Smoke control design to CEN/TR 12101-5

Paul Compton Colt International Limited

LOGO

CEN/TR 12101-5:
Smoke and heat control systems Part 5: Guidelines on functional recommendations and calculation methods for smoke and heat exhaust systems.

LOGO

Contents
Introduction How to use the TR Results The future

LOGO

History
Based on British design methods: -Fire papers 7 & 10 1963 & 1964 -BR 34 1979 -BR 186 1990 -BR 258 1994 -BR 368 1999 -BS 7346-4 2003
4

LOGO

Why a CEN/TR?
A CEN/TR is a Technical Report.
It does not have the same authority as an EN.

It is used when there is insufficient agreement for an EN.


LOGO

Purpose of the TR
Fire Size

Guidance to designers on function and steady state calculation of SHEVS. Doesnt cover equipment selection or installation (CEN/TR 12101-4).

Time

Gives zoning, mass and volume flow rates, aerodynamic area of exhaust and inlet and minimum number of exhausts.
6

LOGO

Weaknesses
Limited guidance on fire size. Not very user friendly layout. Best spill plume calculation is difficult to use. More research is needed to improve some calculations.

LOGO

Who should use CEN/TR 12101-5


Intended for people with suitable understanding, knowledge and training. Authorities checking designs also need knowledge so they can do more than simply check the maths.
8

LOGO

How to use it criteria


The starting point is to know what the system is for and what criteria need to be met:
-Maximum smoke layer temperature -Minimum clear layer height -Maximum air inlet velocity.

LOGO

How to use it design fire


This is the most critical part of the design:
-Pre flashover, not maximum possible size -Realistic maximum before control by sprinklers or fire fighters -Realistic high and low heat outputs.
LOGO

10

How to use it smoke reservoirs


Design formulae in the TR do not allow for cooling of the smoke layer. Therefore: -Maximum reservoir areas are limited to keep cooling low enough to be ignored, or; -Heat losses by conduction and radiation should be separately calculated. The 60m limit separately limits travel distance for evacuation under the smoke layer.
11

LOGO

Interaction with sprinklers


Sprinklers allow use of a smaller design fire. The heat output per m2 is unchanged. Cooling of the smoke layer due to sprinklers is explicitly included in the calculations. Guidance on initiation gives priority to sprinklers unless the SHEVS is a life safety system.
12

LOGO

Options
The standard is deliberately written with all calculations in Informative Annexes. This allows use of alternative calculation methods, such as NFPA 92 or 204, while still following 12101-5. Mixing calculation methods is not recommended. Follow one method throughout.
LOGO

13

Results
Following this standard provides design flow rates and ventilation areas. There is still much work to be done to turn this into an installed system. CEN/TR 12101-4 and/or national guidance can be used for this.
14

LOGO

The future
12101-12 for time dependent design is being written. It takes a more European approach. 12101-5 will need to change to match it but probably not for at least 5 years. In the meantime used properly CEN/TR 12101-5 is a good guide, probably the best.
15

LOGO

The end

16