Bid Pack 5A,B -Roads,Site Utilities,Substations,Sarface Parking ,Land Scaping and Oasis works KU/KUCP/CO251/10-11 M/s Canadian Consortium Architects & SSH International (CCA/SSH) M/s.Sinohydro Corporation Limited (China) . & M/s. Copri Co
Subject:
Sr.No
Item Description
Temporary Internal Road Stockpile material used in subgrade mix design (1:1) Temporary External Road Stockpile material used in subgrade mix design (1:1) Ring Road (5A) Ring Road (5B) Primary Road (5A) Primary Road (5B) Surface Parking (5A) Surface Parking (5B) Irrigation Tank 1 (5A) Irrigation Tank 2 (5B) Irrigation Tank 3 (5B Irrigation Tank 4 (5A) Basement Ramp 4 (5A) Basement Ramp 3(5B)
Unsuitable Material
Remarks
M3
0.00
Use in subgrade
2 3 4 5 6 7 8 9 10 11 12 13 14
M3 M3 M3 M3 M3 M3 M3 M M
3 3
0.00 -38196 -8325 -24561 -5896 -18965 -19115 -26027 -29253 -36990 -32463 -11310 -12856 -263,957
11638 5929 7281 17945 6471 2263 8874 0 0 0 0 0 0 69,083 20,943 20943
Use in subgrade
M3 M3 M
3
M3 M
3
Total
1 OF 1