Sunteți pe pagina 1din 16

S10

CONSORCIO PALACIOS Y BARRERA

Hoja resumen

Obra

0304004

MEJORAMIENTO DE SERVICIOS EDUCATIVOS DE LA I.E N 31114 - SACHACOTO, DISTRITO DE SURCUB

Localizacin

090717

HUANCAVELICA - TAYACAJA - SURCUBAMBA

Fecha Al

01/12/2009

Presupuesto base

001

INFRAESTRUCTURA EDUCATIVA

494,399.9438

002

SERVICIOS HIGINICOS

003

EQUIPAMIENTO Y MOBILIARIO ESCOLAR

102,578.9500

004

CERCO PERIMTRICO

298,413.9161

005

PATIO CVICO Y CIRCULACIN PEATONAL

23,326.7810

006

TANQUE CISTERNA Y TANQUE ELEVADO

21,066.8231

007

TANQUE SPTICO Y POZOS DE PERCOLACIN

21,214.4749

008

FLETE TERRESTRE

87,336.4698

009

MITIGACIN AMBIENTAL

13,179.8796

60,941.5536

(CD)

COSTO DIRECTO

1,122,458.7919

1,122,458.7919

GASTOS GENERALES
UTILIDAD

S/.

5%

7.3188%

82,150.5138
56,122.9396
-------------

SUBTOTAL

1,260,732.2453

IMPUESTO (IGV)

19%

239,539.1266
--------------

COSTO TOTAL DE OBRA

1,500,271.3719

SUPERVISIN DE OBRA (3% DE COSTO TOTAL DE OBRA)


CAPACITACIN

45,008.1412

(0.02% DE COSTO TOTAL DE OBRA)

3,000.5427
=========

PRESUPUESTO TOTAL

1,548,280.0558

Descompuesto del costo directo

MANO DE OBRA

S/.

317,188.4529

MATERIALES

S/.

738,949.6667

EQUIPOS

S/.

66,320.6675

SUBCONTRATOS

S/.

Total descompuesto costo directo

Nota : Los precios de los recursos no incluyen I.G.V. son vigentes al :

01/12/2009

S/.

1,122,458.7871

Pgina:

DE SURCUBAMBA-TAYACAJA-HUANCAVELICA

TIENE 7 FORMULAS POLINOMICAS

DESAGREGADO DE PRESUPUESTO ANALTICO COSTO DIRECTO


Proyecto

: MEJORAMIENTO DE SERVICOS EDUCATIVOS DE LA I.E. N 31114 - SACHACOTO, DISTRITO DE SURCUBAMBA TAYACAJA - HUANCAVELICA - CODIGO SNIP Nro. 110533

Realizado : Arq. Wilfredo Isaas Palacios Santos - CAP N 8966


Propietario : MUNICIPALIDAD DISTRITAL DE SURCUBAMBA
Ubicacin : Lugar: SACHACOTO; Distrito: SURCUBAMABA; Provincia: TAYACAJA; Departamento: HUANCAVELICA
SUBGENERICA

Tipo de
Genrica
Transacci
del Gasto Subgen Subgenri Especfica
n
rica
ca Detalle

Fecha

ESPECFICA
ESPECIFICA DETALLE

2 GASTOS PRESUPUESTARIOS
6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2 INSTALACIONES EDUCATIVAS
2
OPERADOR DE EQUIPO LIVIANO
OPERADOR DE EQUIPO PESADO
OPERARIO
OFICIAL
PEON
CONTROLADOR OFICIAL
OPERARIO DE TRABAJOS ELECTRICOS
OPERARIO TOPOGRAFO

UND

hh
hh
hh
hh
hh
hh
hh
hh

CANT.

207.26
478.22
16,206.16
4,859.69
14,273.57
7.17
18.67
83.27

4 COSTO DE ADMINISTRACION DIRECTA DE BIENES


ACERO
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
kg
22,971.37
CEMENTO
CEMENTO PORTLAND TIPO I (42.5 kg)
bls
4,920.52
AGREGADOS
ARENA FINA
m3
93.12
TIERRA DE CHACRA O VEGETAL
m3
5.60
PIEDRA CHANCADA DE 1/2"
m3
26.70
PIEDRA CHANCADA DE 3/4"
m3
328.72
PIEDRA GRANDE DE 8"
m3
79.48
PIEDRA MEDIANA DE 6"
m3
19.00
ARENA GRUESA
m3
254.33
HORMIGON (PUESTO EN OBRA)
m3
206.56
FERRETERIA
ALAMBRE NEGRO RECOCIDO # 16
kg
1,260.95
ALAMBRE NEGRO RECOCIDO # 8
kg
568.04
ALAMBRE TW # 12 AWG
m
705.60
ALAMBRE DE ACERO PARA TENSAR 7 mm
kg
5.01
CLAVOS PARA MADERA CON CABEZA DE 1"
kg
25.21
CLAVOS PARA MADERA CON CABEZA DE 2 1/2"
kg
108.75
CLAVOS PARA MADERA CON CABEZA DE 2"
kg
7.08
CLAVOS PARA MADERA CON CABEZA DE 3"
kg
673.32
CLAVOS PARA MADERA CON CABEZA DE 5"
kg
54.00
CLAVOS PARA CEMENTO DE ACERO CON CABEZA DE 3/4"
kg
152.65
PERNOS DE ANCLAJE DE 1/4" X 1 1/4"
pza
36.00
PERNO HEXAGONAL DE 3/4" X 3 1/2"
pza
9.00
ACERO LISO
kg
0.18
PERNOS 1/4" X 4"
pza
32.00
PERNOS 1 1/2" X 6"
pza
6.00
GIGANTOGRAFA EN BANNER
m2
8.64
GANCHO PLATINA 1", 2"X1/4" SEGN DISEO
pza
180.29
CABLE TW # 14 AWG 2.5 mm2
m
2,017.40
CABLE TW # 2 AWG - 35 mm2
m
25.00
CONDUCTOR DE COBRE DESNUDO 5MM
m
12.00
GANCHOS AJUSTADORES PARA APARATOS SANITARIOS DE 100 mm
u
12.00
INODORO TANQUE BAJO NORMAL BLANCO
u
6.00
LAVATORIO CON PEDESTAL TIPO MANCORA BLANCO SIN ACCESORIOS
u
6.00
URINARIO PICO BLANCO
u
3.00
JABONERA CON ASA PARA BAO 15 X 15 cm BLANCA
u
6.00
TOALLERA CON BARRA PLASTICA BLANCA
u
6.00
PAPELERA CON EJE 15 X 15 cm BLANCA
u
6.00
MEZCLADORA MONOCOMANDO PARA LAVADERO CROMO ORO u
6.00
TUBO PROLONGACION PARA DESAGUE BRONCE/CROM 1 1/4"X5"C/TUERCA
pza
6.00
ACCESORIO COMPLETOS TANQUE CISTERNA
u
1.00
ACCESORIO COMPLETOS TANQUE ELEVADO
u
1.00
TRAMPA P CROMADA PARA LAVATORIO JAMECO 1 1/4"
u
6.00
TUBO DE ABASTO PARA INODOROS
u
6.00
TUBO DE ABASTO PARA LAVADEROS
u
6.00
REGISTRO DE BRONCE DE 4"
u
6.00
CRUCETA DE 5MM
bls
36.39
CRUCETA DE 3MM
bls
4.47
PARARRAYOS THOR-25
pza
1.00
TABLERO DE DISTRIBUCION DE 4 CIRCUITOS
u
6.00
TABLERO GABINETE METAL BARRA BRONCE 12 POLOS
pza
1.00
TOMACORRIENTE DOBLE PLANO BAKELITA
u
49.00
INTERRUPTOR SIMPLE BIPOLAR BAKELITA
u
21.60
SPOT LIGTH CROMADO
u
22.00
CAJA OCTOGONAL GALVANIZADA LIVIANA 4" X 4" X 2 1/2
u
83.32
CAJA RECTANGULAR GALVANIZADA LIVIANA DE 4" X 2 1/8"
u
27.50
CAJA OCTOGONAL GALVANIZADA LIVIANA 4" X 2 1/8 "
u
55.00
FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA
u
50.00
FOCO "WS" 150R JOSFEL + LAMPAPRA DE 1OOW
u
8.00
ASFALTO RC-250
gal
41.34
LADRILLO DE ARCILLA PARA TECHO h=15 cm
u
2,458.05
LADRILLO PASTELERO 24 X 24 X 3 cm
u
1,903.91
LADRILLO CORRIENTE HECHO A MANO 8 X 12 X 23 cm
u
34,245.18
LADRILLO PANDERETA DE ARCILLA 9 X 12 X 24 cm 18 HUECOS
u
54,761.28
CUMBRERA INFERIOR PARA TEJA ANDINA MATE
pza
73.05
CUMBRERA SUPERIOR PARA TEJA ANDINA MATE
pza
73.05

COSTO
PARCIAL
UNITARIO

9.69
2,008.35
9.69
4,633.97
9.69 157,037.71
8.58 41,696.15
7.76 110,762.90
8.58
61.55
9.69
180.92
9.69
806.91

2.35

53,982.72

15.38

75,677.60

92.44
35.29
92.44
92.44
50.42
50.42
92.44
92.44

8,608.40
197.62
2,468.43
30,386.66
4,007.34
958.02
23,509.92
19,093.96

3.78
3.78
1.26
7.98
5.46
3.78
3.78
3.78
5.46
15.13
2.10
4.20
2.44
1.01
5.04
12.61
7.56
1.00
12.61
5.21
0.84
106.72
45.38
71.43
10.08
10.08
10.08
75.63
10.08
340.76
126.89
21.01
5.88
5.88
5.46
10.08
10.08
3,529.41
13.45
88.24
6.55
4.62
12.61
0.42
0.42
0.42
71.43
1.09
10.92
2.06
0.76
0.40
0.88
15.13
15.13

4,766.40
2,147.20
889.06
39.96
137.65
411.06
26.78
2,545.15
294.84
2,309.63
75.60
37.80
0.43
32.32
30.24
108.95
1,362.98
2,017.40
315.25
62.52
10.08
640.32
272.28
214.29
60.48
60.48
60.48
453.78
60.48
340.76
126.89
126.06
35.28
35.28
32.76
366.80
45.04
3,529.41
80.70
88.24
320.95
99.79
277.42
34.99
11.55
23.10
3,571.50
8.72
451.48
5,063.58
1,446.97
13,698.07
48,189.93
1,105.26
1,105.26

DESAGREGADO DE PRESUPUESTO ANALTICO COSTO DIRECTO


Proyecto

: MEJORAMIENTO DE SERVICOS EDUCATIVOS DE LA I.E. N 31114 - SACHACOTO, DISTRITO DE SURCUBAMBA TAYACAJA - HUANCAVELICA - CODIGO SNIP Nro. 110533

Realizado : Arq. Wilfredo Isaas Palacios Santos - CAP N 8966


Propietario : MUNICIPALIDAD DISTRITAL DE SURCUBAMBA
Ubicacin : Lugar: SACHACOTO; Distrito: SURCUBAMABA; Provincia: TAYACAJA; Departamento: HUANCAVELICA
SUBGENERICA

Tipo de
Genrica
Transacci
del Gasto Subgen Subgenri Especfica
n
rica
ca Detalle

Fecha

ESPECFICA
ESPECIFICA DETALLE

UND

CABLE ELECTRICO NYY 2 X 4 mm2


m
PLANCHA DE FIBROCEMENTO 4MM 1.20X2.40
pl
TARUGO
u
MANIJA DE BRONCE PARA PUERTAS
pza
CERRADURA EXTERIOR DE DOS GOLPES
u
BISAGRAS DE FIERRO PARA PORTON METALICO
pza
CAPUCHON DE PLSTICO
u
BISAGRA CAPUCHINA PLOMA 3" X 3"
par
BISAGRA CAPUCHINA PLOMA 3 1/2" X 3 1/2"
par
CERRADURA DE PERILLA EPOLEG BAO
u
CINTA AISLANTE
rll
OCRE
kg
FRAGUA CREMA
kg
SOLDADURA
kg
SOLDADURA CELLOCORD
kg
CEMENTO BLANCO BOLSA 50 kg
bls
RODOPLAST PARA BORDE DE MAYOLICAS
m
VARILLA DE COBRE DE 1/2" X 2.40 m
u
ADITIVO IMPERMEABILIZANTE
gal
MASILLA PARA VIDRIO
kg
PINTURA BARNIZ MARINO
gal
PLANCHA DE POLICARBONATO ALVEOLAR 6MM, COLOR
pl
TRANSPARENTE DE 5.90M X 2.10M
PEGAMENTO PARA PVC AGUA FORDUIT
gal
PEGAMENTO PARA LOSETAS Y CERAMICAS
u
SILICONA
u
PEGAMENTO PARA PVC 1/4 gl
u
PEGAMENTO PARA CERMICOS (25 KG)
bls
SOLDADURA CELLOCORD P 3/16"
kg
CINTA TEFLON
pza
ANILLO DE CERA
u
TAPAS DE FIERRO
pza
COLA SINTETICA FULLER
gal
LIJA DISCO ASALITE SR 24
u
LIJA DISCO ASALITE SR 80
u
LIJA PARA MADERA
u
PLOMO ELECTROLITICO
kg
ARENADO LABOR PINTADO TUBO FIERRO 2"
m
MARMOLINA
kg
CERAMICO 20X30
m2
CERAMICO 30X30
m2
CERAMICO 40X40 ALTO TRNSITO
m2
TAPA PARA CAJA DE DESAGUE DE FIERRO FUNDIDO DE 12" X 24" u
TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 12" X 24"
pza
ANGULO DE ACERO LIVIANO DE 1" X 1" X 3/16" X 6 m
pza
PLATINA DE ACERO 1" X 1 1/2" X 6 m
pza
PLATINA DE ACERO 1" X 1/4" X 6 m
pza
TUBO CUADRADO DE ACERO 2"X2"X3/16"
m
TUBO RECTANGULAR DE ALUMINIO 2"X3"X6 M
pza
TUBO RECTANGULAR DE ALUMINIO 2"X2"X6 M
pza
FILETE DE ALUMINIO PARA ESCALERAS
pza
DISOLVENTE THINER
gal
PINTURA ESMALTE SINTETICO
gal
PINTURA ESMALTE SINTETICO CPP
gal
PINTURA LATEX SUPERMATE
gal
PINTURA LATEX PARA INTERIORES
gal
PINTURA LATEX PARA EXTERIORES
gal
PINTURA LATEX PARA CIELORRASOS
gal
PINTURA LATEX PARA COLUMNAS
gal
PINTURA LATEX PARAVIGAS
gal
PINTURA VINILICA
gal
PINTURA ANTICORROSIVA
gal
PINTURA ESMALTE ANTICORROSIVA COLOR TEKNO
gal
PINTURA ANTICORROSIVA EPOX-USO NAVAL
gal
PINTURA ESMALTE ANTICORROSIVA
gal
BARNIZ MARINO
gal
PINTURA PARA PIZARRA COLOR VERDE
gal
PINTURA IMPRIMANTE PARA MUROS
gal
PLANCHA ACERO 1.3mm X 1.22m X 2.40 m
pl
PLANCHA ACERO 6.4mm X 1.22m X 2.40 m
pl
PLANCHA DE FIERRO 3/16 X 1.20 X 2.4 m
m2
PUERTA METALICA DE TUBOS CUADRADOS 2" 2.40M, H=3.00M
u
PUERTA METALICA DE TUBOS CUADRADOS 2" 0.60M, H=1.80M
u
PUERTA METALICA DE TUBOS CUADRADOS 2" 0.70M, H=1.20M
u
TEJA ANDINA ETERNIT 1.14m X0.72m X5mm
pza
PLANCHA DE TECKNOPOR DE 1" X 4' X 8'
pl
PLANCHA DE MICROPOROSO IMPORTADO 12MM 1.20X2.40
pl
CANALETA DE PLANCHA GALVANIZADA D 6" PLANCHA 1/40
m
GRANALLA ROJO CLARO
kg
TUBO FIERRO GALVANIZADO DE 1 1/4"
m
TUBO FIERRO GALVANIZADO DE 2"
m
TUBO FIERRO GALVANIZADO DE 3"
m
TUBO FIERRO GALVANIZADO DE 4"
m
TUBO FIERRO GALVANIZADO PESADO C-40 1"
m

CANT.

COSTO
PARCIAL
UNITARIO

107.10
222.51
36.00
1.00
14.00
4.00
2,992.80
6.00
52.00
6.00
7.10
124.85
189.13
23.26
2.06
6.38
2.52
4.00
3.51
66.41
0.16

5.46
21.85
0.25
10.08
48.74
5.80
0.08
3.36
3.78
23.53
2.10
3.78
3.70
10.08
10.08
100.84
2.94
201.68
15.97
6.72
31.09

584.77
4,861.85
9.00
10.08
682.36
23.20
239.42
20.16
196.56
141.18
14.91
471.93
699.79
234.46
20.76
643.01
7.41
806.72
56.09
446.28
4.97

0.63

689.08

434.81

1.67
23.25
10.35
0.48
165.88
2.12
0.33
6.00
2.00
24.25
3.97
3.97
166.82
2.12
19.13
425.10
68.16
118.38
603.71
1.00
1.00
2.00
33.49
17.80
465.20
1.83
1.58
11.88
2.11
53.22
56.18
2.69
30.83
13.74
27.09
40.29
26.38
1.12
21.09
83.74
0.27
0.09
4.24
1.73
443.57
0.40
0.04
3.60
2.00
6.48
1.00
686.73
197.38
3.11
105.17
425.10
6.63
12.30
12.00
10.80
6.63

36.97
11.68
7.98
23.53
11.68
10.08
2.10
5.04
12.61
15.13
3.36
3.36
1.26
13.45
6.72
3.19
18.40
21.85
22.43
23.53
23.53
25.21
115.97
19.33
65.55
80.67
65.55
30.25
10.76
22.27
31.93
37.82
14.20
23.53
14.20
23.53
23.53
37.82
29.41
33.19
74.37
29.41
36.13
36.72
12.61
100.84
403.36
253.78
1,260.50
184.87
126.05
18.91
11.34
96.64
20.17
2.52
12.61
20.17
30.25
40.34
10.08

61.85
271.58
82.59
11.29
1,937.45
21.34
0.69
30.24
25.22
366.91
13.33
13.33
210.19
28.47
128.55
1,356.07
1,254.06
2,586.61
13,541.17
23.53
23.53
50.42
3,884.35
344.07
30,493.86
147.24
103.83
359.40
22.70
1,185.30
1,793.96
101.92
437.77
323.39
384.67
948.04
620.69
42.20
620.27
2,779.20
19.89
2.65
153.34
63.45
5,593.46
40.34
16.13
913.61
2,521.00
1,197.96
126.05
12,986.15
2,238.29
300.07
2,121.24
1,071.25
83.60
248.09
363.00
435.67
66.83

DESAGREGADO DE PRESUPUESTO ANALTICO COSTO DIRECTO


Proyecto

: MEJORAMIENTO DE SERVICOS EDUCATIVOS DE LA I.E. N 31114 - SACHACOTO, DISTRITO DE SURCUBAMBA TAYACAJA - HUANCAVELICA - CODIGO SNIP Nro. 110533

Realizado : Arq. Wilfredo Isaas Palacios Santos - CAP N 8966


Propietario : MUNICIPALIDAD DISTRITAL DE SURCUBAMBA
Ubicacin : Lugar: SACHACOTO; Distrito: SURCUBAMABA; Provincia: TAYACAJA; Departamento: HUANCAVELICA
SUBGENERICA

Tipo de
Genrica
Transacci
del Gasto Subgen Subgenri Especfica
n
rica
ca Detalle

Fecha

ESPECFICA
ESPECIFICA DETALLE

UND

TUBO FIERRO GALVANIZADO ESTANDAR ISO-I 2"


m
TUBO FIERRO GALVANIZADO 2"
m
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2"
u
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4"
u
UNION ROSCADA DE FIERRO GALVANIZADO DE 1"
u
UNION UNIVERSAL DE FIERRO GALVANIZADO 1"
pza
UNION UNIVERSAL DE FIERRO GALVANIZADO 1 1/2"
pza
UNION UNIVERSAL DE FIERRO GALVANIZADO 2"
pza
UNION UNIVERSAL DE FIERRO GALVANIZADO 1/2"
pza
UNION ROSCADA DE FIERRO GALVANIZADO DE 1 1/4"
u
NIPLE DE FIERRO GALVANIZADO DE 1/2" X 1 1/2"
u
TUBO DE FIERRO NEGRO ESTANDAR ISO-I 3/4" X 6.4 m
u
MARCO Y TAPA FIERRO GALVANIZADO PARA MEDIDOR 1/2" - 3/4" u
ESCALERA TIPPO GATO DE FIERRO GALVANIZADO 1 3/4"
u
TIRAFONES PARA TEJAS DE 1/4" X 5"
pza
SUMIDERO DE BRONCE DE 2"
u
TUBERIA PVC SAP PRESION C-10 C/R. 3/4" X 5m
u
TUBERIA PVC SAP PRESION PARA AGUA C-10 R. 1/2"
m
TUBERIA PVC SAP PRESION PARA AGUA C-10 R. 3/4"
m
CODO PVC SAP PARA AGUA CON ROSCA DE 3/4" X 90
u
CODO PVC SAP PARA AGUA CON ROSCA DE 1/2" X 90
u
TEE PVC SAP PARA AGUA CON ROSCA DE 1/2"
u
TEE PVC SAP PARA AGUA CON ROSCA DE 3/4"
u
TUBERIA PVC SAL PARA DESAGUE DE 2"
m
TUBERIA PVC SAL PARA DESAGUE DE 4"
m
CODO PVC SAL DE 2" X 90
u
CODO PVC SAL DE 4" X 90
u
CODO PVC SAL DE 3" X 45
u
RAMAL TEE SIMPLE PVC SAL DE 2"
u
TEE SANITARIA SIMPLE PVC SAL DE 4"
u
TEE SANITARIA SIMPLE CON REDUCCION PVC SAL 4"A 2"
u
YEE PVC SAL CON REDUCCION 4" - 2"
u
TUBERIA PVC SAL 2" X 3 m
pza
TUBERIA PVC SAL 4" X 3 m
pza
TUBERIA PVC SAL 4"
m
CODO PVC SAL 2" X 90
pza
CODO PVC SAL 3" X 90
pza
CODO PVC SAL 4" X 90
pza
CODO PVC SAL 2" X 45
pza
CODO PVC SAL 4" X 45
pza
YEE PVC SAL DE 3" X 3"
pza
YEE PVC SAL DE 4" X 4"
pza
TUBO PVC SAP E/C PARA INSTALACIONES ELECTRICAS 1" X 3 m pza
TUBERIA PVC SAP PARA INSTALACIONES ELECTRICAS DE 3/4" pza
TUBERIA PVC SAP PARA INSTALACIONES ELECTRICAS DE 1"
m
TUBERIA PVC SEL PARA INSTALACIONES ELECTRICAS DE 5/8" X 3m
u
TUBO PVC SEL ESPIGA CAMPANA 3/4" X 3.00 m
pza
TUBO PVC SAP 2"X5 m
pza
CURVA PVC SAP PARA INSTALACIONES ELECTRICAS 1"
pza
CURVA PVC SAP PESADO PARA INSTALACIONES ELECTRICAS DE u3/4"
CURVA PVC SAP PESADO PARA INSTALACIONES ELECTRICAS DE u1"
UNION SIMPLE PVC SAP PARA INSTALACIONES ELECTRICAS 1" pza
UNION PVC SEL 3/4"
pza
CONEXION A CAJA PVC SAP 3/4"
pza
CONEXION A CAJA PVC SAP PARA INSTALACIONES ELECTRICAS 3/4"
u
VALVULA COMPUERTA DE BRONCE DE 1/2"
u
VALVULA COMPUERTA DE BRONCE DE 3/4"
u
VALVULA COMPUERTA DE BRONCE DE 1 1/2"
u
VALVULA COMPUERTA DE BRONCE DE 2"
u
VALVULA COMPUERTA DE BRONCE DE 1/2"
u
VALVULA COMPUERTA DE BRONCE DE 1"
u
VALVULA CHECK DE BRONCE DE 1"
u
VALVULA CHECK DE BRONCE DE 1 1/2"
u
VALVULA FLOTADORA 3/4" CON BOLA DE COBRE
u
VIDRIO TRANSPARENTE INCOLORO SIMPLE
p2
ESPEJO MARCO DE FIBRA DE VIDRIO
u
BROCHA DE 4"
u
ELECTROBOMBA 1.5 HP ALTO CAUDAL
u
EQUIPAMIENTO ESCOLAR
SILLA MELAMINA 18 MM, ESTRUCTURA METLICA
u
MESA MELAMINA 18 MM, ESTRUCTURA METLICA
u
SILLA SECRETARIAL MODELO 509E
u
SILLA TIPO MODELO 10200
u
ARCHIVERO EN LINEA 4 GAVETAS DE MELAMINA 18 MM
u
ESCRITORIO MELAMINA 18 MM, 1.80 M DE ANCHO
u
LIBRERO MELAMINA 18 MM, 1.80 M DE ANCHO
u
ESCRITORIO EJECUTIVO TIPO DUCON, 1.80 M DE ANCHO
u
SERVICIOS HIGIENICOS Y VESTUARIOS
m2
IMPRESORA MULTIUSOS A COLORES
glb
IMPRESORA LASER NEGRO
glb
EQUIPO DE CMPUTO DUO CORE 2GB RAM, 160 GB DISCO DUROglb
TACHOS METLICO SEGN DISEO
pza
EQUIPO MULTIMEDIA
glb
MESA DE TRABAJO DE MELAMINA 18 MM, 1.40 ANCHO
jgo

CANT.

COSTO
PARCIAL
UNITARIO

133.37
30.40
8.00
6.00
0.98
6.00
4.00
2.00
2.00
0.98
4.00
0.01
4.00
1.00
2,992.80
2.00
12.60
75.81
17.25
53.90
8.00
54.42
13.12
19.00
18.60
16.00
12.00
6.00
10.00
18.00
12.00
4.00
14.00
58.42
5.00
16.80
42.00
15.45
4.20
6.30
2.00
10.50
273.35
220.00
32.00
31.73
73.50
1.10
84.86
55.00
7.00
260.28
49.00
98.00
110.00
2.00
1.00
2.00
1.00
1.00
3.00
1.00
2.00
1.00
1,394.63
6.00
2.64
2.00

20.17
20.17
2.94
4.62
6.30
6.30
10.92
14.29
2.94
1.26
1.51
30.25
37.82
184.87
0.42
2.10
11.76
5.04
6.72
1.68
0.84
1.01
1.68
4.62
10.92
2.10
2.94
1.26
4.20
6.30
6.30
3.78
7.98
14.71
4.90
2.10
2.94
3.78
2.10
3.78
2.94
3.78
5.63
2.27
1.89
3.78
6.30
12.18
0.67
0.50
0.67
1.01
0.67
1.01
1.01
8.82
13.45
22.69
37.82
8.82
16.81
16.81
22.69
13.45
1.93
25.21
21.04
252.10

2,690.09
613.17
23.52
27.72
6.14
37.80
43.68
28.58
5.88
1.23
6.04
0.25
151.28
184.87
1,256.98
4.20
148.18
382.08
115.92
90.55
6.72
54.96
22.04
87.78
203.11
33.60
35.28
7.56
42.00
113.40
75.60
15.12
111.72
859.28
24.50
35.28
123.48
58.40
8.82
23.81
5.88
39.69
1,538.96
499.40
60.48
119.93
463.05
13.40
56.86
27.50
4.69
262.88
32.83
98.98
111.10
17.64
13.45
45.38
37.82
8.82
50.43
16.81
45.38
13.45
2,691.64
151.26
55.47
504.20

180.00
180.00
8.00
50.00
4.00
8.00
10.00
1.00
30.00
2.00
1.00
26.00
6.00
1.00
1.00

54.62
105.04
226.89
75.63
327.73
436.97
403.36
243.70
33.61
327.73
336.13
1,848.74
201.68
756.30
294.12

9,831.60
18,907.20
1,815.12
3,781.50
1,310.92
3,495.76
4,033.60
243.70
1,008.30
655.46
336.13
48,067.24
1,210.08
756.30
294.12

DESAGREGADO DE PRESUPUESTO ANALTICO COSTO DIRECTO


Proyecto

: MEJORAMIENTO DE SERVICOS EDUCATIVOS DE LA I.E. N 31114 - SACHACOTO, DISTRITO DE SURCUBAMBA TAYACAJA - HUANCAVELICA - CODIGO SNIP Nro. 110533

Realizado : Arq. Wilfredo Isaas Palacios Santos - CAP N 8966


Propietario : MUNICIPALIDAD DISTRITAL DE SURCUBAMBA
Ubicacin : Lugar: SACHACOTO; Distrito: SURCUBAMABA; Provincia: TAYACAJA; Departamento: HUANCAVELICA
SUBGENERICA

Tipo de
Genrica
Transacci
del Gasto Subgen Subgenri Especfica
n
rica
ca Detalle

Fecha

ESPECFICA
ESPECIFICA DETALLE
MESA DE TRABAJO DE MELAMINA 18 MM, 1.80 ANCHO
SILLON GIRATORIO SEMIEJECUTIVO MODELO 1S 5100
MUEBLE MLTIPLE PARA EQUIPO DE CMPUTO
MADERA
MADERA TORNILLO
CASETA DE MADERA TORNILLO ADICIONAL TECHADA
MADERA TORNILLO CEPILLADA
MADERA TORNILLO 3"X6"X10
MADERA TORNILLO 3"X3"X10
MADERA TORNILLO 3"X6"X11
MADERA TORNILLO 3"X6"X8
MADERA TORNILLO 1"X12"X10 PARA CARTELAS
MADERA TORNILLO 1"X10"X10 PARA CARTELAS
MADERA TORNILLO 2"X3"X10
MADERA TORNILLO 1"X8"X10
MADERA DE CEDRO (p2)
MADERA PINO (P2)
MADERA PINO PARA ANDAMIOS
MADERA PINO (REGLAS)
MADERA ANDAMIAJE
TRIPLAY DE 8 mm
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
PLANTAS
PLANTA DE SAUCO
PLANTA DE ACACIA
PLANTA DE PINO ARAUCARIA
PLANTA DE ALAMO CAROLINO
FLETE
FLETE TERRESTRE DESDE HUANCAYO A SACHACOTO
HERRAMIENTAS
HERRAMIENTAS

UND

CANT.

COSTO
PARCIAL
UNITARIO

glb
u
u

10.00
1.00
26.00

378.15
462.18
184.87

3,781.50
462.18
4,806.62

p2
m2
p2
p2
p2
p2
p2
p2
p2
p2
p2
p2
p2
p2
p2
p2
m2
p2

11,346.34
6.00
360.18
810.00
387.00
445.50
1,296.00
387.00
224.91
1,057.88
1,207.60
1,698.56
22.00
2,193.60
66.97
306.71
8.64
7,960.85

2.86
168.01
2.94
2.86
2.86
3.19
2.86
2.94
2.94
2.86
2.86
4.20
4.62
4.62
4.62
1.68
40.34
2.86

32,450.52
1,008.06
1,058.92
2,316.60
1,106.82
1,421.15
3,706.56
1,137.78
661.24
3,025.52
3,453.72
7,133.93
101.64
10,134.42
309.42
515.27
348.54
22,768.02

pza
pza
pza
u

24.00
7.00
12.00
9.00

33.61
37.82
76.47
50.42

806.64
264.74
917.64
453.78

kg

513,743.94

0.17

87,336.47

GLB

1.00

8,635.25

8,635.25

5 COSTO DE ADMINISTRACION DIRECTA DE SERVICIOS


CAMION VOLQUETE 4 X 2 140-210 HP 6 m3
hm
CAMION VOLQUETE 6 X 4 330 HP 10 m3
hm
SOLDADORA ELECTRICA MONOFASICA ALTERNA 225 A
hm
ANDAMIO METAL TABLAS ALQUILER
est
ANDAMIOS TIPO ACROW 1.90 (4 PARES)
pza
SIERRA CIRCULAR
hm
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP
hm
RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 tonhm
CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3
hm
TRACTOR DE ORUGAS DE 190-240 HP
hm
CINCEL PARA CORTE DEMOLICION
est
VIBRADOR DE CONCRETO 4 HP 2.40"
hm
VIBRADOR DE CONCRETO 3/4" - 2"
hm
MOTOSOLDADORA DE 250 A
hm
MOTONIVELADORA DE 125 HP
hm
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3
hm
MEZCLADORA DE CONCRETO TROMPO 18HP 7 p3
hm
WINCHE DE DOS BALDES DE 350 kg MOTOR ELECTRICO 3.6 HP hm
NIVEL TOPOGRAFICO CON TRIPODE
he
TEODOLITO
hm
CEPILLADORA ELECTRICA
hm
CERCO TEMPORAL DE PALIZADAS Y ENVOLVENTE TEXTIL
glb
GESTION Y MANEJO DEL BOTADERO
glb

64.45
100.61
194.08
1,039.08
184.09
90.77
194.45
1.39
7.18
0.75
1,722.88
0.98
171.25
37.16
1.39
269.29
19.70
0.98
83.28
83.27
103.50
1.00
6.00

134.45
88.24
10.08
10.08
12.61
5.04
10.08
151.26
134.45
151.26
5.88
6.72
6.72
10.08
151.26
21.01
21.01
37.82
8.40
16.81
10.08
2,100.84
1,512.05

8,665.46
8,878.08
1,956.33
10,473.95
2,321.32
457.46
1,960.07
210.49
964.96
113.54
10,130.53
6.56
1,150.77
374.54
210.49
5,657.72
413.96
36.91
699.53
1,399.82
1,043.25
2,100.84
9,072.30

TOTAL COSTO DIRECTO

STO DIRECTO

COTO, DISTRITO DE SURCUBAMBA o. 110533


Dic. 2009

SUB TOTAL

2,008.35
4,633.97
157,037.71
41,696.15
110,762.90
61.55
180.92
806.91

53,982.72
75,677.60
8,608.40
197.62
2,468.43
30,386.66
4,007.34
958.02
23,509.92
19,093.96
4,766.40
2,147.20
889.06
39.96
137.65
411.06
26.78
2,545.15
294.84
2,309.63
75.60
37.80
0.43
32.32
30.24
108.95
1,362.98
2,017.40
315.25
62.52
10.08
640.32
272.28
214.29
60.48
60.48
60.48
453.78
60.48
340.76
126.89
126.06
35.28
35.28
32.76
366.80
45.04
3,529.41
80.70
88.24
320.95
99.79
277.42
34.99
11.55
23.10
3,571.50
8.72
451.48
5,063.58
1,446.97
13,698.07
48,189.93
1,105.26
1,105.26

STO DIRECTO

COTO, DISTRITO DE SURCUBAMBA o. 110533


Dic. 2009

SUB TOTAL

584.77
4,861.85
9.00
10.08
682.36
23.20
239.42
20.16
196.56
141.18
14.91
471.93
699.79
234.46
20.76
643.01
7.41
806.72
56.09
446.28
4.97
434.81
61.85
271.58
82.59
11.29
1,937.45
21.34
0.69
30.24
25.22
366.91
13.33
13.33
210.19
28.47
128.55
1,356.07
1,254.06
2,586.61
13,541.17
23.53
23.53
50.42
3,884.35
344.07
30,493.86
147.24
103.83
359.40
22.70
1,185.30
1,793.96
101.92
437.77
323.39
384.67
948.04
620.69
42.20
620.27
2,779.20
19.89
2.65
153.34
63.45
5,593.46
40.34
16.13
913.61
2,521.00
1,197.96
126.05
12,986.15
2,238.29
300.07
2,121.24
1,071.25
83.60
248.09
363.00
435.67
66.83

STO DIRECTO

COTO, DISTRITO DE SURCUBAMBA o. 110533


Dic. 2009

SUB TOTAL

2,690.09
613.17
23.52
27.72
6.14
37.80
43.68
28.58
5.88
1.23
6.04
0.25
151.28
184.87
1,256.98
4.20
148.18
382.08
115.92
90.55
6.72
54.96
22.04
87.78
203.11
33.60
35.28
7.56
42.00
113.40
75.60
15.12
111.72
859.28
24.50
35.28
123.48
58.40
8.82
23.81
5.88
39.69
1,538.96
499.40
60.48
119.93
463.05
13.40
56.86
27.50
4.69
262.88
32.83
98.98
111.10
17.64
13.45
45.38
37.82
8.82
50.43
16.81
45.38
13.45
2,691.64
151.26
55.47
504.20
9,831.60
18,907.20
1,815.12
3,781.50
1,310.92
3,495.76
4,033.60
243.70
1,008.30
655.46
336.13
48,067.24
1,210.08
756.30
294.12

STO DIRECTO

COTO, DISTRITO DE SURCUBAMBA o. 110533


Dic. 2009

SUB TOTAL

3,781.50
462.18
4,806.62
32,450.52
1,008.06
1,058.92
2,316.60
1,106.82
1,421.15
3,706.56
1,137.78
661.24
3,025.52
3,453.72
7,133.93
101.64
10,134.42
309.42
515.27
348.54
22,768.02
806.64
264.74
917.64
453.78
87,336.47
8,635.25

8,665.46
8,878.08
1,956.33
10,473.95
2,321.32
457.46
1,960.07
210.49
964.96
113.54
10,130.53
6.56
1,150.77
374.54
210.49
5,657.72
413.96
36.91
699.53
1,399.82
1,043.25
2,100.84
9,072.30
1,122,458.79

DESAGREGADO DE PRESUPUESTO ANALTICO GASTOS DE SUPERVISIN


Proyecto

: MEJORAMIENTO DE SERVICOS EDUCATIVOS DE LA I.E. N 31114 - SACHACOTO, DISTRITO DE SURCUBAMBA - TAYACAJA HUANCAVELICA CODIGO SNIP Nro. 110533

Realizado

: Arq. Wilfredo Isaas Palacios Santos - CAP N 8966

Propietario

: MUNICIPALIDAD DISTRITAL DE SURCUBAMBA

Ubicacin

: Lugar: SACHACOTO; Distrito: SURCUBAMABA; Provincia: TAYACAJA; Departamento: HUANCAVELICA


SUBGENERICA

Fecha

Dic. 2009

ESPECFICA

Tipo de
Transaccin

Genrica
Subgenr
UND
CANT.
del Gasto Subgen
ica
Especfica
ESPECIFICA DETALLE
rica
Detalle
2 GASTOS PRESUPUESTARIOS
6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2 INSTALACIONES EDUCATIVAS
2
4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES
ARTICULOS DE LIBRERA
Cuaderno espiralado de 100 hojas A-4
Papel bond A-4
Lapiceros
Portaminas
Archivadores de palanca
Cuaderno espiralado de 100 hojas A-4
Folder manila
Folder manila
Plumon tinta indeleble
Roll vinifan grande
Papel carbon
Plumon resaltador
Otros

COSTO
UNITARIO

PARCIAL

1208.14
und
Mil
und
Und
und
und
und
und
und
und
GLB
und
GLB

6.00
4.00
8.00
6.00
6.00
3.00
30.00
30.00
4.00
2.00
1.00
4.00
1.00

4.83
24.00
0.50
10.00
6.00
9.00
0.80
0.55
3.00
6.50
35.00
2.61
845.25

28.95
96.00
4.00
60.00
36.00
27.00
24.00
16.50
12.00
13.00
35.00
10.44
845.25

mes

6.00

1800.00

10800.00

SERVICIOS DE CONSULTORIA
Ing. Supervisor

mes

6.00

4000.00

24000.00

ALQUILER DE CAMIONETA
Alquiler de camioneta 4x4

mes

6.00

1500.00

9000.00

5 COSTO DE ADMINISTRACION DIRECTA DE SERVICIOS


SERVICIOS NO PERSONALES
Asistente de Supervisin

TOTAL

SUB TOTAL

10800.00

24000.00

9000.00

45008.14

DESAGREGADO DE PRESUPUESTO ANALTICO GASTOS GENERALES


Proyecto

: MEJORAMIENTO DE SERVICOS EDUCATIVOS DE LA I.E. N 31114 - SACHACOTO, DISTRITO DE SURCUBAMBA - TAYACAJA HUANCAVELICA CODIGO SNIP Nro. 110533

Realizado

: Arq. Wilfredo Isaas Palacios Santos - CAP N 8966

Propietario

: MUNICIPALIDAD DISTRITAL DE SURCUBAMBA

Ubicacin

: Lugar: SACHACOTO; Distrito: SURCUBAMABA; Provincia: TAYACAJA; Departamento: HUANCAVELICA


SUBGENERICA

Fecha

Dic. 2009

ESPECFICA

Tipo de
Transaccin

Genrica
Subgen
UND
Espec
del Gasto Subgen
rica
ESPECIFICA DETALLE
rica
fica
Detalle
2 GASTOS PRESUPUESTARIOS
6 ADQUISICION DE ACTIVOS NO FINANCIEROS
2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2 INSTALACIONES EDUCATIVAS
2
4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES
VESTUARIO
GUANTES DE JEBE
PAR
GUANTES DE CUERO TIPO MOSQUETERO
UND
PROTECTOR DE CABEZA
UND
BOTAS DE JEBE
PAR
PONCHOS PARA LLUVIA
UND
CHALECOS
UND
ZAPATOS DE SEGURIDAD
UND
ALIMENTOS PARA PERSONAL
PERSONAL ADMINISTRATIVO
MES
REFRIGERIO PARA PERSONAL DE OBRA
GLB
ARTICULOS DE LIBRERA
CUADERNO DE OBRA DE 100 HOJAS
UND
CUADERNO DE ESPIRALADO DE 100 HOJAS
UND
ARCHIVADORES CON PALANCA
UND
PAPEL BOND DE 75 GR.
MILLAR
ENGRAPADOR
UND
PERFORADOR
UND
LAPICEROS
UND
PORTAMINAS
UND
ESCALIMETRO
UND
ESTUCHE DE MINAS 0.5
UND
PAPEL CARBON
UND
FOLDER MANILA A4
UND
TAMPON
UND
GRAPAS
UND
CORRECTOR TIPO LAPICERO
UND
PLUMON RESALTADOR
UND
CINTA MASKING 3/4"
UND
BIENES DE CONSUMO
THONNER DE IMPRESORA
UND
MEMORIAS USB
UND
THONNER PARA FOTOCOPIADORA
UND
CARTUCHOS TINTA ACOLOR
UND
CARTUCHOS TINTA BLANCO Y NEGRO
UND
TINTA n 21
UND
TINTA n 22
UND
COMPRA CD EN BLANCO
UND
PASAJES Y GASTOS DE TRANSPORTE
PASAJES
GLB
5 COSTO DE ADMINISTRACION DIRECTA DE SERVICIOS
SERVICIOS DE TERCEROS
SERVICIO DE FOTOCOPIADO
UND
TALONARIO KARDEX
UND
SELLOS RESIDENCIA Y OTROS
UND
SERVICIOS NO PERSONALES
RESIDENTE DE OBRA
MES
MAESTRO DE OBRA
MES
ASISTENTE ADMINISTRATIVO
MES
ASISTENTE TECNICO
MES
ALMACENERO DE OBRA
MES
OTROS
GLB
ALQUILER DE BIENES E INMUEBLES
ALQUILER DE COMPUTADORA INTEL CORE DUO E IMPRESORA
GLB
ALQUILER DE IMPRESORA LASER
GLB
ALQUILER DE IMPRESORA A TINTA COLORES
GLB
TOTAL

CANT.

COSTO
PARCIAL SUB TOTAL
UNITARIO

2,885.00
35.00
25.00
30.00
30.00
37.00
6.00
3.00

8.00
10.00
10.00
20.00
15.00
27.50
245.00

280.00
250.00
300.00
600.00
555.00
165.00
735.00

2.00
1.00

200.00
1200.00

400.00
1200.00

4.00
9.00
14.00
8.00
1.00
1.00
6.00
6.00
1.00
6.00
50.00
50.00
1.00
1.00
2.00
5.00
3.00

25.00
5.00
6.00
24.00
12.00
10.00
2.00
4.50
15.00
1.50
0.18
0.26
5.00
4.00
3.00
2.50
2.50

100.00
45.00
84.00
192.00
12.00
10.00
12.00
27.00
15.00
9.00
9.00
13.00
5.00
4.00
6.00
12.50
7.50

3.00
3.00
1.00
1.00
1.00
2.00
2.00
12.00

240.00
100.00
160.00
66.00
60.00
80.00
85.00
1.00

720.00
300.00
160.00
66.00
60.00
160.00
170.00
12.00

1.00

300.00

300.00

1,600.00

563.00

1,648.00

300.00

753.51
3000
1
4.00

0.10
413.51
10.00

300.00
413.51
40.00

6.00
6.00
6.00
6.00
6.00
1.00

4000.00
2200.00
2000.00
2000.00
800.00
1.00

24000.00
13200.00
12000.00
12000.00
4800.00
1.00

6.00
6.00
6.00

800.00
300.00
300.00

4800.00
1800.00
1800.00

66,001.00

8,400.00

82,150.51

73,750.51

63,426.1783
##################