Documente Academic
Documente Profesional
Documente Cultură
RUC 20477886095
A
DE
ASUNTO
REFERENCIA
A.
VALORIZACION CONTRACTUAL ( I )
PRESUPUESTO
283,148.53
SUB - TOTAL
283,148.53
8.38%
7.97%
REAJUSTE (s)
Presupuesto
0.00
SUB - TOTAL
0.00
D.
E.
F.
283,148.53
DEDUCCIONES
De adelanto en efecivo
De materiales
Total ( C )
0.00
0.00
0.00
AMORTIZACIONES
Amortizacin de Adelanto en Efectivo
Amortizacin de Adelanto de Materiales
Total (D )
56,629.71
0.00
56,629.71
226,518.82
226,518.82
En Efectivo
En I.G.V. ( 18% VN )
226,518.82
40,773.39
267,292.21
ATENTAMENTE,
S/.
267,292.21
OBRA
UBICACION
CONTRATISTA
RESIDENTE
SUPERVISOR
FECHA
:
:
:
:
:
HUACHO-HUAURA-LIMA
CONSTRUCTORA LATINA ESTUDIOS Y PROYECTOS S.A.C.
ING. JOSE ELEODORO NARBASTA VELASQUEZ
CONSORCIO "Ch&S"- Jefe Sup:ING. EDUAR SALINAS VASQUEZ
2/28/2014
DESCRIPCION
A:
MONTO
CONTRATO
(S/IGV)
283,148.53
283,148.53
8.38%
3,097,574.71
3,380,723.23
0.00
283,148.53
283,148.53
8.38%
3,097,574.71
0.00%
0.00%
8.38%
7.97%
8.38%
7.97%
PRESUPUESTO
0.00
0.00
0.00
TOTAL (B)
0.00
0.00
0.00
0.00
283,148.53
283,148.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56,629.71
0.00
56,629.71
56,629.71
0.00
56,629.71
0.00
226,518.82
226,518.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
226,518.82
40,773.39
267,292.21
226,518.82
40,773.39
267,292.21
DEDUCCIONES
AMORTIZACIONES
797,850.69
0.00
797,850.69
RETENCIONES
FONDO DE GARANTIA (5%*VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL (D)
E:
91.62%
92.03%
REAJUSTES
D:
ACUMULADO
0.00
D:
ACTUAL
SALDO
POR
VALORIZAR
3,380,723.24
C:
ANTERIOR
%
AVANCE
ACUMULADO
VALORIZACION CONTRACTUAL
PRESUPUESTO
B:
VALORIZACION
267,292.21
741,220.98
0.00
741,220.98
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
DESCRIPCION
01
ESTRUCTURAS
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.01.08
01.01.09
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y
HERRAMIENTAS
CASETA Y GUARDIANIA
VESTUARIOS Y COMEDOR
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO DURANTE EL PROCESO
LIMPIEZA DE TERRENO MANUAL
CERCADO PROVISIONAL DE REA DE TRABAJO
SSHH PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA 3.60x2.40m
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO Y ELIMINACION DE MATERIAL EXISTENTE
EXCAVACION PARA CIMIENTOS HASTA 1.90 MT TERRENO
NORMAL
EXCAVACION PARA ZAPATAS HASTA 2.10 MT DE PROFUNDIDAD
EXCAVACION PARA VIGAS DE CIMENTACION
EXCAVACION PARA CISTERNA
RELLENO CON MATERIAL PROPIO COMPACTADO
RELLENO CON MATERIAL DE PRSTAMO COMPACTADO
AFIRMADO EN INTERIORES
DEMOLICION DE LOSA CE CONCRETO
DEMOLICION DE GRADERIAS DE CONCRETO
NIVELACION INTERIOR Y COMPACTADO C/EQUIPO
BASE GRANULAR AL 95% PROCTOR MODIFICADO (e=0.20m)
ELIMINACION DE DESMONTE (D=10 KM)
PRESUPUESTO BASE
UND
GLB
GLB
GLB
m2
m2
m2
m2
mes
und
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m2
m3
m3
METRADO
P.UNIT
CANTIDAD
MONTO
1.00
1.00
1.00
901.85
901.85
1,182.00
282.00
5.00
1.00
8,500.00
3,183.62
3,161.02
1.87
1.72
1.26
13.98
755.00
1,044.35
8,500.00
3,183.62
3,161.02
1,686.46
1,551.18
1,489.32
3,942.36
3,775.00
1,044.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
236.40
22.14
423.49
128.65
134.10
254.10
118.61
115.82
861.41
114.61
579.09
156.15
416.16
14.36
31.42
31.42
31.42
31.42
12.56
50.57
56.69
6.56
6.56
6.82
56.99
24.73
3,394.70
695.64
13,306.06
4,042.18
4,213.42
3,191.50
5,998.11
6,565.84
5,650.85
751.84
3,949.39
8,898.99
10,291.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.03.08
01.03.09
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.04
01.04.04.01
PRESUPUESTO BASE
UND
METRADO
P.UNIT
CANTIDAD
MONTO
m2
m3
m3
m3
m2
m3
m2
m2
m2
384.35
67.82
160.37
13.71
293.45
21.41
181.70
575.25
156.15
18.17
175.11
154.00
147.40
25.73
217.24
29.20
29.79
42.10
6,983.64
11,875.96
24,696.98
2,020.85
7,550.47
4,651.11
5,305.64
17,136.70
6,573.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
122.43
266.20
3,662.83
342.35
26.19
4.50
41,913.91
6,971.78
16,482.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
68.88
301.44
5,253.21
404.85
26.45
4.81
27,886.07
7,973.09
25,267.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
2.38
31.76
172.56
404.85
26.45
4.81
963.54
840.05
830.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
260.87
382.31
99,733.21
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
PRESUPUESTO BASE
UND
METRADO
P.UNIT
CANTIDAD
MONTO
01.04.04.02
01.04.04.03
01.04.05
01.04.05.01
01.04.05.02
01.04.05.03
01.04.06
01.04.06.01
01.04.06.02
01.04.06.03
01.04.07
01.04.07.01
01.04.07.02
01.04.07.03
01.04.07.04
01.04.08
m2
kg
1,367.19
38,175.71
49.72
4.81
67,976.69
183,625.17
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
27.96
782.98
4,183.00
412.40
49.72
4.50
11,530.70
38,929.77
18,823.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
206.73
1,644.56
22,380.33
389.55
45.30
4.66
80,531.67
74,498.57
104,292.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
und
180.94
1,815.42
25,113.70
15,084.00
333.88
28.74
4.81
4.09
60,412.25
52,175.17
120,796.90
61,693.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
01.04.08.01
01.04.08.02
01.04.08.03
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
m3
m2
kg
66.81
84.64
1,909.17
399.53
63.92
4.81
26,692.60
5,410.19
9,183.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m2
kg
und
und
18.00
126.21
1,483.77
1.00
1.00
397.23
43.15
4.50
359.00
249.00
7,150.14
5,445.96
6,676.97
359.00
249.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.06.05
01.06.06
01.06.07
01.06.08
01.06.09
01.06.10
01.06.11
01.06.12
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.08
01.08.01
01.08.02
02
02.01
02.01.01
02.01.02
PRESUPUESTO BASE
UND
CUARTO DE MAQUINAS
MURO DE SOGA LADRILLO CARAVISTA KK 18 huecos C/CEMENTO- m2
ARENA
ACERO GRADO 60 EN COLUMNAS
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
m2
CONCRETO EN COLUMNAS F'C=210 KG/CM2
m3
CONCRETO EN VIGAS F'C=210 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
m2
ACERO GRADO 60 EN VIGAS
kg
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS
m2
ALIGERADAS
ACERO GRADO 60 EN LOSAS ALIGERADAS
kg
LADRILLO 30X30X15
und
PUERTA METALICA
m2
TANQUE ELEVADO
CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO m2
ACERO GRADO 60 EN TANQUE ELEVADO
kg
TAPA METALICA C/PLANCHA DE ACERO
und
JUNTA SISMICA
TECNOPORT e=3"
m
TECNOPORT e=1"
m
ARQUITECTURA
ALBAILERIA
MURO DE SOGA LADRILLO KK 18 huecos C/CEMENTO-ARENA
m2
MURO DE CABEZA LADRILLO KK 18 huecos C/CEMENTO-ARENA
m2
METRADO
P.UNIT
CANTIDAD
MONTO
11.76
185.00
7.28
0.65
0.50
5.46
149.30
0.23
2.85
20.82
23.74
1.00
61.61
4.81
49.72
382.31
389.55
45.30
4.66
333.88
28.74
4.81
2.64
110.67
724.53
889.85
361.96
248.50
194.78
247.34
695.74
76.79
81.91
100.14
62.67
110.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.04
72.99
1,095.78
1.00
453.52
42.01
4.50
329.00
5,460.38
3,066.31
4,931.01
329.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101.25
331.80
5.23
3.59
529.54
1,191.16
0.00
0.00
0.00
0.00
0.00
0.00
1,020.36
561.41
58.74
96.51
59,935.95
54,181.68
0.00
0.00
0.00
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.06
02.06.01
PRESUPUESTO BASE
UND
METRADO
P.UNIT
CANTIDAD
MONTO
m2
m2
m2
m2
m2
m2
m2
m
m2
m
625.46
493.78
207.52
2,277.60
1,051.70
149.33
94.37
352.20
1,961.14
550.00
17.69
20.64
24.40
30.62
31.13
25.82
23.26
11.83
29.89
6.19
11,064.39
10,191.62
5,063.49
69,740.11
32,739.42
3,855.70
2,195.05
4,166.53
58,618.47
3,404.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
2,057.59
2,214.24
25.31
69.55
52,077.60
154,000.39
0.00
0.00
0.00
0.00
0.00
0.00
m
m2
m2
1,358.47
397.98
86.63
21.90
67.26
76.64
29,750.49
26,768.13
6,639.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
m
m
138.89
60.00
513.54
144.00
465.16
193.90
35.36
43.50
64,606.07
11,634.00
18,158.77
6,264.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
303.56
169.85
51,559.67
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
02.06.02
02.07
02.07.01
02.07.02
02.07.03
02.07.04
02.07.05
02.07.06
02.08
02.08.01
02.08.02
02.08.03
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.09.05
02.09.06
02.10
02.10.01
02.10.02
02.10.03
02.10.04
02.10.05
PRESUPUESTO BASE
UND
METRADO
P.UNIT
CANTIDAD
MONTO
pza
6.00
362.55
2,175.30
0.00
0.00
0.00
m2
m2
m2
m2
m2
m2
546.61
207.52
2,277.60
1,051.70
2,110.47
329.55
8.18
9.97
14.47
14.47
11.03
23.62
4,471.27
2,068.97
32,956.87
15,218.10
23,278.48
7,783.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
pza
m
27.90
2.00
123.00
84.17
111.63
54.34
2,348.34
223.26
6,683.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pza
pza
pza
pza
und
und
54.00
30.00
189.00
60.00
36.00
30.00
74.97
55.61
14.76
12.30
41.52
19.02
4,048.38
1,668.30
2,789.64
738.00
1,494.72
570.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pza
pza
pza
pza
pza
31.00
31.00
18.00
2.00
82.00
239.00
300.00
255.00
220.00
71.61
7,409.00
9,300.00
4,590.00
440.00
5,872.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
02.11
02.11.01
02.11.02
02.11.03
02.12
02.12.01
02.12.02
02.12.03
02.12.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
03.01.10
03.01.11
03.01.12
03.01.13
03.01.14
PRESUPUESTO BASE
UND
METRADO
P.UNIT
CANTIDAD
MONTO
pza
pza
pza
31.00
31.00
62.00
15.00
239.00
18.73
465.00
7,409.00
1,161.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
und
m
m
21.14
12.00
93.34
625.46
235.13
621.91
359.00
6.19
4,970.65
7,462.92
33,509.06
3,871.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pto
m
m
m
und
und
und
und
und
und
pza
pza
und
m
82.00
103.70
74.34
143.52
164.00
26.00
6.00
8.00
69.00
3.00
70.00
14.00
12.00
320.93
104.46
17.34
20.22
50.67
10.56
14.04
30.23
21.04
18.08
30.49
8.67
11.94
88.64
2.16
8,565.72
1,798.16
1,503.15
7,272.16
1,731.84
365.04
181.38
168.32
1,247.52
91.47
606.90
167.16
1,063.68
693.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.02.09
03.02.10
03.02.11
03.02.12
04
04.01
04.01.01
04.01.02
04.01.03
04.02
04.01.04
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
PRESUPUESTO BASE
UND
METRADO
P.UNIT
CANTIDAD
MONTO
pto
pto
pto
m
m
und
und
und
und
pza
pza
pza
34.00
32.00
12.00
51.16
97.44
60.00
8.00
18.00
8.00
20.00
8.00
6.00
79.06
101.85
67.46
9.30
20.34
8.20
8.20
9.66
10.91
38.91
15.96
316.02
2,688.04
3,259.20
809.52
475.79
1,981.93
492.00
65.60
173.88
87.28
778.20
127.68
1,896.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pto
pto
pto
269.00
69.00
4.00
72.13
110.52
110.52
19,402.97
7,625.88
442.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pto
m
m
m
m
m
1.00
108.50
10.20
25.00
313.00
310.00
723.15
379.42
156.82
156.82
22.42
29.30
723.15
41,167.07
1,599.56
3,920.50
7,017.46
9,083.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
04.02.06
04.03.01
04.03
04.04
04.04.01
04.04.02
04.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.06
04.06.01
04.06.02
04.06.03
04.06.05
04.06.04
04.06.06
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
DESCRIPCION
ALIMENTADOR DE TG HACIA TB NH-80 3 -1x 25 mm2 +(T)
1x10mm2
- 40 mm MANUAL
PVC-P HASTA 0.80 M PARA ALIMENTADORES
EXCAVACION
EXCAVACIONES DE ZANJAS PARA ALIMENTADORES
RELLENO DE ZANJA COMPACTADA
TIERRA CERNIDA COMPACTADA
CINTA SEALIZADORA BAJA TENSION
EQUIPOS Y ACCESORIOS
LUMINARIA (A)
LUMINARIA (B)
LUMINARIA (C)
LUMINARIA (D)
LUMINARIA (E)
INTERRUPTORES
INTERRUPTOR UNIPOLAR SIMPLE DE 15 AMP 220 V MODULAR
INTERRUPTOR UNIPOLAR DOBLE DE 15 AMP 220 V MODULAR
INTERRUPTOR UNIPOLAR TRIPLE DE 15 AMP 220 V MODULAR
TOMACORRIENTE DOBLE CON LINEA A TIERRA
INTERRUPTOR DE CONMUTACION SIMPLE 15 AMP 200 V
MODULAR
TOMACORRIENTE BIPOLAR DOBLE A PRUEBA DE AGUA CON
TOMA
A TIERRA (15A-220V)
CAJAS
CAJA DE PASE DE FIERRO GALVANIZADO 100X100X50 MM.
FABRICADO
ENFG,
PLANCHA
1.2
MM
ESPESOR
POSTE DE
DE 100DE
mm
DE
? TENDRA
3.50m snpt. PINTADA
CON
PINTURA
EPOXICA
Y DOS
MANOS
DE PINTURA DE ESAMALTE
POSTE
DE C.A.C.
9/ 255
/ 120
/ 200kg
TABLEROS ELECTRICOS
TABLERO GENERAL TG 42 POLOS
UND
METRADO
P.UNIT
CANTIDAD
MONTO
m
m
28.00
112.22
156.82
15.30
4,390.96
1,716.97
0.00
0.00
0.00
0.00
0.00
0.00
m
m
115.59
235.66
29.19
10.29
3,374.07
2,424.94
0.00
0.00
0.00
0.00
0.00
0.00
und
und
und
und
und
150.00
36.00
76.00
28.00
12.00
130.00
186.00
195.00
225.00
450.00
19,500.00
6,696.00
14,820.00
6,300.00
5,400.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
und
und
und
und
und
und
14.00
6.00
12.00
69.00
7.00
4.00
12.50
18.08
13.20
16.55
12.50
18.40
175.00
108.48
158.40
1,141.95
87.50
73.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
und
und
und
4.00
14.00
6.00
15.60
951.20
1,250.00
62.40
13,316.80
7,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
und
1.00
2,744.44
2,744.44
0.00
0.00
0.00
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
04.08.02
04.08.03
04.08.04
04.09
04.09.01
04.09.02
04.09.03
05
05.01
05.01.01
05.01.01.01
05.01.01.01.01
05.01.01.02
05.01.01.02.01
05.01.01.02.02
05.01.01.03
05.01.01.03.01
05.01.01.04
05.01.01.04.01
05.01.01.05
05.01.01.05.01
05.01.01.05.02
05.01.02
05.01.02.01
05.01.02.02
DESCRIPCION
TABLERO DE DISTRIBUCION ST-2
TABLERO DE DISTRIBUCION ST-3
TABLERO DE BOMBAS DE 24 POLOS
VARIOS
POZO PUESTA A TIERRA
PRUEBA ELECTRICAS
ACOMETIDA TRIFASICA INCLUYE MEDIDOR
OBRAS EXTERIORES
INSTALACIONES SANITARIAS
DESAGUE
EXCAVACIONES
EXCAVACION MANUAL HASTA 0.80 M P/TUB. DESAGUE 160"
REFINE Y NIVELACION DE ZANJA
REFINE Y NIVELACION DE ZANJAS T.N. P/TUB. 6"-8"
CAMA DE ARENA e=10 cm
RELLENO COMPACTADO P/ZANJA
RELLENO COMP.ZANJA HASTA 0.80 M
TUBERIAS
SUMINISTRO E INST. TUBERIA DE PVC UF 160 mm S-25
CAMARAS DE INSPECCION Y EMPALMES
CAJA DE REGISTRO ALB. 24" X 24" C/TAPA DE CONCRETO
EMPALME A BUZON EXISTENTE
AGUA
RED DE ALIMENTACION TUBERIA DE 63mm PVC-SAP
RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP
UND
METRADO
P.UNIT
CANTIDAD
MONTO
und
und
und
1.00
1.00
1.00
1,363.76
1,373.75
1,025.54
1,363.76
1,373.75
1,025.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pto
GLB
GLB
1.00
1.00
1.00
1,404.90
2,156.29
2,500.00
1,404.90
2,156.29
2,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127
9.07
1,151.89
0.00
0.00
0.00
m
m
127
76.2
9.07
6.36
1,151.89
484.63
0.00
0.00
0.00
0.00
0.00
0.00
80.01
5.43
434.45
0.00
0.00
0.00
127
54.34
6,901.18
6
1
232.71
524.36
1,396.26
524.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.5
112.5
22.18
50.67
2,118.19
5,700.38
0.00
0.00
0.00
0.00
0.00
0.00
und
GLB
m
m
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR
FECHA
ITEM
05.02
05.02.01
05.02.02
06
06.01
07
07.01
07.01.01
07.01.02
07.01.03
07.02
07.02.01
07.02.02
DESCRIPCION
SISTEMA CONTRAINCENDIO
SISTEMA DE AGUA CONTRA INCENDIO (AULAS)
SISTEMA DE BOMBEO DE AGUA POTABLE (AULAS)
MOVILIARIO EDUCATIVO
MOVILIARIO EDUCATIVO
IMPACTO AMBIENTAL Y SEGURIDAD
IMPACTO AMBIENTAL
TIERRA DE CHACRA Y HUMUS
SEMBRADO DE GRAS NACIONAL
PLANTAS ORNAMENTALES
SEGURIDAD
EQUIPOS DE SEGURIDAD
IMPLEMENTACION DEL PLAN DE SEGURIDAD
Costo Directo
PRESUPUESTO BASE
UND
METRADO
P.UNIT
CANTIDAD
MONTO
GLB
GLB
1
1
65044.97
5200
65,044.97
5,200.00
0.00
0.00
0.00
0.00
0.00
0.00
GLB
174022
174,022.00
0.00
0.00
0.00
500
500
35
8.33
8.58
11.58
4,165.00
4,290.00
405.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1
1
6500
6400
6,500.00
6,400.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
m2
und
GLB
est
2,817,269.37
0.00
281,726.94
0.00
Utilidad (10%)
281,726.94
0.00
Sub Total
3,380,723.25
0.00
3,380,723.25
0.00
608,530.18
0.00
3,989,253.43
0.00
IGV 18 %
TOTAL PRESUPUESTO
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.50
1.00
1.00
615.60
0.00
1,182.00
282.00
1.00
0.00
4250.00
3183.62
3161.02
1151.17
0.00
1489.32
3942.36
755.00
0.00
50.00
100.00
100.00
68.26
0.00
100.00
100.00
20.00
0.00
0.50
1.00
1.00
615.60
0.00
1182.00
282.00
1.00
0.00
4250.00
3183.62
3161.02
1151.17
0.00
1489.32
3942.36
755.00
0.00
50.00
100.00
100.00
68.26
0.00
100.00
100.00
20.00
0.00
0.50
0.00
0.00
286.25
901.85
0.00
0.00
4.00
1.00
4,250.00
0.00
0.00
535.29
1,551.18
0.00
0.00
3,020.00
1,044.35
50.00
0.00
0.00
31.74
100.00
0.00
0.00
80.00
100.00
236.40
13.43
321.54
83.15
0.00
127.08
0.00
0.00
430.71
114.61
0.00
0.00
200.00
3394.70
421.97
10102.79
2612.57
0.00
1596.12
0.00
0.00
2825.42
751.84
0.00
0.00
4946.00
100.00
60.66
75.93
64.63
0.00
50.01
0.00
0.00
50.00
100.00
0.00
0.00
48.06
236.40
13.43
321.54
83.15
0.00
127.08
0.00
0.00
430.71
114.61
0.00
0.00
200.00
3394.70
421.97
10102.79
2612.57
0.00
1596.12
0.00
0.00
2825.42
751.84
0.00
0.00
4946.00
100.00
60.66
75.93
64.63
0.00
50.01
0.00
0.00
50.00
100.00
0.00
0.00
48.06
0.00
8.71
101.95
45.50
134.10
127.02
118.61
115.82
430.71
0.00
579.09
156.15
216.16
0.00
273.67
3,203.27
1,429.61
4,213.42
1,595.38
5,998.11
6,565.84
2,825.43
0.00
3,949.39
8,898.99
5,345.64
0.00
39.34
24.07
35.37
100.00
49.99
100.00
100.00
50.00
0.00
100.00
100.00
51.94
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
243.07
44.95
127.50
9.02
169.99
0.00
0.00
0.00
0.00
4416.58
7871.19
19635.00
1329.55
4373.84
0.00
0.00
0.00
0.00
63.24
66.28
79.50
65.79
57.93
0.00
0.00
0.00
0.00
243.07
44.95
127.50
9.02
169.99
0.00
0.00
0.00
0.00
4416.58
7871.19
19635.00
1329.55
4373.84
0.00
0.00
0.00
0.00
63.24
66.28
79.50
65.79
57.93
0.00
0.00
0.00
0.00
141.28
22.87
32.87
4.69
123.46
21.41
181.70
575.25
156.15
2,567.06
4,004.77
5,061.98
691.30
3,176.63
4,651.11
5,305.64
17,136.70
6,573.92
36.76
33.72
20.50
34.21
42.07
100.00
100.00
100.00
100.00
91.88
196.69
2809.09
31455.12
5151.31
12640.91
75.05
73.89
76.69
91.88
196.69
2809.09
31455.12
5151.31
12640.91
75.05
73.89
76.69
30.55
69.51
853.74
10,458.79
1,820.47
3,841.83
24.95
26.11
23.31
0.00
0.00
3554.96
0.00
0.00
17099.36
0.00
0.00
67.67
0.00
0.00
3554.96
0.00
0.00
17099.36
0.00
0.00
67.67
68.88
301.44
1,698.25
27,886.07
7,973.09
8,168.58
100.00
100.00
32.33
0.00
0.00
111.90
0.00
0.00
538.24
0.00
0.00
64.85
0.00
0.00
111.90
0.00
0.00
538.24
0.00
0.00
64.85
2.38
31.76
60.66
963.54
840.05
291.77
100.00
100.00
35.15
0.00
0.00
0.00
0.00
0.00
0.00
260.87
99,733.21
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
18,058.65
0.00
86862.11
0.00
47.30
0.00
18058.65
0.00
86862.11
0.00
47.30
1,367.19
20,117.06
67,976.69
96,763.06
100.00
52.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.96
782.98
4,183.00
11,530.70
38,929.77
18,823.50
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
206.73
1,644.56
22,380.33
80,531.67
74,498.57
104,292.34
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180.94
1,815.42
25,113.70
15,084.00
60,412.25
52,175.17
120,796.90
61,693.56
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.81
84.64
1,909.17
26,692.60
5,410.19
9,183.11
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.00
126.21
1,483.77
1.00
1.00
7,150.14
5,445.96
6,676.97
359.00
249.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.76
185.00
7.28
0.65
0.50
5.46
149.30
0.23
2.85
20.82
23.74
1.00
724.53
889.85
361.96
248.50
194.78
247.34
695.74
76.79
81.91
100.14
62.67
110.67
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.04
72.99
1,095.78
1.00
5,460.38
3,066.31
4,931.01
329.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101.25
331.80
529.54
1,191.16
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,020.36
561.41
59,935.95
54,181.68
100.00
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
625.46
493.78
207.52
2277.60
1051.70
149.33
94.37
352.20
1961.14
550.00
11,064.39
10,191.62
5,063.49
69,740.11
32,739.42
3,855.70
2,195.05
4,166.53
58,618.47
3,404.50
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,057.59
2214.24
52,077.60
154,000.39
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,358.47
397.98
86.63
29,750.49
26,768.13
6,639.32
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
138.89
60.00
513.54
144.00
64,606.07
11,634.00
18,158.77
6,264.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
303.56
51,559.67
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
6.00
2,175.30
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
546.61
207.52
2277.60
1051.70
2110.47
329.55
4,471.27
2,068.97
32,956.87
15,218.10
23,278.48
7,783.97
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.90
2.00
123.00
2,348.34
223.26
6,683.82
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.00
30.00
189.00
60.00
36.00
30.00
4,048.38
1,668.30
2,789.64
738.00
1494.72
570.60
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.00
31.00
18.00
2.00
82.00
7409.00
9300.00
4590.00
440.00
5,872.02
100.00
100.00
100.00
100.00
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.00
31.00
62.00
465.00
7409.00
1161.26
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.14
12.00
93.34
625.46
4970.65
7,462.92
33,509.06
3871.60
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82.00
103.70
74.34
143.52
164.00
26.00
6.00
8.00
69.00
3.00
70.00
14.00
12.00
320.93
8565.72
1798.16
1503.15
7272.16
1731.84
365.04
181.38
168.32
1247.52
91.47
606.90
167.16
1063.68
693.21
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.00
32.00
12.00
51.16
97.44
60.00
8.00
18.00
8.00
20.00
8.00
6.00
2688.04
3259.20
809.52
475.79
1981.93
492.00
65.60
173.88
87.28
778.20
127.68
1896.12
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
269.00
69.00
4.00
19402.97
7625.88
442.08
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
108.50
10.20
25.00
313.00
310.00
723.15
41,167.07
1599.56
3,920.50
7017.46
9083.00
100.00
100.00
100.00
100.00
100.00
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
112.22
4390.96
1,716.97
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
115.59
235.66
3374.07
2424.94
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.00
36.00
76.00
28.00
12.00
19500.00
6696.00
14,820.00
6300.00
5400.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.00
6.00
12.00
69.00
7.00
4.00
175.00
108.48
158.40
1141.95
87.50
73.60
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
14.00
6.00
62.40
13316.80
7500.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2744.44
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1,363.76
1373.75
1025.54
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1,404.90
2156.29
2500.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
127.00
1151.89
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127.00
76.20
1151.89
484.63
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
80.01
434.45
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
127.00
0.00
6.00
1.00
6,901.18
0.00
1,396.26
524.36
100.00
#DIV/0!
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.50
112.50
2,118.19
5,700.38
100.00
100.00
VALORIZACION ACTUAL
METRADO
MONTO
FECHA DE INICIO:
PLAZO:
FECHA DE TERMINO:
15-Jan-14
210
12-Aug-14
F.P. N. 01:
Presupuesto
METRADO
MONTO
dias
SALDO
%
CANTIDAD
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
65,044.97
5,200.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
174,022.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
500.00
500.00
35.00
4,165.00
4,290.00
405.30
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
6,500.00
6,400.00
100.00
100.00
235,957.11
235,957.11
2,581,312.26
23,595.71
23,595.71
258,131.23
23,595.71
23,595.71
258,131.23
283,148.53
283,148.53
3,097,574.72
283,148.53
283,148.53
3,097,574.72
50,966.74
50,966.74
557,563.45
334,115.27
334,115.27
3,655,138.17
OBRA
UBICACIN
CONTRATISTA :
RESIDENTE
SUPERVISOR:
Factor de Relacin
FORMULA
POLINOMICA
PRESUPUESTO
1.00000
797,850.69
27-Dec-13
ADELANTO
OTORGADO
MONTO
VALORIZADO
AMORTIZACION
AMORTIZACION
ACUMULADA
SALDO POR
AMORTIZAR
797,850.69
VALORIZACION 01
283,148.53
VALORIZACION 02
56,629.71
56,629.71
741,220.98
S/.56,629.71
S/.741,220.98
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
VALORIZACION 07
TOTALES
S/.797,850.69
Valoriz. N
01
02
03
S/.283,148.53
S/.56,629.71
Amortizacin
Amortiz.Acum.
56,629.71
56,629.71
-
OBRA
UBICACIN
CONTRATISTA :
INSPECTOR :
SUPERVISOR
Factor de Relacin
FORMULA
POLINOMICA
PRESUPUESTO
1.00000
922,763.06
ADELANTO
OTORGADO
AMORTIZACION
AMORTIZACION
ACUMULADA
SALDO POR
AMORTIZAR
922,763.06
VALORIZACION 01
283,148.53
VALORIZACION 02
VALORIZACION 3
TOTALES
MONTO
VALORIZADO
S/.922,763.06
Valoriz. N
01
02
03
S/.0.00
113,259.41
S/.0.00
Amortizacin
Amortiz.Acum.
113,259.41
113,259.41
113,259.41
113,259.41
113,259.41
809,503.65
113,259.41
809,503.65
113,259.41
S/.113,259.41
809,503.65
S/.809,503.65
210
OBRA
CONSTRUCCIN DEL CENTRO PRE UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL JOSE FAUSTINO SANCHEZ CARRION-HUACHO
PLAZO VIGENTE (D.N.)
UBICACIN
HUACHO-HUAURA-LIMA
FECHA DE INICIO
15 de Jan de 14
CONTRATISTA :
12 de Aug de 14
INSPECTOR
12 de Aug de 14
SUPERVISOR
VALOR REFERENC.
PRESUP. CONTR.
:S/.
:S/.
210
PROGRAMADO
No.
VAL
1
2
PERIODO AL :
28-Feb-14
31-Mar-14
SOLES
MENSUAL
ACUMULADO
269,561.36
269,561.36
763,812.67
494251.31
EJECUTADO
PORCENTAJE
MENSUAL
ACUMULADO
7.97%
7.97%
14.62%
22.59%
30-Apr-14
760623.91
1,524,436.58
22.50%
45.09%
31-May-14
763623.94
2,288,060.52
22.59%
67.68%
30-Jun-14
629579.18
2,917,639.70
18.62%
86.30%
31-Jul-14
3,276,310.04
10.61%
96.91%
12-Aug-14
358670.34
104,413.20
3,022,052.90
3.09%
100.00%
TOTALES CD
3,380,723.24
1.00000
100.00%
SOLES
MENSUAL
ACUMULADO
283,148.53
283,148.53
283,148.53
PORCENTAJE
MENSUAL
ACUMULADO
8.38%
8.38%
8.38%
210
OBRA
CONSTRUCCIN DEL CENTRO PRE UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL JOSE FAUSTINO SANCHEZ CARRION-HUACHO
PLAZO VIGENTE (D.N.)
UBICACIN
HUACHO-HUAURA-LIMA
FECHA DE INICIO
15 de Jan de 14
CONTRATISTA :
12 de Aug de 14
INSPECTOR
12 de Aug de 14
SUPERVISOR
VALOR REFERENC.
PRESUP. CONTR.
:S/.
:S/.
1.00000
7.97%
22.59%
45.09%
67.68%
86.30%
100.00%
96.91%
8.38%
100.00%
86.30%
67.68%
70.00%
AVANCE %
60.00%
PROGRAMADO
50.00%
45.09%
EJECUTADO
40.00%
30.00%
22.59%
20.00%
10.00%
0.00%
FEB.14
210
MAR.14
ABR.14
MAY.14
JUN.14
JUL.14
AGO.14
FORMULA POLINOMICA
CALCULO DEL COEFICIENTE DE REAJUSTE MENSUAL "K"
L.P.I. N
: Licitacin Publica 005-2013-CE-AD HOC - UNJFSC
OBRA
: CONSTRUCCIN DEL CENTRO PRE UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL JOSE FAUSTINO SANCHEZ CARRION-HUACHO
UBICACIN
: HUACHO-HUAURA-LIMA
CONTRATISTA : CONSTRUCTORA LATINA ESTUDIOS Y PROYECTOS S.A.C.
SUPERVISOR : ING. JOSE ELEODORO NARBASTA VELASQUEZ
FECHA:
CONSORCIO "Ch&S"- Jefe Sup:ING. EDUAR SALINAS VASQUEZ
IND. CREPCO
DESCRIPCION
SIM-
COEF.
BO-
INCID.
PRES. BASE
SETIEMBRE
2011 (b)
Oct-11
Nov-11
Dec-11
Jan-12
LO
(a)
(K)
I=axk/b
(K)
I=axk/b
(K)
I=axk/b
(K)
I=axk/b
Mo1
0.206
100.00%
1,718.06
1,718.06
0.206
1,718.06
0.206
1,718.06
0.206
1,718.06
0.206
MANO DE OBRA
Jo
0.200
100.00%
448.29
448.29
0.2
448.29
0.2
448.29
0.2
448.25
0.2
Mq
0.107
100.00%
239.12
238.25
0.107
235.99
0.106
235.02
0.105
235.20
0.105
13
ASFALTO
47
49
AGREGADO GRUESO
Mo2
0.090
100.00%
213.98
213.98
0.09
213.60
0.09
213.60
0.09
213.60
0.09
39
GGU
0.268
100.00%
0.129
100.00%
371.47
332.68
0.271
Mo3
370.49
332.68
0.27
368.88
332.68
0.269
21
367.72
332.68
371.10
332.68
0.129
1.000
0.129
1.001
0.129
1.001
0.129
1.001
0.27
1.000
S/. 1,352,289.30
PRESUPUESTO
VALORIZACION
MONTO
No.
MES
1
2
3
4
4
May-12
Jun-12
Jul-12
Aug-12
Oct-12
283,148.53
ADELANTO PAGADO
MONTO
FECHA
1-Feb-12
COEFICIENTE
COEF.INCID.
INCID.
0.107
100%
INDICES
SET.11
ENE.12
Io
239.120
Ia
235.20
ADELANTO
UTILIZADO
MONTO AMORTIZABLE
AMORTIZACION
SALDO POR
AU=Cx%xV
MA=AU*Ia/Io
Am=MA
S=A-Am
0.00
0.00
RESUMEN
Presupuesto
TOTAL AMORTIZACION
AMORTIZAR
0.00
0.00
0.00
0.00
0.00
L.P.I. N
:Licitacin Publica 005-2013-CE-AD HOC - UNJFSC
OBRA
CONSTRUCCIN
:
DEL CENTRO PRE UNIVERSITARIO DE LA UNIVERSIDAD NACIONAL JOSE FAUSTINO SANCHEZ CARRION-HUACHO
UBICACIN HUACHO-HUAURA-LIMA
:
CONTRATISTACONSTRUCTORA
:
LATINA ESTUDIOS Y PROYECTOS S.A.C.
SUPERVISOR :ING. JOSE ELEODORO NARBASTA VELASQUEZ
FECHA:
CONSORCIO "Ch&S"- Jefe Sup:ING. EDUAR SALINAS VASQUEZ
MONTO CONTRATADO:
3,380,723.24 S/IGV
VALORIZACION
No.
MES
AVANCE PROGRAMADO
Valorizacin
Acumulado
Programada
PRESUPUESTO
1
May-12
31,428.49
2
Jun-12
121,455.95
3
Jul-12
238,937.95
4
Aug-12
312,029.54
4
Sep-12
224,232.52
4
Oct-12
107,408.11
SUB-TOTAL
1,035,492.56
ACUM. EN VALORIZ. ANTERIOR
REINTEGRO ACTUAL
31,428.49
152,884.44
391,822.39
703,851.93
AVANCE REAL
Valorizacin
Acumulado
Real
283,148.53
283,148.53
283,148.53
FACTOR DE REAJUSTE
MES
K
REINTEGRO
PROGRAM.
Jan-12
1.000
EJECUTADO
REINTEGRO
BRUTO
AUTORIZADO
DEDUCCION
EFECTIVO
MATER.
REINTEGRO
NETO
AUTORIZADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
RESUMEN
Presupuesto
TOTAL REINTEGROS
0.00
0.00
107.18
78.97
107.18
78.97
3.8
2.8
100.00
73.68