Sunteți pe pagina 1din 1

TATA PROJECTS LIMITED

INSPECTION REPORT FOR BENDS


Report No.: _______________

Batch No.:

Date:_____________

Job Code No.: _____________ Customer:____________ Project:___________________


Pipe line No. : ____________________
Size of Tube :

Code of Construction:___________________

O.D ______________ x _____________ W.T

Material Specification: ______________________________


Bend Radius (R ) : __________ mm Drawing No.: _____________

Rev No.: ______

Ovality ( % ) Permissible: ____________ % of Thinning Allowed: ____________________


Note: 10% of Bends shall be inspected at random and recorded as given below:
Part No.

Measured
Thk (mm)

Thinning
(%)

D max.
mm

D min.
mm

Ovality
(%)

Visual Inspection

SRRPPL-QA/QC
Form No.: FQ / 030 Rev No.: 0

212580749.doc

TPL-FQE

PGPL

Remarks

S-ar putea să vă placă și