA

297.5000
EQ.

Descripcin Recurso
ENERGIA ELECTRICA

297.50

Precio S/.

Parcial S/.

59.50

297.50

297.5000

297.50
02.01.07

AGUA PARA LA CONSTRUCCION

GLB/DIA

500.0000
EQ.

Descripcin Recurso
AGUA PARA LA CONSTRUCCION

500.00

Precio S/.

Parcial S/.

500.00

500.00
500.00

02.02.01

EXCAVAC. DE ZANJA, TERRENO NORMAL TUB. 4" HASTA 1.50 M

m/DIA

EQ.

Descripcin Recurso

24,066.57

Precio S/.

Parcial S/.

CAPATAZ

14.40

157.57

PEON

11.05

4,885.93
5,043.50

HERRAMIENTAS MANUALES
RETROEXCAVADORA S/O 75-110 HP,.50-1.3Y3

5,043.50

252.18

170.00

18,770.89
19,023.07

02.02.02

REFINE Y NIVELACION DE ZANJA NORMAL DE 4" PARA AGUA POTABLE.

m/DIA

EQ.

Descripcin Recurso

8,524.16

Precio S/.

Parcial S/.

CAPATAZ

14.40

372.43

PEON

11.05

5,740.55
6,112.98

MATERIAL DE RELLENO CLASIFICADO

14.16

2,288.92
2,288.92

HERRAMIENTAS MANUALES

6,112.98

122.26
122.26

02.02.03

CAMA DE APOYO P/TUBO DE AGUA POTABLE DE 4", E=0.60

m/DIA
Descripcin Recurso

EQ.

14,896.68

Precio S/.

Parcial S/.

CAPATAZ

14.40

476.29

OPERARIO

12.88

4,269.72

OFICIAL

12.05

3,994.57
8,740.58

500.0000

ARENILLA

30.00

5,893.88
5,893.88

HERRAMIENTAS MANUALES

8,740.58

262.22
262.22

02.02.04

RELLENO Y COMPACTACION DE ZANJA C/MAT. PREST. 0.60 X 0.20 (SOBRE CAMA)

m/DIA

EQ.

Descripcin Recurso

15,357.89

Precio S/.

Parcial S/.

CAPATAZ

14.40

286.49

PEON

11.05

6,595.21
6,881.70

ARENILLA

30.00

AGUA

10.00

4,476.38
671.46
5,147.84

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 4 HP

6,881.70

344.09

15.00

2,984.26
3,328.35

02.02.05

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3/DIA

EQ.

Descripcin Recurso

8,956.80

Precio S/.

Parcial S/.

CAPATAZ

14.40

238.14

PEON

11.05

5,496.00
5,734.14

AGUA

10.00

621.72
621.72

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 7 HP

5,734.14

114.68

15.00

2,486.26
2,600.94

02.02.06

RELLENO CON MATERIAL PROPIO C/COMPACTADO

m3/DIA

EQ.

Descripcin Recurso

7,767.48

Precio S/.

Parcial S/.

CAPATAZ

14.40

204.12

PEON

11.05

4,711.45
4,915.57

AGUA

10.00

621.72
621.72

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 7 HP

4,915.57

98.31

15.00

2,131.88
2,230.19

02.02.07

ELIMINACION MATERIAL EXCEDENTE S/ACARREO

m3/DIA
Descripcin Recurso
CAPATAZ

EQ.

13,484.71

Precio S/.

Parcial S/.

14.40

124.76

OPERARIO

12.88

1,332.48

OFICIAL

12.05

207.25

PEON

11.05

381.53
2,046.02

CAMION VOLQUETE 4X2 140-210 HP 6 M3.

100.00

HERRAMIENTAS MANUALES
CARGADOR S/LLANTAS 125 HP 2.5 YD3.

8,625.44

2,046.02

61.38

160.00

2,751.87
11,438.69

02.03.01

SUMINISTRO E INSTALACION DE TUBERIA P.V.C. 4" (AGUA POTABLE)+PRUEB. HIDRAULICO.

m/DIA

EQ.

Descripcin Recurso

87,037.97

Precio S/.

Parcial S/.

CAPATAZ

14.40

286.49

OFICIAL

12.05

2,397.34

PEON

11.05

6,595.18
9,279.01

HIPOCLORITO DE CALCIO AL 70%

67.23

167.19

LUBRICANTE P/TUBERIA DE UNION FLEXIBLE

47.20

117.38

AGUA

10.00

547.11

6.43

2,664.03

TUB. PVC SAP PRESION C-7.5 DN 110 mm - 4"

26.94

70,346.09

TAPON HEMBRA SP PVC SAP P/AGUA DE 4"

23.60

ANILLO DE JEBE A-7.5 DE 110 MM

117.38
73,959.18

HERRAMIENTAS MANUALES
BALDE DE PRUEBA-TAPON-ABRAZ. Y ACCESORIOS

9,279.01

278.37

17.70

3,521.41
3,799.78

02.03.02

EMPALME A TUBERIA PVC 110mm EXISTENTE

und/DIA

EQ.

Descripcin Recurso

293.24

Precio S/.

Parcial S/.

CAPATAZ

14.40

17.28

OPERARIO

12.88

154.56

PEON

11.05

88.40
260.24

CIERRE DE CIRCUITO P/ 3" - 6" SEDAPAL

25.00

25.00
25.00

TARRAJA P/TUBERIA A.C.

2.00

8.00
8.00

02.03.03

SUM. E INST. TAPON PVC 110mm C/A

und/DIA
Descripcin Recurso

EQ.

80.51

Precio S/.

Parcial S/.

CAPATAZ

14.40

1.92

OPERARIO

12.88

17.17

PEON

11.05

14.73
33.82

LUBRICANTE P/TUBERIA DE UNION FLEXIBLE

47.20

1.00

TAPON PVC C-7.5 DE 110 MM

22.00

44.00
45.00

HERRAMIENTAS MANUALES

33.82

1.69
1.69

02.03.04

SUM. E INST. TEE HE DUCTIL 110mm X 110mm ISO 2531 LUFLEX C/A

und/DIA

EQ.

Descripcin Recurso

3,983.85

Precio S/.

Parcial S/.

CAPATAZ

14.40

13.45

OPERARIO

12.88

120.22

PEON

11.05

103.14
236.81

LUBRICANTE P/TUBERIA DE UNION FLEXIBLE


TEE R PVC SAP P/AGUA DE 4"

47.20

7.00

266.30

3,728.20
3,735.20

HERRAMIENTAS MANUALES

236.81

11.84
11.84

02.03.05

SUM. E INST. CODO HE DUCTIL 110mm X 90 ISO 2531 LUFLEX C/A

und/DIA

EQ.

Descripcin Recurso

725.16

Precio S/.

Parcial S/.

CAPATAZ

14.40

3.84

OPERARIO

12.88

34.35

PEON

11.05

29.47
67.66

LUBRICANTE P/TUBERIA DE UNION FLEXIBLE


CODO DE 90 PVC SAP P/AGUA DE 110 mm - 4""

47.20

2.00

163.03

652.12
654.12

HERRAMIENTAS MANUALES

67.66

3.38
3.38

02.03.06

SUM. E INST. DE CRUZ HE DUCTIL110mm x110mm ISO 2531 PIEZAS LUFLEX

und/DIA

EQ.

Descripcin Recurso

1,801.29

Precio S/.

Parcial S/.

CAPATAZ

14.40

7.68

OPERARIO

12.88

68.70

PEON

11.05

58.94
135.32

CRUZ HE DUCTIL 110mm X 110mm ISO 2531 LUPLEX

165.00

1,320.00

8.00

256.00

CEMENTO PORTLAND TIPO I (42.5KG)

21.50

34.40

HORMIGON

25.00

48.00

AGUA

10.00

ANILLO DE JEBE P/TUBO PVC DN 110mm

0.80
1,659.20

HERRAMIENTAS MANUALES

135.32

6.77
6.77

02.03.07

SUM. E INST. VALVULA 110 MM T/COMPUERTA LUFLEX C/A

und/DIA
Descripcin Recurso

EQ.

9,862.03

Precio S/.

Parcial S/.

CAPATAZ

14.40

46.08

OPERARIO

12.88

412.16

PEON

11.05

353.60
811.84

CAJA DE CONCRETO PARA VALVULA

90.86

1,453.76

TAPA DE FF PARA VALVULA

23.60

377.60

TUB. C.S.N. 8" - EC

17.70

368.16

425.63

6,810.08

VALVULA COMPUERTA F.F. DN 110 mm - 4"

9,009.60
HERRAMIENTAS MANUALES

811.84

40.59
40.59

02.03.08

INSTALACION DE GRIFO CONTRA INCENDIO - POSTE DE 2 BOCAS HD

und/DIA

EQ.

Descripcin Recurso

2,290.02

Precio S/.

Parcial S/.

CAPATAZ

14.40

17.28

OFICIAL

12.05

48.20

PEON

11.05

88.40
153.88

CLAVOS Fo No C/C 3/4"

4.48

0.27

PIEDRA CHANCADA DE 1/2"

39.67

8.65

ARENA GRUESA

25.00

3.05

CEMENTO PORTLAND TIPO I (42.5KG)

21.50

38.36

CAJA DE C SIMPLE P/GRIFO C/I


GRIFO CONTRA INCENDIO T/POSTE 2 BOCAS
MADERA TORNILLO INC.CORTE P/ENCOFRADO

59.00

118.00

980.00

1,960.00

6.44

7.81
2,136.14

02.04.01

TRAZO Y REPLANTEO CONEXION DOMICILIARIA

und/DIA

EQ.

Descripcin Recurso

1,116.37

Precio S/.

Parcial S/.

TOPOGRAFO

14.40

253.57

CAPATAZ

14.40

25.47

PEON

11.05

388.86
667.90

TIZA

8.85

23.36

MADERA TORNILLO CEPILLADA

7.34

19.38
42.74

HERRAMIENTAS MANUALES

667.90

33.40

TEODOLITO

94.40

206.85

NIVEL

75.52

165.48
405.73

02.04.02

EXCAVACION MANUAL ZANJA T.N. a=0.60m h< 1.40 m

m/DIA
Descripcin Recurso

EQ.

35,972.12

Precio S/.

Parcial S/.

TOPOGRAFO

14.40

10,812.45

CAPATAZ

14.40

2,703.49

PEON

11.05

20,743.22
34,259.16

HERRAMIENTAS MANUALES

34,259.16

1,712.96
1,712.96

02.04.03

REFINE Y NIVELACION EN TERRENO NORMAL ZANJA a= 0.60

m/DIA

EQ.

Descripcin Recurso

6,757.83

Precio S/.

Parcial S/.

CAPATAZ

14.40

635.58

PEON

11.05

4,874.86
5,510.44

MATERIAL DE RELLENO CLASIFICADO

14.16

971.87
971.87

HERRAMIENTAS MANUALES

5,510.44

275.52
275.52

02.04.04

CAMA DE ARENA GRUESA ZANJA TN/TSR

m/DIA

EQ.

Descripcin Recurso

3,407.71

Precio S/.

Parcial S/.

CAPATAZ

14.40

89.71

PEON

11.05

691.91
781.62

ARENA GRUESA

25.00

2,587.01
2,587.01

HERRAMIENTAS MANUALES

781.62

39.08
39.08

02.04.05

RELLENO COMP. ZANJA TUBERIA HASTA 1.50M

m/DIA

EQ.

Descripcin Recurso

26,480.40

Precio S/.

Parcial S/.

CAPATAZ

14.40

506.33

PEON

11.05

3,888.92
4,395.25

MATERIAL DE RELLENO CLASIFICADO

14.16

AGUA

10.00

16,147.97
570.20
16,718.17

HERRAMIENTAS MANUALES
COMPACTADOR VIBR. TIPO PLANCHA 4 HP

4,395.25

87.91

15.00

5,279.07
5,366.98

02.04.06

PRUEBA HIDRAULICA+DESINFECCION TUB. 4"(100MM) A ZANJA TAPADA

m/DIA
Descripcin Recurso

EQ.

2,985.20

Precio S/.

Parcial S/.

CAPATAZ

14.40

101.88

PEON

11.05

778.25
880.13

HIPOCLORITO DE CALCIO AL 70%

67.23

646.01

646.01
BALDE PRUEBA-TAPON -ABRAZ. Y ACCESORIOS
CAMION CISTERNA 4x2 (AGUA) 122 HP 1,500

5.90

415.54

147.50

1,043.52
1,459.06

02.04.07

CONEXION DOMICILIARIA DE AGUA

und/DIA

EQ.

Descripcin Recurso

90,719.64

Precio S/.

Parcial S/.

CAPATAZ

14.40

760.32

OPERARIO

12.88

13,601.28

PEON

11.05

5,834.40
20,196.00

MEDIDOR DE AGUA POTABLE PARA DIAMETRO DE 1/2"

98.00

25,872.00

TAPA TERMOPLASTICOS P/CAJA DE MEDIDOR

29.41

7,764.24

ABRAZADERA DE PVC 110 MMX1/2"

22.00

5,808.00

4.72

2,492.16

CORPORATION PVC DE 1/2"

14.87

3,925.68

UNION DE PVC C-7.5 DE 1/2"

3.54

1,869.12

VALVULA COMPUERTA DE PVC DE 1/2"

14.75

7,788.00

CAJA DE CONCRETO P/MEDIDOR AGUA

29.50

7,788.00

TUB. PVC SAP PRESION P/AGUA C-10 R. 1/2"

3.29

5,211.36

CODO PVC SAP 1/2

1.12

NIPLE Y TUERCA DE PVC DE 1/2"

591.36
69,109.92

HERRAMIENTAS MANUALES

20,196.00

1,413.72
1,413.72

02.05.01

BASE GRANULAR DE 0.20m (MANUAL)

m2/DIA

EQ.

Descripcin Recurso

153.11

Precio S/.

Parcial S/.

CAPATAZ

14.40

0.44

OPERARIO

12.88

15.87

OFICIAL

12.05

14.85

PEON

11.05

20.42
51.58

MATERIAL AFIRMADO

25.00

AGUA

10.00

86.63
7.70
94.33

HERRAMIENTAS MANUALES

51.58

2.58

COMPACTADOR VIBR. TIPO PLANCHA 7 HP

15.00

4.62
7.20

02.05.02

IMPRIMACION BITUMINOSA (MANUAL)

m2/DIA
Descripcin Recurso

EQ.

75.00

Precio S/.

Parcial S/.

OPERARIO

12.88

1.17

OFICIAL

12.05

1.10

PEON

11.05

4.03
6.30

ARENA GRUESA

25.00

1.54

ASFALTO RC-250

12.40

55.38

KEROSENE INDUSTRIAL

12.40

11.46
68.38

HERRAMIENTAS MANUALES

6.30

0.32
0.32

02.05.03

CARPETA ASFALTICA EN FRIO DE 2" (MANUAL)

m/DIA
Descripcin Recurso

EQ.

456.39

Precio S/.

Parcial S/.

CAPATAZ

14.40

2.37

OPERARIO

12.88

21.16

OFICIAL

12.05

9.89

PEON

11.05

27.23
60.65

PIEDRA CHANCADA DE 1/2"

39.67

ARENA GRUESA

25.00

55.29
16.94

ASFALTO RC-250

12.40

284.53

KEROSENE INDUSTRIAL

12.40

0.76

PETROLEO

12.40

2.29
359.81

HERRAMIENTAS MANUALES

60.65

COMPACTADOR VIBR. TIPO PLANCHA 7 HP

15.00

3.03
6.17

COCINA DE ASFALTO 320 GLNS

65.00

26.73
35.93

E OBRA
MES2

MES3

MES4

MES5

3,451.4947

223.1017
1,710.0743

1,421.6603

96.6583
3,451.4947
13,961.9940

320.2440
7,390.7820

6,019.6380

231.3300
13,961.9940
27,267.3596

306.9424
2,360.6451

17,308.6178
4,006.6271

80.0271
3,204.5000
27,267.3596
22,637.5200

286.4900
17,587.1400

1,243.4400

536.2100
2,984.2400

19,381.2383 23,853.8317

288.0307
354.4993
8,829.8017 10,867.4483

9,989.8724 12,295.2276
273.5334
336.6566
19,381.2383 23,853.8317
4,904.5752

549.0464
4,212.6784

142.8504
4,904.5752
85,267.1435

2,188.2245
4,698.4520
1,831.1205
10,076.4730

161.3975
1,497.4465
2,065.3435
1,497.4465
58,906.8095
57.6840

1,614.7835
108.1355
563.8270
85,267.1435
41,291.4349

2,752.7623

300.0628
8,051.4977
1,757.6233
7,137.7953

20.0042
536.7665
117.1749
475.8530

21.4465
1,558.8837
40.2837
1,462.3256
701.7907
7,686.0000
3,976.3256
209.0233
1,920.2791

1.4298
103.9256
2.6856
97.4884
46.7860
512.4000
265.0884
13.9349
128.0186

344.9372
4,725.5023
390.6907
1,006.9674
41,291.4349

22.9958
315.0335
26.0460
67.1312
2,752.7623

20,895.3257

3,482.5543

118.4914

19.7486

3,179.5200
991.5429
2,909.6229

529.9200
165.2571
484.9371

8.4686
615.6000
18.9686
726.8143
353.5114
3,847.8857
1,570.2429
758.3143

1.4114
102.6000
3.1614
121.1357
58.9186
641.3143
261.7071
126.3857

143.9829
5,100.4200
154.2857
397.6543
20,895.3257

23.9971
850.0700
25.7143
66.2757
3,482.5543
403.3400

11.5200
51.5200
96.4000
176.8000

0.7900
2.5000
43.0000
4.0000

16.8100
403.3400
2,331.9800

264.4000
236.4900
403.8900

429.0000
429.0000

183.6100
110.1700
275.4200
2,331.9800
6,307.4350 44,152.0450

706.1000 4,942.7000
5,417.6238 37,923.3663

183.7113 1,285.9788
6,307.4350 44,152.0450
2,617.1500

580.6900
116.1400
291.5600
893.1000

94.0700
241.9600
399.6300
2,617.1500
5,675.3036

1,527.9664

258.9364
1,991.4503

69.7136
536.1597

3,312.4000

891.8000

112.5170
5,675.3036

30.2930
1,527.9664

21,233.3745

7,962.5155

239.0182
1,838.2618

89.6318
689.3482

13,478.4000
3,120.0000

5,054.4000
1,170.0000

62.3200
2,495.3745
21,233.3745

23.3700
935.7655
7,962.5155

8,591.2365

7,029.1935

108.7240
6,674.5525

88.9560
5,460.9975

471.9000

386.1000

203.5000
1,132.5600
8,591.2365

166.5000
926.6400
7,029.1935
3,774.0500

88.9600
786.8300
675.0400

230.7300

1,081.2900
911.2000
3,774.0500
6,412.5833 12,825.1667

95.3000
2,921.4767

190.6000
5,842.9533

3,305.3033 6,610.6067
90.5033
181.0067
6,412.5833 12,825.1667
75,535.6800

760.3200
13,601.2800
6,362.4000
5,834.4000

660.0000
11,880.0000
1,702.8000
5,607.3600
3,894.0000
25,233.1200
75,535.6800

1,350.0000

1,395.0000

810.0000

1,350.0000

1,395.0000

810.0000

3,379.5700

383.1800
342.7300
585.3200

621.7200
621.7200

266.1000
159.6600
399.1400
3,379.5700
119.2900

1.1800
21.1600
18.1600

0.8100
77.9800
119.2900

22,562.4094

1,504.1606

147.7219
4,580.5594

9.8481
305.3706

236.4188
17,597.7094
22,562.4094

15.7613
1,173.1806
1,504.1606

2,994.9751

5,529.1849

130.8538
2,016.9500

241.5762
3,723.6000

804.2151

1,484.7049

42.9562
2,994.9751

79.3038
5,529.1849

3,339.0381

9,825.4698

1,732.1721

106.7587
957.0426
895.3687

314.1487
2,816.1983
2,634.7164

55.3826
496.4791
464.4849

1,321.0924

3,887.4528

685.3349

58.7757
3,339.0381

172.9536
9,825.4698

30.4907
1,732.1721

3,290.9764 12,066.9136

61.3907
1,413.2593

225.0993
5,181.9507

959.2243
143.8843

3,517.1557
527.5757

73.7336
270.3564
639.4843 2,344.7757
3,290.9764 12,066.9136
746.4000

8,210.4000

19.8450
458.0000

218.2950
5,038.0000

51.8100

569.9100

9.5567
207.1883
746.4000

105.1233
2,279.0717
8,210.4000

1,874.9090

5,892.5710

49.2703
1,137.2466

154.8497
3,574.2034

150.0703

471.6497

23.7300
514.5917
1,874.9090

74.5800
1,617.2883
5,892.5710
13,484.7100

124.7600

1,332.4800
207.2500
381.5300

8,625.4400
61.3800
2,751.8700
13,484.7100
27,852.1504 59,185.8196

91.6768
767.1488
2,110.4576

194.8132
1,630.1912
4,484.7224

53.5008
113.6892
37.5616
79.8184
175.0752
372.0348
852.4896 1,811.5404
22,510.7488 47,835.3412
37.5616
79.8184

89.0784
189.2916
1,126.8512 2,394.5588
27,852.1504 59,185.8196
293.2400

17.2800
154.5600
88.4000

25.0000

8.0000
293.2400
80.5100

1.9200
17.1700
14.7300

1.0000
44.0000

1.6900
80.5100
3,983.8500

13.4500
120.2200
103.1400

7.0000
3,728.2000

11.8400
3,983.8500
725.1600

3.8400
34.3500
29.4700

2.0000
652.1200

3.3800
725.1600
1,794.5200

7.6800
68.7000
58.9400

1,320.0000
256.0000
34.4000
48.0000
0.8000
1,794.5200
6.7700

9,862.0300

46.0800
412.1600
353.6000

1,453.7600
377.6000
368.1600
6,810.0800

40.5900
9,862.0300
2,290.0200

17.2800
48.2000
88.4000

0.2700
8.6500
3.0500
38.3600
118.0000
1,960.0000
7.8100
2,290.0200
1,116.3700

253.5700
25.4700
388.8600

23.3600
19.3800

33.4000
206.8500
165.4800
1,116.3700
8,393.4947 27,578.6253

2,522.9050 8,289.5450
630.8143 2,072.6757
4,840.0847 15,903.1353

399.6907 1,313.2693
8,393.4947 27,578.6253
1,206.7554

5,551.0746

113.4964
870.5107

522.0836
4,004.3493

173.5482

798.3218

49.2000
1,206.7554

226.3200
5,551.0746
3,407.7100

89.7100
691.9100

2,587.0100

39.0800
3,407.7100
14,443.8545 12,036.5455

276.1800
2,121.2291

230.1500
1,767.6909

8,807.9836
311.0182

7,339.9864
259.1818

47.9509
39.9591
2,879.4927 2,399.5773
14,443.8545 12,036.5455
2,985.2000

101.8800
778.2500

646.0100

415.5400
1,043.5200
2,985.2000
57,730.6800 32,988.9600

483.8400
8,655.3600
3,712.8000

276.4800
4,945.9200
2,121.6000

16,464.0000
4,940.8800
3,696.0000
1,585.9200
2,498.1600
1,189.4400
4,956.0000
4,956.0000
3,316.3200
376.3200

9,408.0000
2,823.3600
2,112.0000
906.2400
1,427.5200
679.6800
2,832.0000
2,832.0000
1,895.0400
215.0400

899.6400
514.0800
57,730.6800 32,988.9600
153.1100

0.4400
15.8700
14.8500
20.4200

86.6300
7.7000

2.5800
4.6200
153.1100
75.0000

1.1700
1.1000
4.0300

1.5400
55.3800

11.4600

0.3200
75.0000
456.3900

2.3700
21.1600
9.8900
27.2300

55.2900
16.9400
284.5300
0.7600
2.2900

3.0300
6.1700
26.7300
456.3900

CRONOGRAMA VALORIZADO
PROYECTO: CONSTRUCCION DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y DESAGUE EN LA ASOC. VIV. LA PRADERA
PARTIDA DESCRIPCIN
01
RED DE ALCANTARILLADO Y CONEXIONES DOMICILIARIAS
01.01
OBRAS PROVISIONALES
01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

01.01.02

SEALIZACION - DESVIO EN VIA

01.02
01.02.01

UND.

METRADO

C.U.

PARCIAL

MES1

MES2

MES3

MES4

MES5

TOTAL

650,725.39
5,781.20
und
GLB

1.00
9.00

560.48
580.08

TRABAJOS PRELIMINARES

560.48
5,220.72

560.48
5,220.72

560.48
5,220.72

15,107.45

LIMPIEZA DE TERRENO MANUAL

m2

2,486.87

2.59

6,440.99

6,440.99

6,440.99

01.02.02

TRAZO Y REPLANTEO ZANJAS P/TUBERIA

2,486.87

1.36

3,382.14

3,382.14

3,382.14

01.02.03

MOVILIZACION Y DESMOVILIZACION DE PERSONAL OBRERO

GLB

3.00

1,761.44

5,284.32

5,284.32

5,284.32

01.03
01.03.01

MOVIMIENTO DE TIERRAS
EXCAVAC. DE ZANJA, TERRENO NORMAL TUB. 8-12" HASTA 1.50 M

180,366.11
m
m
m

2,486.87
2,486.87
2,786.87

10.19
5.95
8.35

25,341.21
14,796.88
23,270.36

25,341.21
11,340.63
9,308.00

m
m

2,486.87
2,486.87

17.01
9.11

42,301.66
22,655.39

15,044.06

RELLENO CON MATERIAL PROPIO C/COMPACTADOR

01.03.06

ELIMINACION MATERIAL EXCEDENTE S/ACARREO

m3

2,506.76

17.25

43,241.61

01.03.07

EXCAVACION MANUAL BUZON T.C.

m3

255.29

34.31

SUMINISTRO E INSTALACION DE TUBERIA P.V.C. 8" (ALCANTARILLADO) + PRUEBA


m HIDRAULICA2,486.87

62.34

8,759.00
155,031.48
155,031.48
83,966.02
59,184.72
24,377.94
403.36
205,973.13

01.03.02

REFINE Y NIVELACION DE ZANJA NORMAL DE 8-12" PARA ALCNT.

01.03.03

CAMA DE APOYO P/TUBO DE ALCANT. 8-12"

01.03.04

RELLENO SOBRE CAMA MATERIAL PRESTAMO SOBRE CAMA

01.03.05

01.04
01.04.01

SUMINISTRO Y COLOCACION DE TUBERIA

01.05
01.05.01

BUZONES DE CONCRETO
BUZON ESTANDAR DE CONCRETO HASTA 2.00 m

28.00
9.00
4.00

2,113.74
2,708.66
100.84

m
1,716.00
m
1,716.00
REFINE Y NIVELACION EN TERRENO NORMAL PARA TUBERIA PVC DE 2" A 6" EN
m ALCANTARILLADO
1,716.00
CAMA DE APOYO P/TUBO DE ALCANT. 6"
m
1,716.00
RELLENO SOBRE CAMA MATERIAL PRESTAMO SOBRE CAMA
m
1,716.00
RELLENO CON MATERIAL PROPIO C/COMPACTADOR
m
1,716.00
PRUEBA HIDRAULICA+DESINFECCION TUB.4"(100MM) A ZANJA TAPADA
m
1,716.00
ELIMINACION MATERIAL EXCEDENTE S/ACARREO
m3
1,115.40
CONEXIONES DOMICILIARIAS-DESAGUE
und
264.00

1.36
29.41
1.53
4.19
17.01
9.11
2.19
17.25
286.12

01.05.02

BUZON ESTANDAR DE CONCRETO HASTA 5.00 m

01.05.03

EMPALME A BUZON Y/O RED EXISTENTE EN DIAMETRO 8 - 12 "

01.06
01.06.01

RED DE CONEXIONES DOMICILIARIAS DE ALCANTARILLADO 6"

01.06.02
01.06.03
01.06.04
01.06.05
01.06.06
01.06.07
01.06.08
01.06.09

01.07
01.07.01
02
02.01
02.01.01
02.01.02
02.01.03

TRAZO Y REPLANTEO ZANJAS P/TUBERIA

1,500.00

2,486.87
15.40
40.12

1.36
7.74
69.21

64.47
5.00
5.00
1.00

69.21
545.38
59.50
500.00

4,461.97
2,726.90
297.50
500.00

2,486.87
2,486.87
2,486.87
1,243.44
1,243.44
1,243.44

9.67
3.43
6.00
12.35
7.20
6.24

93,068.22
24,048.03
8,529.96
14,921.22
15,356.48
8,952.77
7,759.07

IMPACTO AMBIENTAL
MITIGACION DE IMPACTO AMBIENTAL

GLB

RED DE AGUA POTABLE Y CONEXIONES DOMICILIARIAS


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO ZANJAS P/TUBERIA
ROTURA PAVIMENTO ASFALTO e=2" (Manual)
OFICINA Y CASETA DE GUARDIANIA
ALMACEN DE OBRA

02.01.05

IMPLEMENTOS DE SEGURIDAD

02.01.06

ENERGIA ELECTRICA PARA LA OBRA

02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06

3.00

2,333.76
50,467.56
2,625.48
7,190.04
29,189.16
15,632.76
3,758.04
19,240.65
75,535.68
4,500.00
4,500.00
381,550.02
14,264.42
3,382.14
119.20
2,776.71

EXCAVAC. ZANJA T.S.R. A PULSO TUB. 6" MENOR= 1 M

02.01.04

02.01.07

und
und
und

AGUA PARA LA CONSTRUCCION

m
m2
m2
m2
mes
mes
GLB

MOVIMIENTO DE TIERRAS
EXCAVAC. DE ZANJA, TERRENO NORMAL TUB. 4" HASTA 1.50 M

m
REFINE Y NIVELACION DE ZANJA NORMAL DE 4" PARA AGUA POTABLE.
m
CAMA DE APOYO P/TUBO DE AGUA POTABLE DE 4", E=0.60
m
RELLENO Y COMPACTACION DE ZANJA C/MAT. PREST. 0.60 X 0.20 (SOBRE CAMA)
m
RELLENO CON MATERIAL PROPIO SELECCIONADO
m3
RELLENO CON MATERIAL PROPIO C/COMPACTADO
m3

3,456.25
13,962.36

25,341.21
14,796.88
23,270.36

27,257.60
22,655.39

42,301.66
22,655.39

19,381.24

23,860.37

43,241.61

3,853.59

4,905.41

8,759.00

69,764.03

85,267.45

155,031.48

15,140.19

41,291.43
20,895.33

2,333.76
6,307.44

2,753.09
3,482.61
403.36

44,160.13
2,625.48
5,675.30
21,233.37
8,591.24
6,412.58
75,535.68

945.00

1,350.00

1,395.00

59,184.72
24,377.94
403.36

1,514.74
7,955.79
7,041.52
3,758.04
12,828.07

810.00

3,382.14
119.20

2,333.76
50,467.56
2,625.48
7,190.04
29,189.16
15,632.76
3,758.04
19,240.65
75,535.68
4,500.00

2,776.71

3,382.14
119.20
2,776.71

4,461.97
2,726.90
297.50
500.00

4,461.97
2,726.90
297.50
500.00
22,562.41
2,994.98
3,339.04
3,290.98
746.40
1,874.91

1,485.62
5,534.98
9,850.01
12,065.50
8,206.37
5,884.16

1,732.17

24,048.03
8,529.96
14,921.22
15,356.48
8,952.77
7,759.07

CRONOGRAMA VALORIZADO
PROYECTO: CONSTRUCCION DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE Y DESAGUE EN LA ASOC. VIV. LA PRADERA
PARTIDA DESCRIPCIN
02.02.07

02.03
02.03.01

ELIMINACION MATERIAL EXCEDENTE S/ACARREO

UND.

METRADO

m3

1,293.17

C.U.

PARCIAL
10.44

TUBERIA DE PVC Y ACCESORIOS

MES1

MES2

MES3

13,500.69

MES4

MES5

TOTAL

13,500.69

13,500.69

59,213.17

87,065.32
293.24

106,101.72

SUMINISTRO E INSTALACION DE TUBERIA P.V.C. 4" (AGUA POTABLE)+PRUEB. m


HIDRAULICO.

2,486.87
1.00

35.01
293.24

87,065.32
293.24

27,852.15
293.24

02.03.02

EMPALME A TUBERIA PVC 110mm EXISTENTE

und

02.03.03

SUM. E INST. TAPON PVC 110mm C/A

und

2.00

40.27

80.54

80.54

80.54

02.03.04

SUM. E INST. TEE HE DUCTIL 110mm X 110mm ISO 2531 LUFLEX C/A

und

14.00

284.57

3,983.98

3,983.98

3,983.98

02.03.05

SUM. E INST. CODO HE DUCTIL 110mm X 90 ISO 2531 LUFLEX C/A

und

4.00

181.30

725.20

725.20

725.20

02.03.06

SUM. E INST. DE CRUZ HE DUCTIL110mm x110mm ISO 2531 PIEZAS LUFLEX

und

8.00

225.17

1,801.36

1,801.36

1,801.36

02.03.07

SUM. E INST. VALVULA 110 MM T/COMPUERTA LUFLEX C/A

und

16.00

616.38

9,862.08

9,862.08

9,862.08

02.03.08

INSTALACION DE GRIFO CONTRA INCENDIO - POSTE DE 2 BOCAS HD

und

2.00

1,145.00

2,290.00

2,290.00

TRAZO Y REPLANTEO CONEXION DOMICILIARIA

und

264.00

4.23

2,290.00
167,430.98
1,116.72

02.04.02

EXCAVACION MANUAL ZANJA T.N. a=0.60m h< 1.40 m

02.04.03

REFINE Y NIVELACION EN TERRENO NORMAL ZANJA a= 0.60

m
m

1,055.92
1,055.92

34.06
6.40

35,964.64
6,757.89

02.04.04

CAMA DE ARENA GRUESA ZANJA TN/TSR

1,055.92

3.23

3,410.61

3,410.61

02.04.05

RELLENO COMP. ZANJA TUBERIA HASTA 1.50M


PRUEBA HIDRAULICA+DESINFECCION TUB. 4"(100MM) A ZANJA TAPADA

1,055.92
1,055.92
264.00

25.07
2.83
343.64

m2
m2
m

15.40
15.40
15.40

9.95
4.87
29.64

26,471.91
2,988.25
90,720.96
684.68
153.22
75.00
456.46

14,443.85

02.04.06

m
m
und

02.04
02.04.01

02.04.07

02.05
02.05.01

CONEXIONES DOMICILIARIAS

CONEXION DOMICILIARIA DE AGUA

OBRAS DE REPOSICION DE ASFALTO


BASE GRANULAR DE 0.20m (MANUAL)

02.05.02

IMPRIMACION BITUMINOSA (MANUAL)

02.05.03

CARPETA ASFALTICA EN FRIO DE 2" (MANUAL)

============================================
TOTAL PRESUPUESTO

=========
1,032,275.41

1,116.72
8,393.49
1,206.76

1,116.72
27,571.15
5,551.13

57,730.68

=========

=========

=========

=========

35,964.64
6,757.89
3,410.61
12,028.06
2,988.25
32,990.28

26,471.91
2,988.25
90,720.96

153.22
75.00
456.46

153.22
75.00
456.46

=========

=========

182,388.44

334,262.26

322,585.70

144,347.75

48,691.27

1,032,275.41

AVANCE PARCIAL (%)

17.67%

32.38%

31.25%

13.98%

4.72%

100.00%

AVANCE ACUMULADO (%)

17.67%

50.05%

81.30%

95.28%

100.00%