Plant Name Report Period day-month-year to day-month-year

INTERVENTION MAINTENANCE REPORT Plant Ppeak x kWp

Issued by Verified by Approved by

Pedro Mota - O&M Portugal Country Manager Lus Marques - O&M Supervision and Reporting Responsible Marco Alves - O&M Business Area Director

Periodic Report Extra Report Other

X -

Report References Int.Maint.Plant.month/year -

Elaboration Date Adressed to Month - Year

Executive Summary

Images System Equipment Serial number Picture Picture Description

Details of intervention

Plant

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts: -

Conclusions

System Equipment Serial number Picture Picture Description

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts:

Conclusions

System Equipment Serial number Picture Picture Description

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts:

Conclusions

System Equipment Serial number Picture Picture Description

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts:

Conclusions

System Equipment Serial number Picture Picture Description Conclusions

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts:

System Equipment Serial number Picture Picture Description Conclusions

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts:

System Equipment Serial number Picture Picture Conclusions

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts: -

System Equipment Serial number Picture Picture Description Conclusions

Start date Solved date Duration Impact level (kWp) Estimated Power Lost (kWh) Resolution

Spare parts: -

Notes

Please note that there may be other damages caused by the same storm that cannot be ascertained at this time.
Revision record Index A.1

Issued by

Date

Revision reason Report elaboration

O&M intervention maintenance report

PT007-OEM-FRM07/01/05.13

Page 1/1