GENERAL NOTES
1. ALL DIMENSIONS ARE IN mm & LEVELS ARE IN METERS

22

23

4080

24

8100

25

8100

26

8100

27

8100

8100

NOTED OTERWISE.
2. DO NOT SCALE DIMENSIONS.
3. CONCRETE GRADE:
FOUNDATION AND PILE CAP=C35
COLUMN AND WALLS=C60
RETAINING WALLS=C35
SLAB AND BEAMS=C35
4. REINFORCEMENT GRADE = 250(PLAIN BAR) 500(DEFORMED
BAR) 460(FABRIC).
5. CONCRETE COVER TO REINFORCEMENT FOUNDATION,
PILE CAPS 75mm BOTTOM & SIDE, 40mm TOP.
RETAINING WALL 40mm.
SUSPENDED SLABS 25mm.
BEAMS LINTELS & CAPPING 40mm.
COLUMNS ,WALLS 40mm.
PARAPET 40mm.
6. LAP & LD LENGTH = 54 DIA.
7. BAR MARK TO BE READ AS:

28
2650

1650

H
4

RE BAR DETAIL
01

T20

01

300

B1
MAIN CONTRACTOR REVIEW STAMP
BAR PLACING NOTES
SPACING OF BARS
BAR MARK
CONSULTANT STAMP

56-T20-38-400-T1

6185

30-T20-34-400-T1

10615

30-T20-06-400-T1

11700

55-T20-06-400-T1

11700

54-T20-39-400-T1

6130

30-T20-35-400-T1

6270

30-T20-06-400-T1

11700

30-T20-06-400-T1

11700

02-T20-14-400-T2

825

ZONE-CPAM-1

56-T20-45-400-T1

6820

52-T20-06-400-T1

11700

MATCH LINE - ADP-CAJ-ST-SD-B-34-B04-00077


CONSTRUCTION JOINT

24-T20-29-400-T2

5790

825

02-T20-23-400-T1

02-T20-16-400-T1

9510

01-T20-04-T1

825

(26)

(34)
(06)

6945

01-T20-24-T2

825

6550

4745

01-T20-25-T2

01-T20-17-T1

685

685 685

(27)
(07)

(35)

(01) 88-T20-06-400-T2
(01) 88-T20-06-400-T2

01-T20-01-T1

7000

2270

01-T20-07-T1

1100
TYP.

825

825

825

01-T20-10-T2

685

825

3710
825

02-T20-10-400-T1

DATE:

2. ADP-CAJ-ST-SD-B-08-BO4-00062
825

3. ADP-CAJ-ST-SD-B-34-BO4-00081

11700

4. ADP-CAJ-ST-SD-B-34-BO4-00082

RESPONSE SENT BY

DATE:

RESPONSE RECEIVED BY

DATE:

REVISION NOTES

5. ADP-CAJ-ST-SD-B-34-BO4-00131

11700

6. ADP-CAJ-ST-SD-B-08-BO4-00084
7. ADP-CAJ-ST-SD-B-32-BO4-00068 & 69

825

CONTRACT DRAWINGS
825

825

1. ADP-CAJ-ST-DRA-B-02-B04-00024
2. ADP-CAJ-ST-DRA-B-08-B04-00041 TO 44
3. ADP-CAJ-ST-DRA-B-34-B04-00010

00

20-02-2014

DESCRIPTION

INITIALS

PROJECT NAME
BBS REFERANCE
825

ABU DHABI PLAZA ASTANA,KAZAKHSTAN

1. ADP-CAJ-ST-SD-B-34-BO4-00080 (SHEET 1 TO 3)

EMPLOYER:

64-T20-11-400-T2

6515

65-T20-12-400-T2

7625

ALDAR EuroAsia LLP


Republic of Kazakhstan

ZONE-CPG/CPJ/CPP

4686
1376

3540

CONSTRUCTION JOINT

ISSUED FOR CONSTRUCTION

REV DATE

PROJECT NO: A560101/2011/C/014

(27)
(22)

(22)
(22)
5740

(22)
(22)

CONSTRUCTION JOINT

1510

01-T20-09-T1

CONSTRUCTION JOINT
MATCH LINE - ADP-CAJ-ST-SD-B-34-B04-000XX

8250

3710

1. ADP-CAJ-ST-SD-B-02-BO4-00060

825

SINGED:
PRINT NAME:
DOCUMENT CONTROL

SHOP DRAWINGS

(27)
(26)

11-T20-33-400-T2

01-T20-09-T2

02-T20-27-400-T1

(27)
(26)

3260

MATCH LINE - ADP-CAJ-ST-SD-B-34-B04-00074

28-T20-43-400-T2

ZONE-CPAQ-1

4895

1790

1510

DATE:

1100
TYP.

15-T20-31-400-T2

4160

01-T20-26-T1

(27)
(26)

1400

15-T20-30-400-T2

6040

12-T20-32-400-T2

Tel: +7 (7172) 516 927


Fax: +7 (7172) 516 929
Syganak Street, 29
Floor 4, Block A, Office 416
Tel: +7 (7172) 516 927
Fax: +7 (7172) 516 929

PROJECT MANAGER & ENGINEER

LEGENDS

CONSTRUCTION SUPERVISION CONSULTANT:

MATCH LINE - ADP-CAJ-ST-SD-B-34-B04-00022

MATCH LINE - ADP-CAJ-ST-SD-B-34-B04-00025

ZONE-U-1

B4

8. ADP-CAJ-ST-SD-B-32-BO4-00120 TO 122

02-T20-08-400-T1

825

1100
TYP.

825

02-T20-18-400-T1

685

825

685

10190

685

685

685
685

9230

7775

2000

B3

SINGED:
PRINT NAME:

825
685

9635

685

01-T20-15-T1

(25)

REF SLAB REINFORCEMENT DWG# ST-SD-B-34-B04-00025

ZONE-CPAO

B1

KEY NOTES

685

01-T20-22-T1

1385

(27)

27-T20-42-400-T2

CORRECTIONS OR COMMENTS MADE ON CONTRACTOR SUBMITTAL(S) FOR REVIEW DO NOT RELIEVE THE
CONTRACTOR FROM ENSURING COMPLIANCE WITH THE REQUIREMENTS OF THE CONTRACT, THE
DRAWINGS AND CONTRACT SPECIFICATIONS. THIS CHECK IS ONLY FOR REVIEW OF CONFORMANCE WITH
OVERALL PROJECT INTENT AND GENERAL COMPLIANCE WITH INFORMATION GIVEN IN CONTRACT
DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRECTING ALL QUANTITIES
AND DIMENSIONS; SELECTING FABRICATION PROCESS AND TECHNIQUES OF CONSTRUCTION;
COORDINATING THE WORK WITH ALL OTHER TRADES, AND PERFORMING ITS WORK IN A SAFE AND
SATISFACTORY MANNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

685

1235

7310

1080

685

825

8600

(29)
(28)

01-T20-05-T2

8100
8100

01-T20-10-T2

02-T20-41-400-T1

FOR INFORMATION
ONLY

ENDORSED BY THE ENGINEER

5490

3710

685

825

685

825

REF SLAB REINFORCEMENT


DWG# BYT-ST-SD-P-34-B04-114_K

825

7310

01-T20-21-T2

825

825

5070

MAKE CORRECTION
NOTED AND RESUBMIT

3110
(29)
(20)

01-T20-04-T2

6275

685
685 685

01-T20-20-T2

825

685

(21)

(29)
(28)
685

9510

02-T20-05-400-T1

01-T20-40-T1

4075

9785

4200

ZONE-CPAM-1

2515

REJECTED AND
RESUBMIT

SIGNED BY CONSTRUCTION SUPERVISION CONSULTANT HAVING PERFORMED THE


REVIEW

+330.625 SSL

REVIEW COMMENTS:

825

NO EXCEPTION TAKEN

1400

01-T20-05-T2

9820

~
~

SUBMITTAL REVIEW
DATE:

NO.

1350

1400

850 THK. RAFT

6080

B1 & T1 - BOTTOM & TOP FIRST LAYER


B2 & T2 - BOTTOM & TOP SECOND LAYER
B3 & T3 - ADDITIONAL THIRD LAYER
B4 & T4 - ADDITIONAL FORTH LAYER
SSL - STRUCTURAL SLAB LEVEL
ALT. STAGG - BAR TO BE PLACED ALTERNATE
WITH STAGGERED.
T2
T1
T3
T4

B2

1080
~

7310

54-T20-44-400-T1

(01) 62-T20-03-400-T2

(34)

26-T20-19-400-T1

1080

3330

(27)

685 685
685

1100

6950

7000

685

26-T20-37-400-T1

8775

54-T20-01-400-T1

118-T20-02-400-T2

LEGEND

825

(08)

27-T20-36-400-T1

(12)
(08)
(08)

(12)

1400

4500

(08)
(08)

(07)

1960

(18)

8600

25-T20-03-400-T2

NUMBER OF BARS
685

01-T20-14-T2

825

8560

1100

02-T20-28-400-T2

825

8560

685

02-T20-14-400-T2

825

5750

685

01-T20-14-T2

8560
685

8560

3300

3600

ZONE-CPAQ

685

BAR TYP & DIAMETER (mm)

MAIN CONTRACTOR:

REF SLAB REINFORCEMENT DWG# ST-SD-B-34-B04-00022


~

ZONE-CPAO-1

~
LEAD D&B CONSULTANT

P & T Architects & Engineers Ltd


Dubai Branch, UAE
STRUCTURAL CONSULTANT

Robert Bird Group


Pty Limited
Dubai Branch, UAE
MEP CONSULTANT

Foreman Roberts
London, UK

TOP REINFORCEMENT PLAN AT BASEMENT B04 ZONE-CPAM-1


SCALE:- 1:100

SUB CONTRACTOR

STAGE:

STAGE F
BUILDING / PACKAGE:

WORK PACKAGE 4
DOCUMENT TITLE:

TOP REINFORCEMENT AT BASEMENT-B04


ZONE-CPAM-1
STATUS:

ISSUED FOR CONSTRUCTION


DRAWN:

CHKD:

GJ

MA
SCALE @ A3:

SCALE @ A1:

1 : 100

DATE

20-02-2014

DRAWING NO:
PRO ORG DISCIP

ADP CAJ

ST

DOC
DWG
DOC REV
BLDG
SERIES
NO
TYPE
TYPE
SD

34

B04

00080

00

S-ar putea să vă placă și